Progress in implementing the lessons learnt from the Fukushima accident

Similar documents
Office for Nuclear Regulation (ONR) Quarterly Site Report for Springfields Fuels Limited

Office for Nuclear Regulation (ONR) Site Report for Springfields Works

Office for Nuclear Regulation, 2015 If you wish to reuse this information visit for details.

THE IAEA FUKUSHIMA REPORT AND THE IMPLICATIONS FOR NUCLEAR SAFETY AND EMERGENCY PREPAREDNESS

Fundamental Principles

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES

Organized in cooperation with the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA)

Amended Nuclear Safety Directive compliance challenges

Post- Fukushima accident. Action plan. Follow-up of the peer review of the stress tests performed on European nuclear power plants

NOT PROTECTIVELY MARKED

Operating Facilities Programme. Assessment of the Periodic Review of Safety for the A** Facility at Aldermaston

Topical Peer Review 2017 Ageing Management of Nuclear Power Plants

Assessment of the readiness of the GDA Requesting Party (RP) and ONR to commence GDA

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

Licensing of Nuclear Installations

Regulatory framework and safety requirements for new (gen III) reactors

Topical Peer Reviews, ARTEMIS and other Approaches to Peer Review

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES CONDUCTED IN JAPAN

Consultation on developing our approach to regulating registered pharmacies

Reform of Japan s Nuclear Safety Regulation

IAEA SAFETY STANDARDS SERIES. GENERAL SAFETY REQUIREMENTS No. GSR Part 1 (Rev.1)

Convention on Nuclear Safety 7 th Review Meeting 2017

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

Overview of the Regulatory Framework for the Safety of Nuclear Power Plants in Romania

The Atomic Weapons Establishment: Present work and possibilities for the future

Regulatory challenges in nuclear safety

ONR GUIDE LC22: MODIFICATION OR EXPERIMENT ON EXISTING PLANT. Nuclear Safety Technical Inspection Guide. NS-INSP-GD-022 Revision 3 TABLE OF CONTENTS

Life Extension of Nuclear Power Plants

EU Stress Tests and National Action Plans

Good decision making: Investigations and threshold criteria guidance

The state of security in the civil nuclear industry and the effectiveness of security regulation April 2009 to March 2011

The IAEA OSART Review. Attachment 1 Tokyo Electric Power Company

Licensing of a Nuclear Installation. November 11th 2010 Licensing of a Nuclear Installation 1

Convention on Nuclear Safety

55 th IAEA General Conference IAEA Nuclear Safety and Security Programme Monday 19 September Friday 23 September 2011

Restoration to the register: Guidance for applicants and committees

INTEGRATED REGULATORY REVIEW SERVICE (IRRS)

IAEA Safety Standards for Regulatory Bodies Overview and Recent Development

Preparedness and Response for a Nuclear or Radiological Emergency

Measures to strengthen international cooperation in nuclear, radiation, transport and waste safety

Nuclear and Radiological Emergency Guidelines. Preparedness, Response and Recovery. Saving lives, changing minds.

The text of this document (but not the logo and branding) may be reproduced free of charge in any format or medium, as long as it is reproduced

GPhC response to the Rebalancing Medicines Legislation and Pharmacy Regulation: draft Orders under section 60 of the Health Act 1999 consultation

Priorities and work programme

Health and Safety in a Construction Environment Qualification Specification

SRP-2.01-SP-11NNNN-026

Making the PMO the beating heart of the NHS Change Agenda:

République du SENEGAL. Un Peuple -Un But -Une Foi CONVENTION ON NUCLEAR SAFETY. Seventh Review Meeting. Vienna-Austria

The Characteristics of an Effective Nuclear Regulator

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

Establishing an effective nuclear safety regulatory regime Part 1 - Objectives and requirements.

