CEN Technical Committees Mode of operations

Similar documents
CEN/TC 354. Doc. Number: N New CEN Enquiry Procedure - Presentation from CEN (Webinar ) Main changes: For information

OPEN CALL FOR PROJECT TEAM EXPERTS European Standard for Patient Summary

ISO Registration Bodies Governance ISO RMG Rules Sub-group Approved on 14 April 2017

Linking research and standardization. Integrating standards in your research project: a pocket guide for project proposers

Form 4: New Work Item Proposal. Reference number: ISO/NP Circulation date: (to be given by Central Secretariat)

CMDv/BPG/002. BEST PRACTICE GUIDE for Veterinary Decentralised Procedure (DCP)

Standards and Research : a key issue for

Simultaneous circulation to CEN and CENELEC TECHNICAL BOARDS

CEN/TC278/WG1 & ISO/TC204/WG5 Status report to CEN/TC204 April 2012

Project Plan for the CEN Workshop on Methodology for Improving the Resource Efficiency of Energy Intensive Industrial Processes WS TOP-REF

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest

TC 100 Guidelines and Procedures

New work item proposal Outsourcing

Date of Publication: 13 December Deadline for tenders: 17 January 2018

Chester County Vision Partnership Grant Program January 2017

ISO/TC 59/SC 13 N 526

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

STUDENT AFFAIRS SUBCOMMITTEE

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

Brussels, 12 June 2014 COUNCIL OF THE EUROPEAN UNION 10855/14. Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD)

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

Standardization Activities of SMIIC Technical Committees (TCs)

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Charter of the Credit and Risk Committee Danske Bank A/S CVR no

Canadian Federation of Medical Students (CFMS) Wellness Committee: TERMS OF REFERENCE

NIA BY-LAWS NURSING INFORMATICS AUSTRALIA (NIA)

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL)

BEST PRACTICE GUIDE FOR DECENTRALISED AND MUTUAL RECOGNITION PROCEDURES

DMTF Standards Incubation Process

The internal quality assurance system of the Foundation for the Accreditation of Study Programmes in Germany

Topical Peer Review 2017 Ageing Management of Nuclear Power Plants

Document 1. Provisional Agenda

CSA Mobile Application Security Testing (MAST) Initiative

ISO/IEC JTC1/SC7 /N3020

FiXs Configuration Control Board Procedures Version 3.0 September 1, 2010

SCIENTIFIC RESEARCH METHODOLOGIES AND TECHNIQUES. Unit 14.c: PROJECT PROPOSAL PREPARATION - EXAMPLES = IMS & ISSS examples =

1. Address by Dr. Chris SAID, Parliamentary Secretary for Consumers, Fair Competition and Public Dialogue

Egyptian Organization for Standardization & Quality. Egyptian Organization for Standardization & Quality. Welcome to EOS

ALICE Policy for Publications and Presentations

Northumbria Healthcare NHS Foundation Trust. Charitable Funds. Staff Lottery Scheme Procedure

Safety EMC Environment Quality assurance

TRINIDAD AND TOBAGO BUREAU OF STANDARDS

Maintenance Review Board PR.MRB

INQAAHE Guidelines of Good Practice

THE REPUBLIC OF BULGARIA THE COUNCIL OF MINISTERS. DECREE No. 121 dated May 31 st, 2007

Ontario Quality Standards Committee Draft Terms of Reference

Request for Proposal (RFP) for Grant Writing Services

Annex. Provisions on auditing notified conformity assessment bodies in the framework of Article 34 3 of the Agency Regulation 1

MSM Research Grant Program 2018 Competition Guidelines

Charter of the Remuneration Committee Danske Bank A/S CVR no

NATIONAL MUSEUMS LIVERPOOL. Board of Trustees. 17 September 2015, 10.00am. (World Museum)

D6.3 Communication management routines and infrastructure implemented

Scientific Advisory Board Terms of Reference

Skagit Watershed Council

The Village requests that responses be submitted by: 4:00 p.m. Pacific Time on Thursday, August 30, 2012.

