TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

Similar documents
Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

DRAFT REGULATORY GUIDE

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

Emergency Preparedness Final Rule Implementation

NATIONAL NUCLEAR REGULATOR

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

NRC INSPECTION MANUAL STSB

Life Extension of Nuclear Power Plants

IAEA Safety Standards for Regulatory Bodies Overview and Recent Development

Record of Proceedings, Including Reasons for Decision

Research and Test Reactor Licensing Actions and Lessons Learned

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

NRC REGULATORY ISSUE SUMMARY RADIATION SAFETY OFFICERS FOR MEDICAL-USE LICENSES UNDER 10 CFR PART 35

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

Technical Basis for the Emergency Preparedness Rulemaking

Office for Nuclear Regulation, 2015 If you wish to reuse this information visit for details.

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

NRC Update on Regulatory Activities Affecting Industrial Radiography

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012

Overview of the Regulatory Framework for the Safety of Nuclear Power Plants in Romania

Dry Cask Storage License Renewal Implementation

NRC Public Meeting October 27, 2014

NRC INSPECTION MANUAL IRIB

NUCLEAR REGULATORY COMMISSION [NRC ] Dry Storage and Transportation of High Burnup Spent Nuclear Fuel

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF REACTOR REGULATION WASHINGTON, DC September 26, 2005

Nuclear Operating Company

Current Situation of TEPCO s Nuclear Power Plants. February 7,2003 Tokyo Electric Power Company Katsutoshi Chikudate Managing Director

Radiation Protection Program Updates

Standard NUC Nuclear Plant Interface Coordination

Human Performance Management Fitness for Duty: Managing Worker Fatigue

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

OVERVIEW OF THE NRC'S CONSOLIDATED NMSS DECOMMISSIONING GUIDANCE

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

Licensing of Nuclear Installations

February 13, 2013 EA

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM

Regulations on the Safety of Nuclear Power Plants Operation (PAK/913)

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

As amended upto 31 1st December 2015

Nuclear Safety Council (State Official Gazette No. 268 of 8 th November 2007) October 2007, on the CSN Resident

Certification of Persons Working at Nuclear Power Plants

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

X STANDARD REVIEW PLAN

NRC REGULATORY ISSUE SUMMARY REQUIREMENTS FOR EXEMPT DISTRIBUTION LICENSEE ANNUAL TRANSFER REPORTS

Functions important to nuclear power plant safety, and training and qualification of personnel

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES

i6 Ct AR (p. 16): HEMORANDUMI FOR: Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers Commissioner Curtiss FROM:

NUCLEAR SAFETY PROGRAM

STRENGTHENING REGULATORY REQUERMENTS FOR PHYSICAL PROTECTION IN INDONESIA BASED ON INFCIRC 225 REV.5. Presented by : Suharyanta BAPETEN

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

Office for Nuclear Regulation (ONR) Site Report for Springfields Works

ARLINGTON COUNTY, VIRGINIA OFFICE OF THE SHERIFF COURTHOUSE 1425 N. COURTHOUSE ROAD, ROOM 9100 ARLINGTON, VIRGINIA (703)

Regulatory framework and safety requirements for new (gen III) reactors

REVIEW PROCESS AND LICENSING FOR RESEARCH REACTOR DECOMMISSIONING ACTIVITIES IN ROMANIA

Request for Proposals (RFP) to Provide Auditing Services

DOE B, SAFEGUARDS AGREEMENT WITH THE INTERNATIONAL ATOMIC SYMBOL, AND OTHER CHANGES HAVE BEEN BY THE REVISIONS,

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

NAMD ACA IMPLEMENTATION SNAPSHOT OPEN ENROLLMENT, WEEK 7

Convention on Nuclear Safety

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

Redirection of DPRK Nuclear Talent to the LWR Project. Authors: John B. Mulligan, HanKwon Choi. 1

November 18, Dear Ms. Vietti Cook:

Decision-Making in an Uncertain World: Regulatory Challenges. nuclearsafety.gc.ca

NRC REGULATORY ISSUE SUMMARY CONTROL OF RADIATION DOSE TO VISITORS OF HOSPITAL PATIENTS

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

SENATE, No STATE OF NEW JERSEY. 216th LEGISLATURE INTRODUCED APRIL 28, 2014

RE: HLT P: Medicaid Reimbursement of Nursing Facility Reserved Bed Days for Hospitalizations

