Design/Builder Qualifications Supplement (DBQS) Instructions. GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg)

Similar documents
Design/Builder Qualifications Supplement (DBQS) Instructions

Construction Manager Qualifications Supplement (CMQS)

Florida Gulf Coast University Professional Qualifications Supplement (PQS)

FLORIDA ATLANTIC UNIVERSITY PROFESSIONAL QUALIFICATIONS SUPPLEMENT (FAUPQS)

APPLICATION FOR CERTIFICATION AS A CONSULTANT TO PROVIDE PROFESSIONAL SERVICES IN ACCORDANCE WITH THE CONSULTANTS COMPETITIVE NEGOTIATIONS ACT

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

A. INTRODUCTION Architects and engineers are selected to provide services under the following types of contracts:

Galesburg Public Library, Galesburg, IL

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

ARCHITECTURAL SERVICES COLLEGEWIDE

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

Colquitt Regional Medical Center

REQUEST FOR QUALIFICATIONS. Design Professional Services

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

AUTHORITY: Sections (3)(p), , F. S. Rules 6C , 6C , and 6C , F.A.C.

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Attention Design Firms

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS

Chabot-Las Positas Community College District

REQUEST FOR QUALIFICATIONS

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

The University of North Carolina at Charlotte Facilities Management 9201 University City Blvd. Charlotte, N.C TEL: 704/

LOCKHART INDEPENDENT SCHOOL DISTRICT

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Southern California Chapter 2017 Project Achievement Awards

Request for Qualifications Construction Manager

Request for Qualifications Construction Manager at Risk Contract

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

University of California, Merced Central Plant/Telecommunications Reliability Upgrade

2017 Construction Management Project Achievement Awards

Request for Qualifications

CITY OF GOLDEN, COLORADO Parks and Recreation Department

Atkins Library Study Request for Proposal

2014 Construction Management Project Achievement Awards

Chabot-Las Positas Community College District

2015 Ohio Valley ABC Excellence in Construction Awards Project Entry Requirements and Forms

ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services

ARCHITECTURAL/ENGINEERING SERVICES

CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY

Project Excellence In Construction Awards

REQUEST FOR QUALIFICATIONS

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

A. Project Description

Request for Qualifications for Assistive Technology Consultant Services

REQUEST FOR QUALIFICATIONS QUALITY ASSURANCE & COST MANAGEMENT SERVICES. For the

Attention Design Firms

Design Build Phase II Service Center Project

2015 Construction Management Project Achievement Awards

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

LOOSE FORMS PACKAGE TECHNICAL RFP No F; Confucius Institute at the University of Maryland, College Park Project No.

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

ANAHUAC INDEPENDENT SCHOOL DISTRICT

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

REQUEST FOR QUALIFICATIONS

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1

Request for Qualifications (RFQ) RFQ203: Architectural Services for Lab Design renovations

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

PLANT GROWTH ENVIRONMENTS FACILITY PROJECT NO

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

CHAPTER 08 - ENGINEERING AND BUILDING CODES DIVISION SECTION GENERAL PROVISIONS SECTION NORTH CAROLINA STATE BUILDING CODE

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT MARKETING AND BRANDING PLAN

Request for Qualifications (RFQ) RFQ202: Code Consultant Services

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104

Would like the list of RFQ respondents in order to contact for teaming.

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

Consultant Qualification Program RFQ Q&A. June 28, 2016

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together

Department of Military Affairs. Construction Facility Management Office PROFESSIONAL QUALIFICATIONS SUPPLEMENT (PQS)

CRAWFORD MEMORIAL PARK

REQUEST FOR QUALIFICATIONS MASTER ARCHITECT CAMPUS GATEWAY COMPLEX UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No. 5148

CITY OF GASTONIA REQUEST FOR LETTER OF INTEREST (LOI)

Request for Statements of Qualifications Architectural Services. University of California, Merced Classroom and Academic Office Building

REQUESTING QUALIFICATIONS FOR PROFESSIONAL DESIGN SERVICES

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR ARCHITECTURAL PROGRAMMING SERVICES

