REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES

Similar documents
Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

Washington County Public Works, Building Services

REQUEST FOR PROPOSALS (RFP) AND STATEMENT OF QUALIFICATIONS

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING EVALUATION SERVICES FOR THE PUBLIC SAFETY BUILDING CITY OF OWOSSO, MICHIGAN

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Galesburg Public Library, Galesburg, IL

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Architectural Services

Ogden City Request for Proposals to Provide Market Study and Site Assessment Services

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

Request for Proposals

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

SOMERSET COUNTY, MARYLAND

Morgan Hill Unified School District

This request for qualifications seeks the following type of service providers:

REQUEST FOR PROPOSAL Architectural Services

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

ARCHITECTURAL SERVICES COLLEGEWIDE

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

REQUEST FOR QUALIFICATIONS

November 16, 2015 I. INTRODUCTION

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 15-BS-2552 as follows:

REQUEST FOR PROPOSALS For Design Services for New Fire Station

Request for Proposals September Review and Evaluate the Azusa Light & Water Meter Replacement Project RFP

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES

CITY OF INGLEWOOD Residential Sound Insulation Program

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

Dakota County Technical College. Pod 6 AHU Replacement

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

REQUEST FOR PROPOSAL (RFP) Police Department Building Construction Manager at Risk, Guaranteed Maximum Price August 30, 2016

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR PROPOSAL

CHARLESTON COUNTY PARK AND RECREATION COMMISSION REQUEST FOR PROPOSAL ARCHITECT/ENGINEERING DESIGN BUILD TEAM HOLLYWOOD SWIMMING COMPLEX HOLLYWOOD SC

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study

B Request for Proposal for. Qualified Firms. Financial Advisory Services. Grossmont-Cuyamaca Community College District

MISSISSIPPI STATE UNIVERSITY Request for Proposals (RFP) Bike Share for Mississippi State University

Request for Proposals (RFP) for Professional Design and Engineering Services

MINNESOTA STATE COLLEGES AND UNIVERSITIES

Request for Proposals and Qualifications for. Owner s Representative Services (RFP) August Farmington Public Schools. Farmington Town Hall

Request for Proposal. And Specifications For. Professional Design Services for. The New School of Business Administration WSU Project No.

Water Filtration Plant Motor Control Center Upgrade Engineering and Design Services City of Bristol Tennessee RFP 16009

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m.

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

Programmer. Request for Contracted Services

Request for Proposals Construction Services Workplace Excellence Project

INVITATION TO BID (Request for Proposal)

SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3

Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES

ARCHITECTURAL/ENGINEERING SERVICES

Request for Proposal (RFP) Architectural Services for Interior Renovations

MISSISSIPPI STATE UNIVERSITY. Request for Proposals (RFP) Football Statistics Solution for Mississippi State University

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

City of Georgetown, SC REQUEST FOR PROPOSAL

All proposals must be received by August 30, 2016 at 2:00 PM EST

BROWARD EDUCATION FOUNDATION REQUEST FOR PROPOSALS FUNDRAISING CONSULTANT SERVICES July 5th, 2018

Town of Hoosick Request for Proposals for Design and Engineering Services

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

REQUEST FOR PROPOSALS Town of Brattleboro, VT

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.

CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY

BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES

Request for Statements Qualifications(RFQ) For

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

Request for Proposals (RFP) for: Food Waste Curbside Collection Pilot Program. City of South Portland, ME

Architectural/Design Services

Introduction. Proposal Submission

1 INTERNAL AUDIT SERVICES RFP

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

Consulting Services for Update of Countywide Impact Fee Study

Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS)

The Park at Fields of Medina Playground Equipment

OREGON VOLUNTEER FIREFIGHTERS ASSOCIATION

ANAHUAC INDEPENDENT SCHOOL DISTRICT

Londonderry Finance Department

Regional Greenhouse Gas Initiative, Inc. Request for Proposals #18-01 RGGI Auction Services Contractor. June 18, 2018

