Pakistan: Punjab Community Water Supply and Sanitation Sector Project

Similar documents
Nepal: Small Towns Water Supply and Sanitation Sector Project

Completion Report. Pakistan: Balochistan Devolved Social Services Program

Viet Nam: Second Small and Medium-Sized Enterprises Development Program

Uzbekistan: Woman and Child Health Development Project

Rajasthan Urban Sector Development Program

Papua New Guinea: Support for Water and Sanitation Sector Management

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

Papua New Guinea: Implementation of the Electricity Industry Policy

Completion Report. Project Number: Loan Number: 2230-PAK October Pakistan: Rural Enterprise Modernization Project

Project Administration Instructions

Kyrgyz Republic: Investment Climate Improvement Program

Sri Lanka: Tsunami-Affected Areas Rebuilding Project

ASIAN DEVELOPMENT BANK

Report and Recommendation of the President to the Board of Directors

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province

Lao People s Democratic Republic and Viet Nam: Greater Mekong Subregion: Sustainable Tourism Development Project

Completion Report. Project Number: Loan Number: 2449-INO(SF) October Indonesia: Rural Infrastructure Support to the PNPM Mandiri Project

PROJECT PREPARATORY TECHNICAL ASSISTANCE

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

(Financed by the Japan Fund for Poverty Reduction)

Pacific Urban Development Investment Planning and Capacity Development Facility

India: Agribusiness Infrastructure Development Investment Program (Tranche 2)

Resettlement Planning Document

Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

OPERATIONS MANUAL BANK POLICIES (BP) These policies were prepared for use by ADB staff and are not necessarily a complete treatment of the subject.

India: Madhya Pradesh State Roads Sector Project II

Report and Recommendation of the President to the Board of Directors

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Project Administration Memorandum. Republic of Uzbekistan: Surkhandarya Water Supply and Sanitation Project

Proposed Extension of Pilot Period for the Project Design Facility

Regional: Supporting the Cities Development Initiative for Asia

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

TERMS OF REFERENCE. East Jerusalem with travel to Gaza and West Bank. June 2012 (flexible depending on consultant availability between June-July 2012)

GRANT AGREEMENT (Special Operations) (Hairatan to Mazar-e-Sharif Railway Project) between ISLAMIC REPUBLIC OF AFGHANISTAN. and ASIAN DEVELOPMENT BANK

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project

The World Bank Romania Secondary Education Project (P148585)

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Report and Recommendation of the President to the Board of Directors

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015

Sri Lanka: Small and Medium-Sized Enterprises Line of Credit Project Additional Financing

Proposed Grant Assistance Kingdom of Thailand: Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin

Local Government Unit Private Infrastructure Project Development Facility (Loan 1729-PHI) in the Philippines

across multiple countries. In turn, the WaterCredit partnership models and financing mechanisms serve to channel and

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

Completion Report. Project Number: SRI Loan / Grant Number: L2167 / G0006 November Sri Lanka: Tsunami-Affected Areas Rebuilding Project

Safe Drinking Water and Sanitation for School Children Zimbabwe Final Report to the Isle of Man Overseas Aid Committee July 2011-April 2012

Country Operations Business Plan. Samoa October 2016

Procedure: PR/IN/04 May 21,2012. Procedure: Accreditation of GEF Project Agencies

AUDIT OF THE UNDP AMKENI WAKENYA PROGRAMME KENYA. Report No Issue Date: 10 January 2014

Terms of Reference AUDIT OF SOLAR HOME SYSTEMS PROJECT. The assignment is to engage an auditor for the following.

