U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

Similar documents
120 White Bridge Rd. Nashville, TN Control of Hazardous Energy Program OSHA (lockout/ Tagout) standard 29 CFR

Salt Lake Community College

QP29.20 Revision 15 Safety

OSHA (PESH) Records. Presented by: Doug Miller. Occupational Safety Consultants, Inc.

BP HUSKY TOLEDO REFINERY

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Management Standards. EHS Policy and Program

BP HUSKY TOLEDO REFINERY

Controlling Office: Director of Clinical Services Effective Date: May 1, Applies to CAMTS: n/a Last Review: January 1, 2018

RESPIRATORY PROTECTION PROGRAM

Sample worker orientation checklist

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT II EXHIBIT D DISTRICT TWO BRIDGE TENDER QUALIFICATIONS MANUAL

Treatment Leader E M P LO YMENT O P PORTUN I T Y A U G U S T 2 2, 2 014

IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL

Baler Gone Wild! Lessons Learned. Volume 03 Issue USW

The policy and procedures described in this program apply to all MCC employees.

Outreach Training Program

Introduction to OSHA. 2-hour Lesson. Directorate of Training and Education OSHA Training Institute

SUMMIT COUNTY SAFETY COUNCIL: FOCUS ON MACHINE GUARDING, LOCKOUT TAGOUT, & OSHA TRENDS

Outreach Training Program

ADMINISTRATIVE PRACTICE LETTER TABLE OF CONTENTS

AWARD APPLICATION. Send Via Mail. Send Via

Oak Grove School District Respiratory Protection Program

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Accident Prevention Process

INJURY & ILLNESS PREVENTION PROGRAM REQUIREMENTS

Health, Safety, Security and Environment

Box 221 Brasstown, NC Phone (828) Fax (678) CONSTRUCTION SAFETY AND HEALTH PROGRAM

Public Employee Safety and Health (PESH)

Subj: CHANGE OR EXCHANGE OF COMMAND OF NUCLEAR POWERED SHIPS. Encl: (1) Engineering Department Change of Command Inspection List

UNIVERSITY OF VICTORIA X-RAY EQUIPMENT SAFETY POLICIES AND PROCEDURES

Job Description City of St. Clair

Director, National Institute for Occupational Safety and Health. FROM: Iowa FACE Program Case No. 2004IA005 Report Date: 5 June 2008

Human Resources Policies Traffic Control. Category: Health and Safety Sub-Category: General Policy Statement

Shawnee State University

Training Course Descriptions

Respiratory Protection

Duties of a Principal

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

SAFETY AND HEALTH IN THE STEEL INDUSTRY worldsteel position paper

Injury and Illness Prevention Program

INJURY AND ILLNESS PREVENTION PROGRAM

Worker s Arm Pulled Into Belt and Pulley

ACCIDENT AND ILLNESS PREVENTION PROGRAM (AIPP)

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

Prison and Jails Standards Documentation Requirements

Personal Protective Equipment

DEPARTMENT OF THE ARMY *III CORPS & FH REG 40-7 HEADQUARTERS, III CORPS AND FORT HOOD Fort Hood, Texas JULY 1999

Self Assessment Guide for an Effective Safety and Health Program

Code of Practice Controlling access to hazardous or sensitive areas

Health & Safety Policy

Building Services Engineering: Health and Safety (SCQF level 5)

Administrative Policies and Procedures

Facilities Department Accident Prevention Plan

PROCEDURE 806 HEALTH AND SAFETY

2.01 All employees of the University of Windsor shall be vigilant and shall exercise appropriate due diligence to minimize risks.

i. Identifying work areas, processes or tasks that require workers to wear respirators, and evaluating hazards.

