Final Agenda Motor-Operated Valve Users' Group Annual Meeting January 5-7, 2009 Contemporary Resort & Conference Center Orlando, Florida, USA
Sunday, January 4, 2009 4:00-7:00 PM Early Registration West Registration 7:00-9:00 PM Steering Committee Meeting Boardroom (Committee Members Only) 7:00 AM 11:00 PM Exhibitor Display Set-Up Expo: Fantasia H/J Monday, January 5, 2009 7:00-8:30 AM Registration West Registration 7:00-8:30 AM Continental Breakfast Expo: Fantasia H/J MUG Committee Meetings 8:00-10:00 AM Technical Advisory Group (TAG) John Arnold, TAG Chairman Nutcracker 1/2 Dominion - Kewanee Power Station Woody Lawman, Director of Sales, Navy and Nuclear Products Flowserve Corporation - Limitorque Limitorque Agenda: (This session is closed to non utility members) Discussion of Mag rotor redesign efforts for the complete conversion to aluminum Mag Rotor Inspection Criteria HBC Splined Adapter modification for torque sensing SMB-00 Fatigue Analysis discussion Maintenance Update 07-02 Supplement #1 date May 2, 2008 Response to 2008 Limitorque OE's. Response to plant questions Request of site visits Review of Sizing class schedules Procedure /Contact information for Limitorque technical questions 10:00 10:15 AM Morning Break - Expo: Fantasia H/J 10:15 11:15 AM Technical Advisory Group (TAG) John Arnold, TAG Chairman Nutcracker 1/2 Dominion Kewanee Power Station TAG Agenda Items (This session is open to all attendees) Response to other (non-limitorque) OE s Response to questions 10:15-11:45 AM Open Discussion Forum William T Morris River Bend Nutcracker 3 12:00 1:00 PM Lunch Provided (Attendee or Exhibit Staff Badge Required) Expo: Fantasia H/J
MUG General Session # 1 Nutcracker 1/2/3 1:00-1:15 PM Opening Remarks and Roll Call William T Morris River Bend 1:15-2:00 PM New Appendix III of the ASME Code. Kevin G Dewall Idaho National Laboratory Chairman ASME OM Subgroup on MOVs. 2:00 2:45 PM Inspection of Motor Operated Valve Limitorque AC Motors with Magnesium Rotors Paul Waterloo Schulz Electric 2:45-3:15 PM Afternoon Break Expo: Fantasia H/J 3:15 3:45 PM Gate Valve Disc to Stem Separations / Hydrogen Embrittlement William T Morris, River Bend 3:45 4:30 PM TBD TBD 4:30 5:00 PM Root Cause Analysis of MOV Significant Thrust Loss. Ron Kropp APS 5:00-7:00 PM Welcome Reception Expo: Fantasia H/J 7:00-10:00 PM Hospitality Events Check Signs
Tuesday, January 6, 2009 7:00-8:00 AM Registration West Registration 7:00-8:00 AM Continental Breakfast Expo: Fantasia H/J MUG General Session # 2 Nutcracker 1/2/3 8:00 8:30 AM Motor Operated Valve Performance Testing and Condition Monitoring Using Data from the Motor Control Center 8:30 9:15 AM Status of Regulatory Activity on Motor Operated Valves. Pierre LeBel, R&D Officer, Chalk River Laboratories. Steve Tingen / Robert Latta NRC 9:15 9:45 AM BWROG VTRG Update Ted Neckowicz BWROG VTRG Chairman / Exelon Corporate 9:45 10:15 AM Morning Break Expo: Fantasia H/J 10:15 10:45 TBD TBD 10:45 11:30 Butterfly Valve Taper Pin OE and Corrective Action Discussion. Zhilin Dong Ameren Callaway 11:30 12:30 PM Lunch Provided (Attendee or Exhibit Staff Badge Required) Expo: Fantasia H/J MUG General Session # 3 Nutcracker 1/2/3 12:30 1:10 PM Computational and Experimental Investigation of the Flow-induced Forces on a Globe Valve Disc in a Single and Two Phase Water Flow. 1:10 1:30 PM Reducing Oil Weepage in SMB Actuators Zachary Leutwyler, Kalsi Engineering Ken Brown, ECO Fluid Center Ltd. (Utility Service Associates). 1:30 2:00 PM Tag Committee Report John Arnold Dominion - Kewanuee Power Station 2:00 2:30 PM Limitorque Update Woody Lawman, Director of Sales, Navy and Nuclear Products Flowserve Corporation - Limitorque, 2:30 3:00 PM EPRI Task Proficiency Evaluation (TPE) for Valve Maintenance and Diagnostics Don Cullers EPRI
3:00 3:30 PM Failure of Torque Seated Butterfly Valves due to packing gland follower corrosion. William T Morris River Bend 3:30-3:45 PM Afternoon Break Expo: Fantasia H/J 3:45 4:15 EPRI Update John Hosler - EPRI 4:15 4:45 PM New Business, Election of New Officers William T Morris River Bend 4:45 5:00 PM Closing Comments William T Morris River Bend 5:00-7:00 PM Vendor Displays/Socials Expo: Fantasia H/J 7:00-10:00 PM Hospitality Events Check signs
Wednesday, January 7, 2009 7:00-8:00 AM Continental Breakfast Expo: Fantasia H/J MUG General Session # 3 8:00 12:00 PM Crane Update Patrick Gilbert Nutcracker 1 8:00 12:00 PM Teledyne Update Mike Richard Nutcracker 3 10:00-10:15 AM Morning Break Expo: Fantasia H/J 12:00 PM MUG Adjourn