Actual Project Name : Community Recovery In Earthquake Affected Areas Through Urban Poverty Project Country: Indonesia

BETF: P (TF and TF013728)

Rural Enterprise Finance Project. Negotiated financing agreement

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

Primary education (46%); Secondary education (26%); Public administration- Education (16%); Tertiary education (12%) Project ID

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

TERMS OF REFERENCE WASH CONTEXT ANALYSIS IN LIBERIA, SIERRA LEONE AND TOGO

Project Administration Manual. Islamic Republic of Afghanistan: Road Asset Management Project

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761)

Gramalaya Tiruchirappalli Annual Report for

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

Philippines: ASEM Country Strategy Note April 2003

Somalia Is any part of this project cash based intervention (including vouchers)? Conditionality:

Republic of Marshall Islands: Ebeye Water Supply and Sanitation Project

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) TF Dec ,900,000.00

ARTICLE I. Grant Regulations; Definitions

Special Section 1 Making Health Services Work for the Poor in Pakistan: Rahim Yar Khan Primary Healthcare Pilot Project *

Microfinance for Rural Piped Water Services in Kenya

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

Mongolia: Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park Project

UNICEF LAO PDR TERMS OF REFERENCE OF NATIONAL CONSULTANT (NOC) COMMUNICATION FOR DEVELOPMENT (C4D) IN IMPROVING ROUTINE IMMUNIZATION

Proposed Grant Assistance Kyrgyz Republic: Improving Livelihoods of Rural Women through Development of Handicrafts Industry

Lao People s Democratic Republic: Strengthening Urban Water Supply Regulation

Introduction. Partnership and Participation

Tanzania: Joint Social Services Programme Health, Phase II

Maldives: Tsunami Emergency Assistance Project

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Evaluation Study. Financing Partnership Facilities. Independent Evaluation Department

Rwanda-Rural Water Supply and Sanitation Project

PAKISTAN DEVELOPMENT FORUM 2005 IMPACT OF DEVOLUTION ON SERVICE DELIVERY PRESENTATION BY MR. DANIYAL AZIZ, CHAIRMAN NRB

Republic of Indonesia: Scaling Up Energy Efficiency

Global Partnership on Output-based Aid Grant Agreement

Public Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)

: Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1

INTERNATIONAL ASSOCIATION FOR NATIONAL YOUTH SERVICE

Uganda Water and Sanitation NGO Network

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Case study: System of households water use subsidies in Chile.

Project Administration Manual

Supplementary Appendix D 1

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA

Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)

Transcription:

Validation Report Reference Number: PCV: PAK 2009-48 Project Number: 35314 Loan Number: 1950-PAK(SF) December 2009 Pakistan: Punjab Community Water Supply and Sanitation Sector Project Independent Evaluation Department

CURRENCY EQUIVALENTS (as of 31 October 2009) Currency Unit Pakistan rupee/s (PRe/PRs) PRs1.00 = $0.01199 $1.00 = PRs83.40 ABBREVIATIONS ADB Asian Development Bank ADF Asian Development Fund CBO community-based organization EA executing agency MFI microfinance institution IED Independent Evaluation Department MIS management information system O&M operation and maintenance OCR ordinary capital resources PCR project completion report PMU project management unit PRWSSP Punjab Rural Water Supply and Sanitation Sector Project RRP report and recommendation of the President SDR special drawing rights SUPER Social Uplift and Poverty Eradication Program TMA tehsil municipal administration WSS water supply and sanitation NOTES (i) In this report, $ refers to US dollars. (ii) For an explanation of rating descriptions used in ADB evaluation reports, see: ADB. 2006. Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations. Manila.

Key Words adb, asian development bank, community-based organizations, drainage, hygiene, ied, independent evaluation department, institutional strengthening, sanitation, microfinance, oed, operations, validation, water supply and sanitation Director Team leader Team members R. B. Adhikari, Independent Evaluation Division 1, Independent Evaluation Department (IED) G. Rauniyar, Senior Evaluation Specialist, Independent Evaluation Division 1, IED A. Morales, Evaluation Officer, Independent Evaluation Division 1, IED V. Melo, Operations Evaluation Assistant, Independent Evaluation Division 1, IED In preparing any evaluation report, or by making any designation of or reference to a particular territory or geographic area in this document, the Independent Evaluation Department does not intend to make any judgments as to the legal or other status of any territory or area.