Health and Safety Plan (HASP) Sampling and Handling of Sediments from (Name & location of project site)

Health & Safety Policy

West Virginia University

RP 4.0: INSPECTION AND CERTIFICATION OF OVERHEAD EQUIPMENT. A Recommended Practice (RP) for the Canadian Well Servicing Industry

RIGHT RENOVATE THE LEAD SAFE CERTIFIED GUIDE TO LEAD (5323) epa.gov/getleadsafe EPA-740-K Revised September 2011

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

Maintenance Mechanic I/II

University Facilities Personal Protective Equipment Procedure

Eye on safety NEWS & NOTES SUMMER 2016 EYE ON STATS. Tropic Island Cruise at Annual Meeting a HIT!!! photos page 4

Conduct Field Maintenance on a Hydra-start System Status: Approved

Injury and Illness Prevention Program. For. Banning Unified School District

WC-OSH 109 Tagging and Isolation

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

Workplace Health & Safety

GENERAL STATEMENT OF SAFETY POLICY

RP 5.0: INSPECTION AND CERTIFICATION OF MANUAL ROTARY TONGS

This document describes the University s processes for reporting and investigating health and safety Incidents and Near Misses.

2017 Business & Industry Training

Incident Reporting Policy and Procedure

(Company name) Health and Safety Plan

CONTRACTOR ORIENTATION

SafeGulf Program Agreement (Form SCO-03sg)

Energy Isolation. Standards, Techniques and Best Practices Jul 2018, Dubai

Aerial Work Platform Program. Risk Management

The Provision and Use of Work Equipment (PUWER) Policy

Corporate Safety Manual. Chapter 14 Near Miss Reporting

HAZARDOUS MATERIALS EMERGENCY. Awareness Level Response Plan 29 CFR (q) and 40 CFR 311

Student Orientation Post-Assessment

POSITION DESCRIPTION AND QUALIFICATIONS Water Treatment Plant Operator I

Southwold Primary School & Early Years Centre Security Policy

Injury and Illness Prevention Program and Safety Procedures Manual

2018 TRAINING SCHEDULE

Index as: DEPARTMENTAL AUDITS AND INSPECTIONS

Safety & Risk Management

Housing Rehabilitation Program Administration

INJURY AND ILLNESS PREVENTION PLAN (IIPP) October 2015

Administrative Safety

OSHA Update. OhSh*tHereAgain. PRESENTED BY: Dale Varney Compliance Assistance Specialist Springfield Area Office

THE CORPORATION OF THE UNITED TOWNSHIPS OF HEAD, CLARA & MARIA HEALTH AND SAFETY POLICY APPENDIX A TO BY-LAW

Health & Safety Policy & Procedures

Environmental Health & Safety Course Information

HAZARD COMMUNICATION PROGRAM. For CRAFTON HILLS COLLEGE

Transcription:

- SAFE -15 Page 1 of 7 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Lock Out / Tag Out Program OBJECTIVE(S): To provide a work atmosphere that is conducive to attaining a high work standard and as free as possible from safety and health hazards. To that end, U.S. Concrete has devised this Standard Operating Procedure developed to eliminate the hazards associated with releases of energy or hazardous materials in an area where employees or others could be adversely affected. This includes, but is not limited to, confined space entry where the unexpected release of electrical, mechanical or chemical energy could result in the injury or adverse health effect to an employee. This program is based on the Occupational Safety and Health Administration (OSHA) Standard 29 CFR 1910.147. GENERAL POLICY: (Defined below) APPLICATION: U.S. Concrete, Inc. RESPONSIBILITY: President/General Manager (1) STATEMENT OF POLICY To eliminate the potential accidental release of stored energy during routine maintenance, cleaning, adjusting or lubricating of equipment at this U.S. Concrete facility, all employees performing such tasks shall adhere to the procedures established by this document.