Department of Defense INSTRUCTION

EUROPEAN SOCIETY OF COLOPROCTOLOGY

This document is a preview generated by EVS

IAF MLA Document. Policies and Procedures for a MLA on the Level of Single Accreditation Bodies and on the Level of Regional Accreditation Groups

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE

Guidance for Authorities. Submitting a Proposal to host the. International Conference of Data Protection and Privacy Commissioners

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

Jim Moore IEEE Computer Society Liaison Representative to ISO/IEC JTC 1/SC 7 Annual Report for Standards Activities Board Oct 2013

Alliance for Nursing Informatics Operating Guidelines

Pre-Submissions and Meetings with FDA Staff

Skagit Watershed Council

Content Sheet 11-1: Overview of Norms and Accreditation

FILE MANAGER-SUBDIVISION APPROVAL PROCESS INTRODUCTION

GUIDE FOR APPLICANTS INTERREG VA

EA Cross Border Accreditation. Policy and Procedure for. Cross Border Cooperation. Between EA Members

PACFA Organisational Structure Document. (Revised 2016)

International Perspectives. Marjorie S. Greenberg, MA National Center for Health Statistics Centers for Disease Control and Prevention

Guidelines for Peer Assessors

Scientific Advice and Protocol Assistance at the EMEA

Report on SAPC HOPS Meeting 5 April The SAPC met with Heads of Pharmaceutical Services from both the public and private sectors.

IECEx OPERATIONAL DOCUMENT

Clinical Commissioning Group Governing Body Paper Summary Sheet For: PUBLIC session PRIVATE session. Date of Meeting: 24 March 2015

ISO TC 130/WG11 Environmental Impact of Printed Products 3 rd meeting 23 April :00 18:00 Yogyakarta, Indonesia

Beddington Community Fund Scheme Terms of Reference

TRINIDAD AND TOBAGO BUREAU OF STANDARDS

DECISION 15/2009/GB OF THE GOVERNING BOARD OF THE EUROPEAN POLICE COLLEGE AMENDING DECISION 30/2006/GB OF THE GOVERNING BOARD

IEEE TELLERS COMMITTEE CHAIR POSITION DESCRIPTION

The CMMI Product Suite and International Standards

Accreditation Guidelines

ESGO-EBCOG ACCREDITATION of European Training Centres in Gynaecological Oncology. GENERAL RULES, REQUIREMENTS and PROCESSES

Nepean Blue Mountains Primary Health Network GP Advisory Committee TERMS OF REFERENCE

Fondazione Principato di San Bernardino Foundation of San Bernardino Principality

Unsolicited proposals. Guidelines for submission and assessment

RECOMMENDATIONS FOR ON-SITE VISITS BY PEERS AND SELECTION CRITERIA FOR ON-SITE VISIT PEER REVIEWERS

Business Practice for IT Project and Procurement Governance

Guidelines for Submission to Hong Kong Engineer and Hong Kong Engineer Online

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

Payments Enterprise Ireland Payments 8 Company Payments 8 Eligible Costs 9

Phase 1: Country Needs Assessment and Fund Allocation Recommendation

Irish Research Council Government of Ireland (GOI) Postgraduate Scholarships Shona Leith Research Development Office

Action Plan. This Action Plan has been completed by the Provider and the Authority has not made any amendments to the returned Action Plan.

WEST BERKSHIRE MULTI AGENCY TRANSITION PROTOCOL

Procedure for handling applications for authorisation and review reports under REACH

PART V BASIC PRINCIPLES FOR SELECTION OF CONSULTANTS

UoA: Academic Quality Handbook

Transcription:

TC structure CEN Technical Committees Mode of operations (Latest update: 2014-11-24) Chair Subgroups Although subgroups do not have any formal status in CEN, a WG can decide to establish these in order to better manage the development of CEN deliverables. This can be especially useful when a WG is working on several projects simultaneously or when it is necessary to divide the workload of a larger project. CEN deliverables Chairman Advisory Group (CAG) Working Group 1 Secretariat Technical Committee (TC) Decision-making body Working Group x Ad Hoc Group A European Standard (EN) is a technical document designed to be used as a rule, guideline or definition. It is a consensusbuilt, repeatable way of doing something. Standards are created by bringing together all interested parties such as manufacturers, consumers and regulators of a particular material, product, process or service. All parties benefit from standardization through increased product safety and quality as well as lower transaction costs and prices. Subgroup 1 Subgroup x The Chair - The Chair provides overall leadership and conducts meetings in an impartial manner, guiding the meeting in order to reach balanced and prompt decisions while ensuring that all points of view are heard and considered. The Secretariat The secretary provides professional management support, in the form of administrative, operational and technical services to a Technical Committee (TC) and particularly its Chairperson to ensure that the TC functions efficiently. Chairman Advisory Group (CAG) - The overall management/coordination will be ensured by a Chairman Advisory Group (CAG) made up of the Chair, the Working Group convenors, and Workshop Secretariat. The CAG will meet when requested by the Chair. Technical Committee The technical committee acts as the decision-making body. In the TC they decide on starting new work items, comment and vote on draft deliverables and decide on final standards. It is the responsibility of the TC to build consensus amongst all its members. The degree of consensus is evaluated and measured amongst the national delegations (vote in meeting) or amongst the CEN Members (vote by correspondence). Working Groups The drafting of standards is usually carried out in the Working Groups. Each of these groups is dedicated to a more specific aspect of the overall subject. A new project can be delegated to an existing working group or a new working group can be established to accomplish the project. Ad Hoc Groups A TC can decide to establish an 'ad hoc group' to perform a specific task that is not directly related to an existing WG (e.g. perform a feasibility study). Besides European Standards (EN), CEN also develops Technical Specifications (TS) and Technical Reports (TR). These deliverables are developed easier and faster than European standards. A Technical Specification can be produced when there is no immediate need for a European standard or when the technology is not mature enough to develop a standard. Technical Specifications require less time to be developed and do not have to be adopted by the national members. A Technical Specification can be converted into a European Standard when deemed ready. A Technical Report contains information on the technical content of standardization work. This information is not suitable to be published as an EN or TS. A Technical Report may include, for example, data obtained from a survey, data on work in other organizations, or any other data that might be useful to a CEN member. A European Standard also differs from Technical Specifications and Technical Reports in that European standard are circulated for public comment (CEN Enquiry). Every concerned group or person (e.g. consumers, manufacturers, public authorities etc.) may comment on a draft version of a European Standard. Furthermore, A European Standard (EN) automatically becomes a national standard in the 31 member countries. Meetings The Technical Committee shall meet in plenary approximately annually, and when possible with Working Groups meetings the same week. Interim meetings for Working Groups and Ad Hoc Groups should be held when necessary. When possible, participants should be provided the opportunity to join a meeting using web- or teleconference. Documents for discussion at the plenary meeting,

including country, liaison, or WG reports shall be submitted at least four weeks in advance of the plenary meeting. New work item proposals for decision at the plenary meeting shall be submitted at least six weeks in advance of the plenary meeting. A NSB can select up to three delegates to represent the country interests at the plenary meeting. Each NSB should select one Head of Delegations Working Groups (WG) A NSB may name any number of individual experts to serve on a WG. WG experts are registered via the TC secretariat. The WG convenor is the first contact point to WG experts. Before a draft is submitted to the TC for further processing, the level of consensus within the WG is evaluated by the WG Convenor. Responsibilities WG convener Prepare standard(s) according to the specifications set by the parent body and within the specified time frame. Convenes meetings and when necessary acts as Chairperson. Involve relevant stakeholders in order to get commitment and resources required to prepare a deliverable. Actively progresses work and reports regularly on progress to the parent body and verbally at meetings of the parent body. Refers any problems encountered to the parent body Align with related activities in other SDO s and / or other liaison organizations. Ensures that WG experts have appropriate briefing on relevant rules and procedures. Liaise with the CAG to ensure consistency of the WG s work with the TC s programme of work. Ballot time limits PWIP/NWIP (EN/TS/TR): 6 weeks TC review: 2-3 months ENQ ballot (EN): 3 months FV ballot: 2-3 months Deadlines The following time limits may be used as guidance when establishing target dates (following approval of the work item): availability of working draft for TC review: 6 months; availability of final draft: 12 months; availability of approval draft (EN): 28 months; Comments handling Comments on drafts shall be submitted using the CEN commenting form and should include specific actionable recommendations, including suggested textual changes. Non-actionable comments may be rejected. Suggested changes not in alignment with the rest of the document may be rejected. The WG shall record the justification for the rejection or deferral of each comment. Time limits Meeting time limits Meeting Announcement/information: 2 months before meeting Meeting Agenda: 2 months before meeting PWIP/NWIP: 6 weeks before the meeting Documents for discussion: 4 weeks before meeting Registration delegations by NSB: 4 weeks before meeting

