Memorandum. Groups EEAC. 8 March Worked with. Worked with. savings and. summarized councilors.

Similar documents
EVALUATION AND STATUS REPORT

5.6 Home Energy Savings Program

WarmWise Business Custom Rebates Program Manual

Three-Year Energy Efficiency Plan

Recommendations and Best Practices for Revising Incentive Structure May 2014

07/01/2010 ACTUAL START

Affordable Access to Clean and Efficient Energy Initiative (AACEE): Update

Finding Funding for Energy Efficiency

Economically Disadvantaged Advisory Council. Ameren Illinois Programs for Income Qualified Customers May 23, 2017

The LGEA Program will provide incentives up to $100,000 per fiscal year, per local government agency to subsidize the cost of the energy audit.

About 44% of the energy was consumed in the residential sector, 30% in the commercial sector, and 26% in the industrial sector.

Energy Optimization Plan

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION

Three-Year Electric & Gas Energy Efficiency Plans Planning Workshops

5.7 Low-Income Initiatives

2016 Energy Efficiency Program Annual Report

Partner(s): City of Asheville, Duke Energy Progress, Green Built Alliance, Community Action Opportunities, NC Sustainable Energy Association (NCSEA)

Xcel Energy Colorado DSM Roundtable Discussion. February 13, :00pm to 4:00pm 1800 Larimer, Room 03G01

9/20/2016 Model Business Plan Outline

New York s system BeNefits Charge Programs evaluation and status report

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL

INNOVATIVE OPPORTUNITIES FOR FINANCING ENERGY EFFICIENCY UPGRADES

2017 HeatSmart Massachusetts Pilot Table of Contents

Joint Marketing Strategy

Innovative Utility Energy Approaches: Quick Lighting Upgrade Initiative.

Energy Efficiency Program for Business

California Self-Generation Incentive Program Evaluation

Next Century Power: Energy Efficiency for LA

EMERGING TECHNOLOGIES CALL FOR IDEAS

Energy Efficiency and Economic Recovery Initiative

Weatherize Upper Valley

1 Customer and Contact Information

Statewide Codes & Standards Program 1

July 1, 2006 Revision 2

The Evolution of a Successful Efficiency Program: Energy Savings Bid

ENERGY STAR OVERVIEW OF 2005 ACHIEVEMENTS

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 30, 2012

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 31, 2013

Removing Disincentives: Efforts to Promote Electric Utility Efficiency

VFD and Pump Incentive Application for Business Customers

Tucson Electric Power. Stakeholder Meeting

INTRODUCTION. Organization Description

Russell Koty, Brian Bowen, William Stack, Harrison Grubbs, Craig Foley

Commonwealth of Massachusetts

San Francisco Energy Efficiency Program Descriptions and Annual Budgets

PROMOTIONAL PRACTICES SCHEDULE PRO

The Energy Smart New Orleans Plan at the request of the New Orleans City Council and presented by Entergy New Orleans, Inc.

DESIGNING AND IMPLEMENTING INTEGRATED ENERGY ASSISTANCE PROGRAMS ENERGY OUTREACH COLORADO

Pedernales Electric Cooperative. Residential HVAC Rebate Program Manual

NASEO 2017 Northeast Meeting U.S. Department of Energy State Energy Program. Greg Davoren State Energy Program

Sustainable Jersey Smal Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:

SDG&E LGP Partnership Meeting: Bridge/Transition Period Discussion

NCSHA 2012 Awards. Category: Special Achievement Entry Name: Expanding the Role of Energy Efficiency in Housing Programs

help winter? you need this

FREQUENTLY ASKED QUESTIONS

Elsia O. Galawish. 65 Ross Avenue, B San Anselmo, CA

Innovative Commercialization Efforts Underway at the National Renewable Energy Laboratory

DRAFT. PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Item 18 (Rev.1) Agenda ID ENERGY DIVISION RESOLUTION G-3522 November 10, 2016

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM

LEAN Operations Review

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RESIDENTIAL BASELINE STUDY RFP EM Date Issued: January 6, 2015

Successful Ramp up in Challenging Times

American Association of Port Authorities Environmental Improvement Awards

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

ENERGY UPGRADE CALIFORNIA

Finding Common Ground

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

What are the steps? Incentives for energy efficient buildings

ORNL Updates: Audits and Radon Study

Non-Pipeline Solutions Pre-RFP Webinar. January 24, 2018

RFP No. FY2017-ACES-02: Advancing Commonwealth Energy Storage Program Consultant

Efficiency Maine Staff

FY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015

GAO. DOD Needs Complete. Civilian Strategic. Assessments to Improve Future. Workforce Plans GAO HUMAN CAPITAL