(2) INDIVIDUAL RESPONSIBILITIES Operations Manager - is responsible for the lockout/tagout program. It is his responsibility that the employees fully understand procedures and that these procedures are strictly followed. If the procedure is not adequate to cover a specific job, the Operations Manager, in conjunction with the Health and Safety Manager, shall develop further procedures that ensure safety during the operation. Shift Supervisor - is responsible for the following: 1. Instructing employees, including contractors, in the following areas: Purpose and nature of the procedure; Recognition and application of adequate methods of isolating hazardous energy sources; and Procedures for safely re-energizing the equipment when work is complete. 2. Ensuring that all employees affected by the job are notified. 3. Providing locks, tags, and keys specifically identified as ones for the lockout/tagout program. Coordinating the continuation of lockout and tagout protection through shift and employee changes. Follow-up periodically to ensure compliance with lockout/tagout procedures. Individual Employees - the employee is responsible for knowing and following the established procedure that is applicable to the safe performance of his job. Safety Manager - is responsible for administering the lockout/tagout program by providing: 1. Training; 2. Procedures; and 3. Audits and evaluations. (3) TRAINING REQUIREMENTS Lockout/tagout training shall consist of classroom and on-the-job training. 1. Classroom instruction shall include: regulations program requirements lockout procedures 2 of 7

terms and definitions hazard recognition potentials for stored energy 2. On-the-job training shall consist of: lockout methods lock and tag placement equipment de-energizing and re-energizing techniques valve binding (4) RETRAINING REQUIREMENTS Employee retraining shall be conducted whenever there is; (1) a change in employee job assignments, (2) equipment or job process changes, or (3) a change in the procedure. Employee retraining shall also be conducted whenever the periodic inspection or the health and safety manager perceives that there are deviations from or inadequacies in the employee s knowledge or use of this procedure. The retraining shall reestablish employee proficiency and introduce new or revised control methods or procedures, as necessary. Acknowledgement of this training shall, as with the initial training, contain each employees name, dates of training, the equipment and procedures utilized and the person performing the inspection. (5) PROCEDURES AND OPERATIONAL REQUIREMENTS Procedures The following steps are required by authorized personnel performing Lockout/Tagout. 1. Review the machinery or processes to ensure an adequate knowledge of the type and magnitude of the energy source(s), the hazards of the energy to be controlled, and the appropriate methods or means to control the energy. 2. Notify the affected employees that hazardous energy is being disconnected. 3. Disconnect hazardous energy sources(s) and place his own lock(s) on the proper device(s). 4. Complete the "Danger" or other approved tags and affix them, with the lock(s), at the point(s) where the energy source(s) were de-energized and at the point where the operation is to take place. 3 of 7

Prior to the placement of any lockout devices, all energy isolating devices (i.e. switches, valves) shall be placed in a "safe" or "off" position. The lockout device(s) shall then be affixed in such a manner as to hold the energy isolating devices in this "safe" or "off" position. In the event tagout devices must be used alone, they shall be affixed in such a manner as to clearly indicate that the operation of movement of energy isolating devices from the "safe" or "off" position is prohibited. NOTE: TAGOUT DEVICES ARE PROHIBITED FROM USE ON ENERGY SOURCES CAPABLE OF ACCEPTING A LOCKOUT DEVICE. In the event that a tag cannot be affixed directly to the energy-isolating device, the tag shall be located as close as safely possible and their intent immediately obvious to anyone attempting to operate the device. 5. Relieve all residual hazardous energies and test equipment to ensure that there is "zero" energy at the point of operation. Depending on the type of machinery, blocks or pins may be required to ensure that all energy is removed from the operation zone. Return all controls to normal (usually off) after testing. If there is a possibility of re-accumulation of stored energy to a hazardous level, verification of isolation shall be continued until the servicing or maintenance is completed, or until the possibility of such accumulation no longer exists. 6. After all work is completed and inspected, all guards shall be replaced (except those covering required adjustment points). 7. When it is determined that the energy is ready to be restored, the affected employees shall be notified that energy is about to be restored and a visual check of the area shall be made to determine that all material, spare parts and employees are clear of any danger area. Each employee shall remove his own padlock and tag. Only after these steps are taken may energy be restored. 8. After final adjustments are completed, the remaining guards shall be replaced. Equipment Testing and Positioning Procedures In the event that lockout or tagout devices must be temporarily removed from the energy-isolating device, the following procedures must be followed: 1. clear the equipment of all tools and materials and ensure that the equipment components are operationally intact; 2. Ensure that all employees are safely positioned or removed; 3. The employee who applies the lockout/tagout device(s) shall then remove said device(s) from each energy isolating device; 4 of 7

4. Re-energize the equipment and proceed with the testing or positioning; 5. De-energize all systems and reapply the energy control devices in accordance with the procedure previously specified. Group Lockout/Tagout Devices When more than one employee is working on the machinery or equipment, the following modifications to the above procedures are required: 1. Shift Supervisor shall install the group lockout/tagout device. 2. Each authorized employee must attach his or her own lock and tag to the group lockout/tagout device before beginning work on the equipment or machinery. 3. Each authorized employee shall remove those devices when they stop working on equipment or machinery. Outside Personnel (Contractor) Procedures Whenever outside personnel are engaged in activities requiring lockout/tagout procedures, the following procedures will be instituted: 1. The Safety and Operations Managers and the outside employer shall review the respective lockout/tagout procedures. 2. The Health and Safety Manager shall ensure that all facility employees are aware of, understand and comply with the off-site personnel lockout/tagout program. In the event that the off-site personnel operate under a deficient program, or do not have a program, they shall be instructed and follow the facility program or the work shall not be performed. Operational Requirements General operating requirements for the lockout/tagout program are as follows: 1. Locks shall be painted in an appropriate color scheme to identify them as a safety lock. These locks will not be used for any other purpose and only safety locks may be used for lockout. Safety locks must not be keyed alike. 2. The Shift Supervisor shall provide each employee servicing or repairing equipment with a safety lock, key and tags. 3. If more than one employee is assigned a task, each employee shall apply his own lock and tags so that the controls cannot be operated (multiple or group lockout devices should be used). 5 of 7

4. If an employee leaves a machine that is locked out, he shall recheck it upon return to ensure that it is still locked out. 5. The Shift Supervisor shall direct any test or adjustment on equipment if it must be done with danger tags still in place. 6. No one, other than the person placing the padlock and tag on the lockout/tagout device shall remove them except the Shift Supervisor or Operations Manager and then only if the employee is unable to do so. Before the padlock is removed by the supervisor, it must be determined that the employee is not at the facility. Reasonable efforts must be made to contact the employee to inform him that his padlock and tags have been removed. The employee must have this knowledge before he resumes work at the facility. 7. If an employee's shift ends before a task is completed on lockout equipment, he shall notify the Shift Supervisor and the supervisor shall apply a lock to replace the employee's lock. Locks and tags shall never be transferred among employees while in place and locking out equipment. 8. If an employee must isolate piping systems, installing blinding devices and tags shall be the primary method. 9. Tags are used as warning devices, attached along with locks to identify operations and operators. They may not be removed without authorization of the person responsible for them. 10. Tags must: identify the authorized employee and the date of issue be legible and understandable by employees be made of materials which will withstand the environmental conditions encountered in the work place be attached with the equivalent of a one piece, environmentally-tolerant, self locking, non-releasing, nylon cable tie not be reused unless all prior information can be thoroughly removed. NOTE: EACH FACILITY SHOULD CONSULT WITH THEIR MAINTENANCE DEPARTMENT AND ADD THE SPECIFIC OPERATIONAL PROCEDURES FOR LOCKING/TAGGING OUT EACH PIECE OF FACILITY EQUIPMENT TO THIS SECTION. 6 of 7

(6) PROGRAM MAINTENANCE AND REVIEW The Safety Manager or his designee shall perform program maintenance and review. This inspection will consist of observing procedures in action. The inspection shall correct any deviations or inadequacies observed. The inspector shall also review with each authorized employee that employee's responsibilities under the procedure being inspected. The Safety manager will certify that periodic, at least annual, inspections are being performed. The certification shall identify the machine or equipment on which lockout/tagout procedures are being utilized, the date of the inspection, the employees included in the inspection and the person performing the inspection. Approved by: ORIGINAL AT US CONCRETE HOUSTON Effective Date: 1/1/03 Signature: Original at US Concrete Houston 7 of 7