Global Strategic Enterprises LLC April 14, University Blvd., Suite 320 Ellicott City, Maryland 21043

Similar documents
ELECTRONICS TEST CENTRE

For Client Labs Purpose This document specifies the general requirements for the calibrations performed on Test and Measurement Equipment.

Course Outline (Winter 2017)

Calibration Certificate Analysis

REPORT. Unit # 1, Street Surrey, British Columbia, V3W 4E6, Canada

COMMERCIAL ITEM DESCRIPTION SHUNT, INSTRUMENT (EXTERNAL, 50 MILLIVOLT, 10 THROUGH 150 AMPERES (A) LIGHTWEIGHT TYPE)

This Letter. Re: PC Guide For Power System Protection Testing

Guidelines for Establishing Calibration Systems

Techstream ECU Flash Reprogramming Procedure

Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT

Page 1 of 5 SOUTH AFRICAN QUALIFICATIONS AUTHORITY REGISTERED QUALIFICATION: National Certificate: Medical Equipment Maintenance

Best Practices for Equipment Calibration and Analytical Controls in the Diagnostics Laboratory

Buck & Boost Transformer Installation Instructions

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

Unit 8: ICHA-HP Classification of health care providers. by International Health Accounts Team

THIS MANUAL IS THE PROPERTY OF THE OWNER. PLEASE BE SURE TO LEAVE IT WITH THE OWNER WHEN YOU LEAVE THE JOB.

Australian/New Zealand Standard

B. All of the documents in this RFP form the Basis-of-Design for this project.

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Learning Objectives. Individualized Quality Control Plans. Agenda. Another Way To Determine QC? Hooray!!!! What is QC?

Joint Electronics Type Designation Automated System

Declaration of Classification ValiSpore Incubator Manual

STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS LANSING

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION.

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

COMDTPUB P16721 NVIC August 25, 2014

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #98

INSTRUMENTATION TECHNICIAN I/II/III

Medical Supply Co. Ltd.

Executive Director s Report

VUMC Office of Research Research Core Facilities/Shared Resources 2015 Professional Development Track. Core Research Assistant I

FOR REFERENCE ONLY. Document Change Record: COR NUMBER INITIATOR DESCRIPTION OF CHANGE DATE OF CHANGE REV #

11/163, C.R.Doss Street, Paramakudi Ramanathapuram Dist:Tamilnadu India E mail ID :

To begin reporting with edwr reports, the responsible official of the water system or laboratory must request the edwr service.

The following installation requirements that detail the exact operating conditions of the valve must be supplied with the valve.

Addendum to ESAH Version 3 Supply Application

FACILITIES MANAGEMENT

MCC. SMBJP6KE6.8(C)A THRU SMBJP6KE550(C)A. Features. Transient Voltage Suppressor 6.8 to 550 Volts 600 Watt.

Processor Application

LikoGuard Overhead Lift System Enhancing patient safety

DEPARTMENT OF THE ARMY TECHNICAL MANUAL OPERATOR'S AND ORGANIZATIONAL MAINTENANCE MANUAL ELECTRONIC MULTIMETERS TS-505A/U

GE Healthcare. ApexPro Enterprise-wide telemetry

WarmWise Business Custom Rebates Program Manual

EPEAT Requirements of PREs

JOB DESCRIPTION. Modern Apprentice Trainee Assistant Technical Officer (Renal Dialysis Equip)

Marine Corps Expeditionary Energy Current Program and Future Priorities

RE: Radiocarbon Dating Results For Samples 10-AN-2-B7, 10-AN-2-16, 10-AN-2-109, 10-AN-2-129, 10-AN-2-137

A. General provisions and other electrical systems are specified in other Sections of Division 26.

POCKET GUIDE TO THE ACCREDITATION STANDARDS (ISO 15189:2014)

GE Healthcare. B40 Patient Monitor Connecting intelligence and care

Announcement of Opportunity soliciting for proposals using the Human Spaceflight Analogue Parabolic Flight ISLSWG-AO-2016-PFC

Dear Prospective Meter Mechanic,

STATEMENT OF INTEREST GUIDE

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Please find enclose Addendum No. 01 for the subject ITB, which includes the following:

Energy Isolation. Standards, Techniques and Best Practices Jul 2018, Dubai

Pipeline Operational Qualification (OQ) Crosswalks

April 17, Edition of the Joint Commission International Accreditation. SUBJECT: MITA Feedback on the 5 th Standards for Hospitals

Hiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY

For some years, the automation of hospital administrative

Powered by Safety. Powell Training Catalog

Rulemaking Hearing Rules of Department of Commerce and Insurance Division of Fire Prevention. Chapter Electrical Installations.

