Asbestos Remediation. Ref: ASBESTOS REMEDIATION HAZARD ASSESSMENT AND RISK CONTROL. Company Name: Company Address: Asbestos Coordinator:

Similar documents
UNIVERSITY OF ROEHAMPTON ASBESTOS POLICY

POLICY ON THE CONTROL OF ASBESTOS AT WORK

Health and Safety Policy

Site Safety Plus. Site Supervisor Safety Training Scheme Refresher (SSSTS-R) Course appendix D

THE MANAGEMENT OF ASBESTOS POLICY, RESPONSIBILITIES AND PROCEDURES

ASBESTOS POLICY PROCEDURES & GUIDANCE

Asbestos Management Policy

Site Safety Plus. Site Supervision Safety Training Scheme Refresher (SSSTS-R) Course appendix D

RISK ASSESSMENT POLICY Independent School Standards Regulations 2014, Part 3 16(a) December 2015

Risk Assessment Policy

HEALTH AND SAFETY POLICY STATEMENT AND ARRANGMENTS MANUAL

HARBEX METAL PROCESSING LTD. Health and Safety Policy and Procedures

Managing Safely v5.0 course syllabus

Ringwood Waldorf School

P400 Foundation Course. Asbestos Surveying and Analysis Course specification

ASBESTOS MANAGEMENT PLAN

Construction Industry Training Board Appendix A - January 2018 version 1

Taking asbestos training to the heart of industry

COMPANY SAFETY PROTOCOL (DRAFT) Helping everyone who comes to Napier Port get home to their family safely every day.

Work Health and Safety

Health and Safety general policy statement (Whole School including EYFS)

Risk Assessment Policy

Appendix 1 Contractor Site Handbook

HEALTH & SAFETY MANAGEMENT A Workshop for Fashion & Textile Sector

Summary of Learning Outcomes Level 2 Award in Health and Safety in the Workplace Qualification Number: 500/5439/9 1

Welcome ADFCA AD EHSMS Workshop

Health and Safety Policy

INSPIRING PRIMARIES ACADEMY TRUST HEALTH AND SAFETY POLICY

Health and Safety Policy and Procedures

Site Safety Plus Site Supervisor Safety Training Scheme (SSSTS) Course appendix C

ASBESTOS POLICY. Version: 3 Senior Managers Operational Group Date ratified: March 2016

Safety Information Book. For. Academic and Administrative Units

NASUWT. heal h safe. ASBESTOS: Advice for NASUWT Representatives. The Teachers Union. at work. the largest UK-wide teachers union

Health & Safety Policy

HEALTH AND SAFETY POLICY

Health and Safety Policy 16 December 2015 December 2016 Dawn Bonfield, Chief Executive. Dawn Bonfield as the Chief Executive Jackie Longworth

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY

Health and Safety Code of Practice Code of Practice Safe Lone Working

Working Safely in Engineering

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

Qualification Specification Highfield Level 3 Award in Health and Safety in the Workplace (RQF)

ST MARY ABBOTS SCHOOL HEALTH AND SAFETY POLICY STATEMENT

Asbestos Management Plan. 12 th Edition. September 2014

IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL

Asbestos - Duty to Manage & Learning From its Mismanagement

ASBESTOS MANAGEMENT POLICY

Health and Safety Policy

RISK ASSESSMENT POLICY This Policy includes the Nursery & Early Years Foundation Stage

Health and safety policy arrangements for Clapham Terrace Primary School

HEALTH AND SAFETY POLICY

National Library of Scotland Health & Safety Policy

Health and Safety Policy and Procedures

Eastwood Community School. Health and Safety Policy

HOLLAND HOUSE SCHOOL 11 - HEALTH, SAFETY AND SECURITY POLICY

STATE OF ALASKA COMPETENCY SPECIFICATION

The Salvation Army Furniture Projects

Policy for Risk Assessment of Young Persons at Work

HUNGERHILL SCHOOL HEALTH & SAFETY POLICY

Cskills Awards Site Safety Plus Health and Safety Awareness Course

RISK ASSESSMENT POLICY

Somerset Road Education Trust. Health and Safety Policy

Health and Safety for the Cleaning and Support Services Industry

Risk Assessment Policy

Asbestos Management Policy (Version 4)

Health & Safety Policy. Oasis Community Learning Health & Safety Policy Version

Dixons Academies Policy Documentation

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos

ASBESTOS MANAGEMENT PLAN

Online training courses EXCELLENT OUTSTANDING. Rated. July Rated T: E: W:

Health Safety and Welfare Policy & Arrangements For Clarendon Primary School and Children s Centre

Trinity School. Health & Safety Policy

Health and Safety Policy

Model Safety Permit-to-Work System

The Butts Primary School Health and Safety Policy

This is the health and safety policy statement of MIM ELECTRICAL SERVICES

SSE Generation Safe System of Work

Health and Safety Policy

Prison Service Order Health and Safety Policy Statement

Health and Safety Policy

SAMPLE. Asbestos. Nominated Supervisor DANGER CONTAINS ASBESTOS FIBRES AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD.

ADMINISTRATIVE PRACTICE LETTER TABLE OF CONTENTS

Health and Safety Policy

NEW ROAD PRIMARY SCHOOL

Ark Academy. Health and Safety Policy Statement, Organisation and Arrangements June 2014

WILSON S SCHOOL HEALTH AND SAFETY POLICY

Health and Safety. Policy. Contents

Table of Contents: Section E1: Useful Contacts See back of this document Section A Introduction:

Statement of Principles

UV21096 Health and safety in catering and hospitality

Policy. Health and Safety Welfare

ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL

Policy and Procedures for. Health and Safety. Agreed by the Governing Body Spring 2017

Health & Safety Policy & Procedures

POSITION DESCRIPTION

Permit to Work Procedure

Marlowe School HEALTH AND SAFETY POLICY STATEMENT OF INTENT

HEALTH and SAFETY POLICY

Summers-Inman Group Health and Safety Policy SUMMERS-INMAN GROUP HEALTH AND SAFETY POLICY. Revision -

Policy. Health and Safety Welfare

Transcription:

SECTION 1: GENERAL Company Name: Company Address: Asbestos Coordinator: Telephone Number: Email Address: Page 1 of 19

SECTION 2: ACM DETAILS Asbestos Containing Material 1: Asbestos Type: Chrysotile (White) Amosite (Brown) Crocidolite (Blue) Analytical Company: Report Number: Asbestos Material & Form: Material Condition: Good Reasonable Poor Material Location: Internal External Building Number: Level Indicator: Room Number: Any Other Details: Page 2 of 19

SECTION 2: ACM DETAILS Asbestos Containing Material 2: Asbestos Type: Chrysotile (White) Amosite (Brown) Crocidolite (Blue) Analytical Company: Report Number: Asbestos Material & Form: Material Condition: Good Reasonable Poor Material Location: Internal External Building Number: Level Indicator: Room Number: Any Other Details: Page 3 of 19

SECTION 2: ACM DETAILS Asbestos Containing Material 3: Asbestos Type: Chrysotile (White) Amosite (Brown) Crocidolite (Blue) Analytical Company: Report Number: Asbestos Material & Form: Material Condition: Good Reasonable Poor Material Location: Internal External Building Number: Level Indicator: Room Number: Any Other Details: Page 4 of 19

SECTION 2: ACM DETAILS Asbestos Containing Material 4: Asbestos Type: Chrysotile (White) Amosite (Brown) Crocidolite (Blue) Analytical Company: Report Number: Asbestos Material & Form: Material Condition: Good Reasonable Poor Material Location: Internal External Building Number: Level Indicator: Room Number: Any Other Details: Page 5 of 19

SECTION 3: LOCATION RISKS & HAZARDS Brief Description of Activities: Hazards or Hazardous Conditions (which exist or which could arise) Slips, Trips, Falls Flammable Materials Electricity Chemicals Dust Fumes Moving Machinery Ejection of Materials Vehicle Movement Pressure Systems Stored Energy Confined Spaces Work at Height Noise Manual Handling Poor Lighting Temperature Hazardous Waste Access / Egress Fire Escape / Route Other Other Details: Specific Risk Assessments Required: Yes No Persons Present During Normal Operations: Operators Lone Workers Office Staff Contractors Maintenance Staff Cleaners Visitors Public Other Other Details: Page 6 of 19

SECTION 4: LOCATIONAL ARRANGEMENTS Hazards or Hazardous Conditions (which exist or which could arise) Days Nights Weekends to to to Security Access: Restricted Access: Yes No Special Arrangements: Yes No Hot Works Isolation Possible: Days Nights Weekends Power Isolation Possible: Days Nights Weekends Water Isolation Possible: Days Nights Weekends Fire / Smoke Detector Isolation Possible: Days Nights Weekends Mechanical Isolation Possible: Days Nights Weekends Chemical Isolation Possible: Days Nights Weekends Other Isolation Possible (State Details): Days Nights Weekends Page 7 of 19

