COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) ADDITIONAL FINANCING

Similar documents
FOR OFFICIAL USE ONLY INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Central African Backbone - APL2

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2678. Project Name. Region. Country

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Financing (In USD Million) Financing Source

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3002. Date ISDS Prepared/Updated: 02/22/2009 I. BASIC INFORMATION. A. Basic Project Data

Report No.: ISDSA12277

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA4973. Project Name

Integrated Safeguards Data Sheet (Updated)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5359. Date ISDS Prepared/Updated: 12/27/2010 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Telecommunications (60%); General information and communications sector (20%); General industry and trade sector (20%) Project ID

NEW PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: Report No.: LATIN AMERICA AND CARIBBEAN Country

Project Information Document/ Identification/Concept Stage (PID)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA2631. Project Name. Region. Country

EU Grant Agreement DOC8UMEW. Public Disclosure Authorized GRANT NUMBER TF0A2379. Public Disclosure Authorized. (Access to Sustainable Energy Project)

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

United Nations Peace Building Fund Grant Agreement

Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY

infoshop Report No AC74 Integrated Safeguards Data Sheet (Updated) Date ISDS Prepared/Updated: 05/15/2003 Section I - Basic Information

EIB Investments in Digital Economies outside the European Union

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

NOTICE OF RECEIPT OF REQUEST. Request for Inspection. Nigeria: Lagos Metropolitan Development and Governance Project (P071340)

INDONESIA NATIONAL ROADS IMPROVEMENT PROJECT WESTERN INDONESIA PROJECT INFORMATION DOCUMENT CONCEPT STAGE Report No.:AB2075 Project Name

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT PROJECT (PRODEPUR) ADDITIONAL FINANCING GRANT

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5878 E-Society and Innovation for Competitiveness (EIC) Project

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4516 Project Name. Threatened Species Partnership - Save Your Logo Region

Republic of Congo: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Afghanistan Reconstruction Trust Fund Grant Agreement

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA109589

Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Nicaragua Rural Telecom

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

OFFICIAL DOCUMENTS I

Global Environment Facility Trust Fund Grant Agreement

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

Resettlement Planning Document

Rajasthan Urban Sector Development Program

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

Digital Economy.How Are Developing Countries Performing? The Case of Egypt

Global Financing Facility Grant Agreement

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Asia-Pacific Information Superhighway Master Plan

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

The African Development Bank Group: A Partner of Choice. GHANA TRADE AND INVESTMENT FORUM Rome, Italy October 31st, 2014

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

Global Environment Facility Grant Agreement

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING MADAGASCAR SCALING RENEWABLE ENERGY PROGRAM (SREP) INVESTMENT PLAN (IP)

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP)

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

GOVERNMENT OF KENYA MINISTRY OF INDUSTRY, TRADE AND COOPERATIVES STATE DEPARTMENT OF INVESTMENT AND INDUSTRY

The World Bank Group, Solomon Islands Portfolio Overview

Nigerian Communications Commission Delivering broadband for development in Nigeria

OFFICIAL DOCUMENTS. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT IN THE AMOUNT OF SDR5.8 MILLION (US$8.97 MILLION EQUIVALENT) TO THE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

OFFICIALf DOCUMENTS. Re: REPUBLIC OF DJIBOUTI JSDF Grant for Enhancing Income Opportunities Project Grant No. TFOAO350

Co-financing for the Promoting Sustainable Community Based Natural Resource Management and Institutional Development Project Grant Agreement

Concept Paper. Project Number: March Proposed Grant REG: Improving Internet Connectivity for Micronesia

Microfinance for Rural Piped Water Services in Kenya

OFFICIAL DOCUMENTS. Financing Agreement. Public Disclosure Authorized CREDIT NUMBER 5960-KH. Public Disclosure Authorized

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Public Private Partnerships (PPPs) to promote Cluster Development and Research and Skills Development. PPP Implementation Manual

