Page 3 of 3 September 18, 2018 Addendum #1 CUY-DOCK-REHAB Cleveland-Cuyahoga County Port Authority PID 80987 Notice to all Bidders and Suppliers to please be advised of Addendum #1. Please use the attached revised bid form. Addenda amendments must be acknowledged and included with the bid. Please sign below acknowledging your receipt and acceptance of this Addendum. Signature Print Name Title Firm Name
Item ODOT Item PROJECT BID FORM REVISED 9.17.2018 ADDENDUM 1 Cleveland Bulk Terminal Maritime Infrastructure Rehabilitation CUY Dock Rehab (80987) Unit Item Description Quantity Unit Price Cleveland Bulk Terminal Maritime Infrastructure Rehabilitation Item Total ROADWAY 1 100 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY AND PROPERTY DAMAGE 1 LS LIABILITY INSURANCE 2 201 CLEARING AND GRUBBING, AS PER PLAN 1 LS 3 201 STUMP REMOVED, 18" 1 EACH 4 203 EXCAVATION, FOR DRAINAGE BMP CONSTRUCTION 1080 CY 5 203 EMBANKMENT 3 CY 6 203 EXCAVATION, AS PER PLAN 188 CY EROSION CONTROL 7 832 EROSION CONTROL 5000 EA $1.00 $5,000.00 8 601 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER FABRIC 59 CY 9 659 TOPSOIL 186 CY 10 659 SEEDING AND MULCHING 1680 SY 11 659 COMMERCIAL FERTILIZER 0.25 TON 12 659 LIME 0.35 ACRE 13 659 WATER 0.02 MGAL 14 670 SLOPE EROSION PROTECTION 600 SY DRAINAGE 15 611 8" CONDUIT, TYPE B: PVC, 707.45 79 LF 16 611 WATER QUALITY BASIN, RETENTION, AS PER PLAN 2 EA 17 638 WATER WORK, MISC.: BACKFLOW PREVENTER 2 EA PAVEMENT 18 304 AGGREGATE BASE, AS PER PLAN 700 CY LIGHTING 19 625 LIGHT POLE FOUNDATION, AS PER PLAN 33 EA 20 625 LUMINAIRE MISC.: MARINE, TYPE V, LED, 277V 33 EA 21 625 LIGHT POLE, MISC.: MARINE 33 EA 22 625 CONDUIT, 1-1/2", 725.051, AS PER PLAN 3,089 FT 23 625 TRENCH, 36" DEEP, AS PER PLAN 475 FT 24 625 LIGHTING, MISC.: FOUNDATION TEST HOLES 33 EA
25 625 PULL BOX, 725.06, SIZE 30, AS PER PLAN0 2 EA 26 625 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE, AS PER PLAN 16,479 FT 27 625 NO. 10 AWG POLE AND BRACKET CABLE, 1000 VOLT 1,188 FT 28 625 CONNECTION, FUSED PULL APART 33 EA 29 625 GROUND ROD, SUPPLEMENTAL GROUNDING 33 EA 30 625 LUMINAIRE REMOVED 20 EA 31 625 LIGHT POLE REMOVED 20 EA 32 625 DISTRIBUTION CABLE REMOVED AND CONDUIT REMOVED 946 FT MISCELLANEOUS STRUCTURE PORTIONS OF STRUCTURE REMOVED, CUT & 33 202 REMOVE SHEET PILE, CAP, WALER & 1 LS FENDERS 34 202 PORTIONS OF STRUCTURE REMOVED, SHEET PILE EXTRACTION 1 LS 35 202 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, CONC. CAP REMOVAL, AREA C 60 CY 36 202 PORTIONS OF STRUCTURE REMOVED, CONCRETE CAP, AREA D 100 CY 37 202 PORTIONS OF STRUCTURE REMOVED, HULETT FOUNDATION 350 CY 38 202 PORTIONS OF STRUCTURE REMOVED, STONE AND RUBBLE REMOVED 200 CY 39 202 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, MOORING BOLLARD REMOVED 16 EACH 40 530 STRUCTURES, MISC. SHEET PILE REPAIRS 2 EACH 41 504 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN BULKHEAD 