Personal Health Monitoring Services SM VITAL SIGNS TRANSMITTER MODEL: VST 3 TM. Instruction Manual

Shakti Electrical INDUSTRIES

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.

Hiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY

Speed Measuring Equipment

Medical Grade Power Strips

Supervision of Biomedical Support Staff (Assistant and Associate Practitioners)

Best Practices to Optimize Postoperative Recovery

2. What is the main similarity between quality assurance and quality improvement?


GE Energy Connections

GUARDING THE INTENT OF THE REQUIREMENT. Stephen J Scukanec. Eric N Kaplan

Vendor Enlistment/ Rate Contract for Pre Bid tie ups.- Stage-I CSG-03-Testing of cooling towers- Induced Draft / Natural Draft

Promoting Data Integrity for the Department of Defense

Accreditation of Clinical Laboratories

COURSE CALENDAR.

CURTIN UNIVERSITY PROJECT DELIVERY GUIDELINES GREEN STAR COMMUNITIES DESIGN GUIDELINES

CMDCAS Handbook Policies and Procedures for Sector Qualification under the Canadian Medical Devices Conformity Assessment System (CMDCAS)

Application Notes for IgeaCare ApoloDS with Avaya IP Office Issue 1.0

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

Charting the Future of Biosolids Management in Florida September 12, 2012

Criteria for Adjudication of Echocardiography Facilities May 2018

Joint Service Safety Testing Study Phase II Final Presentation

IW and Plugfest Event Meeting September 29th, 2008

ADVANCE PROGRAM & REGISTRATION FORM

YOU ARE INVITED EDUCATIONAL COURSES CREDITS OFFERED. IDN-H. Hoffman & ASSA ABLOY are proud to offer

Solar PV Pilot Program Guidebook

Submissions can now be done electroni cally and we are streamlining the submission process by using a PDF fo rm.

China Cluster Server Industry 2016 Market Research Report

John, In honor of your military service, you are entitled to a free gift of your choice plus these exclusive benefits. IMPORTANT CARD ENCLOSED

Medicaid Funding by Voluntary Donations

Development of a Hover Test Bed at the National Hover Test Facility

NOTICE INVITING TENDER FOR SUPPLY OF DCR SOLAR CELL 4.45 WATT TENDER NO. REIL/MM/16-17/E-PROC./38 DATED

Answers To Current Reviews For Nurse Anesthetists

Pilot Program Framework Proposal

STANDARDS Point-of-Care Testing

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Transcription:

MET Laboratories, Inc. Safety Certification - EMI - Telecom Environmental Simulation 914 WEST PATAPSCO AVENUE BALTIMORE, MARYLAND 21230-3432 PHONE (410) 354-3300 FAX (410) 354-3313 Global Strategic Enterprises LLC April 14, 2006 6021 University Blvd., Suite 320 Ellicott City, Maryland 21043 Dear Mr. Schulman, Enclosed is the test data obtained from the testing of the Power Optimizer -. The Device was subjected to Energy Consumption Testing in accordance with MET Quote Number 2GSE0710, and Global Strategic Enterprises LLC a.k.a Energy Optimization LLC & K&A Americas LLC. Order Number GSE101005100. The Testing was performed as follows: 1. An AC Motor was connected to the electrical monitoring equipment. The following parameters where recorded: Voltage, Current, Watt-hours, and Room Temperature. 2. The motor was connected to a squirrel cage fan and hydraulic motor to create the load. The load was adjusted by restricting the flow through the hydraulic motor. 3. The system was adjusted to approximately 2.3KVA and monitored for 24 hours. 4. The was connected and the system was monitored for approximately 8 days. 5. The was disconnected and the system was monitored for approximately 17 days. All equipment used in making physical determination is accurate and bears recent traceability to the National Institute of Standards and Technology. MET Laboratories, Inc. Environmental Laboratory is accredited by A2LA. Thank you for using the services of MET Laboratories, Inc. If you have any questions regarding these results or if MET can be of further service to you, please feel free to contact me. Sincerely yours, MET LABORATORIES, INC. Angela D. Brown Documentation Department Reference: (\Global Strategic Enterprises LLC\ESL18472-GEN Rev1) Certificates and reports shall not be reproduced except in full, without the written permission of MET Laboratories, Inc. While use of the National Voluntary Laboratory Accreditation Program (NVLAP) letters or the NVLAP Logo, the Standards Council of Canada Logo, A2LA or the Nationally Recognized Testing Laboratory (NRTL) Letters in this report reflects MET Accreditation under these programs, these letters, logo, or statements do not claim product endorsement by NVLAP or any Agency of the U.S. Government. This letter of transmittal is not part of the attached report. The Nation s First Licensed Nationally Recognized Testing Laboratory