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

Global Partnership on Output-based Aid Grant Agreement

COLOMBIA Integrated National Adaptation Program

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202)

LICENSINGAPPLICATION GUIDELINES, 2016

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971)

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized COMBINED PROJECT INFORMATION DOCUMENTS / INTEGRATED SAFEGUARDS DATA SHEET (PID/ISDS) ADDITIONAL FINANCING Date Prepared/Updated: I. BASIC INFORMATION A. Basic Project Data 19-Jan-2017 Report No.: PIDISDSA19973 Country: Congo, Republic of Project ID: P160292 Parent Project ID (if any): P122398 Project Name: Central African Backbone SOP3 Republic of Congo Additional Financing (P160292) Parent Project AFCC2/RI-Central African Backbone - APL3 - Republic of Congo (P122398) Name: Region: AFRICA Estimated Appraisal Date: 09-Jan-2017 Estimated Board Date: 07-Mar-2017 Practice Area Transport & ICT (Lead): Borrower(s): Implementing Agency: Financing (in USD Million) Financing Source Lending Instrument: Ministry of Posts and Telecommunications in Charge of ICT CAB Project Implementation Uniit Investment Project Financing Amount International Development Association (IDA) 5.00 Financing Gap 0.00 Total Project Cost 5.00 Environmental B - Partial Assessment Category: Appraisal Review Decision (from Decision Note): Other Decision: Is this a Repeater project? The review did authorize the team to appraise and negotiate No Page 1 of 10

B. Introduction and Context Country Context Congo Republic is richly endowed in oil and mining ore (iron, potash and magnesium). However, the country s key social indicators (notably, health and education outcomes, as well as service delivery in these sectors) do not match those in countries with a similar resource endowment, indicating a failure of the country to transform this great potential into opportunities for its citizens. Two key factors contribute to this mystery of missed opportunities: i) the recurrent sociopolitical instability and civil wars and ii) the severity of economic cycles in Congo which for the most part have been driven mainly by oil price and production dynamics The Congolese economy is mainly driven by the supply side. Its main drivers are natural resources (oil and forestry). Its main constraints are: i) the volatility of oil prices and production; ii) the weak productivity due to Dutch disease, a weak financial environment, a weak business environment, weak governance and an unstable political system); iii) the waste in using the full potential of human capital (due to low skills and youth unemployment); and iv) the low quality of infrastructure reducing the ability of the country to achieve the full potential of its natural and physical capital. Sectoral and institutional Context The proposed additional credit would help finance the costs associated with (i) the completion of connectivity infrastructure in Congo s western region (active equipment ) from Pointe Noire to Mbinda along the CFCO railway infrastructure, as well as (ii) the establishment of an ICT incubator and a Digital Development Fund in the Republic of Congo. The construction of this fiber optic infrastructure was included under the CAB3 project s scope as originally defined at appraisal. However, there are insufficient funds under the original IDA Credit to finance some key equipment due to cost overruns incurred in the delivery of the rest of the civil works and of the active equipment (notably termination and shelters equipment). Counterpart funding that was supposed to cover these extra costs has been delayed due to severe budget constraints. Construction of this fiber optic link and related active equipment at the shelter level continue to be vital to the international connectivity of Congo and its connection to Gabon as originally intended, and it will lead to more fully realizing the benefits of other structures already financed in the sector, most notably the PCN (Projet de Couverture National) and the upcoming infrastructure project funded by the African Development Bank. In addition, the proposed Additional Financing will scale up activities in component 3 by establishing and providing seed money for a new Digital Development Fund (Fonds de Dà veloppement du Numà rique), aiming at leveraging private investors willing to promote entrepreneurship in the ICT sector in Congo, creation of local content, and create new job opportunities for youth in the country. C. Proposed Development Objective(s) Original Project Development Objective(s) - Parent The development objective of the proposed project is consistent with the PDO for the CAB Program: to contribute to increase geographical reach and usage of regional broadband network services and reduce their prices, in the Republic of Congo. Key Results Finalization of the construction of the fiber optic infrastructure between Pointe Noire - Dolisie - Mbinda (furniture and installation of active equipment). Sustainability of an ICT Incubator in Congo and establishment of a new Digital Development Page 2 of 10