CITY OF PORT HUENEME COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSAL FOR BUILDING & SAFETY SERVICES

A. Project Description

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects

COLORADO DEPARTMENT OF EDUCATION DIVISION OF PUBLIC SCHOOL CAPITAL CONSTRUCTION ASSISTANCE 1 CCR BUILDING EXCELLENT SCHOOLS TODAY GRANT PROGRAM

COMMUNITY CONSOLIDATED SCHOOL DISTRICT West Dundee Road Wheeling, IL REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT SERVICES

Housing Rehabilitation Program Administration

8, 2018 REQUEST FOR PROPOSALS (RFP): G

City of Malibu Request for Proposal

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

The District is looking for the architectural firm to provide the following (not listed in order of preference):

Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis

Transcription:

REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES Prepared by: Middleton-Cross Plains Area School District 7106 South Avenue Middleton, Wisconsin 53562 December 22, 2011

Request for Proposal - Design Services The Middleton-Cross Plains Area School District (District) is accepting written proposals from qualified firms to provide design (architectural and engineering) services. Sealed proposals shall be submitted no later than 2:00 p.m. on January 19, 2012, to the Middleton-Cross Plains Area School District, ATTN: Tom Wohlleber, 7106 South Avenue, Middleton, WI 53562. Proposals shall be clearly marked on the envelope as PROPOSAL FOR DESIGN SERVICES. A recommendation will be submitted to the Board of Education at their regular meeting on February 13, 2012. Thomas E. Wohlleber Assistant Superintendent of Business Services

I. Purpose and Objectives The purpose of this Request for Proposal (RFP) is to obtain proposals from qualified design firms (herein referred to as A/E ) interested in contracting with the Middleton- Cross Plains Area School District (herein referred to as District ) to provide desired services as outlined in this RFP. The District has identified the following objectives: to bring all facilities up to a standard that allows equitable access to education across the district; to maximize efficiency in facilities utilization across the district; and to address identified facility/space needs in the District in an efficient and costeffective manner; to significantly reduce the carbon footprint required to construct and operate its facilities (commitment to sustainability); to provide educational facilities that support 21 st Century learning. II. Background The Middleton-Cross Plains Area School District, located in Dane County, serves approximately 6,400 students in grades PreK-12. The District has ten school facilities - six elementary schools (grades K-5), two middle schools (grades 6-8), a high school (grades 9-12), and an alternative high school (grades 10-12). The District has experienced enrollment growth over the past ten years. In 2002, the District completed a $32 million expansion and renovation of its high school (including the construction of a new alternative high school facility). Attention was then focused on addressing growing enrollment pressures and enrollment imbalances at the elementary and middle school levels. Short-term strategies implemented by the District to address the increased enrollment include attendance boundary re-districting, relocation of programs (i.e. early childhood), and conversion of non-instructional spaces into classrooms or instructional support spaces. Following a two-year comprehensive review of enrollment and facility needs, the Board of Education authorized a four question referendum to be held on October 11, 2005. The goal of the four questions was to address student enrollment and other facility needs in the District for the next ten years. One of the four referendum questions was approved by District citizens on October 11 th. The approved question provided $8.9 million in funding for small classroom and multi-purpose room additions at three elementary schools as well as HVAC system upgrades at those schools and one other elementary school. The projects resulting from the approved referendum question provided only temporary relief - it did not address the long-term facility/space needs of the District.

