Availability of Draft Amendment No. 1 to the 2019 FTIP for Interagency Consultation and Public Review

Similar documents
Annual Listing of Projects with Federal Funding for Federal Fiscal Year 2014/15

Regional Planning Partnership

MEMORANDUM. February 12, Interagency Transit Committee Members and Interested Parties. Anthony Zepeda, Associate Regional Planner

Appendix E: Grant Funding Sources

Overview of Local Highway Safety Improvement Program (HSIP)

Staff Recommendation:

Understanding the. Program

KYOVA Interstate Planning Commission

APPENDIX 5. Funding Plan

FFY Transportation Improvement Program

Formal STIP Amendment

Regional Transportation Plan/Sustainable Communities Strategy Roundtable (RTP Roundtable) MEETING AGENDA

Agenda. Tulare County Association of Governments Railroad Advisory Committee

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2007 Annual List of Obligated Projects

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C

Overview of the Regional Transportation Improvement Program

MANAGEMENT AND FINANCE COMMITTEE STANCOG BOARD ROOM 1111 I STREET, SUITE 308 MODESTO, CA WEDNESDAY, JANUARY 4, :00 PM

SAN JOAQUIN COUNCIL OF GOVERNMENTS

Transportation Improvement Program

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for

Ohio Statewide Urban Congestion Mitigation/Air Quality (CMAQ) Program 2013

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding

LAP Manual 7-1 February 2014 Compliance Assessment Program Requirements

Transportation Funding Terms and Acronyms Unraveling the Jargon

MINUTES WINSTON-SALEM URBAN AREA TRANSPORTATION ADVISORY COMMITTEE (TAC) NOVEMBER 18, :15 P.M. FIFTH FLOOR, PUBLIC MEETING ROOM, BRYCE A

PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer

DCHC MPO Funding Source Overview & Guidance draft January 2015

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.

Contents. FY 2014 YEAR END REPORT Kalamazoo Area Transportation Study

WELCOME TO THE KALAMAZOO AREA TRANSPORTATION STUDY

CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION

MAP-21: Overview of Project Delivery Provisions

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY

Ohio Department of Transportation. Transportation Funding for LPAs

SAFETEA-LU. Overview. Background

Re: Public Comment Period DRAFT Fiscal Years Transportation Improvement Program Amendment

Intentional blank page. Los Angeles County Metropolitan Transportation Authority

FY May Quarterly Revision AUSTIN DISTRICT

Missoula Urban Transportation Planning Process Public Participation Plan Prepared by

National Capital Region Transportation Planning Board

Transportation Alternatives Program (TAP) Recreational Trails Program (RTP)

Please complete your phone connection now:

TRANSPORTATION IMPROVEMENT PROGRAM REVISION 23 A M E N D M E N T F E D E R A L F I S C A L Y E A R S

LPA Programs How They Work

THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA

NORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM

Megan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017

FISCAL YEAR OVERALL WORK PROGRAM

MAP-21 and Its Effects on Transportation Enhancements

Purpose. Funding. Eligible Projects

Mississippi Gulf Coast Metropolitan Planning Organization. Transportation Improvement Program FY

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act

Summary of. Overview. existing law. to coal ash. billion in FY. funding in FY 2013 FY 2014

Navigating MAP 21. Securing Federal Funding for Community Walking & Biking Projects

2018 Call for Projects Guidebook

Appendix 5 Freight Funding Programs

REPORT TO MAYOR AND COUNCIL

Appendix E Federal and State Funding Categories

NORTH DAKOTA SIDE TRANSPORTATION IMPROVEMENT PROGRAM

MiTIP APPLICATION PACKET

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

Staff Approve Resolution R to amend the FY TIP.

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS

Non-Motorized Transportation Funding Options

CIRTPA Small Community Fund Application

TRANSPORTATION IMPROVEMENT PROGRAM FY 2013

County Executive Office/Legislative Affairs. County of Orange Report on Grant Applications/Awards

9. REVENUE SOURCES FEDERAL FUNDS

Cass County Rural Task Force Call for Projects Deadline: December 12, 2018

SMALL CITY PROGRAM. ocuments/forms/allitems.

Statewide Performance Program (SPP) Interstate and National Highway System (NHS) Pavement

Draft MAPA FY2019-FY2024 Transportation Improvement Program

Table to accompany Insight on the Issues 39: Policy Options to Improve Specialized Transportation

INTRODUCTION... 1 OVERVIEW... 2 SECTION I: FUND LISTING AND ELIGIBILITY CHART... 5 SECTION II: FUNDING SOURCE DESCRIPTIONS... 8

CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference

Annual Listing of Federal Obligation Projects FFY

The Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018

2018 Regional Transportation Improvement Program

Centre County Metropolitan Planning Organization (CCMPO) Coordinating Committee Meeting Tuesday, March 22, :00 p.m.

Moving Ahead for Progress in the 21 st Century (MAP-21)

SCOTT COUNTY COMMUNITY SERVICES DIVISION

Safety Projects and the Local Agency Program (LAP)

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads

TAC Agenda Item 5A Mailout - 04/13/16

Regional Transportation Plan: APPENDIX B

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

Lake Norman Regional Transportation Commission AGENDA March 8, 2017

Memorandum. Date: RE: Plans and Programs Committee

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

.?-& Approved as to Fonn. R. ZIEGLER, County Counsel THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER:

ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM

2018 Project Selection Process. Transportation Policy Board January 11, 2018

2018 and 2020 Regional Congestion Mitigation Air Quality Improvement Program (CMAQ) Grant Application

FY Transportation Improvement Program

Oregon Statewide Transportation Improvement Program. STIP Users Guide

A Field Guide. Local Program Opportunities

SMART SCALE Policy Guide

NILES-BUCHANAN-CASS AREA TRANSPORTATION STUDY

Transcription:

