UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2019 OCO. FY 2019 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Spacelift Range System

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Depot Maintenance (NON-IF) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System (User Equipment) (SPACE)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #47

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 R-1 Line #174

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 80.911 108.395 - - - - - - - 0.000 189.306 80.911 108.395 - - - - - - - 0.000 189.306 A. Mission Description and Budget Item Justification Joint Air-to-Ground Missile is an Army-led close-air-support missile program that will utilize tri-mode seeker technology and be employed against land and maritime stationary and moving targets. JAGM will provide a fixed wing, rotary wing, and unmanned aircraft system launched missile system that provides advanced Line-of-sight and Beyond-line-of-sight capabilities, including precision point targeting and fire and forget seeker technologies, increased range, and increased lethality against soft and hardened moving and stationary targets. Its multi-mode seeker will provide robust capability in adverse weather, day or night, and in an obscured/ countermeasure environment, against both stationary and moving targets. Initial Navy platform integration efforts include the F/A-18E/F, AH-1Z and MH-60R platforms. The JAGM system includes the missiles, trainers, containers, support equipment, and launcher modifications. FY08 funding captured under PE 0604450N. Due to changing priorities within the Department and overall reduction in defense funding it was deemed a manageable risk to terminate the Navy Marine Corps investment in the JAGM program through the FYDP. B. Program Change Summary ($ in Millions) FY 2011 FY 2012 Previous President's Budget 100.846 118.395 124.490-124.490 Current President's Budget 80.911 108.395 - - - Adjustments -19.935-10.000-124.490 - -124.490 Congressional General Reductions - - Congressional Directed Reductions - -10.000 Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings -9.950 - SBIR/STTR Transfer -2.072 - Program Adjustments - - -124.754 - -124.754 Rate/Misc Adjustments - - 0.264-0.264 Congressional Recision Adjustments -7.400 - - - - Congressional General Reductions Adjustments -0.513 - - - - Navy Page 1 of 8 R-1 Line #139

Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 Change Summary Explanation Due to changing priorities within the Department and overall reduction in defense funding it was deemed a manageable risk to terminate the Navy Marine Corps investment in the JAGM program through the FYDP. Funding in FY12 will go towards the orderly shutdown of Navy and Marine Corp investment in JAGM. Following the maturation of the shutdown requirement the Department of Navy intends to apply any remaining funds towards other higher Navy priorities. Navy Page 2 of 8 R-1 Line #139

Exhibit R-2A, RDT&E Project Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To 80.911 108.395 - - - - - - - 0.000 189.306 Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification Joint Air-to-Ground Missile is an Army-led close-air-support missile program that will utilize tri-mode seeker technology and be employed against land and maritime stationary and moving targets. JAGM will provide a fixed wing, rotary wing, and unmanned aircraft system launched missile system that provides advanced Line-of-sight and Beyond-line-of-sight capabilities, including precision point targeting and fire and forget seeker technologies, increased range, and increased lethality against soft and hardened moving and stationary targets. Its multi-mode seeker will provide robust capability in adverse weather, day or night, and in an obscured/ countermeasure environment, against both stationary and moving targets. Initial Navy platform integration efforts include the F/A-18E/F, AH-1Z and MH-60R platforms. The JAGM system includes the missiles, trainers, containers, support equipment, and launcher modifications. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2011 FY 2012 Title: JAGM Technology Development (TD) Phase Articles: FY 2011 Accomplishments: Major efforts included continued software integration activities on the AH-1Z and F/A-18E/F, preparation and release of the EMD RFP, activities associated with preparation for MS B, source selection activities, and modeling and simulation efforts associated with maritime target and scene generation software. FY 2012 Plans: Funding in FY12 will go towards the orderly shutdown of Navy and Marine Corp investment in JAGM. Following the maturation of the shutdown requirement the Department of Navy intends to apply any remaining funds towards other higher Navy priorities. 80.911 0 108.395 0 Accomplishments/Planned Programs Subtotals 80.911 108.395 - C. Other Program Funding Summary ($ in Millions) Line Item FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To RDT&E ARMY, 0605450A: JAGM 130.340 126.895 10.000 0.000 10.000 10.000 9.800 0.000 0.000 Continuing Continuing D. Acquisition Strategy The Joint Air-to-Ground Missile system is a pre-acquisition Category 1D Joint Army/Navy program with the Army designated as lead service. The Government utilized full and open competition to initiate the Technology Development (TD) phase of the JAGM program. The originally planned 27 month TD phase is complete and - Navy Page 3 of 8 R-1 Line #139