PROJECT COMPLETION REPORT VALIDATION FORM A. Basic Project Data PCR Validation Date December 2009 Project and Loan 35314 Approved Actual Number: 1950-PAK (SF) Project Name: Punjab Community Total Project Costs ($M) 71.4 78.2 Water Supply and Sanitation Sector Project Country: Pakistan Loan/Grant ($M) 50.0 53.9 Sector: Water Supply and Sanitation Total Cofinancing ($M) 0.0 0.0 ADB Financing ($M): ADF: 50.0 Borrower ($M): 16.8 19.5 OCR: 0.0 Beneficiaries ($M): 04.6 04.8 Cofinanciers: 0.0 Others ($M): 0.0 0.0 Approval Date: 28 Nov 2002 Effectiveness Date: 23 Apr 2003 29 Apr 2003 Signing Date: 23 Jan 2003 Closing Date: 30 Jun 2007 06 Dec 2007 Project Officers: Location (HQ or RM): From To S. Khan R. Farrukh HQ RM 2003 2005 2005 2007 Validator: G. Rauniyar Director: R. B. Adhikari, IED1 Quality Control G. Rauniyar Reviewer/ Senior Evaluation Peer Reviewer: Specialist, IED1 ADB = Asian Development Bank, ADF = Asian Development Fund, HQ = headquarters, IED = Independent Evaluation Department, IED1 = Independent Evaluation Division 1, M = million, OCR = ordinary capital resources, PCR = project completion report, RM = resident mission, SDR = special drawing rights, SF = Special Funds. B. Project Description (summarized from the Report and Recommendation of the President [RRP]) (i) Rationale. Punjab is the country s largest province and had a population of about 84 million, or around 62% of the country s total of 135 million, at the time of appraisal. About 60% of Punjab s population lived in rural settlements, 36% of which were classified poor. The overall water supply coverage in rural Punjab was 53%, about half of which was provided by piped systems and the rest through community hand pumps. The remaining 47% of households relied on often distantly located sources of unsafe water, such as uncovered wells, rivers, and rain-fed or canal-fed ponds. Similarly, only about 27% of the rural population had access to sanitation facilities, in the form of household latrines. About half of the villages were located in areas of brackish, polluted, or scarce water. Lack of water affected the lowest income groups, especially women and children who spend much time in fetching water. This task caused women to miss productive opportunities, while children missed educational opportunities. These groups also suffered significantly from waterborne diseases caused by the use of water unfit for human consumption, and from the high cost of health care as a result of illness. The provision of clean water was expected to enable these beneficiaries to make more productive use of their time and would yield significant health benefits. (ii) Impact. The main expected benefit was the economic value of the time saved by women in fetching water and diverted to activities leading to the socioeconomic well-being of the household. With water supply on their doorstep, women could contribute their labor input in farm-related activities, tend livestock, and pursue other off-farm income-generating activities. Moreover, women would have more time for household chores and better child care. Girls, who used to share the burden of fetching water and thus miss school, were expected to be able to attend school regularly. These activities were considered to have significant social and economic benefits. In addition, significant health-related benefits were expected, including decreased morbidity and infant mortality. The access to clean water would have significantly reduced the resultant productivity loss caused by absenteeism in the