210 N. Church Street Suite B. Visalia, California 93291 Phone (559)-623-0450 FAX (559)-733-6720 www.tularecog.org DATE: September 12, 2018 TO: FROM: RE: Interagency Consultation Partners and Public Gabriel Gutierrez, TCAG Staff Availability of Draft Amendment No. 1 to the 2019 FTIP for Interagency Consultation and Public Review The Association of Governments (TCAG) is proposing a formal amendment (Type 3) to its Board approved 2019 Federal Transportation Improvement Program (FTIP). The 2019 FTIP is the programming document that identifies four years (Federal Fiscal Years 2018/19, 19/20, 20/21, and 21/22) of federal and other funding sources for projects in. Amendment No. 1 consists of the following changes: CTIPS ID No. 215-0000-0736: Visalia City Transit Bus Purchases. Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit". CTIPS ID No. 215-0000-0549: Grouped Projects for Bridge Rehabilitation and Reconstruction - HBP Program. Corrects the Local AC to HBP funding conversion in FY 18/19. CTIPS ID No. 215-0000-0615: Grouped Projects for Safety Improvements - HSIP Program. Corrects the amount of HSIP funds programmed in FY 18/19 which was not shown correctly in the Draft FTIP. CTIPS ID No. 215-0000-0627: Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program. Adds new 18/19 Minor projects to the 2019 FTIP per email request from Caltrans dated 7/6/2018. CTIPS ID No. 215-0000-0727: Grouped Projects for Operating Assistance to Transit Agencies. Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects. CTIPS ID No. 215-0000-0381: Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program. Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May 2018. CTIPS ID No. 215-0000-0730: Northwest Downtown Traffic Signal Interconnections. Programs conversion of Local AC to CMAQ in FFY 18/19. CTIPS ID No. 215-0000-0731: City of Tulare Solid Waste Truck Purchases. Programs conversion of Local AC to CMAQ in FFY 18/19. Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare

CTIPS ID No. 215-0000-0734: City of Porterville Solid Waste Truck Purchases (2): Programs conversion of Local AC to CMAQ in FFY 18/19. CTIPS ID No. 215-0000-0754: Visalia Road (Ave 280) Improvements. Changes project limits and scope, adds Highway Infrastructure Program (HIP) funds for construction and increases Regional Measure funds for construction. CTIPS ID No. 215-0000-0728: Grouped Projects for Bicycle and Pedestrian Facilities funded with Congestion Mitigaiton and Air Quality (CMAQ) funds (using toll credits). Project from Bike and Ped group listing moved from FFY 20/21 to FFY 19/20. CTIPS ID No. 215-0000-0624: Grouped Projects for Pavement Resurfacing and/or Rehabilitation (STBGP). STBGP programming amounts increased for each of the agencies receiving federalized STBGP funds, per the latest STBGP apportionment estimates dated 12/12/2017. CTIPS ID No. 215-0000-0750: City of Dinuba Alta and Nebraska Roundabout. Decreases CMAQ CON funds in 21/22 by $446k and increases Regional Measure CON funds in 21/22 by $446k. CTIPS ID No. 215-0000-0759: State Route 190 and Westwood Roundabout and Operational Improvements. New Project added to 2019 FTIP. CTIPS ID No. 215-0000-0749: Porterville Transit Charging Station Infrastructure. New project. Carried over from 2017 FTIP. Project List Attachment 1 includes a summary of programming changes that result from Amendment No. 1. These projects and/or project phases are consistent with the 2018 Regional Transportation Plan (RTP), which was adopted by TCAG on August 20, 2018. The attachment also includes the CTIPS project listings for the proposed project changes. Updated Financial Plan Attachment 2 consists of the Financial Summary Tables from the 2019 FTIP which have been updated to include the project list as provided in Attachment 1. Attachment 3 consists of the MPO Fund Type Report. Attachment 4 consists of the grouped project lists. Performance Measures The 2012 federal transportation authorization legislation, Moving Ahead for Progress in the 21st Century (MAP-21) established new requirements for performance management and reporting to ensure the most efficient investment of Federal transportation funds. To incorporate the new federal performance requirements into the Federal Transportation Improvement Program (FTIP), the Tulare County Association of Governments is required to show (1) that the FTIP makes progress towards achieving the region s performance targets and (2) that the FTIP includes, to the maximum extent practicable, a description of the anticipated effect of the FTIP towards achieving the performance targets. The projects contained within Amendment No. 1 have been developed in accordance with the applicable provisions and requirements of 23 CFR Part 450 and are expected to support the achievement of these targets. These targets will be achieved through the implementation of investment priorities through the programming of transportation projects in the 2019 FTIP, this FTIP Amendment, and subsequent FTIP Amendments and Administrative Modifications. Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare

Conformity Requirements The proposed project changes have been determined to be exempt from the requirement that a conformity determination and/or regional emissions analysis be performed per 40 CFR 93.126, 93.127, or 93.128. Because the projects are exempt, no further conformity determination is required. In addition, the project and/or project phases contained in Amendment No. 1 do not interfere with the timely implementation of any approved Transportation Control Measures (TCMs). As per TCAG s adopted 2015 Public Participation Plan, the public review and comment period is open for 14 days commencing on Wednesday, September 12, 2018 to Wednesday, September 26, 2018. Amendment No. 1 to the 2019 FTIP is posted on the TCAG website for public review at www.tularecog.org. All comments are due to TCAG by Wednesday, September 26, 2018. The 2019 FTIP meets all applicable transportation planning requirements per 23 CFR Part 450, 40 CFR Part 93, and conforms to the applicable SIPs, and does not interfere with the timely implementation of approved TCMs. If you have any questions regarding this amendment or wish to submit comments please contact Gabriel Gutierrez at (559) 623-0465 or ggutierrez@tularecog.org. Attachment 1: Summary of Changes Table and CTIPS project listings Attachment 2: Financial Summary Tables Attachment 3: MPO Fund Type Report Attachment 4: Grouped Project Listings Dinuba Exeter Farmersville Lindsay Porterville Tulare Visalia Woodlake County of Tulare

