Technical Position Paper

Similar documents
Processes and Responsibilities. ERA ETCS Conference on Testing and Certification Lille March 29 th 2011

ETCS Baselines, status, roadmap

Position Paper. ETCS On-board Subsystem Reliability Requirement for Operational Safety

for European Commission regarding OPINION OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ERA/OPI/ specifications test

Guidance on the Application of the Control Command and Signalling TSI

COMMISSION DIRECTIVE 2011/18/EU

Return of Experience on the approval processes for projects of retro-fit and upgrade vehicles with an ETCS On Board subsystem

Technical specifications for Interoperability (TSIs)

Annex. Provisions on auditing notified conformity assessment bodies in the framework of Article 34 3 of the Agency Regulation 1

Railway Interoperability and Safety Committee. Working document

INTEROPERABILITY UNIT

3. OBJECTIVES AND PRIORITIES:

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular

IAF Guidance on the Application of ISO/IEC Guide 61:1996

Negotiation Guidance Notes

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

OA08 ACCREDITED BODIES' REPORTING. Table of contents

DRAFT. Transition guide from former RIV/UIC regime to new TSI/GCU regime

CNAS-RL01. Rules for the Accreditation of Laboratories

1. INTRODUCTION SNVEL

CEF TRANSPORT 2016 CALL FOR PROPOSALS. Guide for Applicants

Brussels, 12 June 2014 COUNCIL OF THE EUROPEAN UNION 10855/14. Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD)

Draft Procedure for Community gtld Change Requests January 2018

Responsibility of NoBo & DeBo in the authorization process

H2020 Programme. Guidelines on Open Access to Scientific Publications and Research Data in Horizon 2020

CONSULTATION PAPER BY DG INTERNAL MARKET AND SERVICES ON THE PROFESSIONAL QUALIFICATIONS DIRECTIVE 15 March 2011

FMO External Monitoring Manual

(Non-legislative acts) REGULATIONS

POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY

European Maritime Safety Agency. Training on Maritime Security October Obligations for. Maritime Administrations

Stakeholder Consultation Workshop on the Draft Implementing Rule for Mode S Interrogator Code Allocation (MSI)

IVDD revision changes to the European regulation of in-vitro diagnostic (IVD) Medical Devices. Med-Info. TÜV SÜD Product Service GmbH

EUROPEAN COMMISSION. CALL - EAC/A06/2017 Erasmus+ Vocational Education and Training Mobility Charter

EUROPEAN COMMISSION. CALL - EAC/A01/2015 Erasmus+ Vocational Education and Training Mobility Charter

A short paper for ENVI & IMCO MEPs Two solutions to improve recognition of specialisms in the Chapter III professions

ALICE Policy for Publications and Presentations

Guidance for the Tripartite model Clinical Investigation Agreement for Medical Technology Industry sponsored research in NHS Hospitals managed by

AUDIT REPORT. Audit of Official Controls carried out by the Health Service Executive (Regulation (EC) No 853/2004)

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

Ordem dos Enfermeiros

Life Extension of Nuclear Power Plants

Erasmus+ Vocational Education and Training Mobility Charter Specifications for call - EAC/A02/2016

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Procedure for handling applications for authorisation and review reports under REACH

DRAFT OPINION. EN United in diversity EN. European Parliament 2018/0018(COD) of the Committee on Industry, Research and Energy

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT

ERN board of Member States

New financial schemes for European transport infrastructure projects. State of Play for CEF and Juncker Plan

"ERA-NET Plus Actions"

CIP Cyber Security Incident Reporting and Response Planning

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO

EL_07_04_07_218

Questions and answers on the procedure of PIP compliance verification at EMA, and on paediatric rewards

Guidance for the conduct of good clinical practice inspections

HARMONISED EUROPEAN NUMBERS FOR SERVICES OF SOCIAL VALUE Comparative selection process for allocation of the Emotional support helpline number

Headline Goal approved by General Affairs and External Relations Council on 17 May 2004 endorsed by the European Council of 17 and 18 June 2004

Inteligencia Artificial. Revista Iberoamericana de Inteligencia Artificial ISSN:

ACCREDITATION REQUIREMENTS

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects

EFTA SURVEILLANCE AUTHORITY DECISION OF 5 JULY 2006 ON AN AID SCHEME FOR RESEARCH, DEVELOPMENT AND INNOVATION IN THE MARITIME INDUSTRY (NORWAY)

