The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

Similar documents
HAAD Standard for CBRNE Contaminated Material Management and Disposal Document Ref. Number: HAAD/CBRNECMMD/0.9 Version: 0.9

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Marine Protection Rules Part 130B Oil Transfer Site Marine Oil Spill Contingency Plans

[Type e-signature] for the Minnesota Pollution Control Agency. [Title] [Office] [Division] Solid Waste Facility Permit SW

COMPANY SAFETY PROTOCOL (DRAFT) Helping everyone who comes to Napier Port get home to their family safely every day.

Navy Non-DERP (Other Accrued) Environmental Liabilities (OEL) ~ Development and Outcomes

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012

2.01 All employees of the University of Windsor shall be vigilant and shall exercise appropriate due diligence to minimize risks.

Goulburn Bioenergy Project Community Consultation Plan and Outcomes. Date of Publication: 9 May, 2017 Document Number: SM01-SC-CC-0002

AUDIT REPORT. Audit of Offi cial Controls in Local Authority Supervised Establishments Cork County Council

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms

DEP Webinar. April 10, 2012

Monitoring notifications handbook

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Massey University Radiation Safety Plan Version

Emergency Response Overview. October, 2013

Unannounced Care Inspection Report 30 June Medcom Personnel Ltd

SECTION 4. Construction Site Runoff Control Program

HARBEX METAL PROCESSING LTD. Health and Safety Policy and Procedures

CORK COUNTY COUNCIL SANITARY CARETAKER GRADE 5 WATER SERVICES ZONE 3 (SOUTH EAST)

MINIMUM CRITERIA FOR REACH AND CLP INSPECTIONS 1

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

CNL-CNSC Administrative Protocol for the Renewal of the Whiteshell Laboratories Licence and the Proposed In Situ Decommissioning of the WR-1 Reactor

Marina Strategy: Section A Request for Proposal. 1. Request for Proposal. 2. Communication. 3. Key Contacts

Unregulated Heating Oil Tank Program Guidance

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

COMMUNITY INFORMATION/INVOLVEMENT MEETING LIFECYCLE BUILDING CENTER FY17 EPA BROWNFIELD CLEANUP GRANT PRESENTED BY:

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER SUPPLY PROGRAM ADMINISTRATIVE CODE

Life Extension of Nuclear Power Plants

2018 Terms and Conditions for Support of Grant Awards Revised 7 th June 2018

Plumbers, Gasfitters and Drainlayers Board (Gasfitting Registration and Licensing) Notice 2016 Pursuant to sections 28 and 30 of the Plumbers,

MEDICINES CONTROL COUNCIL

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

SOLID WASTE DISPOSAL FACILITY PERMIT

Department of Environmental Health and Safety Laboratory Inspection Protocol

Management Standards. EHS Policy and Program

WHEELCHAIR ACCESSIBLE VEHICLE GRANT SCHEME 2018 (WAV18)

Radiation Licensure and Management (RS100) Course

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

Guideline for the notification of serious breaches of Regulation (EU) No 536/2014 or the clinical trial protocol

Guidance for MRC units on HTA licence applications for storage of human samples for research purposes

The KICCS Portal. Kentucky s Integrated Child Care System

Standard for Zoo Containment Facilities

SAFETY DIRECTIVE. This directive applies to all departments and employees of the Town of Marana.

DEPARTMENT OF EDUCATION OCCUPATIONAL HEALTH AND SAFETY POLICY

MEDICINES CONTROL COUNCIL

RE: COMPLIANCE ASSESSMENT REPORT FOR THE DAMPIER MARINE SERVICES FACILITY PROJECT MINISTERIAL STATEMENT NUMBER 868

Port Botany Terminal Q. Environmental Management System. Community Feedback Quarterly Report. Reporting Period: 1 April to 30 June 2018

Jefferson Parish Department of Drainage. Emergency Plan

Applicable State Licensing Requirements for Combined Federal and Comprehensive HHA Survey

PROCEDURE FOR THE PREPARATION AND FOLLOW-UP OF AN AGENCY FOR TOXIC SUBSTANCES AND DISEASE REGISTRY (ATSDR) PUBLIC HEALTH ASSESSMENT

Qualifications due May 30, 2018 by 4:00 PM

RULES OF THE TENNESSEE BOARD OF PHARMACY CHAPTER STERILE PRODUCT PREPARATION IN PHARMACY PRACTICE TABLE OF CONTENTS

RQIA Provider Guidance Nursing Homes

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012

ENVIRONMENTAL HEALTH AND SAFETY MANAGER

Announced Care Inspection of N Wright Dental Practice Ltd. 9 June 2015

Port Botany Terminal Q. Environmental Management System. Community Feedback Quarterly Report. Reporting Period: 1 July to 30 September 2018