82,350 SF 42 504 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN DEADMAN WALLS 4,640 SF 43 513 STRUCTURAL STEEL, MISC.: WALER BEAMS, BULKHEAD 1,185 FT 44 513 STRUCTURAL STEEL, MISC.: WALER BEAMS, DEADMAN 578 FT 45 513 STRUCTURAL STEEL, MISC.: WALER BEAMS, W14X90 50 FT 46 513 STRUCTURAL STEEL MISC.: CAP CHANNEL 1,185 FT 47 513 STRUCTURAL STEEL MISC.: TIE RODS 7,926 FT 48 611 CONDUIT, BORED OR JACKED, AS PER PLAN 6 INCH DIAMETER 5,280 FT 49 613 LOW STRENGTH MORTAR BACKFILL 5,700 CY 50 518 POROUS BACKFILL 4,740 CY
51 511 CLASS QC2 CONCRETE, SIDEWALK, AS PER PLAN 52 530 STRUCTURES, MOORING BOLLARDS MOUNTED TO CONCRETE CAP STRUCTURES, MOORING BOLLARDS 53 530 MOUNTED WITH PILE SUPPORTED FOUNDATIONS 54 530 STRUCTURES, MARINE CYLINDRICAL FENDERING 55 530 STRUCTURES, MARINE COMPOSITE FENDERING 56 530 STRUCTURES, MARINE COMPOSITE FENDERING, TRANSITION SECTION 57 530 STRUCTURAL SURVEY AND MONITORING OF VIBRATION MAINTENANCE OF TRAFFIC 58 530 STRUCTURES, TEMPORARY MORRING BOLLARDS INCIDENTALS 875 CY 14 EACH 3 EACH 410 FT 890 FT 40 FT 1 LS 14 EACH 59 505 PILE DRIVING EQUIPMENT MOBILIZATION 1 LS 60 623 CONSTRUCTION LAYOUT STAKES AND SURVEYING 1 LS 61 624 MOBILIZATION 1 LS 62 690 PRE-CONSTRUCTION VIDEO 1 LS 63 619 FIELD OFFICE, TYPE A, AS PER PLAN 8 MNTH 64 690 UTILITY COORDINGATION AND RELOCATION 1 LS 65 690 AS-BULT CONSTRUCTION PLANS 1 LS 66 103 67 607 PREMIUM FOR CONTRACT PERFORMANCE BOND AND PAYMENT BOND FENCE, MISC.: RAILROAD EASEMENT MARKING 1 LS 3000 FT TOTAL PROJECT COST:
CLEVELAND BULK TERMINAL MARITIME REHABILITATION PROJECT CUY DOCK REHAB (80987) BID FORM CONT. Please provide a list of all major Subcontractors, Scope of Work, Estimated Contract Dollar Value, & Past Project Experience: Estimated Contract Past Project Experience & ODOT Company Scope of Work Dollar Value Prequalifications BIDDER AFFIDAVITS: EEO CERTIFICATION: The bidder hereby certifies that by signing and submitting this bid he has..., has not..., participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that he has..., has not..., filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. The Bidder must circle the appropriate has or has not above. BIDDER: Signature: Title: Company: Address: City/State/Zip Code: Phone E-Mail ADDITIONAL BID INFORMATION & QUESTIONS: 1.) Does General Contractor Have Experience Working on Similar Types of Projects? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 2.) Does Contractor Have Experience Working on Active Maritime Transportation & Cargo Handling Facilities? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 3.) Total Estimated DBE Participation Percentage: *Please copy of DBE Utilization Plan to Port Authority with bid and follow ODOT DBE Utilization Plan per ODOT's requirements. 4.) Please confirm that the Project was estimated using Davis Bacon prevailing wage rates. YES / NO 5.) Do you have experience working with the Cleveland-Cuyahoga County Port Authority? YES / NO *If yes, please provide a list of projects. 