Fund (Fonds de Dà veloppement du Numà rique), aiming at leveraging private investors willing to promote entrepreneurship in the ICT sector in Congo. D. Project Description The proposed additional credit would help finance the costs associated with (i) the completion of connectivity infrastructure in Congo s western region (active equipment) from Pointe Noire to Mbinda along the CFCO railway infrastructure, as well as (ii) the support to a local ICT incubator such as Yekolab, and the establishment of a Digital Development Fund in the Republic of Congo. The construction of this fiber optic infrastructure was included under the CAB3 project s scope as originally defined at appraisal. However, there are insufficient funds under the original IDA Credit to finance some key equipment due to cost overruns incurred in the delivery of the rest of the civil works and of the active equipment (notably termination and shelters equipment). Counterpart funding that was supposed to cover these extra costs has been delayed due to severe budget constraints. Construction of this fiber optic link and related active equipment at the shelter level continue to be vital to the international connectivity of Congo and its connection to Gabon as originally intended, and it will lead to more fully realizing the benefits of other structures already financed in the sector, most notably the PCN (Projet de Couverture National) and the upcoming infrastructure project funded by the African Development Bank. In addition, the proposed Additional Financing will scale up activities in component 3 by establishing and providing seed money for a new Digital Development Fund (Fonds de Dà veloppement du Numà rique), aiming at leveraging private investors willing to promote entrepreneurship in the ICT sector in Congo, creation of local content, and create new job opportunities for youth in the country. Component Name Component 2 Connectivity Comments (optional) This component will close the financing gap for the delivery of the rest of the active equipment (notably termination and shelters equipment) Component Name Component 3 Promotion of ICT sector Comments (optional) This component will fund: (a) light retrofitting of the incubator premises, (b) first two years of operating costs including coaching and support to startups, logistics, (c) technical assistance and support to the incubator: legal and financial advisory services, accounting strategy, marketing and communications costs, (d) equipment, connectivity and logistics (furniture, appliances...). The component will also finance the establishment of the Digital Development Fund. Including: (a) Technical Assistance and Advisory Services to set up the DDF, and (b) Contribution to the fund and organization of a hackathon to select and subsidize the first batch of incubatees. Component Name Component 4 Project Management Comments (optional) This component will extent support to the Project Implementation Unit (audit, communications Page 3 of 10

and fiduciary functions of the project) E. Project location and salient physical characteristics relevant to the safeguard analysis (if known) The project will complement the deployment of the national backbone infrastructure to be developed by the GoC under the NCP (National Coverage Project). It will finance complementary and missing international links developed under the NCP including fiber-optic cables, microwave equipments, terminal equipments, switches, to guarantee the establishment of an open access network (open to all operators), leveraging private sector investment and to ensure the interconnection with neighboring countries: Gabon (link Dolisie - Mbinda), Cameroon (link Oyo - Ouesso), and DRC (link Brazzaville - Kinshasa). Dolisie - Mbinda link: this segment is 338 km long and will consist of a 12 pair fiber optic cable. The link will be comprised of (i) 2 (two) repeaters and powered by solar solutions, (ii) 2 (two) SDH terminal stations located in Dolisie and Mbinda. The acquisition and installation cost of the cable is estimated to be US$2.4 million. The SDH and terminal stations cost is estimated to US $1.6 million. The cost of the 2 (two) repeaters and their respective solar powered station s is estimated around US$1 million. Oyo - Ouesso link: this segment is 420 km long and will consist of 6 (six) microwave links. Each link will comprised 1 (one) repeater powered by solar solutions and 1 (one) SDH terminal station. The acquisition and installation cost of the six poles is estimated to be US$3 million. The SDH and terminal stations cost is estimated to US$3 million. The cost of the 6 (six) repeaters and their respective solar powered stations is estimated around US$3 million. The technical and management options identified for this segment are based on the successful experiences carried out in Nigeria and Iran. In these two countries, the Government created an SPV with private operators to ensure infrastructure sharing through collocation of poles and hence reduce the number of poles installed. However, to ensure a minimum bandwidth of 2 Gb/s, the poles cannot be distant of more than 80 k m. The component costing includes the installation of 6 poles between Oyo and Ouesso. Brazzaville - Kinshasa link: this segment is 10 km long and will consist of 2 (two) microwave links. Each link will comprised 1 (one) repeater powered by solar solutions and 1 (one) SDH terminal station. The acquisition and installation cos t of the two poles is estimated to be US $0.3 million. The SDH and terminal stations cost is estimated to US$1.7 million. F. Environmental and Social Safeguards Specialists Lucienne M. M'Baipor (GSU01) II. Implementation Institutional and Implementation Arrangements There will be no change iin institutional and implementation arrangements. III.Safeguard Policies that might apply Safeguard Policies Triggered? Explanation (Optional) Page 4 of 10