In 2006, the Board of Education revised the charge of the District s Long Range Planning Committee (LRPC) to focus on the development of a comprehensive Facilities Master Plan. The District engaged the services of Plunkett-Raysich to assist the LRPC in development of the plan and perform the following functions: Function 1 - Assessment of Existing Major Building Systems / Components The objective of this function is to assess the condition of existing major building systems / components, determine the projected life expectancies of these systems / components, provide cost estimates for updating or replacement of these systems / components, and assist the school district with the development of a comprehensive long-range maintenance plan to address identified capital maintenance needs. Function 2 - Educational Space / Capacity Analysis and Solutions The objective of this function is to review space utilization and educational delivery, develop a detailed space program on a room-by-room basis (current space deficiencies, the impact of future growth and vision translated into space requirements), assist with the determination or definition of capacity(ies) at existing school facilities, and develop facilities & educational delivery options (including preliminary budgets). Function 3 - Kromrey Middle School Life Expectancy Analysis The objective of this function is to determine the anticipated life expectancy of Kromrey Middle School taking into consideration the physical condition of the building and capability of the existing facility to support the existing and future educational program. Function 4 - School Safety & Security Building Review This objective of this function is to conduct a safety and security review of existing school facilities utilizing recognized best practices and CPTED principals, identify deficiencies, and identify possible options (including preliminary budgets) to address the deficiencies and/or to improve school safety and security. The LRPC presented a Facilities Assessment Report (current conditions of existing school district facilities) to the Board of Education on November 12, 2007. A copy of the Facilities Assessment Report can be accessed on the District s website at: http://www.mcpasd.k12.wi.us/design-services-rfp The LRPC then spent the next six months developing, analyzing, refining and finalizing options to address the District s facilities needs. The LRPC presented the Facilities Master Plan (incorporating its findings and options to address the District s facilities needs) to the Board of Education on April 28, 2008. A copy of the Facilities Master Plan is available on the District s website at the above URL. Following issuance of the Facilities Master Plan, the District developed and conducted (utilizing School Perceptions, LLC) a survey of District residents to gage the community s understanding/awareness of the District s facilities needs and level of support for addressing these needs. School Perceptions presented the survey results and

their analysis to the Board of Education in July. The Board of Education then directed the LRPC, with the assistance of Bray Architects, to reduce or refine the facility options outlined in the Facilities Master Plan to two or three that the District could take out to the community this fall for feedback/ input prior to the Board determining the specific projects to include in a spring 2009 referendum. The LRPC presented the refined facility options to the Board in September 2008. In November/December 2008, the Board approved the project scope to be included in an April 2009 referendum. The referendum questions project scope included: QUESTION #1 - Borrowing question totaling $34.75 million: New K-5 elementary on the Pope Farm site (land owned by the school district), classroom and gymnasium addition to Glacier Creek Middle School, a classroom and multipurpose room addition to Park Elementary School, and District-wide school safety & security improvements. QUESTION #2 - Recurring revenue limit authority of $1.975 million: Funding for operational expenditures associated with the new facilities and increase to the District s instructional materials and technology budget. QUESTION #3 - Borrowing question totaling $33.98 million: Remodel/rebuild of Kromrey Middle School. The referendum results were: QUESTION #1 - Yes 4,766 (45.64%) No 5,677 (54.36%) QUESTION #2 - Yes 4,693 (45.04%) No 5,726 (54.96%) QUESTION #3 - Yes 5,008 (48.00%) No 5,425 (52.00%) Following defeat of the referendum, the Board charged a committee (Enrollment Management Committee) to develop possible options or considerations for attendance boundary changes as a short-term means of addressing school enrollment imbalances until space needs could be addressed through a referendum. The Board approved attendance boundary changes in February 2010 that went into effect for the 2010-11 school year. In November 2010, the Board charged a Long Range Planning (LRP) Task Force, with assistance from Bray Architects and JH Findorff, with reviewing all previous work/plans and to develop options for consideration by the Board to address the District s facility needs (including the potential for a grade level reconfiguration). The Task Force met over a period of nine months. This process included periodic meetings with the Board to update them on the progress of the Task Force and to obtain feedback/input on what options were under consideration. In August 2011, the LRP Task Force presented its findings (reflecting three possible options) to the Board. The Task Force reviewed refined options with the Board in September 2011.