6.) Does Contractor Have Experience Driving Pile Near Sensitive Infrastrucutre & Implementing Vibration Monitoring Programs? YES / NO * REQUIRED- Please supply experience w/ client reference contact information. 7.) Please confirm if the Contracotr or any major subcontractors are "ODOT Prequalified". YES / NO * If yes, please provide a list of the applicable qualifications for this Project. 1
CLEVELAND BULK TERMINAL MARITIME REHABILITATION PROJECT CUY DOCK REHAB (80987) BID FORM CONT. 8.) Please verify the Contractor reviewed and familiarized themselves with the the geotechnical reports? YES / NO 9.) Do you have experience working adjacent to active Norfolk Southern rail tracks? YES / NO *If yes, please provide a list of projects. 10.) Does the Contractor have Standard Form 100 (EEO-1) on file with the Federal government for last period? YES / NO * If yes, please record/verification, see Section A-30 of the Bid Instructions. 11.) Contractor complies with Ohio Adminstrative Code 9.47 regarding Affirmative Action Programs? YES / NO * Contractor is required to submit a valid Certificate of Compliance w/ Affirmative Action Programes issued by the State EEO Coordinator with Bid. 12.) Please confirm Contractor is in good standing with an OBWC-approved Drug Free Workplace Program? YES / NO * Contractor must provide record of enrollment and good standing with bid. 13.) Please verify Contractor undestand's this is an ODOT LPA Project and verify the contractor understands the YES / NO FHWA 1273 Contract Provisions for Projects involving Federal Aid. 14.) Please verify Contractor has submitted DBE Utilizaiton Plan to ODOT using Formstack and if the Contractor is YES / NO is the lowest, reponsive, & responsible bidder they will submit DBE Affirmation Forms within 5 calendar days of bid opening. 15.) Please verify the contractor has fully reviewed and fully understands the requirements of Norfolk Southern's YES / NO Special Provisions for Protection of Railway Interest. 16.) Please provide the Port Authority with the Contractor's EEO Officer's Contact Information. Name: Phone: Email: 17.) Please provide completion deadline for the Project: RIVERCLASS NAVIGATION IMPACT: PILE DRIVING & MARITIME WORK (STA. 6+00 to STA 11+15): LAKER FLEET NAVIGATION IMPACT: PILE DRIVING & MARITIME WORK (STA. 2+30 to STA 6+00): SUBSTANTAIL COMPLETION: FINAL COMPLETION: 18.) I acknowledge receipt of the following addenda (if any): 1 2 3 4 5 2
CLEVELAND BULK TERMINAL ANNUAL RAIL & MARITIME TRAFFIC TACONITE AGGREGATE MONTH INBOUND @ BERTH DURATION OUTBOUND @ BERTH DURATION TOTAL AVERGE MONTHLY HOURS SHIP @ BERTH INBOUND @ BERTH DURATION TOTAL TRAINS LOADED OUT (EA.) Sep-17 36 64 100 10 3 Oct-17 70 184 254 30 4 Nov-17 54 120 174 0 2 Dec-17 92 168 260 10 0 Jan-18 22 104 126 0 0 Feb-18 0 0 0 0 0 Mar-18 14 176 190 0 0 Apr-18 108 160 268 30 3 May-18 76 176 252 30 5 Jun-18 72 144 216 10 4 Jul-18 58 128 186 20 3 Aug-18 58 120 178 0 3