Environmental Assessment OP/BP 4.01 Natural Habitats OP/ BP 4.04 Yes Yes The project under component 2 foresees three Inter-regional links to neighboring countries including fiber optic cables, terminal equipment and switches. These activities are expected to have potential adverse environmental impacts, even if on limited scale. Impacts here will mostly be related to digging along the railways track of the CFCO and across human settlements, forests and other habitats. An Environmental and Social Management Framework (ESMF) has been prepared, reviewed, consulted upon and disclosed within the Republic of Congo and at the Bank Infoshop on April 1, 2011 prior to the appraisal. The project is not expected to be implemented in natural habitats. But as the Republic of Congo is known of having forest habitats not negligible in that part of the country, particular attention needs to be paid to some fragile ecosystems along the fiber optic cable right of way during the implementation of the project. However, no specific safeguard instrument is required. The ESMF prepared in accordance with OP/PB4.01 has taken into consideration this issue. The ESMF has been prepared, reviewed, consulted upon and disclosed within the Republic of Congo and at the Bank s Infoshop on April 1, 2011and contains a chapter with guidance to ensure Natural Habitats protection. Forests OP/BP 4.36 No The project is not expected to have significant adverse impacts on the forest resources due to the weak influence of the fiber optic cables and other equipment. Pest Management OP No 4.09 Physical Cultural Resources OP/BP 4.11 Indigenous Peoples OP/BP 4.10 Involuntary Resettlement OP/BP 4.12 Yes Yes Yes The ESMF has been prepared, reviewed, consulted upon and disclosed within the Republic of Congo and at the Infoshop on April 1, 2011 prior to the appraisal. It includes a chapter on managing Physical Cultural Resources matters. Because the project area is populated with indigenous people, an Indigenous Peoples Planning Framework (IPPF) was prepared, reviewed, approved and disclosed in the targeted areas and at the Infoshop on March 1, 2011 before appraisal of the parent project. The IPPF of the Parent project has been redisclosed in country on January 19th 2017, in all the project areas and local languages, as well as on the Bank s websit on January 20th, 2017. No land acquisition or resettlement is expected in the Additional Financing, as the works were completed in the Parent Project. The ongoing works are a completion of the Parent Project works. Should any land acquisition be required in the AF phase, the RPF of the Parent Project will apply. Page 5 of 10