Power Consumption Testing for the Global Strategic Enterprises LLC Tested Under Customer Order Number: GSE101005100 MET Report: ESL18472-GEN Rev1 April 14, 2006 Prepared For: Global Strategic Enterprises LLC 10249 Bristol Channel Ellicott City, Maryland 21042 Prepared By: MET Laboratories, Inc. 914 West Patapsco Avenue Baltimore, Maryland 21230

Introduction Test Report for the Global Strategic Enterprises LLC Tested Under Customer Order Number: GSE101005100 Testing Performed By: Report Prepared By: Philip Layman Test Engineer Angela D. Brown Documentation Department Lab Manager: Todd Talbot Environmental Lab MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page ii of iii

Table of Contents Table of Contents I. Test Results... 1 II. Test Equipment... 7 MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page iii of iii

Test Results I. Test Results MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 1 of 9

Test Results Notes: On 3/18/06 @ ~5:00am, a sudden drop in power consumption was noted. After the was unplugged, the power consumption continued to decrease. On 4/7/06, it appears that the power consumption has started to increase. According to Daniel Schulman, this is a result of the residual effects of the device which takes time to dissipate. MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 2 of 9

Test Results 220 215 210 205 200 195 190 Pre No Saver With Saver Post No Saver MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 3 of 9

Test Results 12 11.8 11.6 11.4 11.2 11 10.8 10.6 10.4 10.2 10 9.8 9.6 9.4 9.2 9 Pre No Saver With Saver Post No Saver MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 4 of 9

Test Equipment 200 195 190 185 180 175 170 165 160 Pre No Saver With Saver Post No Saver MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 5 of 9

Test Equipment 2500 2450 2400 2350 2300 2250 2200 2150 2100 2050 2000 Pre No Saver With Saver Post No Saver MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 6 of 9

Test Equipment II. Test Equipment MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 7 of 9

Test Equipment Test Equipment Test equipment utilized during testing was maintained in a current state of calibration per the requirements of MIL-STD- 45662A and ISO 10012-1:1992(E). MET ID # EQUIPMENT MANUFACTURER MODEL # 2T1007 PORTABLE WATTHOUR STANDARD SCIENTIFIC- COLUMBUS LAST CAL CAL DUE SC-10 07-JUL-05 07-JUL-06 2T2408 CURRENT SHUNT EMPRO HA-100-100 SEE NOTE 2T5232 6.5 DIGIT DMM HP 34401A 22-JUL-05 22-JUL-06 2T5592 DIGITAL MULTIMETER AGILENT 34401A 24-MAR-05 24-MAR-06 2T5593 DIGITAL MULTIMETER AGILENT 34401A 04-MAR-05 04-MAR-06 2T5594 DIGITAL MULTIMETER AGILENT 34401A 25-MAR-06 25-MAR-07 2T5804 AC/DC CLAMP METER EXTECH 38095C 25-JAN-06 25-JAN-07 N/A DATA ACQUISITION PC N/A N/A SEE NOTE N/A 5HP, 230V, SINGLE PHASE, AC MOTOR GE MOTORS & INDUSTRIAL SYSTEMS 5KCR49ZN2151AU N/A N/A Note: Functionally verified test equipment is verified at the time of testing. MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 8 of 9

End of Report End of Report MET Report: ESL18472-GEN Rev1 2006, MET Laboratories, Inc. Page 9 of 9