2 workplace. Similarly, elimination of stagnant ponds (a breeding place for mosquitoes) and cleaner streets (caused by the complementary improved drainage investment) were expected to contribute considerably to environmental improvement. Strengthening the tehsil (subdistrict) municipal administrations (TMAs) would build their capacity to ensure sustainability of the subprojects and enable them to implement similar subprojects in the future in an ongoing manner. This would substantially accelerate achievement of the sector goals. Project implementation would result in substantial savings in time and a reduced health burden, and rural women would be the main beneficiaries. Through its Social Uplift and Poverty Eradication Program (SUPER), the Punjab Community Water Supply and Sanitation Sector Project would aim at boosting village economies by using time savings of women and children in productive and livelihood activities. It would also result in manifold increases in school enrollment, particularly of girls, as experienced in the Punjab Rural Water Supply and Sanitation Sector Project (PRWSSP). (iii) Objectives or expected outcomes. Key expected outcomes of the Project were (a) improved access to clean, safe, sufficient, and regular water supply; (b) improved hygiene behavior of community residents; (c) sustainable local water supply and sanitation (WSS) institutions; (d) improved livelihood opportunities, particularly for rural women; and (e) improved capacity of the executing agencies (EAs) and implementing agencies in delivering WSS services. (iv) Components and/or outputs. The Project had four components: Component A: Construction of water supply and drainage facilities. The construction of about 500 community-based simple, low-cost water supply and drainage subprojects and rehabilitation of about 250 need-based inoperative old subprojects, meeting the subproject selection criteria. The new subprojects would include about 450 pump-based schemes and 50 gravity-based schemes. At least 10 sites would be identified for the rain-harvesting schemes. Component B: Hygiene education program. Carrying out a hygiene education program as formulated and implemented in the phase I project. Education material, service vehicles, and consulting services would be provided to support the program. This part also included establishing a revolving fund to assist selected beneficiaries in project villages to install household latrines. All schools in the project area would be provided adequate supply of safe drinking water and latrines. Component C: Institutional strengthening and capacity building. Strengthening and building the capacity of the local government institutions, including TMAs in all districts of Punjab, by providing consulting services, management information system (MIS) software, and education material. The project management unit (PMU) of the Housing Urban Development and the Public Health Engineering Department would be provided consulting services, equipment, service vehicles, and operational cost support for the community development unit and project implementation offices. Component D: Social Uplift and Poverty Eradication Program. Two key interventions were (a) microcredit schemes for using the time saved, mainly by women and children, in more productive and livelihood activities; and (b) constructing additional classrooms in the village schools where existing space was not sufficient to accommodate additional children freed from the chore of fetching drinking water. SUPER was expected to cover the provision of financial assistance, a local community liaison advisor, and service vehicles initially in the selected PRWSSP communities and later, based on success, to the remaining areas of the PRWSSP and the Project. This phase would introduce subborrowers to group-based microfinance, which would lead to linkages with the microfinance institutions (MFIs) and greater access to microfinance services. The interest rate charged would be consistent with those of the established MFIs.