Safety of Dams OP/ BP 4.37 Projects on International Waterways OP/BP 7.50 Projects in Disputed Areas OP/BP 7.60 No No No IV. Key Safeguard Policy Issues and Their Management A. Summary of Key Safeguard Issues 1. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or irreversible impacts: The project prepared a RAP which was not properly implemented due to a design change. In this case, the activities of the project prepared to occur on the right side of the Congo Ocean Railway were implemented on the left side instead; this change resulted in no physical displacement or land acquisition. Since the RAP did not reflect the project activities, a commission was put in place to carry out a census of the PAPs, an assessment of the affected properties and compensation of the PAPs for crop and fruit trees losses. In regards to OP 4.10, the parent project triggered the policy on Indigenous Peoples and prepared an Indigenous Peoples Policy Framework (IPPF). The areas identified in the initial project design were identified as locations with IPs. However, the project at a later stage proposed an alternative with less impact, notably along the national railway (CFCO). As a result, this alternative design posed no risk or impact on IPs as the cables were to be layed along the train tracks without coming in contact with the IP communities. Activities in the projects AF phase will remain on the CFCO path, therefore posing no risk to IPs. However, it is recommended that the project apply the existing IPPF in case the project does impact IPs. The IPPF was already disclosed for the parent project, but will be re-disclosed for the AF. In regards to OP 4.12, the project triggered the policy on involuntary resettlement, and consequently prepared a Resettlement Action Plan (RAP). However, as mentioned above, when the project proposed an alternative design for laying of the cables, the project did not update the RAP to reflect the new alternative. It is worth mentioning that no physical resettlement, only nonland economic displacement (loss of crops and trees) along the train tracks was induced, and that the estimated number of PAPs is well below the estimated 70 in the initial RAP. The project did at a later stage assess the impacts and prepare a budget for compensation of the affected households, this was done with the Governmental Land Commission. The total cost of compensation for the new alternative was estimated to be around US $50,000 (33,401,563 FCFA). Seeing as the Additional Financing does not finance any new or additional civil works or activities generating safeguard issues, there are no expected cases of further economic displacement.. The project has updated and will re-disclose the existing RAP in case of any remaining cases of involuntary resettlement. The IPPF has been published in country on January 19 and will be published on World Bank website on January 20th 2017 (prior to Appraisal). Page 6 of 10

2. Describe any potential indirect and/or long term impacts due to anticipated future activities in the project area: During a Bank mission to Pointe Noire, in supervision of the parent project some issues were identified in regards to OP 4.12 and the RAP implementation. The issues were in regards to the non-updated RAP, and consequent lack of consultation and payment of a few PAPs. The parent project RAP has just been revised to incorporate compensation effectively paid but which were not in the initial PAR. 3. Describe any project alternatives (if relevant) considered to help avoid or minimize adverse impacts. N/A 4. Describe measures taken by the borrower to address safeguard policy issues. Provide an assessment of borrower capacity to plan and implement the measures described. The task team has requested the PIU to conduct a social and environmental audit of the activities conducted under the parent project. The audit will provide recommendations for any remaining activities to be completed. 5. Identify the key stakeholders and describe the mechanisms for consultation and disclosure on safeguard policies, with an emphasis on potentially affected people. Given that, the sites for the installation of the cables are already completed and no new or additional civil works will be undertaken. The project s Environmental and Social safeguards team member in charge of supervising environmental and social measures, and who has also followed the parent project, has conducted a number consultations with various stakeholders and affected people in the preparation of the Parent Project RAP. During the disclosure and dissemination of the IPPF and the RAP of the Parent Project, the Client ensured consultation mechanisms for all stakeholder contributions in regards to the project s impact, design, as well as implementation. The IPPF of the Parent project will be redisclosed in country on January 19th 2017, in all the project areas and local languages, as well as on the Bank s Infoshop on January 20th, 2017. B. Disclosure Requirements Environmental Assessment/Audit/Management Plan/Other Date of receipt by the Bank 28-Feb-2011 Date of submission to InfoShop For category A projects, date of distributing the Executive Summary of the EA to the Executive Directors "In country" Disclosure 05-Apr-2011 Comments: Resettlement Action Plan/Framework/Policy Process Date of receipt by the Bank 28-Feb-2011 Page 7 of 10