NUCLEAR EMERGENCY MANAGEMENT IN CANADA AND THE UNITED STATES

Subj: CHANGE OR EXCHANGE OF COMMAND OF NUCLEAR POWERED SHIPS. Encl: (1) Engineering Department Change of Command Inspection List

license AUTHORITY FILE CC Apv il., 1982

EXHIBIT A for RFP. Navajo Nation Environmental Protection Agency Air Quality Control/Operating Permit Program. Scope of Work

Emergency Preparedness Near Nuclear Power Plants

Fukushima Dai-ichi March 11, 2011 and Beyond

MEDICINES CONTROL COUNCIL

4.2. Clinical Trial Monitor (or Monitor): The person responsible for monitoring the data on behalf of the sponsor or contract research organization.

abcdefghijlm Health Department Human Resources Directorate Dear Colleague 13 April 2000

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Distribution Restriction Statement Approved for public release; distribution is unlimited.

DRAFT REGULATORY GUIDE

The Code of Conduct on the Safety of Research Reactors

Preparation of Environmental Reports for Nuclear Power Stations

ASSISTED LIVING FACILITIES STATUE RULE CRITERIA

ASSEMBLY BILL No. 214

IAEA SAFETY STANDARDS SERIES. GENERAL SAFETY REQUIREMENTS No. GSR Part 1 (Rev.1)

May 23, Docket No License No. DPR-12

Oklahoma State University Policy and Procedures INSTITUTIONAL RADIATION SAFETY POLICY

TEXAS LOTTERY COMMISSION INTERNAL AUDIT DIVISION. An Internal Audit of CHARITABLE BINGO LICENSING

The Characteristics of an Effective Nuclear Regulator

Transcription:

Appendix u June 15, 1982 Letter to All Licensees of Operating Plants, Applicants for an Operating License, and Holders of Construction Permits from Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Nuclear Regulatory Commission

UNITED STATES NUCLEAR REGULATORY COMMISSION W ASHINGTON D. C. 20555 June 15, 1982 TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS Gentlemen SUBJECT: NUCLEAR POWER PLANT STAFF WORKING HOURS (Generic Letter No.82-12) On February 8, 1982, we forwarded to you a copy of a policy statement issued by the Commission entitled "Policy on Factors Causing Fatigue of Operating Personnel at Nuclear Reactors." That policy statement has now been slightly revised and the revised version is attached to this letter. The forwarding letter (Generic Letter 82-02) stated that actions were underway to incorporate the Commission policy on working hours into Regulatory Guide 1.33 and into NUREG-0737 (Item I.A.1.3). Publication of Regulatory Guide 1.33 is now anticipated in June 1982, following release of ANS 3.2. Revised pages ofnureg-o737 that incorporate the Commission policy on working hours are enclosed. Our letter of February 8, 1982 requested that you take action as necessary to revise the administrative section of your technical specifications to assure that your plant administrative procedures follow the revised working hour guidelines, including a provision for documentation of authorized deviations which should be available for NRC review. You should review your past actions to assure that they are consistent with the attached revised policy statement. Note that the revised guidelines are to be incorporated by October 1, 1982. Sincerely, Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Attachment: Revision to Item I.A. ofnureg-o737,3

8206160341 I.A.l.3 SHIFT MANNING Pages I.A.l.3-l through I.A.l.3-3 are replaced in their entirety by the following. A bar in the margin indicates changes from the material originally included on these pages. Position This position defines shift manning requirements for normal operation. The letter of July 31, 1980 from D. G. Eisenhut to all power reactor licensees and applicants ( copy attached) sets forth the interim criteria for shift staffing (to be effective pending general criteria that will be the subject of future rulemaking). Overtime restrictions were also included in the July 31,1980 letter. Changes to Previous Requirements and Guidance Errors were discovered in the last colunm of the table attached to the letter of July 31,1980. A corrected table is enclosed; a bar in the margin indicates the correction. (See p. I.A.1.3-4. ) The overtime requirements have been rewritten to incorporate the provisions of a Commission policy statement on working hours and operator fatigue. Clarification Licensees of operating plants and applicants for operating licenses shall include in their administrative procedures (required by license conditions) provisions governing required shift staffing and movement of key individuals about the plant. These provisions are required to assure that qualified plant personnel to man the operational shifts are readily available in the event of an abnormal or emergency situation. -2- These administrative procedures shall also set forth a policy, the objective of which is to prevent situations where fatigue could reduce the ability of operating personnel to keep the reactor in a safe condition. The controls established should assure that, to the extent practicable, personnel are not assigned to shift duties while in a fatigued condition that could significantly reduce their mental alertness or their decision making ability.the controls shall apply to the plant staff who perform safety-related functions ( e.g., senior reactor operators, reactor operators, auxiliary operators, health physicists, and key maintenance personnel). le Circular No.80-02, "Nuclear Power Plant Staff Work Hours", dated February 1, 1980 (copy attached) discusses the concern of overtime work for