3 C. Evaluation of Design and Implementation (Project Completion Report [PCR] Assessment and Validation) (i) Relevance of design and formulation. The Project, as designed, sought to address lack of access to clean drinking water and sanitation facilities in rural Punjab by providing piped or community stand pipes, as appropriate, through community-managed subprojects. Through the provision of water to the household premises, the Project aimed to (a) reduce expenditure on health; (b) improve productivity and income, particularly for women; (c) increase school enrollments and reduce dropout rates, particularly for girls at the primary school level; and (d) reduce overall negative impacts on the socioeconomic conditions of the rural population, particularly of the poor. The Project was appropriately designed as a sector project. The project design incorporated relevant lessons from the PRWSSP, piloted in seven districts, and sought a greater role for local communities at all stages of subproject management. The Project was relevant in both the national and provincial context. As stated in the PCR, the main design feature consisted of (a) constructing cost-effective WSS subprojects, with beneficiary communities involved in planning, design, and implementation; (b) building the capacity of participating TMAs and community-based organizations (CBOs); and (c) implementing a complementary SUPER. The Independent Evaluation Department (IED) 1 concurs with the PCR assessment that the Project was reasonably flexible. According to the PCR, the project formulation process was adequate, key stakeholders were consulted during the project preparatory technical assistance, stakeholders concerns were addressed in the design, and lessons from PRWSSP implementation were incorporated. As reported in the PCR (para. 14), construction of additional classrooms by the Project was not required because the Punjab government initiated an education sector reform project in the province, under which additional classrooms were constructed to increase the capacity of primary and secondary schools in the project area. The Project demonstrated strong commitment and ownership from the provincial EA the Public Health Engineering Department. However, the assumption that the TMAs would be interested and cooperative and take ownership of the subprojects did not materialize. The provision for the SUPER, hygiene education, and latrine construction program was under-resourced. While the EA had strong technical hardware capabilities, it fell short on institutional capabilities to implement the SUPER and hygiene education programs. Overall, IED considers that the project design remained relevant 2 during project implementation and at completion. (ii) Project outputs. The PCR (paras. 8 14) provides a list of project outputs. While the Project envisaged construction or rehabilitation of 750 subprojects, it achieved 778 subprojects comprising 713 pumpbased, 14 gravity-based, 12 rain harvesting water supply, and 39 sanitation subprojects. Far fewer gravity-based subprojects were developed (14 actual versus 50 envisaged). The PCR does not provide reasons for this divergence. The Project also constructed sanitation facilities in 39 villages, which included street drains, street pavements, silage carriers, and oxidation ponds. While the PCR reports that many villages are using drainage effluent and sewage for irrigation purposes, following oxidation, the actual number of such facilities has not been reported. The Project developed several hygiene education materials, including 130 compact discs, 572 audiotapes, 240 video cassettes, 3,900 charts, 2,110 posters, and 25 booklets in the form of a wall hanging library to the communities. A revolving fund for latrine construction was utilized under the Project for the construction of 1,221 latrines. In addition, the Project organized several workshops for the CBOs. The effectiveness of these activities has not been properly documented in the PCR. Several activities were reportedly undertaken under the institutional strengthening and capacity building component of the Project (PCR, para. 12). Similarly, under the SUPER component, the Project reportedly linked CBOs to MFIs such as Khushali Bank, the National Rural Support Program, the 1 IED was named the Operations Evaluation Department (OED) until December 2008. 2 For an explanation of rating descriptions used in ADB evaluation reports, see: ADB. 2006. Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations. Manila.

4 Punjab Rural Support Program, and Punjab Small Industries Corporation disbursing microcredit for income-generating activities. The Project directly disbursed PRs2.073 million to 213 borrowers in 38 CBOs of the PRWSSP. While the PCR reports a substantial increase in disbursement by the MFIs, their effectiveness has not been assessed and will require a separate exercise. (iii) Project cost, disbursements, Borrower contribution, and conformance to schedule (as relevant to project performance). As stated in the PCR, the actual project cost exceeded the appraisal estimates by 9.5%, but this shortfall was covered by an increase in the Asian Development Bank (ADB) loan amount from $50.0 million to $56.1 million because of a change in the US dollar SDR parity, of which $53.9 million was utilized by the Government. The total project cost was $78.2 million, of which ADB financed 68.9%; the Government 25%; and local communities 6.1%. The PCR reports that the disbursement procedures were efficient and supported smooth project implementation. Para. 3 of the back-to-office report of 18 January 2007 noted that the allocated amount for equipment and materials category (component A) was not sufficient, and that the additional amount of $1,400,136 (18% above the allocation) would be required to complete the target schemes. It also noted a saving of $1,619,123 from the hygiene education program category (component B), and $203,536 in the SUPER category (component D). The PCR notes that there was an undisbursed balance of $1.47 million under the equipment category, but almost all the amount under hygiene education and SUPER was utilized. Clarification from the Pakistan Resident Mission to an IED query indicated that the SUPER fund was not required because project beneficiaries were linked to MFIs. In addition, the actual cost for hygiene education realized was less than estimates. (iv) Implementation arrangements, conditions and covenants, related technical assistance, and procurement and consultant performance. The implementation arrangement under the then Housing Urban Development and Public Health Engineering Department was considered efficient by the PCR. However, the PCR does not provide adequate information to ascertain the effectiveness of the implementation arrangements. It was originally planned that the Project would strengthen TMAs and build their capacity to organize community-based water supply and drainage schemes, and improve related management functions. However, this seems not to have taken place as the operational link between the PMU and TMAs was quite weak. Interviews with TMA staff at the provincial level, during the fieldwork for the impact evaluation study undertaken by IED, 3 noted that some of the TMA staff received management information training; but training imparted by the Project was not adopted to improve the TMAs information system due to resource constraints. The Project had 34 loan covenants and, according to the PCR, all but one was complied with; and compliance was rated either satisfactory or highly satisfactory. Only one covenant related to the 6 monthly water quality monitoring was partly complied with. No reason for partial compliance is given in the PCR. Protracted delays in recruitment of consultants and a review of consulting services requirements resulted in the utilization of only national consultants. The Project utilized 626 person-months of national consultant services compared with 613 person-months provisioned in the project design. As noted in the PCR, the quality of outputs produced by the national consultants was mediocre, and their delivery was delayed. The problems associated with the quality of consultants and their weaknesses are stated in the PCR (para. 23). (v) Performance of the Borrower and the Executing Agency. The PCR reported that the Borrower provided counterpart funds, facilities, services, and other resources required for carrying out the Project in a timely manner and complied with obligations agreed upon in the Loan Agreement. The Project had a high level of ownership by the Punjab government and the PCR rated Borrower performance satisfactory. IED concurs with this rating, as evidenced by continued commitment by the Punjab government to keep the PMU functional at a substantially reduced level of staffing even 18 months after 3 ADB. 2009. Impact of Rural Water Supply and Sanitation in Punjab, Pakistan. Manila.