Attachment 1 Summary of Changes Table and CTIPS Project Listings

Summary of Changes TCAG 2019 FTIP Amendment No. 1 (Type 3 - Formal Amendment) (Dollars rounded to thousands) Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments Existing 215-0000-0736 City of Visalia Visalia City Transit Bus Purchases No Funding Changes Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit" Existing Grouped Projects for Bridge $0 $1,452,000 18/19 HBP $1,452,000 215-0000-0549 Various Rehabilitation and Reconstruction - HBP CON $82,323,000 $82,323,000 Program $0 ($1,452,000) 18/19 Local AC ($1,452,000) $0 0% Corrects the Local AC to HBP funding conversion in FFY 18/19. Existing 215-0000-0615 Various Grouped Projects for Safety Improvements - HSIP Program CON $520,000 $550,000 18/19 HSIP $30,000 $4,323,000 $4,353,000 $30,000 1% Corrects the amount of HSIP funds programmed in FY 18/19 which was not shown correctly in the DFTIP. New 215-0000-0627 Various Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program CON $0 $3,447,000 18/19 SHOPP AC $3,447,000 $0 $3,447,000 $3,447,000 New Project Adds new 18/19 Minor projects to the 2019 FTIP per email request from Caltrans dated 7/6/2018. Existing 215-0000-0727 Various Grouped Projects for Operating Assistance to Transit Agencies $730,000 $874,000 18/19 FTA 5311 $144,000 CON $50,876,000 $52,770,000 $1,894,000 4% $6,913,000 $8,663,000 18/19 LTF $1,750,000 Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects. Existing 215-0000-0381 Various Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program CON $6,049,000 $6,799,000 18/19 SHOPP AC $750,000 $5,210,000 $5,977,000 19/20 SHOPP AC $767,000 $7,328,000 $9,758,000 20/21 SHOPP AC $2,430,000 $36,406,000 $40,353,000 $3,947,000 11% Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May 2018. $0 $331,000 Prior CMAQ $331,000 $0 $76,000 Prior Regional Measure $76,000 $0 $251,000 Prior Local AC $251,000 Existing 215-0000-0730 City of Visalia Northwest Downtown Traffic Signal Interconnections CON $0 $251,000 18/19 CMAQ $251,000 $790,000 $790,000 $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19. $0 -$251,000 18/19 Local AC ($251,000) $582,000 $0 19/20 CMAQ ($582,000) $76,000 $0 19/20 $0 $209,000 Prior Regional Measure Local City Funds ($76,000) $209,000 $0 $1,611,000 Prior Local AC $1,611,000 Existing 215-0000-0731 City of Tulare City of Tulare Solid Waste Truck Purchases $0 $1,611,000 18/19 CMAQ $1,611,000 CON $1,820,000 $1,820,000 $0 -$1,611,000 18/19 Local AC ($1,611,000) $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19 $1,611,000 $0 20/21 CMAQ ($1,611,000) $209,000 $0 20/21 Local City Funds ($209,000)

Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments $0 $489,000 Prior Local AC $489,000 $0 $64,000 Prior Regional Measure $64,000 Existing 215-0000-0734 City of Porterville City of Porterville Solid Waste Truck Purchases (2) CON $0 $489,000 18/19 CMAQ $489,000 $0 -$489,000 18/19 Local AC ($489,000) $553,000 $553,000 $0 0% Programs conversion of Local AC to CMAQ in FFY 18/19 $489,000 $0 19/20 CMAQ ($489,000) $64,000 $0 19/20 Regional Measure ($64,000) $0 $700,000 Prior ROW $0 $530,000 Prior Existing 215-0000-0754 City of Exeter Visalia Road (Ave 280) Improvements Regional $3,500,000 $6,020,000 $2,520,000 72% $3,500,000 $3,635,000 18/19 $135,000 Measure CON $0 $1,155,000 18/19 Regional Measure Regional Measure Highway Infrastructure Program (HIP) $700,000 $530,000 $1,155,000 Changes project limits and scope and adds Highway Infrastructure Program (HIP) funds for construction and increases Regional Measure funds for construction. $0 $1,500,000 19/20 CMAQ $1,500,000 Existing 215-0000-0728 Various Grouped Projects for Bicycle and Pedestrian Facilities funded with Congestion Mitigaiton and Air Quality (CMAQ) funds (using toll credits) Regional $0 $195,000 19/20 $195,000 Measure CON $5,360,000 $5,360,000 $0 0% $1,500,000 $0 20/21 CMAQ ($1,500,000) Project from Bike and Ped group listing moved from FFY 20/21 to FFY 19/20 $195,000 $0 20/21 Regional Measure ($195,000) $2,772,000 $2,992,000 18/19 STBGP $220,000 Existing 215-0000-0624 Various Grouped Projects for Pavement Resurfacing and/or Rehabilitation (STBGP) $2,772,000 $2,992,000 19/20 STBGP $220,000 CON $32,888,000 $33,768,000 $880,000 3% $2,772,000 $2,992,000 20/21 STBGP $220,000 STBGP programming amounts increased for each of the agencies receiving federalized STBGP funds. Per the latest STBGP apportionment estimates dated 12/12/2017. $2,772,000 $2,992,000 21/22 STBGP $220,000 Existing 215-0000-0750 City of Dinuba City of Dinuba Alta and Nebraska Roundabout CON $1,461,000 $1,015,000 21/22 CMAQ ($446,000) $189,000 $635,000 21/22 Regional Measure $446,000 $2,077,000 $2,077,000 $0 0% Decreases CMAQ CON funds in 21/22 by $446k and increases Regional Measure CON funds in 21/22 by $446k.

Existing / New CTIPS ID Implementing Agency Project Title Phase Prior CTIPS Amt. Current CTIPS Amt. FFY Financial Table Fund Source Category Net Change Prior Total Project Cost Current Total Project Cost Total Project Cost Change % Change Comments New 215-0000-0759 Caltrans State Route 190 and Westwood Roundabout and Operational Improvements $0 $1,210,000 18/19 ROW $0 $1,500,000 19/20 Regional Measure Regional Measure $1,210,000 $1,500,000 CON $0 $735,000 20/21 CMAQ $735,000 $0 $8,960,000 $8,960,000 New Project New Project added to 2019 FTIP. CON $0 $5,515,000 20/21 Regional Measure $5,515,000 $0 $110,000 Prior LTF $110,000 New 215-0000-0749 City of Porterville Porterville Transit Charging Station Infrastructure CON $0 $2,210,000 20/21 FTA 5307 $2,210,000 CON $0 $950,000 20/21 LTF $950,000 $0 $4,070,000 $4,070,000 New Project New project. Carried over from 2017 FTIP. CON $0 $800,000 20/21 CMAQ $800,000 Note: Prior years amounts shown for informational purposes only. The total net change does not include the prior year amounts shown in the summary table. Total $21,377,000 Summary of Net Increases and Decreases by Federal Fiscal Year Fund Source 18/19 19/20 20/21 21/22 Total CMAQ $2,351,000 $429,000 ($1,576,000) ($446,000) $758,000 FTA 5307 $0 $0 $2,210,000 $0 $2,210,000 FTA 5311 $144,000 $0 $0 $0 $144,000 HBP $1,452,000 $0 $0 $0 $1,452,000 Highway Infrastructure Program (HIP) $1,155,000 $0 $0 $0 $1,155,000 HSIP $30,000 $0 $0 $0 $30,000 Local AC ($3,803,000) $0 $0 $0 ($3,803,000) Local City Funds $0 $0 ($209,000) $0 ($209,000) LTF $1,750,000 $0 $950,000 $0 $2,700,000 Regional Measure $1,345,000 $1,555,000 $5,320,000 $446,000 $8,666,000 SHOPP AC $4,197,000 $767,000 $2,430,000 $0 $7,394,000 STBGP $220,000 $220,000 $220,000 $220,000 $880,000 Total $8,841,000 $2,971,000 $9,345,000 $220,000 $21,377,000