Deutsche Börse Group Response

H2020 FOF Innovation Action GUIDE FOR APPLICANTS. HORSE Application Experiments

DATA PROTECTION POLICY (in force since 21 May 2018)

WORKING CONSOLIDATED TEXT

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

consultation A European health service? The European Commission s proposals on cross-border healthcare Key questions for NHS organisations

ECHO-NGOs Framework Partnership Agreement -Towards a strengthened partnership

EUCERD RECOMMENDATIONS on RARE DISEASE EUROPEAN REFERENCE NETWORKS (RD ERNS)

Public consultation on the Establishment of the Innovation Fund

Deliverable 3.3b: Evaluation of the call procedure

GDPR readiness at efinancialcareers. Our Responsibilities and the General Data Protection Regulation

Electric Mobility Europe Call 2016

High Level Pharmaceutical Forum

Opinion No 13/2016. Technical records

Communication Strategy

Comment: Not always appropriate for the medical assessor to issue a medical certificate. Combine (c) and (d)

Summary Report of the 1 st Register Committee

CMDv/BPG/002. BEST PRACTICE GUIDE for Veterinary Decentralised Procedure (DCP)

NEGOTIATION GUIDANCE NOTES

General Osteopathic Council

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

EUROPEAN PARLIAMENT Committee on the Environment, Public Health and Food Safety

November Innovative Medicines Initiative (IMI) Intellectual Property (IP) Policy. Guidance Note for IMI Applicants and Participants

The Register of Training Organisations Due Diligence Assurance Gateway

ERA SAFETY UNIT SAFETY REPORTING SECTOR GUIDANCE ON SAFETY RECOMMENDATIONS IN TERMS OF ARTICLE 25 DIRECTIVE 2004/49/EC

1 The EU Harmonised technical ectd guidance version 4.0

CUSC Modification Proposal Form CMP233

Current and future standardization issues in the e Health domain: Achieving interoperability. Executive Summary

Council, 25 September 2014

COMMISSION IMPLEMENTING REGULATION (EU)

Joint Operational Programme Romania Republic of Moldova

EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME)

Annex 4.3 Notes of session 1

Guidance on the preparation of dossiers for harmonised classification and labelling (CLH) under Regulation (EC) No.

Harmonizing national legislation on Food Safety

Horizon ERA-NET Cofund actions

Revision 03. Preparation Approval Authorization Application date. Director of the Dept. of Certification & Inspection

NATIONAL AIRSPACE SYSTEM (NAS)

CALL FOR PROPOSALS HOME/2014/PPXX/AG/SPBX NEW INTEGRATED MECHANISMS FOR COOPERATION BETWEEN PUBLIC AND PRIVATE ACTORS TO IDENTIFY SPORTS BETTING RISKS

Transcription:

Technical Position Paper CCS TSI Recast January 4 th 2016 Banedanmark does not support this EIM position paper

1. Introduction The CCS TSI set out as annex to Commission Decision 2012/88/EU has been amended two times: 1. With Commission Decision 2012/696/EU, introducing the Baseline 3 specifications for the train protection part ETCS; 2. With Commission Decision (EU) 2015/14, extending the scope to the whole EU rail network, closing some open points and providing clarifications for the certification process. The European Commission has requested a further recast of the current CCS TSI to change its legal state from Commission Decision to Regulation, in line with what has been done for other TSIs. ERA has used the recast as an opportunity to suggest improved text of the CCS TSI, including the publication of GSM-R Baseline 1 and ETCS baseline 3 release 2 specifications. The main focus on the proposed text changes of the CCS TSI were contained within chapters 6, Assessing the Conformity and/or Suitability for use of the Constituents and Verifying the Subsystems, and chapter 7, Implementing the TSI Control-Command and Signalling. The recast of the current CCS TSI entered the stakeholder consultation phase 1 on 10 th June 2015, with the closing date 15 th September 2015. 2. EIM Comments and Positon EIM participated in the recast consultation, sending ERA our comments on the proposed chapter 6 and chapter 7 text 2. Following the consultation and comments received by numerous stakeholders, ERA released an updated proposal of the Chapter 6 text. EIM also received feedback from ERA on the comments submitted by EIM 3. Annex 1 contains the comments submitted by EIM to ERA during the public consultation and the response from ERA. Reviewing the updated proposal documentation received by ERA, EIM believe that the comments submitted during the stakeholder consultation phase have not been sufficiently taken in account and there remains an unacceptable risk with the current proposed text. 1 Consultation on recast of CCS TSI, Reference: ERA-CON-2015-01-ERTMS, [http://www.era.europa.eu/document-register/pages/consultation-on-recast-of-ccs-tsi-.aspx] 2 Document : 20150910_CCS TSI_Social consultation_eim.doc 3 Document 20150910_CCS TSI_Social consultation_eim - ERA answer_98a48b.doc - 1 -