Development track of CEN deliverables Stage Description Approval requirements EN TS/TR 00 Preliminary stage (Optional) A Preliminary Work Item can be adopted to define the TC future's programme of work through a 'Preliminary stage'. This stage is in particular useful when the TC does not believe that it has the resources required to progress the work item within the appropriate timeframe. There is no time limit for WI registered in the preliminary stage. Simple majority PWI PWI 10 Proposal stage The proposal stage is to confirm that a particular standard is needed and the project can be completed within the CEN timeframe. The final draft will need to be available within 12 months to prevent automatic cancelation of the project by CCMC. (1) 71% weighted votes A, and (2) commitment to participate in the work by at least 5 CEN members NWI NWI 20 Preparatory Stage 30 TC review (Optional) Once a work item is adopted the work may be allocated to one of the working groups in the TC. In the working group experts develop the draft deliverable. As soon as a first committee draft is available, the WG convener may request the TC secretariat to distribute the WD draft to all committee members for review. It is the responsibility of the WG to draw up the final document considering the comments received. WD WD 40 Enquiry stage (EN only) Once a final draft is available, it is released for public comment and approval, a process known in CEN as Enquiry. During this stage, everyone who has an interest (e.g. manufacturers, public authorities, consumers, etc.) may comment on the draft. The final draft is drawn up considering the comments received during the Enquiry stage. - 71% weighted votes ENQ 50 Approval Stage B (Optional for EN) C The final draft standard is drawn up considering the comments received during the Enquiry (EN only) and is then forwarded to the NSBs for a vote on whether or not to approve the draft as a standard. - 71% weighted votes (EN, TS) - Simple majority (TR) FV FV 60 Publication Stage On receipt of a positive result of the Formal Vote, CCMC will resolve the editorial comments. In case of a EN, the standard is published identically by the standards bodies in 31 countries and any conflicting national standards will need to be withdrawn. PUB PUB Foot notes A. For the adoption of a NWI for the development of a TR a simple majority is sufficient. B. A TC decision (majority) is required to proceed to the Approval stage C. Skipping stage 50 for a EN is possible when the ENQ draft is approved, and no comments are received that require significant changes to the technical content of the EN, and a decision to skip the FV is taken by the TC. NOTE The decision to proceed to a next stage (except the approval stage (see footnote B)) is taken by the Chair in collaboration with the TC secretary and the Working Group convenor/project leader.

CEN Timeframes European Standard TS / TR Stage Stage name Role T Stage Stage name Role T 10 Approval stage TC 0 10 Approval stage TC 0 20 Drafting Stage WG 1 20 Drafting Stage WG 1 20 Drafting Stage WG 2 20 Drafting Stage WG 2 20 Drafting Stage WG 3 20 Drafting Stage WG 3 20 Drafting Stage WG 4 20 Drafting Stage WG 4 20 Drafting Stage WG 5 20 Drafting Stage WG 5 20 Drafting Stage WG 6 20 Drafting Stage WG 6 30 Committee stage TC 7 30 Committee stage TC 7 30 Committee stage TC 8 30 Committee stage TC 8 30 Committee stage TC 9 30 Committee stage TC 9 30 Comment resolution WG 10 30 Comment resolution WG 10 30 Comment resolution WG 11 30 Comment resolution WG 11 30 Comment resolution WG 12 30 Comment resolution WG 12 40 Administrative CCMC 13 50 Administrative CCMC 13 40 Administrative (Translation) CCMC 14 50 Administrative (Translation) CCMC 14 40 Administrative (Translation) CCMC 15 50 Administrative (Translation) CCMC 15 40 Enquiry Stage NSB 16 50 Approval stage NSB/TC 16 40 Enquiry Stage NSB 17 50 Approval stage NSB/TC 17 40 Enquiry Stage NSB 18 50 Approval stage NSB/TC 18 40 Comment resolution WG 19 60 Publication stage CCMC 19 40 Comment resolution WG 20 60 Administrative (Translation) CCMC 20 40 Comment resolution WG 21 60 Publication stage CCMC 21 40 Comment resolution WG 22 40 Comment resolution WG 23 40 Comment resolution WG 24 40 Comment resolution WG 25 40 Comment resolution WG 26 50 Administrative CCMC 27 50 Administrative (Translation) CCMC 28 50 Administrative (Translation) CCMC 29 50 Approval stage NSB 30 50 Approval stage NSB 31 60 Publication stage CCMC 32 60 Administrative (Translation) CCMC 33 60 Publication stage CCMC 34 The clock starts when the WI is approved by the TC (T0) Stage 30 and 50 are optional Skipping stage 50 is only possible when the ENQ draft is approved, and no comments are received that require significant changes to the technical content of the document, and a decision to skip the FV is taken by the TC. Limit dates: Missing these dates means action is needed to avoid cancelation of the project by CCMC The TC can request a 9 month tolerance. This will required a TC decision at least 3 months before the cancelation date

This guide has been prepared by Maarten Peelen (maarten.peelen@nen.nl) from the Netherlands standardization institute NEN. If you find this guide useful you might be interested in the following guides as well: Drafting CEN ISO deliverables - Common rules and elements Drafting CEN ISO deliverables - Corrigenda's and amendments