Optimization Annual Report

Residential Heating and Cooling Program

COUNTY OF SANTA BARBARA

Delaware Sustainable Energy Utility

Summary of Major Changes in FY 2015 Compliance Filling. General. 1. Added savings goals per program. RNC

Sustainable Jersey Grants Program for Energy Initiatives Funded by The Gardinier Environmental Fund Announcement Date: Application Due Date:

Southern California Gas Company

Des Moines Energy Policy Task Force Committee. Session #6 September 13, 2018

California s Distributed Solar Energy Program. Working to Transform the Market for Solar PV and Thermal

ENERGY EFFICIENCY PROGRAM FOR BUSINESS Program Overview & Designated Trade Ally Training

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM

PATIENT ATTRIBUTION WHITE PAPER

Con Edison Commercial and Industrial Energy Efficiency Program

Commercial-Scale Air-Source Heat Pump Program Program Manual

Energy Advantage Program (EAP)

New Jersey s Clean Energy Program. Honeywell s Residential Energy Efficiency and Renewable Energy Program Plan Filing for 2011

TREES HEAT NEBRASKA PROGRAM nfs.unl.edu/trees-heat-nebraska. Wood Energy Conversion Grant Funding

The President s Economic Recovery Advisory Board

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application

a clean energy leader without specific measures to ensure that low-income households participate and benefit.

Colorado s Successful Low-income Demand Side Management Programs. April 22, 2014

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION ENERGY EFFICIENCY AND CONSERVATION PROGRAM DOCKET NO. M

Implementing Subsidy Reforms: lessons from international experience Maria Vagliasindi, Program Leader, GCC, World Bank SUBSIDY REFORM 11 1

DOE Technical Assistance Program

FOA* ISSUED? WHO IS ELIGIBLE TO APPLY. Grant DOE $3.1 billion Yes -- 3/12 States, territories, and DC

Chico Energy Pioneers Project

Transcription:

Memorandum Eric Belliveau and the 8 March 2012 Monthly Report February 2012 ultant Team is pleased to provide this monthly update to the Council on our recent and planned activities. hts from the Advisory Groups & Analysis Advisory Group Discussed and reviewed drafts of planning and analysis activities for the initial stages of the development of the next Three-Year Plans (2013-2015). Reviewed and analyzed the market opportunity analysis being conducted by two PAs; large C&I surveys/interviews and market analysis; analysis of thee economy and its effects; information available in EM&V studies and reports; and updated results from potential studiess in the region. Compiled and analyzed the above data to develop an initial assessment of EE potential, for presentationn to the Council in March. Worked with the Council and PAs to develop a proposed schedule for the next Three-Year Plan process, and presented the schedule to the at its February meeting. Worked with the PAs to develop templates for completion of the Initial Draft Plans to be submitted to the Council in April 2012. Developed additional analysis and recommendations on the DPU EEE Guidelines NOI regarding net savings and environmental/carbon compliance costs for the consideration of the Council and individual Councilors, as directed. Further analyzed the two topics including options for addressing the issues, summarized the issues at the meeting in February, and briefed and answered questions from councilors. Continued discussions of approaches for documenting energy savings and baselines for future planning, including in meetings with the PAs.

C&I Advisory Group Reviewed and analyzed the 2011 preliminary year-endd estimates and Q4 reports, reviewed preliminary PA data on 2011 performance benefits, savings and other Council priorities, and reported to the Council during its February meeting. Reviewed the 2010 Annual Reports, results relative to the 2010 Plan values, and performance incentive claims and metrics submitted to the DPU by the PAs. Reviewed the variation in 2010 and 20111 performance across the sectors and across PAs. Began Three-Year Planning Process with PAs. Held multiple input sessions with all PAs on program priorities, enhancements, and strategies to be incorporated into the Three-Year Plan. Reached general consensus agreement on priorities. Developed list of all evaluations underway with expected completion dates. Prioritized to determine what is most important and what can be included in Three-Year planning process. Held meeting with Healthcare without Harm to discuss their Three-Year Plan input that was delivered to the Council and DPU. Summarized input and sent to PAs for discussion at next Management Committee Meeting. Worked with PAs on a path forward on defining how codes and standards savings and attribution would be evaluated. PAs are in the process of developing a straw proposal,, and have engaged with our team and EM&V and set up a meeting to review and discusss their proposal in March. Completed preliminary analysis of the 2011 year end data, with particular attention to variances by PA. Findings are that PA variances have decreased over time, and there appear to be some reasonable explanations for remaining outliers, which primarily occur for the veryy small PAs. For example, while CLC has significantly higher costs/kwh saved than others, we believee these are roughly what would be expected from the fact that CLC pays higher incentivess for small DI and municipal work, has many fewer large customers, and often has lower hours of use of equipment because of the seasonal nature of many buildings. Reviewed the Large C&I Process Evaluation Trade Allyy survey instrument and exchanged email with the evaluators to clarify scope and advise on appropriate lighting measures for inclusion. As a result of consulting team input, the evaluation team have revised the surveys to be custom for each market segment instead of using a single, less specific survey instrument. Reviewed the Multi-family 4-8 story Process evaluationn and provided substantive comments. Summarized evaluation findings and issues for internall review in preparation for their use in work with PAs in threee year planning for multifamily. Participated in Large C&I Evaluation Planning Meeting and helped identify top priority evaluation activities. Page 2