Option 1 - total rebuild of 80% of Kromrey Middle School and remodel some portions of the 1991 section of the school Option 2 - renovation of existing school with enlargement of classrooms and additions to accommodate fifth grade and maintain programs Option 3 - renovation of existing school with maintaining existing size in classrooms and additions to accommodate fifth grade and maintain programs All the options including moving 5 th grade from some or all of the District s to the middle school buildings. A copy of the September 2011 report is available on the District s website at the URL listed above. The Board has NOT made a final decision regarding which option to proceed with a referendum. At the November 7, 2011 Board Development Meeting, the Board directed the administration to issue Request for Proposals for Design Services, Construction Management Services and Referendum Consulting/Communications Services. It is the District s intent to utilize an integrated project team delivery approach (District, A/E, and Construction Manager). The District will issue a RFP for Construction Management (CM) Services following selection of the A/E. III. Scope of Services The following scope of design services, including structural, mechanical, & electrical engineering services, site/civil engineering services, energy modeling/analysis and food service consultant, shall be provided by the A/E: Pre-Referendum / Referendum Assistance Phase (Phase I) The A/E shall assist the District in the community engagement process (with the goal of determining which facility option to include on the referendum) and referendum campaign process. This assistance includes but is not limited to attending planning meetings with District officials, participating in meetings with the public, preparing concept drawings, helping with the development of informational presentations and materials, and conducting research or gathering information related to the proposed project. Concept/Schematic Design Phase (Phase II) Refine program, space needs and project scope. This phase will involve meetings with school staff, students, parents, community members and local governmental officials for program development/refinement. For each component in the project, determine relationships of proposed new spaces to existing building (where applicable) and site.

Design Development Phase (Phase III) After approval and acceptance of the end product from Phase II by the District, the A/E will work to create detailed plans for building elevations, material selections, mechanical systems, electrical systems and final design. Several revisions of the plan may be needed as the project is developed during this planning stage. The A/E shall provide energy modeling for mechanical and other buildings systems under consideration. The A/E will then prepare a final design plan based on the input received from the District and any applicable governmental agencies responsible for project approvals. Construction Documents (Phase IV) After approval and acceptance of the end product from Phase III by the District, the A/E will be responsible for preparation of the applicable architectural drawings and plan documents, e.g. site plan, landscape plan, exterior lighting plan. After final approval of the architectural drawings and plan documents by the District, as well as the appropriate municipal commissions and other governing bodies, the A/E will create detailed construction documents for bidding purposes. The final construction documents shall include as a minimum: Site Plan, Landscaping Plan, Stormwater Management Plan, Roof Plan, Drainage Plan, Floor Plan(s), Exterior Elevations, Building Sections, Foundation plan, Framing Plan(s), Details, Plumbing Isometrics, Door/ Window/ Room Finish/ Header/ Plumbing/ HVAC/ Electrical schedules, HVAC Plans, Electrical Plans, Submittal Worksheets and the project manual including Specifications in the CSI sixteen division format. Bidding & Contract Award (Phase V) The A/E will assist the District and Construction Manager in bidding the project to prospective contractors. Services will include assisting the CM with the distribution of plans and specifications, assisting with sub-contractor pre-bid meetings, assisting with formulating responses to prospective bidders questions, issuing addendums (if necessary), attendance at the bid opening, and providing the District with a recommendation for contract awards. Construction Administration & Project Closeout (Phase VI) The A/E shall be a representative of and shall advise and consult with the District during construction until the final payment to the Contractor is due and during the correction period described in the Contract for Construction. a. Plan Approvals The A/E is responsible for the procurement of ALL plan approvals from the local municipality(ies), Dane County, and the State of Wisconsin Department of Commerce, Safety & Building Division for the building(s) including, but not limited to, Stormwater Management, HVAC, Plumbing and/or Fire Protection.

b. Construction Related Services The A/E will provide on the owner s behalf, construction administration and inspection services. At a minimum, services to be provided consist of coordinating regular progress meetings, review of shop drawings, assist owner in color and finish material selection, undertake construction observation, process certificates for payment to Contractor, and facilitate preparation of final record drawings, warranty follow-up and project closeout. The A/E, in conjunction with the Construction Manager, shall provide updated budgetary cost estimates during each phase of the design process. IV. Design Guidelines The District will require the A/E to integrate sustainable principles/design into the District s projects. The A/E shall apply/utilize standards found in the Leadership in Energy & Environmental Design (LEED ) Green Building Rating System or other nationally recognized sustainability program/certification. The District may consider pursuing LEED or other sustainability program certification. The District may engage the services on an independent commission agent/authority. The A/E shall integrate, to the extent that it is feasible, to integrate the adjacent Pheasant Branch Conservancy into the program and design of the Kromrey Middle School Project. The A/E shall integrate 21 st Century learning concepts into the program and design of all projects. The A/E shall include options in the program and design to provide more expansive community access and use. V. Project Timeline (assuming successful referendum in November 2012) The project(s) must be totally completed and approved for occupancy no later than August 1, 2015 assuming passage of the referendum in November 2012. Both Kromrey and Glacier Creek Middle Schools will remain open during the construction process resulting in the need for phased construction. The District s expectation during the construction process is to minimize disruption of the educational process. The A/E shall develop preliminary project timelines (and related expectations or obligations of the District) which project completion by August 1, 2015.