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: 215-0000-0736 ROUTE: MPO ID.: TUL16-008 PM: TITLE (DESCRIPTION): Visalia City Transit Bus Purchases (In Visalia: Purchase of 7 electric transit buses for Visalia City Transit. (2018 RTP, Table F-6, page C-14)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Purchase new buses and rail cars to replace exist. IMPLEMENTING AGENCY: Visalia, City of PROJECT MANAGER: Carmen Quevedo PHONE: (559) 713-4592 EMAIL: carmen.quevedo@visalia.city PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 10,880,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 10,880,000 * CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration (FHWA) CON 2,254,000 2,254,000 Total: 2,254,000 2,254,000 * Local Funds - * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Visalia, City of CON 8,626,000 8,626,000 Total: 8,626,000 8,626,000 Project Total: CON 10,880,000 10,880,000 Total: 10,880,000 10,880,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Changes project description from "Purchase of 17 transit buses for Visalia City Transit" to "Purchase of 7 electric transit buses for Visalia City Transit".//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 1-07/12/2016 ********New project for 2017 FTIP.//gg Products of CTIPS Page 1 09/06/2018 04:21:03

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: 215-0000-0736 ROUTE: MPO ID.: TUL16-008 PM: TITLE (DESCRIPTION): Visalia City Transit Bus Purchases (In Visalia: Purchase of 17 transit buses for Visalia City Transit. (2018 RTP, Table F-6, page C-14)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Purchase new buses and rail cars to replace exist. IMPLEMENTING AGENCY: Visalia, City of PROJECT MANAGER: Carmen Quevedo PHONE: (559) 713-4592 EMAIL: carmen.quevedo@visalia.city PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 10,880,000 * CMAQ - * Fund Source 1 of 2 * Fund Type: Congestion Mitigation * Funding Agency: Federal Highway Administration (FHWA) CON 2,254,000 2,254,000 Total: 2,254,000 2,254,000 * Local Funds - * Fund Source 2 of 2 * Fund Type: City Funds * Funding Agency: Visalia, City of CON 8,626,000 8,626,000 Total: 8,626,000 8,626,000 Project Total: CON 10,880,000 10,880,000 Total: 10,880,000 10,880,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 1-07/12/2016 ********New project for 2017 FTIP.//gg Products of CTIPS Page 1 09/06/2018 04:08:24

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: 215-0000-0549 ROUTE: MPO ID.: TUL11-120 PM: TITLE (DESCRIPTION): Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (In : Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (Using Toll Credits). (2018 RTP, Table F-15, page C-26)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Jason Vivian PHONE: (559) 624-7135 EMAIL: jvivian@co.tulare.ca.us PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/12/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 82,323,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 82,323,000 * Local HBRR - * Fund Source 1 of 3 * Fund Type: Highway Bridge Program * Funding Agency: Federal Highway Administration (FHWA) CON 14,367,000 1,452,000 4,463,000 133,000 58,909,000 79,324,000 Total: 14,367,000 1,452,000 4,463,000 133,000 58,909,000 79,324,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 54,000 444,000 17,000 2,484,000 2,999,000 Total: 54,000 444,000 17,000 2,484,000 2,999,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds - Advance Construction * Funding Agency: CON 1,452,000-1,452,000 Total: 1,452,000-1,452,000 Project Total: CON 15,873,000 4,907,000 150,000 61,393,000 82,323,000 Total: 15,873,000 4,907,000 150,000 61,393,000 82,323,000 Products of CTIPS Page 1 09/12/2018 09:35:19

Association of Governments - Federal Transportation Improvement Program State Highway System Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Corrects the Local AC to HBP funding conversion in FFY 18/19.//gg ******** DFTIP Version 1-04/10/2018********Carry over from 2017 FTIP ******** Version 19-11/28/2017 ********Amendment No. 11. Changes made in accordance with HBP Lump Sum Project list dated 10/26/2017. Requested by Caltrans via email dated 10/31/2017.//gg ******** Version 18-04/28/2017 ********Amendment No. 2 (A-Mod). Changes made in accordance with HBP Lump Sum Project list dated 3/29/2017. Requested by Caltrans via email dated 4/5/2017.//gg ******** Version 17-01/25/2017 ********Amendment No. 1. Revisions made in accordance with HBP Individually listed project list. Amendment requested by Caltrans via email dated 11/4/2016.//gg ******** Version 1-06/24/16 ********Project data transfered from 2014 FTIP.//gg ******** Version 14-04/28/2016 ********Amendment No. 16. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 3/26/2016 per email from Abhijit Bagde dated 4/4/2016.//gg ******** Version 13-11/24/2015 ********Amendment No. 14. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 10/30/2015 per email from Abhijit Bagde on 11/4/2015//gg ******** Version 12-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Bridge Program grouped projects listing update per email from Abhijit Bagde received on 3/27/15.//gg ******** Version 11-12/22/2014 ********Amendment No. 2 to make changes per Caltrans' updated lump sum HBP backup list dated 10/29/14. //gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 8-12/02/2013 ********Requested by CaltransAbhijit Bagde, by email dated 11/21/2013 to update the bridge lump sum. GG ******** Version 7-04/03/2013 ********Requested by CaltransAbhijit Bagde, by email dated 4/2/2013 to update the bridge lump sum. EW ******** Version 6-01/30/2013 ********email dated 11/6/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance Highway Bridge Program (HBP). Please program these projects in your 2013 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 03/22/2012 which were transmitted to you on April 3, 2012. The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) 653-5740 (by e-mail at eric.bost@dot.ca.gov), or Linda Newton at (916) 651-0022 (by e-mail at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) 654-3638, CALNET 464-3638 ******** Version 1-05/09/12 ********Revised 3/23/2012-9:37AM List-Back up list on Caltrans website Project data transfered from 2010 FTIP. 4-3/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance (HBP). This information is to be used for updating programming from the current 2011 FTIP, and for developing your 2013 FTIP. Please program these projects in your 2011 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 10/24/2011which were transmitted to you on October 31, 2011. The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) 653-5740 (by e-mail at eric.bost@dot.ca.gov), or Linda Newton at (916) 651-0022 (by e-mail at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) 654-3638, CALNET 464-3638 FAX: (916) 654-2738 ******** Version 4-12/06/2011 ********Requested by Caltrans Thomas Glaski, verified by Caltrans HBR website to update the Lump Sum Highway Bridge program to match the 2010/11-2015/16 Highway Bridge Program List dated 11/10/2011, 9:20 AM. Email dated 11/16/2011 back up list is provided at http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html. EW ******** Version 3-04/04/2011 ********Requested by Caltrans Abhijit J. Bagde to updated Bridge List, by email dated 4/4/11. Back up list provided on website at http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html -EW ******** Version 2-03/28/2011 ********Toll Credits Programmed for & Con. as requested by Caltrans Bridge list 11/20/2010. email dated 11/22/10. ******** Version 1-02/03/2011 ********Requested by Caltrans, Thomas Glaski, Muhaned Aljabiry HBR-Bridge Program List. email dated 11/22/10 to add Lump Sum Bridges with back up list located on Caltrans Website http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html -EW Products of CTIPS Page 2 09/12/2018 09:35:19