5 project completion. IED noted that this provision facilitated the project staff in providing continued support for community schemes encountering operational problems in various forms. IED also agrees that the performance of the EA was satisfactory based on the level of commitment outlined in the PCR. Introduction of water metering in rural areas introduced by the Project in selected subprojects is commendable. On the other hand, IED noted that the engagement of other specialized agencies for disseminating hygiene education materials and implementation of the SUPER would have freed up project staff time and efforts in providing support to CBOs in the EA's areas of area of expertise. (vi) Performance of the Asian Development Bank. IED rates ADB s performance satisfactory. ADB fielded 11 missions (one inception, seven review, one midterm, one environmental safeguard, and one project completion) over the life of the Project. The total mission input was 130 person-days. IED, in the context of another study, learned that some of the subproject approvals were too late, some even close to the project closing date. These subprojects were either incomplete or partially complete at the time of project completion. This may have contributed to keeping the PMU operational well beyond project duration. A 1-year extension would have been more desirable from an operational point of view because the PMU would have had substantially greater capacity and newly approved subprojects could have been handed over to the communities during the life of the Project. An assessment of community organizations capacity was presented in IED s impact evaluation study, which includes the Project (footnote 3). D. Evaluation of Performance (PCR Assessment and Validation) (i) Relevance. IED rates the Project relevant (rated highly relevant in the PCR). The project design appropriately assessed problems associated with water supply in rural Punjab, identified opportunities, and incorporated lessons from the PRWSSP which was piloted in seven districts of Punjab. The Project was consistent with the Government s strategy, as well as ADB s strategy and program for Pakistan at the time of approval. The choice of modality and instrument was reasonably appropriate and has some degree of private sector participation. The project design adopted a modest solution to address the identified problem. The Project, however, had limited coordination and/or complementarity with other development partners such as local nongovernment organizations, TMAs, and the United Nations Children s Fund operating in the WSS area. The upfront requirement of a 2% cash contribution and limitation of funds in poorer households led to a lower participation rate by these households in the Project. IED appreciates the value associated with the SUPER and hygiene components to the Project. However, in the context of project coverage, added efforts would have helped to upscale activities associated with these activities in a more meaningful way. While the Project developed several audiovisual materials for hygiene education promotion, another IED mission 4 noted that these materials were largely not known to most of the community members, and none of the 115 subprojects could provide an example other than 25 booklets developed for a wall hanging library. Even the booklets were heavily text dominated, and of limited use for less educated members in the local communities. The PCR does not state the reasons associated with a large difference in the number of gravity-based water supply systems stated in the RRP and actual achievement. The pump-based water supply systems may have been technically appropriate, but their cost-effectiveness was not analyzed. Social mobilization was achieved for establishing CBOs, but the mechanism ensuring CBOs stability and sustainability after project completion was weak. The added value of the SUPER and hygiene education program requires further assessment. The Project, at its design as well as at implementation, had weak coordination with development partners in Pakistan. (ii) Effectiveness in achieving outputs and outcome. IED rates the Project highly effective (as in the PCR) in achieving outputs and outcomes. The Project attained its purpose, which is achievement of 4 The Independent Evaluation Mission for the impact evaluation study of the PRWSSP and the Project, October 2008.

