MEMORANDUM OF MEETING

Similar documents
w 2521 CLARK STREET, SUITE 600

MEMORANDUM OF MEETING

U.S. Army Audit Agency

Information Technology

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Graphics, Framing and Engraving Services

MEDIA CONTACTS. Mailing Address: Phone:

Department of Defense Defense Commissary Agency Fort Lee, VA DIRECTIVE. Records Management Program

DCN: Predecisional --- For Official Use Only --- Not for Release under FOIA VIRGINIA. Ft Belvoir

Infrastructure Steering Group Meeting February 23, Attendees

SAAG-IMT 30 June 2004

Army Use of United Service Organizations, Inc., Services

MEDIA CONTACTS. Mailing Address: Phone:

Joint Base Planning Opportunities and Challenges. April 13, 2012

TACTICS, TECHNIQUES, AND PROCEDURES FOR GARRISON FOOD PREPARATION AND CLASS I OPERATIONS MANAGEMENT

Fort Leavenworth Statistics As of 30 September 2016

INFORMATION FOR ATTENDEES OF THE DOD PEST MANAGEMENT COURSES. MCCS-WAA-P 01 June 2017

IMLD-ZA 6 June SUBJECT: Garrison Policy 06, Army Managers Internal Control Program (MICP)

Department of Defense

CLOSE HOLD. Deliberative Document For Discussion Purposes Only Do Not Release Under FOIA

MILITARY HOUSING Costs of Separate Barracks for Male and Female Recruits in Basic Training

JUNE 2017 Vol. 26, No. 08. New range complex nears completion. 51st Fighter Wing s mission, operations and activities. the upgrades.

FMFADA Deputy Director, Operations

BASE VlSOT REPORT FORT SILL. OK 11 JUNE 2005

DOD MANUAL DOD FIRE AND EMERGENCY SERVICES (F&ES) ANNUAL AWARDS PROGRAM

REQUEST FOR PROPOSALS (RFP): COMMERCIAL LEASE BROKER

Planning Systems Support 99 th RSC Fort Dix, NJ

Aberdeen Proving Ground Transformation In Action 30 October 2009

T h e U n i t e d S t a t e s A i r F o r c e. Housing Requirements. and Market Analysis

Subject: Audit Report 16-14, Spartan Complex Renovation, San Jose State University

Strategic Cost Reduction

Retain command and control of the Area of Responsibility, as designated by Air Force Mortuary Affairs.

MEMORANDUM. ~ The California State University ~ OFFICE OF THE CHANCELLOR. To: Vice Presidents for Administration

BRAC TRANSITION TASK FORCE ARLINGTON ECONOMIC DEVELOPMENT COMMISSION

a. 5 CFR , Policy on Granting Excused Absence to Regular Employees.

Medicaid Cost Report: Capital Asset History

Cost Benefit Analysis Case Study: European Infrastructure Consolidation

Chapter 2 Authorities and Structure

REQUEST for INTEREST. Building & Parking Redevelopment Project. Travis Park United Methodist Church. TABLE of CONTENTS


Appendix C DA Form 7632 Instructions

GAO DEFENSE INFRASTRUCTURE. Army Needs to Improve Its Facility Planning Systems to Better Support Installations Experiencing Significant Growth

Utilization of Real Property

Department of Defense

US Army Corps of Engineers

OFFICE OF THE NATIONAL COMMANDER CIVIL AIR PATROL UNITED STATES AIR FORCE AUXILIARY MAXWELL AIR FORCE BASE, ALABAMA


COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

JBM-HH Army Personnel and Finance In-Processing is held daily from 8 to 11:15 a.m. in Building 230, Room 117, Fort Myer.

ort ich-(vc~ Office of the Inspector General Department of Defense USE OF THE INTERNATIONAL MERCHANT PURCHASE AUTHORIZATION CARD

Plan-Do-Study-Act. We will know if the change was an improvement if the percent of active clients retained increases.

Fort Monmouth, NJ. Conveyance Progress Report. Insert Picture of entire base if available

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment)

THE UNDER SECRETARY OF DEFENSE WASHINGTON, DC

OUR MISSION PARTNERS DISA S BUDGET. TOTAL DOD COMPONENT/AGENCY ORDERS FOR DISA DWCF FY16 (in thousands)

REPORT OF THE CHIEF LEGISLATIVE

Office of the Inspector General Department of Defense

Fleet Readiness Centers

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT

Army Regulation Management. Stationing. Headquarters Department of the Army Washington, DC 20 August 2010 UNCLASSIFIED

SAAG-ZA 12 July 2018

VA Office of Inspector General

WASHINGTON DC. SUBJECT: 2005 AF Base Realignment and Closure (BRAC 2005) Site Survey Guidance

W hy is there no water pressure in the barracks? Why

Joint Base San Antonio (JBSA) 2017 Alamo Ace 14 November 2017

Department of Defense

CIVILIAN MANPOWER STATISTICS

DEPARTMENT OF THE ARMY UNITED STATES ARMY GARRISON WIESBADEN UNIT29623 APO AE

An Interview with The Honorable Deborah Lee James, Secretary of the Air Force

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015

Army. Environmental. Cleanup. Strategy

Military Police Staff Duty Officer hour SAPR line Marine Corps Recruit Depot

i' ~t to CIJ~ ~lb ">9""