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: 215-0000-0549 ROUTE: MPO ID.: TUL11-120 PM: TITLE (DESCRIPTION): Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (In : Grouped Projects for Bridge Rehabilitation and Reconstruction-HBP Program (Using Toll Credits). (2018 RTP, Table F-15, page C-26)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Jason Vivian PHONE: (559) 624-7135 EMAIL: jvivian@co.tulare.ca.us PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 82,323,000 * Local HBRR - * Fund Source 1 of 3 * Fund Type: Highway Bridge Program * Funding Agency: Federal Highway Administration (FHWA) CON 14,367,000 4,463,000 133,000 58,909,000 77,872,000 Total: 14,367,000 4,463,000 133,000 58,909,000 77,872,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 54,000 444,000 17,000 2,484,000 2,999,000 Total: 54,000 444,000 17,000 2,484,000 2,999,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds - Advance Construction * Funding Agency: CON 1,452,000 1,452,000 Total: 1,452,000 1,452,000 Project Total: CON 15,873,000 4,907,000 150,000 61,393,000 82,323,000 Total: 15,873,000 4,907,000 150,000 61,393,000 82,323,000 Products of CTIPS Page 1 09/06/2018 04:09:32

Association of Governments - Federal Transportation Improvement Program State Highway System Comments: ******** DFTIP Version 1-04/10/2018********Carry over from 2017 FTIP ******** Version 19-11/28/2017 ********Amendment No. 11. Changes made in accordance with HBP Lump Sum Project list dated 10/26/2017. Requested by Caltrans via email dated 10/31/2017.//gg ******** Version 18-04/28/2017 ********Amendment No. 2 (A-Mod). Changes made in accordance with HBP Lump Sum Project list dated 3/29/2017. Requested by Caltrans via email dated 4/5/2017.//gg ******** Version 17-01/25/2017 ********Amendment No. 1. Revisions made in accordance with HBP Individually listed project list. Amendment requested by Caltrans via email dated 11/4/2016.//gg ******** Version 1-06/24/16 ********Project data transfered from 2014 FTIP.//gg ******** Version 14-04/28/2016 ********Amendment No. 16. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 3/26/2016 per email from Abhijit Bagde dated 4/4/2016.//gg ******** Version 13-11/24/2015 ********Amendment No. 14. Updates the Highway Bridge Program (HBP) grouped project listing as reflected in the latest HBP backup list dated 10/30/2015 per email from Abhijit Bagde on 11/4/2015//gg ******** Version 12-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Bridge Program grouped projects listing update per email from Abhijit Bagde received on 3/27/15.//gg ******** Version 11-12/22/2014 ********Amendment No. 2 to make changes per Caltrans' updated lump sum HBP backup list dated 10/29/14. //gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 8-12/02/2013 ********Requested by CaltransAbhijit Bagde, by email dated 11/21/2013 to update the bridge lump sum. GG ******** Version 7-04/03/2013 ********Requested by CaltransAbhijit Bagde, by email dated 4/2/2013 to update the bridge lump sum. EW ******** Version 6-01/30/2013 ********email dated 11/6/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance Highway Bridge Program (HBP). Please program these projects in your 2013 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 03/22/2012 which were transmitted to you on April 3, 2012. The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) 653-5740 (by e-mail at eric.bost@dot.ca.gov), or Linda Newton at (916) 651-0022 (by e-mail at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) 654-3638, CALNET 464-3638 ******** Version 1-05/09/12 ********Revised 3/23/2012-9:37AM List-Back up list on Caltrans website Project data transfered from 2010 FTIP. 4-3/2012 Dear MPO FTIP Coordinator, The note below provides information on an update to the Local Assistance (HBP). This information is to be used for updating programming from the current 2011 FTIP, and for developing your 2013 FTIP. Please program these projects in your 2011 FTIP through the next FTIP administrative modification/amendment. Note that this information replaces the project lists dated 10/24/2011which were transmitted to you on October 31, 2011. The information below along with the detailed (back-up) listings is posted on Caltrans HBP website. The link is included in the note below. Please contact Eric Bost at (916) 653-5740 (by e-mail at eric.bost@dot.ca.gov), or Linda Newton at (916) 651-0022 (by e-mail at linda.newton@dot.ca.gov) should you have any questions on the information below. Thank you. Abhijit J. Bagde, P.E. Senior Transportation Engineer Division of Transportation Programming Office of Federal Trans. Mgmt. Program (916) 654-3638, CALNET 464-3638 FAX: (916) 654-2738 ******** Version 4-12/06/2011 ********Requested by Caltrans Thomas Glaski, verified by Caltrans HBR website to update the Lump Sum Highway Bridge program to match the 2010/11-2015/16 Highway Bridge Program List dated 11/10/2011, 9:20 AM. Email dated 11/16/2011 back up list is provided at http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html. EW ******** Version 3-04/04/2011 ********Requested by Caltrans Abhijit J. Bagde to updated Bridge List, by email dated 4/4/11. Back up list provided on website at http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html -EW ******** Version 2-03/28/2011 ********Toll Credits Programmed for & Con. as requested by Caltrans Bridge list 11/20/2010. email dated 11/22/10. ******** Version 1-02/03/2011 ********Requested by Caltrans, Thomas Glaski, Muhaned Aljabiry HBR-Bridge Program List. email dated 11/22/10 to add Lump Sum Bridges with back up list located on Caltrans Website http://www.dot.ca.gov/hq/localprograms/hbrr99/hbp_fstip.html -EW Products of CTIPS Page 2 09/06/2018 04:09:32