Develop a roadmap for market characterization and baseline studies that will ensuree that research is performed and informationn available to inform the 20155 three year planning work while providing key interim dataa in targeted areas. Residential Advisory Group The Residential Advisory Group covered key program areas by engaging with several working groups. General: Engaged the PAs on high level Residential Sector issues att the bi-weekly Residential Management Committee (RMC) meeting, including on pre-weatherization, retirement of old boilers, and Three-year planning. Drafted Residential Vision Paper outlining a vision of where the Massachusetts residential programs could be in three and ten years, and presented it to the RMC, after DOER review. Recent RMC successes include a vetted PA proposal to address pre-weatherization, and posting documents on the Huddle website. Communicated with the DOER Residential Team, at their weekly calls, about residential sector issues. Participated in weekly Consulting Team calls and bi-weekly RES Consulting Team coordination calls. and all working groups using RMC meeting agenda/minutes templatess Home Energy Services: Reviewed and monitored progress of the HES working group and Contractor Best Practices group. Deep Energy Renovation pilot: Participated in planningg calls with DOER and others on modeling work being performed to support the draft 2013-15 proposal for a cost-effective DER-HES program. Products: Participated in discussions with PAs, NEEP and D&R (market lift contractor) regarding implementation of a market lift pilot for lighting. Discussions with EPA on LED incentive eligibility. Attended Working Group meeting to discuss Three-year planning, including strategic approach to promoting LEDs in 2012 and beyond. HVAC: Attended GasNetworks meeting to discuss initial Three-year planning activities. Provided RMC recommendation on Manual J requirement for HEAT Loan for fossil fuel fired heating systems. Brought Cool Smart measure (ductless air conditioning) savingss and tracking issue to Sponsors attention Low Income Retrofit: Reviewed and monitored progress of the Low Income Best Practices working group. Attended the LEAN meeting to discuss and get input on Three-year planning. Codes and Standards: Met with PAs, their consultants and advocatess to review plans for development of codes and standards proposal and plans to feed intoo Three-Year plan. Residential New Construction: Participated in Joint Management Committee (JMC) working group discussionss as we start the Three-Year planning process, including baseline evaluation results and cost-effectiveness issues. Page 3

Evaluation, Measurement & Verification Advisory Groupp Evaluation planning. Nailed down a majority of the additional studies to be initiated in 2012 as the current round of studies nears completion. Met in person with PA planning and evaluation managers to discuss the 2013-2015 EM&V plan to be included with the Three-Year Plan, along with possible changes to the system through which EM&V projects are administered in 2013-2015. Reached agreement to establish a statewide overall EM&V management committee, parallel to the RMC and MA PA committees. Also discussed was the potential for changes to the manner in which research areas are organized and contractors are recruited. In-Progresss studies. Moved forward some 25-30 studies already in the implementation phase, including a comprehensive process evaluation and market assessment of large C&I programs, C&I non-energy benefits study, approximately 9 C&I impact evaluations, impact evaluation of the Home Energy Services program, a combined impact and process evaluation of Low-Income programs, and a process evaluation of multi-family programs. Reviewed draft reports on the following studies: 4-8 story multifamily pilot evaluation; solar water heating pilot evaluation; brushless fan motor evaluation; small C&I summer logger study; and a residential lighting consumer survey. EM&V Activities: Began working with PAs to develop a proposed approach to attribution for savings from codes and standardss support programs; collaborated with C&I program staff on the development of an on-site verification process for the C&I upstream lighting program, which is to be coordinatedd with a later impact evaluation of the same program; laid thee groundwork for evaluation of a number of Education & Training efforts that are currently ongoing,, including CLC s K-12 program and C&I gas trade ally training events; contributed to the development of the legislatively mandated savings potential analysis, focusing on the contribution to be made by completed EM&V studies; provided EM&V-related input into the DPU investigation on the savings basis NOI; worked with cross-cutting PA EM&V staff to initiate an evaluation of Northampton and Pittsfield CMI pilots. Implementation of EM&V Forum Studies. Provided input to the implementation of the latest incremental costs study, the market lift pilot for residential lighting, and the VSD load shape study. Upcoming Activities Per your request you will find at the end of this report a monthly calendar of upcoming events related to our Consultantt activities, PA implementationn work, and important filings and work-product milestones. A two-month calendar appears after the Advisory Group summaries. Planning & Analysis Advisory Group Three year planning activities are ramping up quickly and will be the major focus off nearly the entire Consultantt Team for the next several months. Some of the specific tasks we anticipate are: Conduct analysis for and review of the development of f the 2013-2015 Three-Year Plans. Will include further review of and input on analyses such as the market opportunity analysis being conducted by several PAs, large C&I surveys/interviews and market analysis, analysis of the economy and its effects, Page 4