VI. RFP Timeline - RFP issued 12/22/11 - Last date/time to submit questions regarding RFP 1/6/12 @ 1:00 p.m. - Voluntary meeting to answer questions related to the RFP 1/9/12 @ 1:00 p.m. - Proposals due to District 1/19/12 @ 2:00 p.m. - Review RFP responses and select which firms will be invited to participate in presentation/interview process 1/30/12 - Notify firms selected to participate in presentation/interview process 1/30/12 - Presentation/Interviews 2/7/12 or 2/8/12 - Select firm 2/10/12 - Approval of firm by Board of Education 2/13/12 VII. Informational Meeting The District will hold a voluntary informational meeting on Monday, January 9, 2012 at 1:00 p.m. to address vendor questions and provide, as needed, clarifications to firms interested in submitting a proposal to the District. The meeting will be held at the Middleton-Cross Plains Area School District Administrative Center, 7106 South Avenue, Middleton. VIII. Firm Profile Respondents to this RFP shall include the following minimum information in their proposal: a. General qualifications: describe the general qualifications of the firm(s). b. Special qualifications: describe any special or unique qualifications of the firm(s) as they relate to this project including, but not limited to, experience with prereferendum assistance, sustainable/green building design and elementary / middle school facility designs. c. Staff qualifications: submit resumes demonstrating relevant experience of key personnel to be assigned to this project. Specify the role of each key staff member in the project. d. Previous experience: provide a list of clients, including name, address, contact person and telephone number for whom similar or related design services (for elementary and middle school facilities) that have been provided within the last five years. Include a short description of the project(s), the name of the project manager(s), and other staff members that were assigned and their role(s) in the project.

IX. Proposal Response Respondents to this RFP shall also include the following minimum information in their proposal: a. Describe how they will organize and perform the work described in the Scope of Services section. List the names of any sub-consultants that are intended to be used on the project and the specific services to be provided the sub-consultant(s). b. Describe their understanding of the project and the planned approach to achieve the goals of the project. Submittal shall include a listing of contemplated tasks and number of estimated hours by personnel classification / discipline for each phase of the project. c. Describe sustainable or green design experience as well as experience working with Focus on Energy. d. Include conceptual time schedules and related expectations / obligations of the District needed to complete the scope of work specified based on occupancy for al projects by August 1, 2015 (based on passage of a referendum in November 2012). e. Provide a fee proposal using the attached fee proposal spreadsheet. Fees shall include ALL meetings needed to successfully complete this project and ALL reimbursable costs other than plan/document printing costs (incurred for the bidding phase of the project) and required plan submittal fees. f. Provide a description of any possible additional related costs and/or fees (not included in your base fee) that the District might incur as a result of this design process. X. Proposal Evaluation / Selection Process The responses will be reviewed an evaluation panel consisting of individuals selected by the District. Responding firms will bear all costs of this RFP and interviews, if any. Proposals will be reviewed using the following criteria / elements: - Conciseness, responsiveness and completeness of the proposal to the information requested, objectives, and deliverables as outlined in the RFP - Fee Proposal/Cost: Overall fee / billing rates - Prior experience, Qualifications, References, Past Performance of A/E