Date of submission to InfoShop "In country" Disclosure Congo, Republic of Comments: Indigenous Peoples Development Plan/Framework Date of receipt by the Bank 05-Apr-2011 05-Apr-2011 19-Jan-2017 Date of submission to InfoShop "In country" Disclosure Congo, Republic of Comments: 19-Jan-2017 19-Jan-2017 If the project triggers the Pest Management and/or Physical Cultural Resources policies, the respective issues are to be addressed and disclosed as part of the Environmental Assessment/ Audit/or EMP. If in-country disclosure of any of the above documents is not expected, please explain why: C. Compliance Monitoring Indicators at the Corporate Level OP/BP/GP 4.01 - Environment Assessment Does the project require a stand-alone EA (including EMP) report? If yes, then did the Regional Environment Unit or Practice Manager (PM) review and approve the EA report? Are the cost and the accountabilities for the EMP incorporated in the credit/loan? OP/BP 4.04 - Natural Habitats Would the project result in any significant conversion or degradation of critical natural habitats? If the project would result in significant conversion or degradation of other (non-critical) natural habitats, does the project include mitigation measures acceptable to the Bank? OP/BP 4.11 - Physical Cultural Resources Does the EA include adequate measures related to cultural property? Does the credit/loan incorporate mechanisms to mitigate the potential adverse impacts on cultural property? OP/BP 4.10 - Indigenous Peoples Has a separate Indigenous Peoples Plan/Planning Framework (as appropriate) been prepared in consultation with affected Indigenous Peoples? If yes, then did the Regional unit responsible for safeguards or Practice Manager review the plan? Page 8 of 10

If the whole project is designed to benefit IP, has the design been reviewed and approved by the Regional Social Development Unit or Practice Manager? OP/BP 4.12 - Involuntary Resettlement Has a resettlement plan/abbreviated plan/policy framework/ process framework (as appropriate) been prepared? If yes, then did the Regional unit responsible for safeguards or Practice Manager review the plan? Is physical displacement/relocation expected? Provided estimated number of people to be affected Is economic displacement expected? (loss of assets or access to assets that leads to loss of income sources or other means of livelihoods) Provided estimated number of people to be affected The World Bank Policy on Disclosure of Information Have relevant safeguard policies documents been sent to the World Bank's Infoshop? Have relevant documents been disclosed in-country in a public place in a form and language that are understandable and accessible to project-affected groups and local NGOs? All Safeguard Policies Have satisfactory calendar, budget and clear institutional responsibilities been prepared for the implementation of measures related to safeguard policies? Have costs related to safeguard policy measures been included in the project cost? Does the Monitoring and Evaluation system of the project include the monitoring of safeguard impacts and measures related to safeguard policies? Have satisfactory implementation arrangements been agreed with the borrower and the same been adequately reflected in the project legal documents? Yes [ ] No [ ] TBD [ ] Yes [ ] No [ ] TBD [ ] V. Contact point World Bank Contact: Jerome Bezzina Title: Senior Regulatory Economist Contact: Title: Marc Jean Yves Lixi Senior Operations Officer Borrower/Client/Recipient Name: Ministry of Posts and Telecommunications in Charge of ICT Page 9 of 10

Contact: Title: Email: LÃ on Juste IBOMBO Ministre legrand_cesar@yahoo.fr Implementing Agencies Name: CAB Project Implementation Uniit Contact: Yvon-Didier Miehakanda Title: Coordonnateur du Projet CAB Email: ymiehakanda@cabcongo.com VI. For more information contact: The World Bank 1818 H Street, NW Washington, D.C. 20433 Telephone: (202) 473-1000 Web: http://www.worldbank.org/projects VII. Approval Task Team Leader(s): Name: Jerome Bezzina,Marc Jean Yves Lixi Approved By Safeguards Advisor: Name: Maman-Sani Issa (SA) Date: 19-Jan-2017 Practice Manager/ Name: Boutheina Guermazi (PMGR) Date: 20-Jan-2017 Manager: Country Director: Name: Djibrilla Adamou Issa (CD) Date: 20-Jan-2017 Page 10 of 10