MONTHLY SUMMARY - IRON ORE Sep-17 09/01/17 Pathfinder 8 09/02/17 Pathfinder 8 09/04/17 Erie Trader 8 09/06/17 Buffalo 8 09/07/17 Buffalo 8 09/10/17 Herbert C Jackson 4 09/12/17 Pathfinder 8 09/16/17 Great Lakes Trader 8 09/16/17 Herbert C Jackson 4 09/21/17 John J Boland 4 09/23/17 Pathfinder 8 09/24/17 Pathfinder 8 09/25/17 Great Lakes Trader 8 09/26/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 36 64 Sep-17 Train Load (EA.) 09/05/17 Rail Out 1 09/11/17 Joseph H Thompson 10 09/13/17 Rail Out 1 09/20/17 Rail Out 1 10 3
MONTHLY SUMMARY - IRON ORE Oct-17 10/01/17 Balance forward 10/01/17 Ashtabula 8 10/03/17 Buffalo 8 10/04/17 Great Lakes Trader 8 10/04/17 Buffalo 8 10/04/17 Herbert C Jackson 4 10/05/17 Erie Trader 8 10/06/17 Buffalo 8 10/07/17 John J Boland 8 10/08/17 Buffalo 8 10/09/17 John J Boland 8 10/09/17 Buffalo 8 10/10/17 Mesabi Miner 14 10/10/17 Buffalo 8 10/11/17 Buffalo 8 10/12/17 Buffalo 8 10/14/17 Buffalo 8 10/16/17 Buffalo 8 10/17/17 Mesabi Miner 14 10/18/17 Buffalo 8 10/19/17 Pathfinder 8 10/20/17 Pathfinder 8 10/20/17 Buffalo 8 10/21/17 Great Lakes Trader 8 10/22/17 Buffalo 8 10/23/17 Buffalo 8 10/26/17 Buffalo 8 10/28/17 Indiana Harbor 14 10/29/17 Sam Laud 8 10/30/17 Buffalo 8 10/31/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 70 184 Oct-17 Train Load (EA.) 10/02/17 Rail Out 1 10/06/17 John J Boland 10 10/10/17 Rail Out 1 10/18/17 Rail Out 1 10/24/17 Joseph H Thompson 10 10/28/17 Rail Out 1 10/29/17 Sam Laud 10 30 4
MONTHLY SUMMARY - IRON ORE Nov-17 11/01/17 Buffalo 8 11/02/17 Walter J McCarthy Jr 14 11/03/17 Pathfinder 8 11/03/17 Buffalo 8 11/04/17 Buffalo 8 11/05/17 James R Barker 14 11/07/17 Buffalo 8 11/08/17 Buffalo 8 11/09/17 Buffalo 8 11/10/17 Mesabi Miner 14 11/13/17 Herbert C Jackson 4 11/13/17 Buffalo 8 11/14/17 Buffalo 8 11/14/17 Buffalo 8 11/16/17 John J Boland 8 11/17/17 Buffalo 8 11/21/17 Great Lakes Trader 8 11/22/17 Buffalo 8 11/22/17 Buffalo 8 11/23/17 Buffalo 8 54 120 MONTHLY SUMMARY - LIMESTONE Nov-17 Train Load (EA.) (AVG. HRS.) 11/13/17 Rail Out 1 11/21/17 Rail Out 1-2
MONTHLY SUMMARY - IRON ORE Dec-17 12/01/17 Balance forward 12/02/17 Mesabi Miner 14 12/03/17 Buffalo 8 12/03/17 Buffalo 8 12/08/17 Great Lakes Trader 8 12/08/17 Buffalo 8 12/09/17 Buffalo 8 12/10/17 Ashtabula 8 12/10/17 Erie Trader 8 12/11/17 Ashtabula 8 12/11/17 Sam Laud 8 12/13/17 Sam Laud 8 12/18/17 Mesabi Miner 14 12/19/17 Sam Laud 8 12/19/17 Sam Laud 8 12/20/17 Sam Laud 8 12/21/17 Sam Laud 8 12/22/17 American Spirit 14 12/23/17 Great Lakes Trader 8 12/23/17 Sam Laud 8 12/24/17 Pathfinder 8 12/24/17 Sam Laud 8 12/25/17 Erie Trader 8 12/26/17 Pathfinder 8 12/27/17 Pathfinder 8 12/27/17 Pathfinder 8 12/28/17 Pathfinder 8 12/29/17 Herbert C Jackson 4 12/29/17 Sam Laud 8 12/30/17 Sam Laud 8 12/31/18 American Century 14 92 168 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 12/11/17 Sam Laud 10 Dec-17 Train Load (EA.) 10 -