6 physical targets of forming CBOs, and construction and rehabilitation of 778 subprojects compared with a target of 750. Stability in project management staff and strong support from the EA were helpful in achieving project effectiveness. While CBOs achieved savings from their members, IED notes that with a bit of more effort from community development workers and their longer engagement with the Project a higher level of saving fund mobilization could have been achieved. CBOs have developed some capacity in managing subproject operation and maintenance (O&M) but there is substantial room for improvement. In addition, cultural barriers remain a limiting factor for full participation of women in decision making, particularly related to water supply system management. The impact evaluation study will present a detailed analysis of CBOs capacity. (iii) Efficiency in achieving outputs and outcome. IED rates the Project efficient (rated highly efficient by the PCR) in terms of using resources and achieving physical targets for the Project. The PCR does not provide details on assumptions associated with replacement costs of equipment. However, based on impact evaluation study field visits, IED noted that the cost of replacement of some of the equipment such as transformers is very high. In addition, it is expected that the project benefits would be lower given that the majority of the tubewells were operating for fewer hours a day, compared with original estimates. This is associated with the high cost of fuel prices and erratic power supply. It would be useful to subject the Project to cost-effectiveness analysis, and compute the cost of delivery per liter/person/household water supplied. (iv) Preliminary assessment of sustainability. IED rates project sustainability likely (rated most likely by the PCR). The importance of water, particularly where there are no alternatives to project subprojects, is likely to bind people together and keep the water supply systems operational. However, IED is concerned about limited experience reflected by the relatively weak maturity of CBOs responsible for the O&M, and inadequate capacity strengthening measures following completion of the Project. Persistent high fuel prices and disruptions in power supply, in addition to the continued threat of transformer theft, are likely to weaken the sustainability of the subprojects. (v) Impact (both intended and unintended). IED concurs with the PCR that the overall impact of the Project has been positive, particularly in terms of reduced drudgery associated with fetching water, and more time available for undertaking other activities. The impact evaluation study of the PRWSSP and the Project will shed more light on the specific nature of the Project s impact on health, education, society, environment, and institutions. E. Overall Assessment, Lessons, and Recommendations (Validation of PCR Assessment) (i) Overall assessment. Overall, IED rates the Project successful (rated highly successful in the PCR). While the output achieved was more than envisaged in the appraisal, a number of subprojects were approved just before project completion. In October 2008, nearly 100 of the 778 subprojects had not been handed over to the communities. While all subprojects were approved before project completion, these nearly 100 subprojects were either under testing operations, or communities were not prepared to take over the schemes for other reasons. The Project was relevant, highly effective, efficient, and likely sustainable with adequate provision for supporting CBOs. (ii) Lessons. IED agrees with the four lessons stated in the PCR resulting from the Project s successful implementation. These were (a) active involvement of beneficiaries in the project processes through social mobilization; (b) training, awareness raising, and capacity building of beneficiaries in the ensuring sustainability of the subprojects; (c) appointment of qualified staff and retaining them for the duration of the Project to avoid implementation delays; and (d) active support of the provincial government and of senior EA management in project implementation. Furthermore, continued capacity building support to the CBOs is required for the sustainability of community infrastructure. (iii) Recommendations. IED concurs with the recommendations made in the PCR. In addition, there is a need to undertake cost-effectiveness analysis of different types of water supply systems and requirement for continued support to CBOs responsible for O&M of the subprojects.