Exhibit R-2A, RDT&E Project Justification: PB 2013 Navy DATE: February 2012 In the TD Phase the two contractors completed a Preliminary Design Review, wind tunnel, ground testing, and flight testing in support of initial Navy platform integration activities. Due to changing priorities within the Department and overall reduction in defense funding it was deemed a manageable risk to terminate the Navy Marine Corps investment in the JAGM program through the FYDP. Funding in FY12 will go towards the orderly shutdown of Navy and Marine Corp investment in JAGM. Following the maturation of the shutdown requirement the Department of Navy intends to apply any remaining funds towards other higher Navy priorities. E. Performance Metrics JAGM completed the OSD directed 27 month competitive technology development effort 1Q FY11. Navy Page 4 of 8 R-1 Line #139

Exhibit R-3, RDT&E Project Analysis: PB 2013 Navy DATE: February 2012 Product Development ($ in Millions) Category Item Technology Development Method & Type C/FP Performing Activity & Location Lockheed Martin:Orlando, FL FY 2012 To 13.846 36.947 Aug 2012 - - - 0.000 50.793 50.793 Technology Development C/FP Raytheon:Tucson, AZ 13.846 36.947 Aug 2012 - - - 0.000 50.793 50.793 Technology Development MIPR Aircraft Integration (AH-1Z) SS/T&M Sytems Eng - WD AMRDEC Redstone Arsenal:Huntsville, AL Bell Helicopter:Hurst, TX NAWCWD:China Lake, CA - 17.000 Aug 2012 - - - 0.000 17.000 6.920 2.100 Apr 2012 - - - 0.000 9.020 9.020 43.412 9.401 Apr 2012 - - - 0.000 52.813 EMD C/CPIF TBD:TBD 27.499 - - - - 0.000 27.499 27.499 Aircraft Integration NAWCAD:Patuxent River 4.395 - - - - 0.000 4.395 Aircraft Integration SS/T&M Various:Various 21.193 - - - - 0.000 21.193 21.193 Support ($ in Millions) Category Item Development Support Integrated Logistics Support Method & Type Performing Activity & Location NAWCWD:China Lake, CA NAWCWD:China Lake, CA Subtotal 131.111 102.395 - - - 0.000 233.506 FY 2012 To 13.007 1.400 Apr 2012 - - - 0.000 14.407 1.602 0.600 Apr 2012 - - - 0.000 2.202 Software Development SS/T&M LMSI:Owego, NY 11.446 - - - - 0.000 11.446 11.446 Subtotal 26.055 2.000 - - - 0.000 28.055 Navy Page 5 of 8 R-1 Line #139

Exhibit R-3, RDT&E Project Analysis: PB 2013 Navy DATE: February 2012 Test and Evaluation ($ in Millions) Category Item Test & Evaluation Test & Evaluation Method & Type Performing Activity & Location NAWCWD:China Lake, CA NAWCAD:Patuxent River, MD FY 2012 To 8.172 0.400 Apr 2012 - - - 0.000 8.572 8.125 - - - - 0.000 8.125 Test & Evaluation MIPR Various:Various 11.865 - - - - 0.000 11.865 Subtotal 28.162 0.400 - - - 0.000 28.562 Remarks type for Test $ Evaluation to NASA AMES is IPR. Management Services ($ in Millions) Category Item Contr Eng Supt - ETS (NON- FFRDC) Government Eng Sup Method & Type Performing Activity & Location FY 2012 To Various Various:Various 7.200 1.000 Apr 2012 - - - 0.000 8.200 NAWCAD:Pax River, MD 9.193 2.000 Apr 2012 - - - 0.000 11.193 Travel - Internal NAVAIR:Pax River, MD 0.300 0.600 Feb 2012 - - - 0.000 0.900 Acquisition Workforce Fund Various Various:Various 0.404 - - - - 0.000 0.404 Subtotal 17.097 3.600 - - - 0.000 20.697 Remarks type for Travel is TO. FY 2012 To Project s 202.425 108.395 - - - 0.000 310.820 Remarks Navy Page 6 of 8 R-1 Line #139

Exhibit R-4, RDT&E Schedule Profile: PB 2013 Navy DATE: February 2012 Navy Page 7 of 8 R-1 Line #139

Exhibit R-4A, RDT&E Schedule Details: PB 2013 Navy DATE: February 2012 Schedule Details Start End Events by Sub Project Quarter Year Quarter Year JAGM Systems Development: Developing Testing: TD Phase 1 2011 4 2011 Navy Page 8 of 8 R-1 Line #139