BT Identity Management Quick Start Service

INTEGRATED REGULATORY REVIEW SERVICE (IRRS)

Nuclear Fuel Cycle Technologies: Current Challenges and Future Plans Andrew Griffith U.S. Department of Energy, Washington, DC USA

CANADIAN NUCLEAR SAFETY COMMISSION S RISK BASED APPROACH TO REGULATING FUEL FACILITIES IN CANADA

Independent Healthcare Regulation. Inspection Methodology

Regulatory Incident Management Policy

Evaluation of the Links Worker Programme in Deep End general practices in Glasgow

Children Education & Families Health and Safety Arrangements Part 3

INTEGRATED REGULATORY REVIEW SERVICE (IRRS) MISSION TO JAPAN

Complaints, Compliments and Concerns (CCC) Policy

1. LEGISLATIVE AND REGULATORY FRAMEWORK LEARNING OBJECTIVES FOR SECTION 1. Legislative and Regulatory Framework

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

A concern means any complaint, claim or reported patient safety incident.

Office for Students Challenge Competition Industrial strategy and skills support for local students and graduates

Physical Protection of Nuclear Installations After 11 September 2001

Nuclear Regulatory Compliance: Enhancing Safety and Security Through a Clear Regulatory Framework

3.3 Facilitate sharing and understanding of: Key nuclear environment, radiological, industrial, safety, health, security, safeguards

This is a repository copy of The UK Naval Nuclear Propulsion Programme and Highly Enriched Uranium.

Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers

Technical Meeting on the International Project on Decommissioning of Small Facilities

Final Report. (Main Text)

Nuclear Law and Malaysian Legal Framework on Nuclear Security AISHAH BIDIN FACULTY OF LAW UKM

Annual Complaints Report 2014/15

NUCLEAR EMERGENCY MANAGEMENT IN CANADA AND THE UNITED STATES

Inspector Training and Qualifications Program

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

Rules and Regulations

Regulatory Cooperation Forum

The Defence Nuclear Enterprise: a landscape review

Endoscopy Global Rating Scale Census Report: April 2014

Guilty or Not Guilty - What s your verdict? 15th September 2016

CLINICAL AND CARE GOVERNANCE STRATEGY

NERC Impact Awards 2018

FRIEDMAN FAMILY VISITING PROFESIONALS PROGRAM

The 18-week wait programme

CNL-CNSC Administrative Protocol for the Renewal of the Whiteshell Laboratories Licence and the Proposed In Situ Decommissioning of the WR-1 Reactor

Interim Consultation Report

REPORT TO MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY

Measures to Strengthen International Cooperation in Nuclear, Radiation, Transport and Waste Safety

Canada. Record of Decision. In the Matter of. University of Alberta. Applicant

Eligibility Criteria for NIHR Clinical Research Network Support

High level guidance to support a shared view of quality in general practice

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July

Level 3 NVQ Diploma in Custodial Care ( )

HEALTH & SAFETY POLICY. 1. Policy Schedule. Date of last review: October Date of next review: September 2018.

The Code of Conduct on the Safety of Research Reactors

Appendix D: Restoration Budget Overview

Measures to Strengthen International Co-operation in Nuclear, Radiation and Transport Safety and Waste Management

Transcription:

Progress in implementing the lessons learnt from the Fukushima accident Office for Nuclear Regulation page 1 of 10

Summary In October 2012 the Office for Nuclear Regulation (ONR) published a comprehensive report (Ref. 1) on the progress of all stakeholders in implementing the recommendations made by the Chief Nuclear Inspector in his final report following the Fukushima accident (Ref. 2) and the outcomes from the European Stress Tests (Refs 3 and 4). Progress updates were published in October 2013, and October 2014. This final report in the series summarises the progress made since. The general recommendations in the Chief Nuclear Inspector s Final Report (Ref. 2) were principally aimed at the UK s response to civil nuclear emergencies, support for global safety standards and review and update of ONR s Safety Assessment Principles. There has been good progress in all of these areas and whilst we recognise that further work in these areas will continue, we consider it to be an integral part of normal business and that the open recommendations from 2014 can be closed. For the recommendations and stress test outcomes relevant to the nuclear licensees, there has also been good progress with more than 80% now closed. Overall, ONR is content that the most significant of the Chief Nuclear Inspector s recommendations and stress test outcomes directed towards licensees have been satisfactorily addressed. ONR will continue to regulate progress on the remaining open matters and on any related work programmes that have resulted from consideration of recommendations and stress test outcomes, as part of normal regulatory business. Office for Nuclear Regulation page 2 of 10