SECTION 5: GENERAL RISK ASSESSMENT Identify Level of Risk (Excluding Asbestos): High Medium Low Method Statements Required (Excluding Asbestos): Yes No Details: Permits to Work Required (Excluding Asbestos): Yes No Details: Page 8 of 19

SECTION 6: ASBESTOS CONSULTANCY Appointment of Asbestos Consultancy: Company Name: Company Address: Contact Name: Telephone Number: Email Address: Insurance Details: Competency Check Details: SECTION 7: ASBESTOS RECOMMENDATIONS Asbestos Consultancy to Prepare Recommendations for the Asbestos Project: Site Visited Date: Recommendations Submitted Recommendations Agreed Recommendations Attached Page 9 of 19

SECTION 8: PRE TENDERING MEETING Meeting Held Date: Attendees: Name: Position: Company: Minutes Issued: Minutes Agreed: Minutes Attached: Page 10 of 19

SECTION 9: TENDERING PROCESS Tender Requests for the Asbestos Projects sent to: Company: Date Sent: Return Date & Time for Quotations Quotations for the Asbestos Projects Received From: Company: Quotation Cost: Any details arising from the tendering process: Page 11 of 19

SECTION 10: ASBESTOS REMOVAL CONTRACTOR Appointment of Asbestos Removal Contractor: Company Name: Company Address: Contact Name: Telephone Number: Email Address: HSE Licence No: Insurance Details: Competency Check Details: SECTION 11: PLAN OF WORK Asbestos Removal Contractor to Prepare Plan of Work for the Asbestos Project: Site Visited Date: Plan of Work Submitted Plan of Work Agreed Plan of Work Attached Page 12 of 19

SECTION 12: ASBESTOS ANALYTICAL COMPANY Appointment of Asbestos Analytical Company: Company Name: Company Address: Contact Name: Telephone Number: Email Address: UKAS No: Insurance Details: Competency Check Details: SECTION 13: PLAN OF WORK Asbestos Analytical Company to Prepare Plan of Work for the Asbestos Project: Site Visited Date: Plan of Work Submitted Plan of Work Agreed Plan of Work Attached Page 13 of 19

SECTION 14: PRE START MEETING Meeting Held Date: Attendees: Name: Position: Company: Minutes Issued: Minutes Agreed: Minutes Attached: Page 14 of 19

SECTION 15: Enforcing Authority: ENFORCING AUTHORITY INFORMATION Office: Health & Safety Executive Local Environmental Health Asbestos Removal Contractors Notification Submitted to Relevant Authority: Notification Submitted Date: Notification Number: Any Other Asbestos Licence Holders Notification Details: Company Name: Role in Project: Notification Submitted Date: Notification Number: Company Name: Role in Project: Notification Submitted Date: Notification Number: SECTION 16: STAFF PROJECT AWARENESS Staff Awareness Training required: Yes No Details: Training Completed: Date: Page 15 of 19

SECTION 17: REMOVAL WORKS Site Prepared Date: Permits Issued Date: Permit for: Permit Number: Expiry Date: Clearance to Proceed: Date: Permits Attached: Page 16 of 19

SECTION 18: ANALYTICAL MONITORING Analytical Monitoring Certificate / Report Numbers: Monitoring Type: Location / Area: Report Number: Reports Issued: Reports Agreed: Reports Attached: Page 17 of 19

SECTION 19: ASBESTOS WASTE Asbestos Waste removed from Site Date: Consignment Note Attached: SECTION 20: AREA HANDOVER Area Released to Asbestos Coordinator Date: All Documentation Attached: SECTION 21: PROJECT REVIEW Project Review Completed Date: Project Review Attached: Details of Issues Arising: Details of Actions Taken: Page 18 of 19

SECTION 22: REMOVAL VERIFICATION Asbestos Project and Document Handover Complete: Name: Position: Company: Site Asbestos Coordinator Name: Position: Company: Signed above on behalf of the Asbestos Consultancy Name: Position: Company: Signed above on behalf of the Asbestos Removal Contractor Name: Position: Company: Signed above on behalf of the Analytical Company Asbestos Register Updated: Date: Page 19 of 19