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Local Highway System PPNO: EA: CTIPS ID: 215-0000-0615 ROUTE: MPO ID.: TUL12-144 PM: TITLE (DESCRIPTION): Grouped Proejcts for Safety Improvements - HSIP Program (Grouped Proejcts for Safety Improvements - HSIP Program. Throughout. (2018 RTP, Table F-14, page C-23)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: GABRIEL GUTIERREZ PHONE: (559) 623-0465 EMAIL: ggutierrez@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 4,353,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 4,323,000 * Other Fed - * Fund Source 1 of 3 * Fund Type: Highway Safety Improvement Program * Funding Agency: Federal Highway Administration (FHWA) CON 337,000 550,000 748,000 2,345,000 3,980,000 Total: 337,000 550,000 748,000 2,345,000 3,980,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 290,000 290,000 Total: 290,000 290,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: City Funds * Funding Agency: Various Agencies CON 39,000 44,000 83,000 Total: 39,000 44,000 83,000 Project Total: CON 337,000 589,000 792,000 2,635,000 4,353,000 Total: 337,000 589,000 792,000 2,635,000 4,353,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Corrects the amount of HSIP funds programmed in FY 18/19 which were not shown correctly in the DFTIP.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 14-03/07/2018 ********Amendment No. 15 (A-Mod) adds $606,592 in STBGP funds to HSIP6-06-015 in FFY 17/18.//gg ******** Version 13-01/21/2017 ********Amendment No. 1. Revisions made in accordance with HSIP Grouped Project list. Amendment requested by Caltrans via email dated 12/7/2016.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 10-07/18/2016 ********Amendment No. 19 (AMOD). Adds additional HSIP funds to group listed HSIP Project No. HSIP5-06-017, as approved by Caltrans HSIP Program Manager via email on June 30, 2016.//gg ******** Version 9-07/07/2016 ********Amendment No. 18 (AMOD). Updates the Highway Safety Improvement Program (HSIP) grouped project listing as requested by Richard Ke, Caltrans Local Assistance via email on 6/30/16.//gg ******** Version 8-11/24/2015 ********Amendment No. 14. Updates the Highway Safety Improvement Program (HSIP) grouped project listing as reflected in the latest HSIP backup list dated 11/12/2015 per email from Lilibeth Green, Caltrans.//gg ******** Version 7-08/13/2015 ********HSIP Grouped Project listing updated per email from Abhijit Bagde received on 7/17/2015.//gg ******** Version 6-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Safety Improvement Program grouped projects listing update per email from Abhijit Bagde received on 3/27/15. Includes toll credits effective until 9/30/16 for Cycle 6 Projects (HSIP6). /gg ******** Version 5-01/12/2015 ********Amendment No. 3 (Administrative Modification) to update grouped project listing to match current HSIP Program list released on 11/21/14.//gg ******** DFTIP Version 2-09/15/2014 ********Revise funding for HSIP projects per updated HSIP back-up list from Caltrans dated 6/4/14.//GG ******** DFTIP Version 1-01/28/2014 ********Carry over from 2013 FTIP -GG ******** Version 2-12/02/2013 ********Changes from cycle 6-- Email from Abhijit Bagde (11/20/13).-GG ******** Version 1-12/19/2012 ********Projects included are in Farmersville, Porterville, Tulare,, Visalia see group listing back up list for project details dated 10/24/2012 as submitted by Caltrans Richard Ke Safety Program Coordinator and Abhijit Bagde, HQ dated 10/29/2012.-EW Products of CTIPS Page 1 09/06/2018 04:28:09

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Local Highway System PPNO: EA: CTIPS ID: 215-0000-0615 ROUTE: MPO ID.: TUL12-144 PM: TITLE (DESCRIPTION): Grouped Proejcts for Safety Improvements - HSIP Program (Grouped Proejcts for Safety Improvements - HSIP Program. Throughout. (2018 RTP, Table F-14, page C-23)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: GABRIEL GUTIERREZ PHONE: (559) 623-0465 EMAIL: ggutierrez@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 4,323,000 * Other Fed - * Fund Source 1 of 3 * Fund Type: Highway Safety Improvement Program * Funding Agency: Federal Highway Administration (FHWA) CON 337,000 520,000 748,000 2,345,000 3,950,000 Total: 337,000 520,000 748,000 2,345,000 3,950,000 * Local Funds - * Fund Source 2 of 3 * Fund Type: County Funds * Funding Agency: CON 290,000 290,000 Total: 290,000 290,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: City Funds * Funding Agency: Various Agencies CON 39,000 44,000 83,000 Total: 39,000 44,000 83,000 Project Total: CON 337,000 559,000 792,000 2,635,000 4,323,000 Total: 337,000 559,000 792,000 2,635,000 4,323,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** Version 14-03/07/2018 ********Amendment No. 15 (A-Mod) adds $606,592 in STBGP funds to HSIP6-06-015 in FFY 17/18.//gg ******** Version 13-01/21/2017 ********Amendment No. 1. Revisions made in accordance with HSIP Grouped Project list. Amendment requested by Caltrans via email dated 12/7/2016.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 10-07/18/2016 ********Amendment No. 19 (AMOD). Adds additional HSIP funds to group listed HSIP Project No. HSIP5-06-017, as approved by Caltrans HSIP Program Manager via email on June 30, 2016.//gg ******** Version 9-07/07/2016 ********Amendment No. 18 (AMOD). Updates the Highway Safety Improvement Program (HSIP) grouped project listing as requested by Richard Ke, Caltrans Local Assistance via email on 6/30/16.//gg ******** Version 8-11/24/2015 ********Amendment No. 14. Updates the Highway Safety Improvement Program (HSIP) grouped project listing as reflected in the latest HSIP backup list dated 11/12/2015 per email from Lilibeth Green, Caltrans.//gg ******** Version 7-08/13/2015 ********HSIP Grouped Project listing updated per email from Abhijit Bagde received on 7/17/2015.//gg ******** Version 6-04/23/2015 ********Amendment No. 6 (A-MOD). Highway Safety Improvement Program grouped projects listing update per email from Abhijit Bagde received on 3/27/15. Includes toll credits effective until 9/30/16 for Cycle 6 Projects (HSIP6). /gg ******** Version 5-01/12/2015 ********Amendment No. 3 (Administrative Modification) to update grouped project listing to match current HSIP Program list released on 11/21/14.//gg ******** DFTIP Version 2-09/15/2014 ********Revise funding for HSIP projects per updated HSIP back-up list from Caltrans dated 6/4/14.//GG ******** DFTIP Version 1-01/28/2014 ********Carry over from 2013 FTIP -GG ******** Version 2-12/02/2013 ********Changes from cycle 6-- Email from Abhijit Bagde (11/20/13).-GG ******** Version 1-12/19/2012 ********Projects included are in Farmersville, Porterville, Tulare,, Visalia see group listing back up list for project details dated 10/24/2012 as submitted by Caltrans Richard Ke Safety Program Coordinator and Abhijit Bagde, HQ dated 10/29/2012.-EW Products of CTIPS Page 1 09/06/2018 04:10:17