Request for Proposals Architectural Services Re: Fremont High School (RFP No date advertised July 17, 2014) ADDENDUM No. 2 (AUGUST 7, 2014)

THE TOWN OF FORT MYERS BEACH

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

GOOSE CREEK CONSOLIDATED INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT

Transcription:

BUSINESS AFFAIRS www.facilities.ufl.edu PLANNING DESIGN & CONSTRUCTION Design/Builder Qualifications Supplement (DBQS) Instructions GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg) A) Submit one (1) hard copy of the proposal plus one electronic (PDF) copy as outlined in the Project Fact Sheet by the time and date stated on the Project Fact Sheet. B) Assemble proposals in a manner that facilitates disassembly & recycling and minimizes the use of plastic covers, binders, and dividers. C) Include a Letter of Interest and (10) tabbed & divided sections as follows, attaching additional pages for each section as necessary: Company Information and Certification (DBQS 0) Services to Be Provided (DBQS 1) Personnel (DBQS 2) including resumes and organization chart if necessary Experience & References (DBQS 3) Design, Construction, and Project Management Questions (DBQS 4-6) Commissioning and LEED (DBQS 7) Safety (DBQS 8) Project-Specific Questions (DBQS 9-11) Joint Venture Information (DBQS 12) if applicable Attachments / Supplements including license(s), proof of corporate status, proof of bonding capacity, and proof of professional liability insurance coverage D) Forms may be retyped or re-sized to provide additional information or pictures, provided that the requested information is provided, and in the order requested. These Instructions need not be submitted. E) Number each page consecutively, including the letter of interest, DBQS forms, questions & answers, and all attachments, licenses, résumés, supplemental information, etc. The entire proposal shall be limited to fifty (50) 8½ X 11 pages. Covers, table of contents, and divider tabs will not count as pages, provided no additional information is included on those pages. Any pages over the stated limit will not be considered as part of the application. F) The Letter of Interest should concisely outline both your understanding of the Ground Floor Renovation (Basic Science Bldg) project and the characteristics of your firm(s) and proposed team that make them uniquely qualified for it. Address the letter to the attention of the UF Project Manager. G) Use the project-specific DBQS 0 form to provide general company information and to formally certify the proposal. H) For DBQS 1, 2, and 3, use the enclosed forms and follow the Submittal Instructions. For the questions in DBQS 4-11, precede each answer with a re-statement of the given question. If the question on joint ventures (DBQS 12) does not apply, simply state NOT APPLICABLE. I) Enclose resumes and other pertinent credentials such as LEED accreditation, BICSI/RCDD certificates, etc. for all proposed staff (applicant and consultants). J) Applicants operating as a corporation, limited liability company, or partnership must be registered to operate in the State of Florida by the Department of State (Division of Corporations) at the time of application. Provide proof of such status (if applicable) for the applicant. Such proof shall take the form of a Certificate of Corporate Status from the Florida Department of State. If paid fees due this office through date has passed, ensure certificate print date is within 10 calendar days of the proposal due PAGE 1 OF 5 PAGES

date. K) Enclose copies of current Florida licenses for the applicant firm (not individuals) and all consulting firms (not individuals). For general contracting, architecture, and landscape architecture firms, this means a valid license from the Department of Business and Professional Regulation. For engineering firms, this means a valid Certificate of Authorization from the Board of Professional Engineers. L) Provide a letter of intent from a surety company indicating the applicant's bonding capacity for this project. The surety shall acknowledge that the applicant/builder may be bonded for each phase of the project, with a potential maximum construction cost of $4,000,000. The letter of intent shall confirm that the Surety Company is licensed to do business in the State of Florida, has a Best Rating of at least "A, and has a financial size of "Class XV." M) Provide proof of the architect, mechanical, electrical, plumbing, fire protection and structural engineering consultants ability to provide Professional Liability insurance coverage in the amount of $1,000,000 each, plus same for the civil engineering consultant at $1,000,000. Such proof may take the form of a draft ACORD certificate or a letter of intent from the respective carrier or agent. Proof of other insurance coverage is not required at this time. N) Applicants should take care in assembling the proposals, as professionalism and attention to detail are among the intangible qualities the Selection Committee will consider. O) Incomplete proposals will be disqualified. This includes, but is not limited to: Failure to submit proposal by the stated time and date Failure to sign the DBQS 0 certification form Missing, invalid, or expired firm licenses Missing, invalid, or expired proof of corporate status in the State of Florida Insufficient proof of bonding capacity, surety rating, or Professional Liability insurance coverage P) See the UF-583 page of the Planning Design & Construction website (www.facilities.ufl.edu) for more information on this project and the DB selection process. PAGE 2 OF 5 PAGES

SUBMITTAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg) NOTE: The numbers on these instructions correspond to the numbered items on the University of Florida Design/Builder Qualifications Supplement (DBQS) forms. 1. SERVICES TO BE PROVIDED: Using the form provided, list all disciplines listed to be provided as part of Basic Services, along with the firm providing each service and the firm s professional license number from the appropriate Florida Licensing Board. Use names and license numbers of the firms as a whole, rather than of individuals in the firms. Enter the number of previous projects on which the builder Applicant has worked with each listed consultant and the number of previous projects on which the architectural design Applicant/consultant has worked with each consultant. If the Applicant feels that its team will require the services of other specialty consultants or in-house specialty expertise, it should so indicate. BICSI Registered Communications Distribution Designer (RCDD): An RCDD is an industry-recognized designation earned by individuals who have attained a level of expertise in the telecommunication field. RCDD designation requires demonstration of expertise in the design, integration, and implementation of telecommunications (voice, data, video, audio, and other low-voltage control) transport systems and their related infrastructure components. An RCDD is responsible for the detailed design of new systems and/or the integration of a design into an existing system. These systems can include combinations of voice, data, video, audio, and low-voltage control. The formats can be digital and/or analog transmissions, as well as conversions of all formats into digital. The designs can include the use of telecommunications copper cabling, optical fiber cabling, and wireless (radio or optical). This designation is intended for those professionals who are actively involved in network infrastructure design and are working directly with architects, engineers, network managers, or other designers/information Systems (IS) professionals. Although it is not precluded, the RCDD designation is not generally intended for those individuals working in direct sales, procurement, telephone support or with responsibility for the installation of the project materials. 2. APPLICANT S PERSONNEL: Using the form provided, list by name and role the Applicant s and Consultants key staff and major discipline heads for the proposed team. Add, delete, or edit role/titles as needed and note non-applicable categories as needed. For all individuals listed, note whether or not they are registered, the disciplines of registration/training, and their city of residence. Enclose résumés for all key staff and discipline heads tailored to demonstrate their experience as it relates to this project. Provide an organization chart or diagram if necessary to clearly explain lines of authority, duties & responsibilities, continuity through design, construction, and post-occupancy, etc. Identify other nonessential positions planned for this project that are not, as yet, filled or named. The team proposed in the DBQS must be available to provide the services for the project, throughout the project. If the Applicant discovers prior to the interview that any part of the listed team (either individual key staff or consultants) will not be available, it shall notify the selection committee immediately. The selection committee will determine whether the change in the team would have affected the Applicant's shortlist score. If the change would lower the score, the Applicant may be removed from the shortlist. Once awarded the contract, the Applicant will not be permitted to alter its team without the Owner's approval. 3. EXPERIENCE and REFERENCES: Submit up to ten most relevant projects for which the Applicant or its composing firms provided (or is providing) design, construction, and/or design-build services. In determining which projects are most relevant to the Ground Floor Renovation (Basic Science Bldg) project, consider the unique aspects of this project, including the design and construction of a 100% Outside Air HVAC system for a lab, the delivery method, the demands of constructing on a bustling campus, and other project-specific issues as conveyed in the selection criteria outlined in the Project Fact Sheet. Also consider the Owner and location, relative size and cost, building/space types, complexity, staffing (how many members of the proposed team worked on the listed project?), currency (how recently was the listed project completed?), and performance metrics (schedule, budget, quality). Use the attached form (one two-page form for each of the ten projects) and provide all requested information as follows: PAGE 3 OF 5 PAGES