7 F. Monitoring and Evaluation Design, Implementation, and Utilization (PCR Assessment and Validation) The Project had an MIS at the subproject level. Because of weak design of the MIS, no household level baseline data was collected, so it is difficult to ascertain project benefits at the household level. While project management tried its best to consolidate project data, not all data have been entered into the database. A large number of completed forms are still stored in hard copy at the PMU. The database has been of limited use for project management decisions. The Loan Agreement (Schedule 1, Section 2, B.b) stated that under the hygiene education program, the Project will monitor the effects of water quality improvement on health, especially child stunting. This activity was not accomplished. G. Other (e.g., Safeguards, Including Governance and Anticorruption; Fiduciary Aspects; Government Assessment of the Project, as applicable) (PCR Assessment and Validation) The PCR notes that none of the subprojects caused involuntary resettlement or had a negative impact on indigenous people. No adverse environmental impacts have been noted. Furthermore, there is no reported case of corruption or fund mismanagement. H. Ratings Project Completion Report Independent Evaluation Department Review Reason for Disagreement/Comments Relevance Highly relevant Relevant Weak support for the inclusion of smallscale SUPER and hygiene components; no involvement of specialized agencies for these two components; and weak coordination with other development partners. Effectiveness in Achieving Outcome Efficiency in Achieving Outcome and Outputs Preliminary Assessment of Sustainability Highly effective Highly effective Highly efficient Efficient Relatively remote location of pump stations, high fuel costs, erratic power supply, and reduced economic benefits. Most likely Likely Weak community organizations with no support mechanisms to strengthen them, high equipment replacement costs, and some uncertainty in the viability of regular O&M. Satisfactory Satisfactory Borrower and Executing Agency Performance of Asian Satisfactory Satisfactory Development Bank Impact Positive Positive Overall Assessment Highly Successful successful Quality of Project Completion Report Satisfactory See comments on relevance, efficiency of achieving outcome and outputs, and assessment of sustainability.

8 I. Comments on PCR Quality IED assesses the PCR quality as satisfactory. Lessons drawn and recommendations are overall consistent with the findings. The PCR complies with the ADB Project Administration Instructions on PCRs 5 and follows the approved guidelines for PCRs using the project performance evaluation reports methodology. The justification for performance rating is largely based on achievement of physical targets but could have been strengthened with evidence-based qualitative achievements. The PCR will contribute to a subsector evaluation of rural water supply and sanitation projects. J. Recommendation for IED follow-up Since IED s impact evaluation study of the PRWSSP and the Project in Punjab was recently completed, there is no need to prepare a project performance evaluation report for this Project. K. Data Sources for Validation (i) Project s RRP and PCR (ii) Minutes of management review and staff review committee meetings (iii) Back-to-office reports and aide-mémoire of ADB missions (iv) Loan agreement (v) Independent Evaluation Mission s observations and discussions with stakeholders during the field visits to project sites for the impact evaluation study of the PRWSSP and the Project 5 ADB. 2009. Project Completion Report. Project Administration Instructions. PAI No. 6.07A. Manila.

REGIONAL DEPARTMENT S RESPONSE TO THE PROJECT COMPLETION REPORT VALIDATION REPORT On 19 December 2008, the Independent Evaluation Department 1 circulated the draft project completion validation report for interdepartmental comments. The Independent Evaluation Department received two rounds of comments and relevant ones were incorporated into the report. The final report was forwarded to the Pakistan Resident Mission on 22 January 2009. 1 The Independent Evaluation Department was named the Operations Evaluation Department (OED) until December 2008.