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: 215-0000-0627 ROUTE: MPO ID.: TUL13-150 PM: TITLE (DESCRIPTION): Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program (Grouped Projects for Safety Improvements, Shoulder Improvements, Pavement Resurfacing and /or rehabilitation - Minor Program. Throughout. (Using Toll Credits) (2018 RTP, Table F-5, page C-14)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Pavement resurfacing and/or rehabilitation. IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: Stephen Tracey PHONE: (559) 243-3462 EMAIL: stephen.tracey@dot.ca.gov PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Active 09/06/2018 GGUTIERR Amendment - New Project 1 3,447,000 * CT Minor Pgm. - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Federal Highway Administration (FHWA) CON 3,447,000 3,447,000 Total: 3,447,000 3,447,000 Comments: ******** DFTIP Version 1-09/06/2018********Amendment No. 1. Adds new 18/19 Minor projects to the 2019 FTIP per email request from Caltrans dated 7/6/2018.//gg ******** Version 7-07/16/2018 ********Amendment No. 19 (Type 3). Adds new Minor projects to group list as requested by Caltrans.//gg ******** Version 6-07/24/2017 ********Amendment No. 8. Adds one new project to the Minor Program Group List. Project added to existing group list with no projects currently programmed in the 4-year element of the 2017 FTIP.//gg ******** DFTIP Version 1-07/19/2016********Carry over from 2015 FTIP.//gg ******** Version 4-07/30/2015 ********Amendment No. 12. Adds three new projects in FFY 15/16 to the Minor Program. Requested by A. Bagde, Caltrans via email received 7/1/2015.//gg ******** DFTIP Version 2-09/15/2014 ********Revised funding for State Minor program per udated Minor Program back-up list form Caltrans dated 7/8/14.//GG ******** DFTIP Version 1-01/23/2014 ********Carry over from 2013 FTIP -GG ******** Version 1-07/23/2013 ******** **Requested by Abhijit Bagde to program the State Highway Maintenance projects for FY 2013/14. email dated 6.26/2013.-EW State Minors Program Highway Grouped Projects in. Products of CTIPS Page 1 09/06/2018 04:34:13

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: 215-0000-0727 ROUTE: MPO ID.: TUL16-204 PM: TITLE (DESCRIPTION): Grouped Projects for Operating Assistance to Transit Agencies (In : Grouped Projects for Operating Assistance to Transit Agencies. (2018 RTP, Table F-4, page C-11)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Transit operating assistance. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Elizabeth Forte PHONE: (559) 623-0450 EMAIL: eforte@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 52,770,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 50,876,000 * FTA Funds - * Fund Source 1 of 3 * Fund Type: FTA5307 - Urbanized Area Formula Program * Funding Agency: Federal Highway Administration (FHWA) CON 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 Total: 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 * FTA Funds - * Fund Source 2 of 3 * Fund Type: FTA 5311 - Non Urbanized * Funding Agency: Federal Highway Administration (FHWA) CON 874,000 730,000 730,000 730,000 3,064,000 Total: 874,000 730,000 730,000 730,000 3,064,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies CON 8,663,000 6,913,000 6,913,000 6,913,000 29,402,000 Total: 8,663,000 6,913,000 6,913,000 6,913,000 29,402,000 Project Total: CON 14,613,000 12,719,000 12,719,000 12,719,000 52,770,000 Total: 14,613,000 12,719,000 12,719,000 12,719,000 52,770,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Programs updated transit operating assistance amounts per the FFY 18/19 FTA 5311 Program of Projects.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. ******** Version 4-03/01/2018 ******** Amendment No. 14. Increases the FTA 5307 and LTF programming amounts from $1,214,000 to $1,350,000 for FFYs 17/18 to 19/20.//gg ******** Version 3-05/12/2017 ********Amendment No. 4. Programming of FTA 5311 Program of Projects for FFYs 2016/17 and 2017/18. Requested by E. Forte.//gg ******** Version 2-05/10/2017 ********Adds FTA funds from prior FTIP to FFY 16/17 in the current FTIP for Tulare City Transit operations assistance. Fund type is FTA 5307. The amounts and corresponding FFY's are as follows: FFY12/13 - $152,058, FFY 13/14 - $467,482, FFY 14/15 - $497,455, and FFY 15/16 - $594,846. Amendment also deletes one FTA 5311f project from group list. Requested by E. Forte on 5/9/17.//gg ******** Version 1-06/24/2016 ********New grouped project listing added to 2017 FTIP.//gg Products of CTIPS Page 1 09/06/2018 04:36:45