Indicate which firm(s) or staff the project is meant to illustrate the experience of, and state the firm s or person s role in that project as follows: "Principal" or Prime if the project was accomplished by the Applicant or design consultant firm "Consultant" or Sub-Contractor if the project was accomplished as a consultant to another firm "I.E." (Individual Experience) if the project represents experience of an individual on the Project Team while working for another firm Note the title and location of the project; indicate the services provided; and complete the other general project information (status, size, value, delivery method, etc.). Provide the names of all key staff whether construction, design, or both and check YES or NO to indicate whether each person is also on the proposed team for the Ground Floor Renovation project. Provide brief narratives on the facility and its relevance to the Ground Floor Renovation project. Provide contact information for the Owner, designer or builder (whichever applies), and the (3) largest subcontractors by value of trade package. Verify that the contact information is still valid (names and numbers). Add, where applicable, contact information for the current Owner s representative, if different from the Owner's representative at the time the applicant s services were provided. List the projects in priority order, with the most relevant project listed first and the least relevant project listed last. The (10) projects may include those accomplished by one or more of the proposed consultants, but INCLUDE NO MORE THAN 10 TOTAL PROJECTS. DESIGN, CONSTRUCTION, and PROJECT MANAGEMENT QUESTIONS 4. The University requires the use of Building Information Modeling (BIM) technology for Architectural, Structural, and MEP design disciplines to facilitate a fully collaborative design process and the development of accurate, information-populated record models upon completion of construction. Describe your firm s approach and experience with the use of BIM, and specifically elaborate on how BIM has been incorporated into routine company workflows as a principle design tool. 5. Elaborate specifically on cost estimating methods for CSI Divisions 15 (mechanical, plumbing, fire protection) and 16/17 (electrical, telecommunications). 6. Describe how the team will develop and maintain the construction schedule throughout design and construction. Who develops the schedule during pre-construction? Who develops the schedule that accompanies the GMP proposal? Who is responsible for updating and adhering to the schedule during construction? 7. COMMISSIONING and LEED (a) Describe the experience of the proposed design and construction staff with building commissioning, including peer reviews during the design phase. (b) Enclose copies of proposed staff s LEED credentials. Describe the experience of the proposed staff with sustainable design and construction and LEED certification efforts. See Project Fact Sheet for more information. 8. SAFETY Safety on and around the jobsite is the responsibility of the Builder. The University of Florida is PAGE 4 OF 5 PAGES

interested in not only the safety of the construction workers, but also the public, including UF students, faculty, staff, and visitors. (a) Explain your approach to safety, including oversight, education, and enforcement. (b) Assuming you have a standard safety plan or manual, describe how it will be tailored to working on an active campus with particular attention to the interaction between construction activities and the public. Questions 9-11 are specific to the Ground Floor Renovation (Basic Science Bldg) project. 9. Discuss your team s approach to jobsite management on a busy campus with a constrained site where parking is at a premium, laydown area is limited, and with heavy traffic around the building. 10. How do you implement the observations, comments and recommendations from the commissioning agent into the design and construction phases of this project? Explain the implementation process. 12. JOINT VENTURE APPLICANTS ONLY Duplicate the Certification form (DBQS 0) signature block and have a principal or officer sign on behalf of each party to the joint venture. Enclose a copy of the joint venture agreement, which specifically states the percentage of fee to be earned by each party and each party's role in the project. Provide answers to the following questions: (a) Describe the division of responsibilities between the participating firms, the offices (location) that will be the primary participants, and the percent interest of each firm. (b) Why does the Applicant feel that a joint venture will best serve the needs of this project? (c) How many projects has the joint venture performed together? (c) Which of the key personnel have worked together before? PAGE 5 OF 5 PAGES