OH&S Policy Aims. Scope and Application. Definitions

Office for Nuclear Regulation (ONR) Quarterly Site Report for Springfields Fuels Limited

Hazardous Materials and Waste Management Plan

CANADIAN NUCLEAR SAFETY COMMISSION S RISK BASED APPROACH TO REGULATING FUEL FACILITIES IN CANADA

Administrative Safety

Environmental & Munitions Center of Expertise (EM CX) Information Fact Sheet US Army Corps of Engineers

PROCEDURE 806 HEALTH AND SAFETY

HEALTH & SAFETY POLICY CONTENTS

NUCLEAR SAFETY PROGRAM

Glynn County Fire Department 121 Public Safety Blvd BRUNSWICK, GEORGIA PHONE (912) FAX (912)

Unannounced Care Inspection Report 9 March Orchard Grove

Solid Waste Facility Permit SW

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

Unannounced Care Inspection Report 23 October Home Instead Senior Care (NI) Limited

Report of an inspection of a Designated Centre for Disabilities (Adults)

Health and Safety in the lab. Seyed Hosseini SA Pathology Chemical Pathology

UST Common Compliance Violations Report FY 2014

Licensing of Operators of Solid Waste Management Facilities and Illegal Dumps Control Officers

GCP INSPECTORATE GCP INSPECTIONS METRICS REPORT

Richland County Local Emergency Planning Committee (LEPC) By-Laws

Laboratory Safety Guidance for University Departments and Functions January 2010 Safety Services Office

Home Energy Saving scheme. Application Guide Version 1.1

Ordinance on Good Laboratory Practice (OGLP)

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

Traditional Medicine Practice Act, 2000 ACT 575 TRADITIONAL MEDICINE PRACTICE ACT, 2000 ARRANGEMENT OF SECTIONS

General Plan Land Use Amendment

P N R Associates Ltd

Entomology and Nematology

BELIZE DISASTER PREPAREDNESS AND RESPONSE ACT CHAPTER 145 REVISED EDITION 2003 SHOWING THE SUBSIDIARY LAWS AS AT 31ST OCTOBER, 2003

OFFICE OF GREEN INDUSTRIES SA / ZERO WASTE SA

RQIA Provider Guidance Day Care Settings

The staff, on considering the risks that may arise, must then put in place sensible health and safety measures to control them.

ADVANCED MANUFACTURING FUTURES PROGRAM REQUEST FOR PROPOSALS. Massachusetts Development Finance Agency.

Safety Best Practices Manual

Inspection Report. Radius Residential Care Limited. Radius Elloughton Gardens. Date of Inspection: 30 November 2016

H (CFACC5) Monitor health and safety procedures in a contact centre

Q:\COMP\ENVIR2\PPA90 POLLUTION PREVENTION ACT OF 1990

Commonwealth of Virginia Lead Abatement

SOLID WASTE DISPOSAL FACILITY PERMIT

ENDOSCOPY MICROBIOLOGY ALERTS PROCEDURE STANDARD OPERATING PROCEDURE

Department of Defense Water Safety on Military Bases

Whitehouse Primary School. Health & Safety Policy

Transcription:

Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not been reported, this should not be construed to mean that there is full compliance with that condition of the licence. Instructions and actions arising from the visit shall be addressed, or where applicable noted, by the licensee in order to ensure compliance, to improve the environmental performance of the installation and to provide clarification on certain issues. The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Licensee Name of Installation Licensee Safety Kleen Ireland Ltd Safety Kleen Ireland Limited Licence Register No. W0099-01 CRO 78822 Site Address Site Visit Reference No. Unit 5, Airton Road, Tallaght, Dublin 24, Dublin SV11140 Report Detail Issue Date 22/02/2017 Prepared By Rachel Griffith Site Visit Detail Date Of Inspection 24/01/2017 Announced No Time In 09:23 Time Out 15:10 Agency Personnel On Site Rachel Griffith Licensee Personnel and Role Ceri Davies, Branch Manager Gavin Scully, Facility Administrator Photo Taken No Samples Taken No Video Taken No Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 1 of 12

Scope Enforcement plan visit to assess compliance against the conditions of Licence Reg. No. W0099-01. Media The following environmental media were assessed: Waste Water Air. Site Areas Inspected The following site areas were inspected: Internal waste storage areas External yard area. Documents Inspected The following documents were inspected: 2.5.1 - Training records 3.12 Waste records and Waste Transfer Forms (WTF) 4.6.6 - Bund integrity test report 5.2 - Waste acceptance procedure 5.2.6 Technical assessment reports 8.2.1 - Closure plan 9.1/ Schedule F.2 - Groundwater monitoring reports 9.1/ Schedule F.3 - Air monitoring reports 10.1 - Emergency Response Procedure (ERP) 10.8 - Site specific risk assessments 11.2.1 - Environmental Liabilities Risk Assessment (ELRA) Site plan Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 2 of 12