members of the plant staff who perform safety-related functions. The guidance contained in le Circular No.80-02 was amended by the July 31, 1980 letter. In turn, the overtime guidance of the July 31, 1980 letter was revised in Section I.A.1.3 ofnureg-0737. The NRC has issued a policy statement (attached) which further revises the overtime guidance as stated in NUREG-073 7. This guidance is as follows : Enough plant operating personnel should be employed to maintain adequate shift coverage without routine heavy use of overtime. The objective is to have operating personnel work a normal 8-hour day, 40-hour week while the plant is operating. However, in the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed: -3 a, An individual should not be pennitted to work more than 16 hours straight (excluding shift turnover time). b. An individual should not be permitted to work more than 16 hours in any 24-hour period, nor more than 24 hours in any 48-hour period, nor more than 72 hours in any seven day period (all excluding shift turnover time). c. A break of at least eight hours should be allowed between work periods (including shift turnover time). d. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on shift. Recognizing that very unusual circumstances may arise requiring deviation from the above guidelines, such deviation shall be authorized by the plant manager or his deputy, or higher levels of management. The paramount consideration in such authorization shall be that significant reductions in the effectiveness of operating personnel would be highly unlikely. Authorized deviations to the working hour guidelines shall be documented and available for NRC review. In addition, procedures are encouraged that would allow licensed operators at the controls to be periodically relieved and assigned to other duties away from the control board during their tours of duty. Operating license applicants shall complete these administrative procedures before fuel loading. Development and implementation of the administrative procedures at operating plants will be reviewed by the Office of Inspection and Enforcement beginning Oct. 1,1982.

See Section m.a.l.2 emergencies. for minimum staffing and augment capabilities for Applicability This requirement applies to all licensees of operating reactors and applicants for operating licenses. Implementation ( 1) Overtime administrative procedures shall be established for operating reactors by Oct. 1, 1982 and by fuel loading for applicants for operating license. (2) Staffing requirements shall be completed by July 1, 1982 for operating reactors and by fuel load for operating license applicants. Type of Review A post-implementation review will be performed on operating reactors. Applicants for operating licenses will be reviewed prior to implementation. Documentation Required The documentation required is as noted in the letter of July 31, 1980, Technical Specification Changes Required Changes to Technical Specifications will be required for overtime administrative procedure and staffing requirements. -4- -5- References NUREG-O660 le Circular No.80-02, "Nuclear Power Plant Staff Work Hours," February I, 1980 Letter from D. G. Eisenhut, NRC, to All Power Reactor Licensees, July 31,1980 Policy on Factors Causing Fatigue of Operating Personnel at Nuclear Reactors, POLICY ON FACTORS CAUSING FATIGUE OF OPERATING PERSONNEL AT NUCLEAR REACTORS Licensees of operating plants and applicants for operating licenses shall establish controls to prevent situations where fatigue could reduce the

ability of operating personnel to keep the reactor in a safe condition. The controls should focus on shift staffing and the use of overtime--key job-related factors that influence fatigue. The objective of the controls would be to assure that, to the extent practicable, personnel are not assigned to shift duties while in a fatigued condition that could significantly reduce their mental alertness or their decision making capability.the controls shall apply to the plant staff who perform safety-related functions (e.g., senior reactor operators, reactor operators, health physicists, auxiliary operators, and key maintenance personnel). Enough plant operating personnel should be employed to maintain adequate shift coverage without routine heavy use of overtime. The objective is to have operating personnel work a normal 8-hour day, 40-hour week while the plant is operating. However, in the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed: a. An individual should not be permitted to work more than 16 hours straight (excluding shift turnover time). b An individual should not be pennitted to work more than 16 hours in any 24-hour period, nor more than 24 hours in any 48-hour period, nor more than 72 hours in any seven day period (all excluding shift turnover time). A break of at least eight hours should be allowed between work periods (including shift turnover time). d, Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift. Recognizing that very unusual circumstances may arise requiring deviation from the above guidelines, such deviation shall be authorized by the plant manager or his deputy, or higher levels of management. The paramount consideration in.such authorization shall be that significant reductions in the effectiveness of operating personnel would be highly unlikely. In addition, procedures are encouraged that would allow licensed operators controls to be periodically relieved and assigned to other duties away from control board during their tour of duty.