information available in EM&V studies and reports, andd updated results from potential studies in the region. Contribute analysiss towards the assessment of EE potential. Compile and analyze the above data to develop an initial assessment of EE potential, for consideration as part of the next Three-Year Plans. Present the initial analysis to the Council in March, with a more complete and thorough analysis (informed by additional data and analysis) in April. Develop and analyze initial options and recommendatio ons for goals for the next Three-Year Plans, for Council review and consideration. Working with the PAs, develop/refine templates and processes for completion of the Initial Draft Plans to be submitted to the Council in April 2012. Work with the Council and the PAs to prepare the Initial Draft Three-Year Plans (due April 30). Support the by continuing analysis and work on the DPU EE Guidelines NOI regarding net savings and environmental/carbon compliance costs, as directed by the Council. Follow up with the Council including on any Council documents as required. Participate in any DPU technical sessions as directed. Participate on behalf of the Council in any other DPU 08-50 processes, potentially ncluding reporting and bill impacts, as scheduled and as assigned. Review, compile, and comment on 2012 dashboard monthly reports and trends. Analyze progress towards full incorporation of the key building blockss for accomplishing the goals of the Three-Year Plans to achieve deeper savings and otherr key priorities. Support the as needed during the DPU review the 2010 Annual Reports, including the PA performance incentive and metric claims in the Annual Reports. Residential Advisory Group General: Engage with PAs on Three-Year planning activities and provide feedback on proposed program savings and budgets. Revise Residential Vision Paper after PA review and feedback. Products: Provide PAs with recommendation on eligibility for LED product incentives. Continue to work with PAs, NEEP, D&R, and Evaluation Advisory Groupp to implement market lift model. HVAC: Develop revised gas/electric HVAC integration plan. Work with Cool Smart Sponsors to make final HPWHH rebate offering. Continue participation in RMC discussions on expanded boiler replacement opportunity, including review of updated measure screening. Codes and Standards: Continue the dialogue with the PAs, their consultants and advocates to develop codes and standards plan for both residential and C&I sectors. Page 5

C&I Advisory Group The C&I Advisory Group will continue to have on-going engagement, monitoring and review of PA plans, activities and accomplishments. In the coming weeks, we will Contribute to the Vision Paper in support of Three-Year Plan efforts. Complete memorandum regarding CHP program implementation research, to be provided to by March 9. Draft a memorandum for the PAs and DOER on the Vermont experience with overcoming barriers to implementation of a Street Lighting Program. EM&V Advisory Group Continue moving in-progress studies through the implementation process. Receive draft (for review and comment) or final reportss on numerous studies, including the following: umbrella marketing surveys of residential and non-residential end-users; residential lighting and electronics on-sites; multifamily market characterization n and potentiall study; C&I code compliance study; single-family residential new construction baseline study; small C&I summer logger study. Page 6

March 2012 MONDAY TUESDAY WEDNESDAY 1 THURSDAY 2 FRIDAY Stretch Code Workshop, Sturbridge 5 6 7 8 9 12 13 14 Mass Save Vendor Open House, Clarion Hotel, Northampton 155 16 19 20 21 222 23 Deep Energy Measure Verification Workshop sponsored by DOER, Peabody Stretch Code Workshop, Needham 26 27 28 299 30 Exec Comm. Meeting DPU Technical Session-EE Program Net Savings Page 7

April 2012 2 MONDAY 3 TUESDAY 4 WEDNESDAY 5 THURSDAY 6 FRIDAY 9 10 11 12 13 Council Meeting 16 17 18 19 20 23 24 25 26 27 Stretch Code Workshop, Mansfield 30 PAs submit initial draft of Three-Year Plan Page 8