3. Conclusion EIM regret that their comments submitted during the recast consultation were not sufficiently taken into account. EIM believe that this will result in an unclear and inconsistent chapter 6 and 7 of the CCS TSI. EIM also believe that the requirements in Chapter 6 will raise costs for infrastructure manager. EIM Position All proposed changes to the CCS TSI chapter 6 and 7 should be cancelled and a proper discussion with the sector should be initiated. Regarding the update of Annex A (ERTMS specifications): EIM recall that the choices made by ERA for to update the specifications, were only for a minor part supported by the sector organisations Although the sector organisations have been working on solutions for (other than those selected by ERA) problems in the ERTMS specifications, ERA refused to include and take these solutions into account EIM regret that the choices made by ERA will not sort out the major issues in the ERTMS specifications. Member States will have to introduce more National Technical Rules to cover these gaps. EIM support the backwards compatibility principle, so trains equipped with new releases of the specifications will be able to run over B2 and B3 equipped infrastructures. - 2 -

Annex 1 EIM Consultation Comments and ERA Answer N Reference (e.g. Art, ) Type/ Assess Reviewer's Comments, Questions, Proposals (EIM Comments) Proposal for the correction or justification for the rejection (by the European Railway Agency) 1 G The proposed modifications are not only editorial. Although the intention isn t wrong, the proposed text is far from mature. EIM proposes to withdraw the proposed modification of chapter 6 and start the discussion with the sector organisations about a better text for inclusion in the first TSI CCS update after the version planned by end of 2015. 2 6.1.2 P / CN An operational test scenario actions of operators). This is practible not feasible. The dynamic behaviour of the combination of a L2 trackside with an onboard can't be described in this simplified way. It will lead to an endless amount of operational test scenarios. What could work is that the internal RBC functional behaviour could be made public. 3 6.1.2 P / CN Check of compliance of a real implementation with an operational test scenario shall be possible gathering information through easily accessible interfaces (preferably the standard interfaces specified in this TSI). Not clear what the aim. Proposal: delete this text 4 6.1.2 P / CN The set of operational test scenarios made available shall be sufficient This text is not relevant. The TSI already states that only TSI CCS compliant products can be certified. Moreover, this text doesn't belong to the paragraph "Principles for testing ERTMS/ETCS and GSM-R". Proposal: delete this text. 5 6.1.2 P / CN The European Railway Agency: 1. shall make a preliminary publication of the operational test scenarios, allowing all interested parties to comment, before the finalisation of the EC verification of the relevant track-side CCS Subsystem, ERA proposal has been extensively discussed with all stakeholders and received several constructive comments that permitted significant improvements. The ERA proposal is finalised to have published the technical behaviour of track-side ETCS (interactions with on-board), and this seems the same objective that EIM is mentioning. This is a requirement that scenarios delivered to EC must respect and is important to permit its understanding and use by different stakeholders. This sentence is related to what should be published. The scope is to ensure that adequate transparency on the way track-side works is achieved. The text has been revised to clarify timing of publishing information and avoiding negative impacts on projects. This is not realistic. Together with the term of six months for comments and the possibility to argue about the solutions afterwards (and possibly again 6 months to comment?), it will take one additional year to place an ERTMS track side into service. The alternative is to check earlier at the design stage, based on the engineering rules. Proposal: Delete this text - 3 -