1. Incidents and Complaints 1.1 If discharge/emission exceedances have occurred in the preceding 12 month period, was the EPA and any other appropriate authorised authority notified as per licence requirements? Not Applicable 3.1(a), 10.7.1 (vi) There have been no discharge/emission exceedances in the preceding 12 month period. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 3 of 12

2. Incident Prevention 2.1 Are emergency shut-off valves for discharges to sewer and surface water easily accessible and clearly labelled? No 7.5 Yes The penstock valve in the outdoor bunded area is not clearly labelled. The penstock valve should be clearly labelled so that it can be accessed immediately in the event of an emergency. 2.2 Have staff received adequate training in relation to fire prevention and response in the event of an incident? Yes 2.5, 2.10 Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 4 of 12

3. Infrastructure Integrity & Drainage 3.1 Has the integrity of bunds, tanks, pipelines and containment structures been demonstrated to the Agency and are these fit for purpose? No 4.6.6 Yes The integrity and water tightness of the two flammable waste storage containers has not been tested. This is in non-compliance with 4.6.6 of the Licence. The integrity and water tightness of these containers shall be tested and shall be reported to the Agency without delay. 3.2 Has a fire water risk assessment been undertaken for the site and all associated actions been implemented? No 1.3, 10.6 Yes Fire water retention barriers which were required to be installed within the waste storage building by the 30/06/2015 were not in place at the time of the site visit. This was previously raised in site visit report ref. SV02610. This is in non-compliance with 1.3 of the Licence. The licensee is required to install the fire water retention barriers detailed in licensee return ref. LR012311 by the 31/03/2017 and shall submit a site update through the EDEN portal by this date confirming that the installation has been completed. 3.3 Is the current drainage infrastructure serving the waste storage and handling areas adequate to collect & divert run-off? Yes 4.6, 4.7 3.4 Where abatement infrastructure is installed, is it adequately maintained and operated? Not Applicable 7.2 Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 5 of 12

There is no abatement infrastructure installed at the facility. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 6 of 12

4. Waste Acceptance Procedures / LoW Codes 4.1 Is documentation available to demonstrate that the waste characterisation undertaken is satisfactory? Yes 5.2.6 4.2 Is compositional analysis performed as part of the initial hazardous waste characterisation process? Yes 4.3 If wastes are accepted from a known customer, are spot checks performed intermittently to verify the baseline characterisation data? Yes Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 7 of 12

5. Waste Handling 5.1 Is appropriate infrastructure installed, operated and maintained to mitigate the risk of an incident occurring? Yes 7.2 5.2 Is there a documented waste acceptance procedure maintained at the facility? Yes 5.2 5.3 Are all containers, including waste and fuel tanks and drums, labelled to clearly indicate their contents? Yes 5.3 5.4 Where a waste acceptance procedure is in place, is it being complied with? Yes 5.2 5.5 Is all waste stored in designated areas, protected as may be appropriate against spillage and contaminated run-off? Yes 4.6 Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 8 of 12

6. Site Specific Issues 6.1 Waste records Checked 3.12 Yes Hazardous waste from a histology laboratory containing Diaminobenzidine (DAB) was incorrectly recorded on the licensee s internal database and the 2015 AER as List of Waste (LoW) code 18 01 09 (medicines). The licensee s technical assessment report for this waste type identifies LoW code 18 01 06* (chemicals consisting of or containing hazardous substances) as being the appropriate code. Records of waste arriving at the facility (Waste Transfer Forms) show that the LoW code recorded at collection was 18 01 06*. Records of waste departing the facility show that the LoW code assigned to the DAB waste was changed to 07 01 04* when it was dispatched to Veolia. The licensee shall ensure that the correct LoW code is applied to all waste streams. The LoW applied to a waste type accepted at the facility for storage prior to transfer should not change when the waste is dispatched from the facility. The licensee shall ensure that accurate written records of waste to include associated LoW codes are maintained at the facility at all times and are reported to the Agency as required. In addition, the licensee shall ensure that, in advance of transfer to another company, waste shall be classified in accordance with National and European standards. 6.2 Decommissioning Management Plan (DMP) Checked 8.2.1 Yes A site closure plan dated July 2010 was reviewed on site. The Decommissioning Management Plan (DMP) has not been submitted to the Agency for agreement in accordance with 8.2. This plan was required to be submitted by the 16/06/2016. This is in non-compliance with 8.2.1 of the Licence. The licensee shall prepare, to the satisfaction of the Agency, a fully detailed and costed plan for the decommissioning or closure of the site. The licensee shall have regard to the Agency guidance as detailed in 8.2.3 and shall include, as a minimum, the information detailed in 8.3 of the Licence. The DMP shall be submitted to the Agency without further delay as a Licensee Return on the EDEN portal. Document type Environmental Liabilities, Closure and Financial Provision and document subtype Closure, Restoration and Aftercare Management Plan (CRAMP), Residuals Management Plan (RMP) or Decommissioning Management Plan (DMP) should be selected. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 9 of 12