MONTHLY SUMMARY - IRON ORE Jan-18 01/03/18 Sam Laud 8 01/03/18 Hon James L Oberstar 14 01/04/18 Sam Laud 8 01/05/18 Sam Laud 8 01/06/18 Sam Laud 8 01/07/18 Sam Laud 8 01/08/18 Sam Laud 8 01/09/18 Sam Laud 8 01/10/18 Sam Laud 8 01/11/18 Sam Laud 8 01/12/18 Joseph H Thompson 8 01/14/18 Sam Laud 8 01/15/18 Sam Laud 8 01/17/18 Sam Laud 8 01/18/18 Sam Laud 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 22 104 Jan-18 Train Load (EA.) - -
MONTHLY SUMMARY - IRON ORE Feb-18 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) - - Feb-18 Train Load (EA.) - -
MONTHLY SUMMARY - IRON ORE Mar-18 03/01/18 Pathfinder 8 03/05/18 Pathfinder 8 03/06/18 Pathfinder 8 03/07/18 Pathfinder 8 03/09/18 Pathfinder 8 03/10/18 Pathfinder 8 03/11/18 Pathfinder 8 03/12/18 Pathfinder 8 03/13/18 Pathfinder 8 03/14/18 Pathfinder 8 03/15/18 Pathfinder 8 03/16/18 Pathfinder 8 03/17/18 Pathfinder 8 03/18/18 Pathfinder 8 03/19/18 Pathfinder 8 03/22/18 Pathfinder 8 03/23/18 Pathfinder 8 03/24/18 Pathfinder 8 03/25/18 Pathfinder 8 03/26/18 Pathfinder 8 03/27/18 Pathfinder 8 03/30/18 American Century 14 03/31/18 Sam Laud 8 14 176 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) Mar-18 Train Load (EA.) - -
MONTHLY SUMMARY - IRON ORE Apr-18 04/01/18 Mesabi Miner 14 04/02/18 Great Lakes Trader 8 04/06/18 Sam Laud 8 04/06/18 Sam Laud 8 04/07/18 John J Boland 8 04/07/18 Herbert C Jackson 4 04/07/18 Sam Laud 8 04/08/18 Sam Laud 8 04/09/18 Sam Laud 8 04/10/18 Mesabi Miner 14 04/10/18 H Lee White 4 04/11/18 Sam Laud 8 04/11/18 Sam Laud 8 04/12/18 Erie Trader 8 04/13/18 Sam Laud 8 04/13/18 Sam Laud 8 04/14/18 Sam Laud 8 04/15/18 Sam Laud 8 04/16/18 American Integrity 14 04/19/18 Sam Laud 8 04/20/18 Sam Laud 8 04/20/18 Sam Laud 8 04/21/18 Herbert C Jackson 4 04/21/18 H Lee White 4 04/22/18 Lee A Tregurtha 8 04/22/18 Sam Laud 8 04/23/18 Sam Laud 8 04/24/18 John J Boland 4 04/24/18 Sam Laud 8 04/27/18 Sam Laud 8 04/28/18 Sam Laud 8 04/29/18 Sam Laud 8 04/30/18 American Integrity 14 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 108 160 Apr-18 Train Load (EA.) 04/05/18 Rail Out 1 04/08/18 Manitowoc 10 04/12/18 Rail Out 1 04/23/18 Rail Out 1 10 3
MONTHLY SUMMARY - IRON ORE May-18 05/01/17 H Lee White 8 05/03/17 H Lee White 8 05/04/17 Walter J McCarthy Jr 14 05/04/17 Buffalo 8 05/06/17 Erie Trader 8 05/09/17 Pathfinder 8 05/10/17 Buffalo 4 05/11/17 Buffalo 8 05/11/17 Buffalo 8 05/12/17 Buffalo 8 05/13/17 Buffalo 8 05/14/17 Buffalo 8 05/14/17 Mesabi Miner 14 05/15/17 Buffalo 8 05/16/17 Buffalo 8 05/16/17 American Century 14 05/17/17 John J Boland 8 05/18/17 Buffalo 8 05/19/17 Buffalo 8 05/19/17 Buffalo 8 05/20/17 Buffalo 8 05/24/17 Buffalo 8 05/25/17 Buffalo 8 05/26/17 Erie Trader 8 05/27/17 Buffalo 8 05/28/17 Buffalo 8 05/29/17 American Century 14 05/30/17 Buffalo 8 05/30/17 Buffalo 8 76 176 MONTHLY SUMMARY - LIMESTONE May-18 Train Load (EA.) (AVG. HRS.) 05/01/17 Balance forward 05/04/17 Rail Out 1 05/10/17 Joseph H Thompson 10 05/11/17 Rail Out 1 05/16/17 American Mariner 10 05/16/17 Rail Out 1 05/22/17 Rail Out 1 05/25/17 H Lee White 10 05/28/17 Rail Out 1 30 5