N Reference (e.g. Art, ) Type/ Assess Reviewer's Comments, Questions, Proposals Proposal for the correction or justification for the rejection (by the European Railway Agency) 6 6.1.2 P / CN 4. shall use the received operational test scenarios above mentioned data base to assess the need of additional harmonised specifications for the Control-Command and Signalling On-board and Track-side subsystems, This isn t a clarification but a fundamental change. Proposal: restore the original text. 7 6.1.2 G / CN 5. shall, on the basis of the operational scenarios received, prepare and publish a standard format to be used for future publications of operational test scenarios. We need a first time right approach else we have to rework our information again with a next project. 8 Table 6.1 P / CN Check that the quantitative reliability target (related to random failures) indicated by the applicant is met This should be consistent with the reliability requirement definition as described in section 4.2.1.2 of the TSI. Proposal: delete this text. 9 6.2.4.1.1 P / CN a specimen of the interoperability constituent has been submitted to a full set of test sequences Not acceptable. Please keep the original text. 10 6.2.4.1.2 P / CN The tests can be performed using real equipment or a simulated track-side CCS subsystem. Not clear what the fundamental change is. There is no obligation of reworking in the proposed text. Not understood. Chapter 6 explains what has to be checked, and in any case this makes reference to a section of chapter 4. Considering that chapter 4 specifies a value for the subsystem, it is necessary that the applicants for subsystem verification have trustable information about the characteristics of equipment they are using. Please, check the full reworded section, explaining how results of tests must be used. Also consider that ss-076 has at least a sequence for each functionality in the SRS, but it does not mean that you have to pass successfully all the sequences to be certified. For instance, there are sequences for Euroloop, RIU, CMD, which are optional functionalities that could be not implemented by the on-board equipment Using of simulators is common practice. No additional explanation is necessary. Not acceptable; there is currently no guarantee that a simulated track side is identical to real equipment. Proposal: or a laboratory which is identical to the track side CCS subsystem - 4 -

N Reference (e.g. Art, ) Type/ Assess Reviewer's Comments, Questions, Proposals Proposal for the correction or justification for the rejection (by the European Railway Agency) 11 6.2.4.1.2 G / CN These tests are not necessary for the certification of the on-board ETCS interoperability constituent; if an applicant requires that they are performed, the documentation accompanying the certificate shall indicate the test scenarios Operational Scenarios are for certifying the infrastructure, no to check the integration 12 Table 6.3 G / GN The test must be able to verify: 2. that the Control-Command and Signalling Track-side subsystem is able to manage the intended number of trains, Not acceptable. This isn t an interoperability requirement. 13 Table 6.3 P / CN If additional tests under operational conditions are made for a subsystem having already an EC Certificate of Verification, corresponding information can be added to the documentation accompanying the certificate. Not clear what the aim is for the CCS Track side. Proposal: delete this text. 14 7.2.5 M / P The text: Being equipped with a Class B system in addition to Class A shall not be a requirement for the compatibility of vehicle with a network, is not correct because it is too general. It is only applicable in case the vehicle is intended to run on lines where Class B is installed in parallel with Class A. Proposal:.of a vehicle with infrastructure where Class B is installed in parallel with Class A. 15 7.4.1 U/P Clause 1: It is not clear what is meant by: extensions short connections such that trains cannot perform service exclusively on these extensions or connections Vehicles will always have to enter the connecting notes (still under Class B). What is the justification of this requirement? Proposal: Either: Limit 7.4.1. to the High Speed network (as it was) Or: Delete 7.4.1. and put all requirements in the updated European Deployment Plan (to keep the consistency). The ERA proposal clarifies in fact that the operational test scenarios are the ones used for certification of track-side. In addition, they may be used to check the behaviour of on-board. Agreed This is to clarify that an applicant can have the certification documents updated if additional evidence of compliance is obtained. The text has been improved after discussions with representative organisations. Agreed The requirements for implementation of ETCS will be the ones in chapter 7 plus the ones in the EDP. - 5 -

******** For information please contact: Ville Saarinen Manager Interoperability and Safety Phone +32 2 234 37 75 E mail Ville.Saarinen@eimrail.org EIM, the association of European Rail Infrastructure Managers, was established in 2002 to promote the interests and views of the independent infrastructure managers in Europe, following the liberalisation of the EU railway market. It also provides technical expertise to the appropriate European bodies such as the European Railway Agency. EIM s primary goal is promoting growth of rail traffic and the development of an open sustainable, efficient, customer orientated rail network in Europe. - 6 -