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program Transit System PPNO: EA: CTIPS ID: 215-0000-0727 ROUTE: MPO ID.: TUL16-204 PM: TITLE (DESCRIPTION): Grouped Projects for Operating Assistance to Transit Agencies (In : Grouped Projects for Operating Assistance to Transit Agencies. (2018 RTP, Table F-4, page C-11)) MPO Aprv: 08/20/2018 State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Transit operating assistance. IMPLEMENTING AGENCY: Various Agencies PROJECT MANAGER: Elizabeth Forte PHONE: (559) 623-0450 EMAIL: eforte@tularecog.org PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 50,876,000 * FTA Funds - * Fund Source 1 of 3 * Fund Type: FTA5307 - Urbanized Area Formula Program * Funding Agency: Federal Highway Administration (FHWA) CON 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 Total: 5,076,000 5,076,000 5,076,000 5,076,000 20,304,000 * FTA Funds - * Fund Source 2 of 3 * Fund Type: FTA 5311 - Non Urbanized * Funding Agency: Federal Highway Administration (FHWA) CON 730,000 730,000 730,000 730,000 2,920,000 Total: 730,000 730,000 730,000 730,000 2,920,000 * Local Funds - * Fund Source 3 of 3 * Fund Type: Local Transportation Funds * Funding Agency: Various Agencies CON 6,913,000 6,913,000 6,913,000 6,913,000 27,652,000 Total: 6,913,000 6,913,000 6,913,000 6,913,000 27,652,000 Project Total: CON 12,719,000 12,719,000 12,719,000 12,719,000 50,876,000 Total: 12,719,000 12,719,000 12,719,000 12,719,000 50,876,000 Comments: ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. ******** Version 4-03/01/2018 ******** Amendment No. 14. Increases the FTA 5307 and LTF programming amounts from $1,214,000 to $1,350,000 for FFYs 17/18 to 19/20.//gg ******** Version 3-05/12/2017 ********Amendment No. 4. Programming of FTA 5311 Program of Projects for FFYs 2016/17 and 2017/18. Requested by E. Forte.//gg ******** Version 2-05/10/2017 ********Adds FTA funds from prior FTIP to FFY 16/17 in the current FTIP for Tulare City Transit operations assistance. Fund type is FTA 5307. The amounts and corresponding FFY's are as follows: FFY12/13 - $152,058, FFY 13/14 - $467,482, FFY 14/15 - $497,455, and FFY 15/16 - $594,846. Amendment also deletes one FTA 5311f project from group list. Requested by E. Forte on 5/9/17.//gg ******** Version 1-06/24/2016 ********New grouped project listing added to 2017 FTIP.//gg Products of CTIPS Page 1 09/06/2018 04:12:41

DIST: 06 CT PROJECT ID: COUNTY: Association of Governments - Federal Transportation Improvement Program State Highway System PPNO: EA: CTIPS ID: 215-0000-0381 ROUTE: MPO ID.: TUL12-170 PM: TITLE (DESCRIPTION): Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program (In : Grouped Projects for Safety Improvements-SHOPP Collision Reduction Program (Using Toll Credits). (2018 RTP, Table F-2, page C-7)) MPO Aprv: State Aprv: Federal Aprv: EPA TABLE II or III EXEMPT CATEGORY Safety Improvement Program. IMPLEMENTING AGENCY: Caltrans PROJECT MANAGER: CALTRANS PHONE: (559) 243-3466 EMAIL: PROJECT VERSION HISTORY (Printed Version is Shaded) (Dollars in whole) Version Status Date Updated By Change Reason Amend No. Prog Con Prog 2 Active 09/06/2018 GGUTIERR Amendment - Cost/Scope/Sch. Change 1 40,353,000 1 Official 08/20/2018 GGUTIERR Adoption - Carry Over 0 36,406,000 * SHOPP - Collision Reduction - * Fund Source 1 of 1 * Fund Type: SHOPP Advance Construction (AC) * Funding Agency: Caltrans CON 1,623,000 6,799,000 5,977,000 9,758,000 16,196,000 40,353,000 Total: 1,623,000 6,799,000 5,977,000 9,758,000 16,196,000 40,353,000 Comments: ******** Version 2-09/06/2018 ********Amendment No. 1. Updates programming amounts in FY 18/19, 19/20, and 20/21 per the latest 2018 SHOPP Collision Reduction Program listing amended by the CTC in May 2018.//gg ******** Version 1-04/03/18 ******** Carryover from 2017 FTIP. Project data transfered from 2016 FTIP. ******** DFTIP Version 1-06/23/2016 ********Carry over from 2015 FTIP.//gg ******** Version 13-04/28/2016 ********Amendment No. 16. Updates the SHOPP Collision Reduction Program listing as reflected in the 2016 SHOPP approved by the CTC in March 2016. Also programs funds for the new project in the current 2015 FTIP as requested by Caltrans.//gg ******** Version 12-07/29/2015 ********Update to SHOPP Collision Reduction Program as shown on most recent Lump Sum report dated 7/13/2015.//gg ******** Version 11-02/18/2015 ********Add new project to SHOPP Collision Reduction Program Grouped Project Listing. Project added to SHOPP via Amendment No. 14H-327. Requested by Stephen Tracy, Caltrans via email dated 2/10/15.//gg ******** Version 10-01/12/2015 ********Amendment No. 3 (Administrative Modification) updates the grouped project listing to match current SHOPP Collision Reduction list released on 12/16/14.//gg ******** DFTIP Version 1-04/01/2014 ******** Carry over from 2013 FTIP//GG ******** Version 7-04/03/2013 ********Requested by Caltrans Stephen Tracy email dated 4/2/2013. To update the Shopp Colllision Reduction program-adding project to the Lump Sum listing. Memorandum from Rachel Falsetti Shopp amendment 12H-201 to 12H-210 dated March 25, 2013. EW ******** Version 1-05/09/12 ******** Project data transfered from 2010 FTIP. ******** Version 5-03/29/2010 ********Carryover into the 2011 FTIP.-EW ******** Version 4-03/16/2010 ********Amended to match Caltrans Back up list sent by Caltrans Stephen Tracy adding funds to FY 11/12 $2,396,000 Pe, $615,000 to and $1487 to Construction. EW ******** Version 3-12/06/2009 ********Requested by Caltrans Stephen Tracy. email dated 9/17/09 and 11/30/09 and phone call. Needs amendment to beging design work on Oakdale signal in Tulare.-EW ******** Version 2-05/14/2008 ********Carry over to the 2008/09 FTIP. -EW ******** Version 1-06/11/2007 *********Converting project to Lump Sum SHOPP-Collision Reduction. Requested by Penny Gray CT HQ. email 4/27/07. Phone call 6/11/07.-EW Products of CTIPS Page 1 09/06/2018 04:41:20