Progress Report The following sections provide more evidence of the progress made by ONR, Government, licensees and other stakeholders involved in addressing the Chief Nuclear Inspector s recommendations and European stress test outcomes. A quantitative indication of the current status is also included. General recommendations The general recommendations in the Chief Nuclear Inspector s Final Report (Ref. 2) were principally aimed at the UK s response to civil nuclear emergencies, looking at international (IR1) 1 and national issues (IR2, IR3, IR 7, FR6 and FR7). Also included in this section were: support for global safety standards (FR9); the adequacy of planning controls for developments near nuclear licensed sites (FR5); review and update of ONR s safety assessment principles (IR5) and openness and transparency (IR4 and FR8). These recommendations fell largely to the Government and ONR itself. Recommendations IR1, IR4, IR6, FR9 and FR12 were closed by October 2012. Recommendations FR5 and IR2 were closed in 2013 and in2014, we reported that FR8 (creation of ONR) and FR10 (expanded nuclear safety research oversight) had been closed. Since then, the publication of ONR s revised SAPs in late 2014 has fulfilled recommendation IR5. The remaining recommendations (IR3, IR7, FR6 and FR7) are all concerned with emergency response and significant progress has been made with tangible improvements already in place. These improvements include better access to detailed plant information to support ONR s emergency response and strengthening of ONR s emergency planning and response function. At a national level, there is better understanding of the techniques for estimation of accident source terms and the ability to provide information on the nature and magnitude of any releases has been reinforced. Overall ONR considers that the recommendations (IR3, IR7, FR6 and FR7) can be closed and additional work in this area will continue as part of normal business. All of the general recommendations are now closed. 1 Interim Recommendation (IR); Final Recommendation (FR). Office for Nuclear Regulation page 3 of 10

Site licensee-facing recommendations and stress test outcomes In the implementation report (Ref. 1) ONR described how it intended to regulate the work of licensees in implementing further measures by embedding the work within the operational regulatory programmes. This has been achieved and ONR s operational programmes have ownership of the work in their areas of responsibility. Nuclear power plants EDF Nuclear Generation Ltd EDF Nuclear Generation Ltd (NGL) submitted its summary report at the end of March 2014 to justify the close out of the Chief Nuclear Inspector s recommendations and stress test outcomes. ONR has now assessed all of the claims made by EDF and considers that EDF s responses to the recommendations and stress test findings demonstrate appropriate progress and commitment to implementing lessons from the Fukushima accident. ONR notes that whilst EDF responded to and closed out each individual recommendation from a bottom-up point of view it has also built an enhanced holistic response capability based on a top-down approach comprising people, procedures, training and equipment to restore key nuclear safety functions regardless of the initiating event. EDF has provided sufficient evidence for closure of all the recommendations and stress test findings. Nevertheless, ONR has raised a number of issues to ensure that any further work that has come to light during the course of this review is adequately captured and addressed. The completion of the work to address these issues will be monitored via normal regulatory interactions and oversight of the committed work plan that EDF is producing. NNB Generation Company Ltd NNB Generation Company Ltd (NNB Genco) has made progress with incorporation of Fukushima-related resilience enhancements into Hinkley Point C and ONR is satisfied that the scope and focus of the work, which includes resolution of the Generic Design Assessment (GDA) findings, is adequate. An area of ongoing discussions with NNB Genco is provision of additional systems to reduce the risk of containment overpressure during prolonged total loss of power supply. ENSREG National Action Plan ONR provided an update to the European Nuclear Safety Regulators Group (ENSREG) on the implementation of the UK s response to Office for Nuclear Regulation page 4 of 10

events at Fukushima in December 2014 (Ref.6). A further update of the national action plan is to be produced, on a timescale to be agreed with ENSREG, based on the information summarised here. It is expected that this will enable close out of the remainder of ONR s post-fukushima reporting for nuclear power plants. Non-power generating nuclear facilities Sellafield Sellafield Ltd acknowledged that it had made slower than expected progress in relation to addressing all of the recommendations and considerations raised following the events at Fukushima, due to the complexity of the potential for interactions between facilities. However, remedial work has accelerated over recent months. ONR s assessment of this recent work identified that Sellafield Ltd had completed a significant amount of work since January 2015, such that a number of recommendations could be closed in the near future. The enhanced resilience work has also been substantial in relation to strengthening a number of facilities on site against the effects of loss of off-site power as well as improvements in the equipment available to respond to a beyond design basis event. Additional enhancements in response capability have been realised since January 2015, demonstrating Sellafield Ltd s ability and commitment to address the most significant recommendations in a more timely manner. Sellafield Ltd has also written to ONR providing a number of commitments to address the areas of greatest impact on hazard and risk reduction over the remainder of the year, which will enable further recommendations to be closed and considered under normal regulatory business by ONR. Decommissioning, Fuel and Waste (DFW) We reported in 2014 that ONR was satisfied that Magnox Ltd had met the intent of the Chief Nuclear Inspector s recommendations and stress test outcomes at its reactor sites and, subject to the continuation of work described under normal business, it needed to do no additional work in response to the events at Fukushima. The remaining sites regulated by the Decommissioning, Fuel and Waste programme in ONR were referred to as restoration and commercial sites in the implementation report (Ref. 1). The vast majority (more than 90%) of the recommendations and stress test outcomes for these sites have now been closed out satisfactorily. There are some remaining actions associated with Urenco UK and the Magnox Ltd site at Harwell (a former Research Site Restoration Ltd site), but ONR is satisfied that the ongoing work to close these actions will be completed. Office for Nuclear Regulation page 5 of 10

Defence In the defence sector, all licensees have continued to make progress with closure of findings and recommendations relating to lessons from Fukushima. At the Atomic Weapons Establishment (Aldermaston and Burghfield) only two of the actions put in place to address the stress test outcomes and recommendations remain open. At Rolls-Royce Marine Power Operations Ltd (Derby) (RRMPOL) the licensee has a programme of work related to Fukushima recommendations. Much of this work is tied into the upcoming update of site safety cases (including the Periodic Review of Safety). ONR expects that by the middle of 2016 RRMPOL will be in a position to close out the remaining recommendations in a proportionate and timely manner, with much of the work completed during 2015. In 2014 we reported that BAE Systems Marine Ltd (Barrow-in-Furness) considered that all recommendations and stress test actions had been completed. Since that time ONR has satisfied itself that all but one of the recommendations can be considered closed and that the open issue is being addressed within the on-going Periodic Review of Safety process. Devonport Royal Dockyard (Plymouth) (DRDL), has continued to progress work on closing out the Fukushima recommendations, many of which have been incorporated into the site Periodic Review of Safety forward action plan with appropriate prioritisation. ONR expects that by mid-2016, DRDL will be in a position to close out the majority of the remaining recommendations with much of the work completed during 2015 and early 2016. At Rosyth Royal Dockyard all of the recommendations and stress test outcomes have been closed out. Quantitative Indicators There were a significant number of recommendations and stress test findings placed on the nuclear industry, as well as the industry s own considerations developed during the stress tests. Although the implementation report (Ref. 1) contained the outcomes of ONR s extensive assessment of these for all licensees, they were, and remain, too numerous to feature individually. Instead, we summarised the overall position and presented it in a simple pie charts, one that would provide visibility of the overall progress being made in closing out the recommendations and stress test outcomes (findings and considerations). ONR s assessment of the licensees current positions has been grouped into the same broad categories as in our earlier reports and are shown in figures 1 and 2 on page 7. Office for Nuclear Regulation page 6 of 10

Figure 1 Is the recommendation or stress test outcome considered closed? The licensee considers it closed and on the basis of the evidence ONR judges this to be reasonable. The licensee considers it closed but ONR needs further information to form a view. The licensee considers it to be still open. Compared with 2014, there has been a significant increase (from 65% to 82%) in the items that have been satisfactorily closed. Figure 2 Is there a reasonable match with ONR s expectations? The licensee s work/proposals/ plans are in accord with ONR expectations. The licensee s work/proposals/ plans are broadly in line with ONR expectations but we are discussing potential improvements to the work/ proposals/plans. The licensee s work/proposals/ plans need further development or provision of evidence/ information before ONR can be content that they adequately address expectation. The number of instances where there is a full accord between ONR expectations and the licensees work has increased from 75% to 84% and the percentage where further development of evidence is needed has fallen to 9%. Office for Nuclear Regulation page 7 of 10

International Atomic Energy Agency In 2014 we reported that the International Atomic Energy Agency (IAEA) s independent review had endorsed ONR s response to the Fukushima accident. Recently IAEA published a comprehensive report on Fukushima (Ref. 5). ONR will review the IAEA report to see if we can identify any further measures that we or the nuclear licensees need to consider. Conclusions The summary information provided here gives an overview of the progress made by ONR, Government, licensees and other stakeholders in addressing the recommendations and stress test outcomes since the publication of the implementation report in October 2012. Overall, ONR s opinion is that the most significant of the Chief Nuclear Inspector s recommendations and stress test outcomes for licensees have been satisfactorily addressed. ONR will continue to regulate progress on the remaining open matters and on any related work programmes that have resulted from consideration of recommendations and stress test outcomes as part of normal regulatory business. Office for Nuclear Regulation page 8 of 10

References 1 ONR Report: Japanese Earthquake and Tsunami: Implementing the lessons for the UK s nuclear industry, October 2012 www.hse.gov.uk/nuclear/fukushima/implementation-report-oct-2012.pdf 2 ONR Report: Japanese Earthquake and Tsunami: Implications for the UK nuclear industry. HM Chief Inspector of Nuclear Installations Final Report, September 2011 www.hse.gov.uk/nuclear/fukushima/final-report.pdf 3 ONR Report: European Council Stress Tests for UK Nuclear Power Plants, National Final Report, December 2011 www.hse.gov.uk/nuclear/fukushima/stress-tests-301211.pdf 4 ONR Report: Stress Tests for UK Non-Power Generating Nuclear Facilities, Final Report, May 2012 www.hse.gov.uk/nuclear/fukushima/ngpf-report.pdf 5 IAEA - The Fukushima Daiichi Accident www-pub.iaea.org/mtcd/publications/pdf/pub1710- ReportByTheDG-Web.pdf 6 ONR progress report UK ONR ENSREG Related National Action Plan December 2014 www.onr.org.uk/fukushima/ensreg-report-2014.pdf Office for Nuclear Regulation page 9 of 10

Office for Nuclear Regulation 2016 The text of this document may be reproduced free of charge in any format or medium, providing that it is reproduced accurately and not in a misleading context under the terms of the Open Government Licence v2.0. ONR logos cannot be reproduced without the prior written permission of the Office for Nuclear Regulation. Some images and illustrations may not be owned by ONR and cannot be reproduced without permission of the copyright owner. Any enquiries regarding this publication should be addressed to: ONR communications team Office for Nuclear Regulation Redgrave Court Merton Road Bootle Merseyside L20 7HS Email: onr@onr.gsi.gov.uk Published February 2016 Further information about ONR is available at www.onr.org.uk Office for Nuclear Regulation page 10 of 10