MONTHLY SUMMARY - IRON ORE Jun-18 06/01/17 Balance forward 06/01/17 John J Boland 4 06/02/17 Buffalo 8 06/02/17 Great Lakes Trader 8 06/02/17 Buffalo 8 06/03/17 Herbert C Jackson 4 06/04/17 Sam Laud 8 06/05/17 Sam Laud 8 06/05/17 Buffalo 8 06/06/17 Indiana Harbor 14 06/07/17 Buffalo 8 06/07/17 Buffalo 8 06/08/17 Buffalo 8 06/08/17 Great Lakes Trader 8 06/09/17 Buffalo 8 06/10/17 Buffalo 8 06/11/17 Herbert C Jackson 4 06/14/17 Buffalo 8 06/14/17 H Lee White 4 06/14/17 Buffalo 8 06/15/17 Buffalo 8 06/18/17 American Integrity 14 06/19/17 Buffalo 8 06/20/17 Buffalo 8 06/21/17 Herbert C Jackson 4 06/27/17 Buffalo 8 06/27/17 Buffalo 8 06/28/17 Great Lakes Trader 8 06/30/17 Buffalo 8 MONTHLY SUMMARY - LIMESTONE (AVG. HRS.) 72 144 Jun-18 Train Load (EA.) 06/01/17 Balance forward 06/06/17 Rail Out 1 06/12/17 Rail Out 1 06/18/17 Calumet 10 06/19/17 Rail Out 1 06/26/17 Rail Out 1 10 4
MONTHLY SUMMARY - IRON ORE Jul-18 07/01/18 Pathfinder 8 07/01/18 Erie Trader 8 07/02/18 Pathfinder 8 07/07/18 Sam Laud 8 07/08/18 Sam Laud 8 07/09/18 Sam Laud 8 07/09/18 Herbert C Jackson 4 07/10/18 Sam Laud 8 07/10/18 Sam Laud 8 07/11/18 Sam Laud 8 07/12/18 John J Boland 4 07/14/18 Erie Trader 8 07/17/18 Pathfinder 8 07/18/18 Pathfinder 8 07/19/18 American Century 14 07/24/18 Sam Laud 8 07/25/18 John J Boland 4 07/26/18 Sam Laud 8 07/27/18 Great Lakes Trader 8 07/27/18 Sam Laud 8 07/28/18 Sam Laud 8 07/29/18 Sam Laud 8 07/30/18 Herbert C Jackson 8 07/31/18 Sam Laud 8 58 128 MONTHLY SUMMARY - LIMESTONE JULY Train Load (EA.) (AVG. HRS.) 07/02/18 Rail Out 1 07/06/18 American Mariner 10 07/10/18 Rail Out 1 07/14/18 Joseph H Thompson 10 07/19/18 Rail Out 1 20 3
MONTHLY SUMMARY - IRON ORE Aug-18 08/01/18 Sam Laud 8 08/02/18 Sam Laud 8 08/03/18 Erie Trader 8 08/04/18 Great Lakes Trader 8 08/05/18 Pathfinder 8 08/06/18 Pathfinder 8 08/09/18 Sam Laud 8 08/10/18 Sam Laud 8 08/14/18 Mesabi Miner 14 08/15/18 Sam Laud 8 08/16/18 Sam Laud 8 08/17/18 Sam Laud 8 08/18/18 Sam Laud 8 08/19/18 Sam Laud 8 08/21/18 Mesabi Miner 14 08/22/18 Sam Laud 8 08/28/18 Paul R Tregurtha 14 08/29/18 Sam Laud 8 08/30/18 Sam Laud 8 08/30/18 Sam Laud 8 58 120 MONTHLY SUMMARY - LIMESTONE Aug-18 Train Load (EA.) (AVG. HRS.) 08/06/18 Rail Out 1 08/14/18 Rail Out 1 08/23/18 Rail Out 1-3
CUY DOCK REHAB Test Pit Photographs Please note: The numbering of the test pits in the archeological report (as shown on the plaque in the photos) differs from the numbering shown on the drawings. Test Pit #1
Test Pit #2
Test Pit #3
Test Pit #4
Test Pit #5
Test Pit #6
Test Pit #7
Test Pit #8
Test Pit #9
Test Pit #10
Test Pit #11