- Experience/Expertise in K-12 School Projects (with an emphasis on middle level education) - Experience with Sustainable or Green Design - Level of Innovation with a Focus on 21 st Century Learning - A/E Firm s Technological Capabilities (to manage this project in a paperless or almost paperless manner) At the District s discretion, to further assist in evaluation, some, one, or all of the responding firms and/or individuals may be requested to participate in an interview process. The interview will be used as another opportunity to clarify any issues within a given response and explore the approaches that may be used to satisfy all requirements for the District. Upon the completion of the selection process, the District shall notify the firms of the selection and the successful firm to enter into an agreement. Firms shall submit fee proposal using the Fee Proposal Form provided with this RFP. At the District s discretion, it may directly negotiate with the best qualified A/E on final scope and budget. The District may also consider alternative proposals to provide engineering services if there is an opportunity for substantive savings (without adversely affecting the project timeline or quality) and other significant benefits (to be clearly articulated by the proposer and be measurable) accruing to the District. The District may investigate the qualifications of any individual or firm under consideration, require confirmation of information furnished and require additional evidence of qualifications to perform the services described in this RFP. The District also reserves certain rights, including, but not limited to, the following: a. Reject any or all of the proposals b. Issue subsequent Requests for Proposals c. Cancel the entire Request for Proposal d. Remedy technical errors in the Request for Proposal process e. Appoint evaluation committees to review qualifications and proposals f. Seek the assistance of outside technical experts in evaluation g. Approve or disapprove the use of particular subcontractors h. Establish a short list of firms eligible for discussions after review of RFP i. Negotiate with any, all, or none of the firms j. Solicit best and final offers from all, some, or one of the firms k. Award a contract to one or more firms l. Waive informalities and irregularities in RFP m. Award without discussion

Selection will be based upon a determination as to which proposal is in the best interest of the Middleton-Cross Plains Area School District. Any decision made by the District, including the selection of vendor, shall be final and is NOT subject to appeal. This RFP shall not, in any manner, be construed to be an obligation on the District to enter into a contract or result in any claim for reimbursement of cost for any efforts expended in responding to the RFP or in anticipation of any contract. XII. Submittal Requirements Any questions concerning this RFP must be submitted via e-mail on or before January 6, 2012 at 1:00 p.m. to: Tom Wohlleber, Assistant Superintendent Middleton-Cross Plains Area School District E-mail: twohlleber@mcpasd.k12.wi.us All responses to this RFP shall be received by the District no later than 2:00 p.m. on January 19, 2012. Five (5) copies of your proposal are requested. Responses to this RFP should be delivered to: Tom Wohlleber, Assistant Superintendent Middleton-Cross Plains Area School District 7106 South Avenue Middleton, WI 53562 Proposals shall be marked "Proposal for Design Services" and shall clearly identify the firm submitting the proposals. Proposals received after the date and time specified will be returned unopened. All proposals will become the property of the Middleton-Cross Plains Area School District.

MIDDLETON-CROSS PLAINS AREA SCHOOL DISTRICT Design Services RFP FEE PROPOSAL FORM Name of Firm: Address: Contact: Telephone: Fax: E-mail: Please state the fees for this project below: FEE FOR PRE-REFERENDUM / REFERENDUM ASSISTANCE (PHASE I) AND CONCEPT / SCHEMATIC DESIGN (PHASE II) Fee shall be expressed as a flat dollar amount (there shall be no reimbursables allowed - all costs shall be included in your fee) $ If our referendum is approved, will any of the fee paid for the Pre- Referendum / Referendum Assistance and Concept / Schematic Design phases be applied as a credit to the remaining phases of the project? No Yes How much will be credited? $ FEE FOR REMAINING PHASES OF PROJECT - DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, BIDDING & CONTRACT AWARD, AND CONSTRUCTION ADMINISTRATION & PROJECT CLOSEOUT Fee shall be expressed as a percentage of total construction costs for the Project including change orders (the only allowable reimbursables will be plan submittal fees and plan printing costs in the Bidding & Contract Award phase - all other costs shall be included in your fee) % The undersigned attests that the information contained within the proposal is accurate to the best of his/her knowledge, and that the firm he/she represents, if selected, agrees to incorporate the requirements of this RFP in the final contact with the District: Signature of Person Authorized to Submit Proposal: Typed Name of Signature Above: