Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Similar documents
Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Standard Development Timeline

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

A. General provisions and other electrical systems are specified in other Sections of Division 26.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

OC Approved 2/17/05 SB/DS Stability Limits for the addition of 3.26% Series Reactor

Bio Energy #1 Distribution Generator Interconnections Less than 35 kv

Standard NUC Nuclear Plant Interface Coordination

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Small and Large Generator Interconnection Procedures

To ensure system protection is coordinated among operating entities.

XXXXX Kwalsa Phase II Project. Interconnection Facilities Study and Project Plan

Future Development Plan:

Addendum to ESAH Version 3 Supply Application

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

The State of Interconnection in NYS:

Transmission Planning Attachment K Public Input Meeting

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

Standard FAC Facility Ratings. A. Introduction

j. Billing procedure k. Periodical Inspections Page 1

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

NPCC Tasks Related to NERC Blackout Recommendations Timeline

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

VIA ELECTRONIC FILING

Implementation Plan Set Two of Phase III & IV Reliability Standards

Comprehensive Interconnection Process Improvements

If any queries arise ESB Networks DAC can be contacted at or

B. All of the documents in this RFP form the Basis-of-Design for this project.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Annual Performance Indicator (PI)

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

WECC Standard VAR-STD-2a-1 Automatic Voltage Regulators

PER-005 System Personnel Training

ADVERTISEMENT OF PUBLIC NOTICE

Luis Fondacci. James Manning. Administrative. The November 14, 2016 OSC Meeting Minutes and Highlights were reviewed and approved with one edit.

CIP Cyber Security Incident Reporting and Response Planning

Energy. Request For Proposals for Renewable Power Supply Resources

DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER

UCF SOLAR FARM-UCF 584 Solar Developer Project Fact Sheet

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

CITY OF COFFEYVILLE, KANSAS REQUEST FOR PROPOSALS FOR ELECTRICAL ENGINEERING, SUBSTATION MAINTENANCE, TESTING & SUPPORT SERVICES

NPCC Tasks Related to NERC Blackout Recommendations Timeline

Request for Proposals and Specifications for a Community Solar Project

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

The University of Texas at San Antonio

AMSP Guidebook. February 2017

BC Hydro writes to provide the BCUC with its second errata to the Addendum to Assessment Report No. 6 (Addendum) filed on September 30, 2013.

Community Update Brochure

NATIONAL NUCLEAR REGULATOR

SunZia Southwest Transmission Project. September. Project Update for the Board of Socorro County Commissioners February 28, 2017.

Refer to section 2.C. for more information on the evaluation criteria.

P A N E L B O A R D S C H E D U L E

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project

WarmWise Business Custom Rebates Program Manual

The Narragansett Electric Company d/b/a National Grid

TRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015

REQUEST FOR PROPOSALS

July 1, 2006 Revision 2

Enduring Connection Policy Stage 1 (ECP-1)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Request for Qualifications. for. Electrical Substation Transformer Replacement. Stillwater Utilities Authority (SUA) City of Stillwater, Oklahoma

APPENDIX 2: Electrical Design

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

Automation, Protection, and Control General Engineering Services for JEA Generating Plants and Substations

TOWN OF NEW TECUMSETH PROTOCOL FIT APPLICATIONS FOR RENEWABLE ENERGY

Buck & Boost Transformer Installation Instructions

Invitation to Submit Expression of Interest and Proposal

Greater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital

Pilot Program Framework Proposal

MLR Institute of Technology

Training and Evaluation Outline Report

PPEA Guidelines and Supporting Documents

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

March 30, Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

May 6, 2002 Revision 2

Embassy of the United States of America Ottawa, August 29, 1988 No. 364

American Recovery and Reinvestment Act (ARRA) Professional Engineering and Related Technical Services

Standard FAC Assessment of Transfer Capability for the Near-term Transmission Planning Horizon

Request for Proposal FirstHealth of the Carolinas, Pinehurst, North Carolina FCC Healthcare Connect Fund. Table of Contents

SunZia Southwest Transmission Project. September. EUCI 2017 Western Transmission Summit SunZia Project Case Study February 27, 2017.

Report Documentation Page

WIND AND SOLAR SPP SOLICITATION 2015 REQUEST FOR QUALIFICATION (RFQ) COMMERCIAL OPERATION OF WIND AND SOLAR SMALL POWER PROJECTS OCTOBER 2015 FOR

REQUEST FOR PROPOSALS

Powered by Safety. Powell Training Catalog

HT1611C Timer with Dialer Interface

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Solar Electricity For Community Buildings Pilot Program. Workbook

FUNDAMENTALS OF ELECTRICITY TRANSMISSION COURSE

NERC SPCTF Supplemental Assessment Addressing FERC Order 693 Relative to PRC System Protection Coordination

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Fiji Electricity Authority. MR 323/2017 Feasibility Study of Pumped Storage Hydropower at Monasavu Request for Prices

1 Customer and Contact Information

Page. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs...

Transcription:

Generator Impact Study Report Bladen County, NC 75.0 Solar Farm Queue #377

Table of Contents 1 PURPOSE... 3 2 ASSUMPTIONS... 3 3 RESULTS... 4 3.1 Power-flow Analysis Results... 4 3.2 Stability Analysis Results... 5 3.3 Power Factor Requirements... 5 3.4 Short Circuit Analysis Results... 6 3.5 Harmonics Assessment... 6 3.6 of Customer s Generation... 7 3.7 Estimate of Cost... 7 4 SUMMARY... 8 APPENDIX I : FIGURES... 9-2 -

1 PURPOSE The purpose of this Impact study is to assess the impacts of the generator interconnection requests on the reliability of the (DEP) transmission system with respect to power flow, power factor, stability, and short circuit. Estimates of the cost and time required to interconnect the generation as well as to resolve the impacts as determined in this analysis are also included. The DEP internal system analysis consists of an evaluation of the internal DEP transmission system utilizing documented transmission planning criteria. The requests are described in Table 1 below. DEP Generator Queue No. Table 1: Requests Requested In-Service Date County Facility 377 75.0 6/30/2018 Bladen County, NC Cumberland-Delco 230 kv Line 2 ASSUMPTIONS The following Impact Study results are from the DEP internal power-flow models that reflect specific conditions of the DEP system at points in time consistent with the generator interconnection requests being evaluated. The cases include the most recent information for load, generation, transmission, interchange, and other pertinent data necessary for analysis. Future years may include transmission, generation, and interchange modifications that are not budgeted and for which no firm commitments have been made. Further, DEP retains the right to make modifications to modeling cases as needed if additional information is available or if specific scenarios necessitate changes. For the systems surrounding DEP, data is based on the ERAG MG model. The suitability of the model for use by others is the sole responsibility of the user. Prior queued generator interconnection requests were considered in this analysis. The results of this analysis are based on Customer s queue requests including generation equipment data provided. If the facility technical data or interconnection points to the transmission system change, the results of this analysis may need to be reevaluated. This study was based on the following assumptions: CUSTOMER would construct, own and operate the electrical infrastructure that would connect their generation to DEP s facilities, including any step up transformers and lines from the generators, but excluding the circuit breaker in the new breaker station where applicable. - 3 -

3 RESULTS 3.1 Power-flow Analysis Results Facilities that may require upgrade within the first three to five years following the in-service date are identified. Based on projected load growth on the DEP transmission system, facilities of concern are those with post-contingency loadings of 95% or greater of their thermal rating and low voltage of 92% and below, for the requested in-service year or the in-service year of a higher queued request. The identification of these facilities is crucial due to the construction lead times necessary for certain system upgrades. This process will ensure that appropriate focus is given to these problem areas to investigate whether construction of upgrade projects is achievable to accommodate the requested interconnection service. All queue requests, as well as nearby existing and prior-queued generation, were modeled and assumed to be operating at full output. Contingency analysis study results show that interconnection of these generation facilities DOES result in potential thermal overloads on the DEP system. The following facilities will need to be upgraded to accommodate the proposed generation: Facility Erwin - Fayetteville East 230 kv Line Upgrade Raise or replace structures over 18.86 miles in order to increase rating These results are dependent on assumptions regarding prior-queued interconnection requests. If any prior-queued requests drop out of the queue, these results may change. Estimate of Resolutions for Power Flow Impacts Total Power-flow Cost Estimate: $12,000,000 Erwin Fayetteville East 230 kv Line Potential Solution: The Erwin - Fayetteville East 230 kv line will have to be rebuilt. A project of this nature would take at least 36 months to complete. Estimated Cost: $12 million Estimated Schedule: 6/1/2020-4 -

3.2 Stability Analysis Results A stability analysis was performed to determine the impact of the proposed generation additions on the DEP transmission system and other nearby generation. All queue requests, as well as nearby existing and prior-queued generation, were modeled and assumed to be operating at full output. The proposed solar farm was modeled considering the specific layout and number of inverters (30 SMA SC2500-EV, 75 MVA). The model included a single lumped equivalent generator (to represent the inverters) with inverter transformer (5.75%Z at 2500 kva x 30) and collector impedance. The interconnection to the DEP transmission system was via a single substation transformer (10%Z at 45/60/75 MVA), based on data provided by the Customer. A representative set of faults was simulated to determine if there would be any adverse impact to the transmission system as a result of the proposed generation. The ability of the solar farm to ride through the voltage depressions resulting from the faults was also verified, based on the model parameters provided by the Customer. The stability evaluation initially found problems with the solar plant tripping for nearby transmission faults. After working with the developer to adjust the model to meet NERC PRC-024 voltage and frequency trip settings, the stability results were deemed acceptable. All generators stayed on-line and stable for all simulated faults. If the Customer data changes from that provided, these results will need to be reevaluated. 3.3 Power Factor Requirements DEP s Large Generator Procedure (LGIP) requires the proposed generation to be capable of delivering the requested to the Point of (POI) at a 0.95 lagging power factor. For analysis of the power factor requirement, the Customer-supplied data regarding inverter capabilities, collector field configuration, impedances and line charging, and transformer impedances were used. The results of the analysis indicate that the proposed solar plant design, without capacitors, DOES NOT meet the 0.95 lagging power factor requirement at the POI for the requested delivery level. If no capacitors are included in the plant design, Table 2 below summarizes the approved at the POI, along with the MVAR capability at the POI required to meet the 0.95 lagging power factor requirement at the POI. If capacitors are included in the design, Table 3 below summarizes the approved at the POI, along with the MVAR capability at the POI and the capacitor size required to meet the 0.95 lagging power factor requirement at the POI. The Customer must notify Duke Energy which option they choose before the Facility Study can be performed. - 5 -

Table 2: Approved and MVAR Capability Required at the POI to Meet Power Factor Requirements Reduce Option DEP Generator Queue No. Requested Approved MVAR Capability Required 377 75 64.5 21.2 Table 3: Approved and MVAR Capability Required at the POI to Meet Power Factor Requirements Add Capacitor Option DEP Generator Queue No. Requested Approved MVAR Capability Required Capacitor MVAR Required 377 75 70.1 23.0 16.1 3.4 Short Circuit Analysis Results A short circuit analysis was performed to assess the impact of the proposed generation addition on transmission system equipment capabilities. The analysis indicates that no short circuit equipment capabilities will be exceeded as result from the proposed generation additions and associated transmission upgrades. The results of the short circuit study are based on Customer provided generation equipment data and location. Also, the prudent use of engineering assumptions and typical values for some data were used. If the units technical data or interconnection points to the transmission system changes, the results of this analysis may need to be reevaluated. 3.5 Harmonics Assessment There is potential interaction of harmonic current injections from the Customer s proposed generation and certain capacitor banks on the DEP system. Testing may be necessary after the actual in-service date of this generation and the Customer will be responsible for mitigation of any detrimental impacts to the system. - 6 -

3.6 of Customer s Generation The point of interconnection for Queue #377 is a new 230 kv breaker station connected to the Cumberland-Delco 230 kv Line near structure 219. The breaker station one-line is provided as Figure 1. The customer should verify that the MVA ratings of their connecting lines are sufficient to accommodate delivering the total MVA output to the point of interconnection at the required 0.95 power factor. 3.7 Estimate of Cost Q377 The estimate includes the assumption that DEP will acquire and use a portion of the property that the Customer will secure for the addition of the facility. Tap Line Description: Estimated Cost: $950,000 New Breaker Station Description: Estimated Cost: $2,200,000 DEP will tap the Cumberland-Delco 230 kv line and Construct a short tap line to New Breaker Station adjacent to DEP ROW. Manual switches will be installed on each side of the Tap. Construct new 1-230 kv breaker station at generation new connection point. Assumes a control building with cable trench, line trap, CCVTs, surge arrestors, power pot, 230 kv breaker with air break switches, metering PTs and CTs. Install Transfer Trip Scheme at New Breaker Station and Transmission Substations Description: It will be necessary to separate this generation facility from the DEP system for faults on the Cumberland-Delco 230 kv line. Install protection system and transfer trip for coordination between the above listed transmission line and proposed generation facility. Estimated Cost: $300,000 Taxes Description: NC utility tax of 7% Estimated Cost: $241,500 Total Cost Estimate: $3,691,500-7 -

Generator Impact Studr Report: Bladen County, NC - 75.0 l'\i\v, Queue #377 4 SUMMARY This Generator Impact Study assesses the impact of interconnecting a new generation facility with a requested summer/winter rating of 75. Based on the data provided by the requester, the approved injection is 64.5 without a capacitor or 70.1 ~ IW with a 16.1 Mvar capacitor bank. While stability and short circuit analyses found no issues with connecting the new plant, power flow analysis found a network upgrade that will be required before connecting the proposed plant. upgrades are also necessary to the DEP Transmission System are necessary to accommodate Q377. DEP estimates that it will require at least 36 months to complete the transmission upgrades after a firm written agreement to proceed is obtained from the customer. The additional cost for telecommunications and metering can be estimated as a monthly charge of S3,000 /month per interconnection. Power-flow Stability Short Circuit Total Estimate $12,000,000 $0 $0 $3.691.500 $15,691,500 Study Completed by: Reviewed by: Duke Energr Progress l'\fay 2, 201 7-8 -

APPENDIX I : FIGURES -Figure 1- - 9 -