6.3 Environmental Liabilities Risk Assessment (ELRA) Checked 11.2.1 Yes The Environmental Liabilities Risk Assessment reviewed at the facility was dated 18/05/2009. The financial provision in place to cover the liabilities has expired. The licensee is required to review and update this risk assessment having regard for the Agency s Guidance on Assessing and Costing Environmental Liabilities (2014) and Guidance on Financial Provision for Environmental Liabilities (2015). The ELRA shall be submitted to the Agency without delay as a Licensee Return on the EDEN portal. Document type Environmental Liabilities, Closure and Financial Provision and document subtype Environmental Liabilities Risk Assessment (ELRA) should be selected. 6.4 Emergency Response Procedure (ERP) Checked 10.1, 10.1.1, 2.10 Yes The Emergency Response Procedure (ERP) reviewed on site was not to the satisfaction of the Agency. A site plan was not included There was no reference to the penstock valve and key The requirement to notify the Agency was not included A complete contact list was not included. In addition, staff had not been trained in the emergency response procedure. The licensee is required to review the Emergency Response Procedure having regard for the Agency Guidance to Licensees on the Preparation of Accident Prevention Procedures and Emergency Response Procedures (2016). The reviewed procedure shall be maintained on site and all relevant staff shall be trained in the procedure at appropriate intervals. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 10 of 12

s NC Type Date of Date of Notification NC007830 Failure to provide/install infrastructure 01/07/2015 24/01/2017 1.3 Fire water retention barriers which were required to be installed within the waste storage building by the 30/06/2015 were not in place at the time of the Agency site visit on the 24/01/2017. This was previously raised in site visit report ref. SV02610. NC Type Date of Date of Notification NC007831 Bunding & Materials handling 24/01/2017 24/01/2017 4.6.6 The integrity and water tightness of the two flammable waste storage containers at the facility has not been tested. NC Type Date of Date of Notification NC007832 ELRA/CRAMP/FP 17/12/2016 24/01/2017 8.2.1 A Decommissioning Management Plan (DMP) has not been submitted to the Agency for agreement in accordance with 8.2. This plan was required to be submitted by the 16/06/2016. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 11 of 12

Summary There were three non-compliances recorded during the site inspection relating to firewater retention, bund testing and the Decommissioning Management Plan (DMP). There were four observations recorded during the site inspection. The licensee shall implement each of the corrective actions required to address the issues raised. FOLLOW-UP ACTIONS You are required to complete the instructions and actions, as outlined in this report, within the specified timeframe. Where required, you shall respond to actions specified in Investigations within the required timeframe. The licensee shall maintain documentary evidence, for review by the EPA, that the prescribed corrective actions were completed within the required timeframe. You are not required to respond directly to items contained in this EPA site visit report; where an issue requires a direct response, the EPA will generate a Investigation through the EDEN system. You will receive notification when a Investigation instruction or action is generated. Please note that this Site Visit Report will be made available for public viewing via the EPA s Licence Enforcement Access Portal within one day of the issue date and will be published on the Licence Details Page of the EPA s website, www.epa.ie, that relates to your licence 60 calendar days after the issue date. You may if you choose submit, within 45 calendar days of the issue date of this Site Visit Report, a Licensee Public Response that will be published alongside the Site Visit Report. This Response, should you wish to avail of it, provides you with an opportunity to inform the public about how you are implementing the actions set out in the report, activities underway, timescales and target completion dates. Please be aware that the content of your Licensee Public Response must be factual and should not breach the EPAs stated online publication standards. If you wish to submit a Licensee Public Response to an EPA Site Visit Report, you should do this by clicking on the Make a Response link on the Site Visits page in EDEN. A.pdf document containing your response can be attached and submitted from here. Please note that you are required to comply with the conditions of your licence at all times, and where noncompliance occurs you must restore compliance within the shortest possible time. These actions will be verified during subsequent EPA visits. Please quote the above Inspection Reference in any future correspondence in relation to this Report. Site Visit Report - SV11140 - Safety Kleen Ireland Limited Page 12 of 12