Ergonomic Challenge: Pentagon & Leased Facilities for 60,000 Workers

AIR WAR COLLEGE AIR UNIVERSITY JOINT-BASING FUNDING. Jeffrey K. McNeely, YD-03, DAF. A Research Report Submitted to the Faculty

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities

Department of Defense DIRECTIVE

MEMORANDUM FOR DOD ACTIVITY ADDRESS DIRECTORY (DoDAAD) PROCESS REVIEW COMMITTEE (PRC)

BASE VISIT REPORT DYESS AIR FORCE BASE, TX 27 JUNE 2005

MCBO B 04/k 25 May 95

This publication is available digitally on the AFDPO WWW site at:

Real Property Category Codes

Department of Defense INSTRUCTION

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DoD Nutrition Environment Strategy

INSTRUCTION Reissues Reference (a) as a DoD Instruction according to the guidance in References (b) and (c).

Encl: (1) Definitions (2) Example of Fiscal Year Bed Capacity Report (3) Example of Fiscal Year Staffed and Unstaffed Beds by Category Report

December 3, 2010 MEMORANDUM. Dr. Karan Watson Chair, Council for the Built Environment. Mr. Tom Taylor Chair, Council for the Built Environment

Department of Defense DIRECTIVE. SUBJECT: Single Agency Manager (SAM) for Pentagon Information Technology Services

GAO. DEPOT MAINTENANCE Air Force Faces Challenges in Managing to Ceiling

59 th Medical Wing. The US Military Dietetic Internship Consortium. Air Force Training Site. I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Contents. Chapter 3 $1 - $2,500 RMA Projects Purpose Actions required Lessons learned

This publication is available digitally on the AFDPO WWW site at:

AD-A NUMBER C_ BIIIIIIIIIIIII IIIBI DATE. Department of Defense Instruction ABDA

Report No. D July 25, Guam Medical Plans Do Not Ensure Active Duty Family Members Will Have Adequate Access To Dental Care

The graphs and tables on the following pages illustrate our findings in greater detail.

Department of Defense INSTRUCTION. SUBJECT: DoD Public Affairs and Visual Information (PA&VI) Education and Training (E&T)

References throughout to Joint Federal Travel Regulations (JFTR) are hereby changed to Joint Travel Regulations (JTR)

Memo to the Planning Commission INFORMATIONAL ONLY

Subject: Audit Report 17-37, Emergency Management, California State University, Bakersfield

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES

Transcription:

2521 CLARK STREET, SUITE 600 ARUNG TON, VIRGINIA 22202 DATE: June 27,2005 MEMORANDUM OF MEETING TIME: 9:30 AM - 12:30 PM MEETING WITH: Mark Simpson, DeCA, Planning Barbara Lamberson, Paid, Garrison Jay Manning, DeCA, GC Rose Alais, DeCA, DOB Michael Marretti DeCA, DO Rick Florek, DeCA,SSS Larry Constantine, DPW-L, (804) 734-4015 John Royster, DPW-L, (804) 734-3368 Wanda Wallace, DeCA, XP Cecil Saunders, DeCA, Program Manager, and BRAC coordinator, (804) 734-84 14 SUBJECT: Briefing and tour of the Defense Commissary Agency (DeCA), Fort Lee, Virginia PARTICIPANTS: Thomas A. Pantelides, Senior Analyst, Joint Issues Team* MEETING SUMMARY: Mr. Cecil Saunders provided a briefing of DeCA and its world wide operations. (See briefing materials attached). The main points of the brief highlight the improvements and efficiencies being made within DeCA and how those improvements would reduce the overall manpower requirements of the organization. Mr. Saunders explained that the leased facility costs are relatively low because DeCA has paid for many of the improvements in the leased Nichols I1 building. The leased cost of the building is $258,100 and is estimated to have about 90,000 square feet. The building has 187 people and is also used as a warehouse storage area. The recommendation shows that an additional 347 personnel will be added to the DeCA population as a result of the proposed consolidation with an estimated savings of 67 positions. Based on the current DeCA plan, Fort Lee will have 1074 personnel with a

savings of 103 positions, for an additional 36 positions savings above that estimated in the BRAC recommendation. Fort Lee planners estimate the cost of the additional facility at $54 million. This estimate is based on a new building requiring 205,600 square feet to house the additional personnel consolidated at Fort Lee. During our discussions all agreed that the current requirement for additional space is only 84,200 square feet. After our brief we took a tour of DeCA facility at Fort Lee. The building is new and has the needed? conference rooms and kitchen facilities required by sales to evaluate new products. Contractors and DeCA staff work in open floors partitioned into cubicles. The additional wing will be open floor space with cubicles. In addition to the DeCA information the following information was provided related to the Defense Contract Management Agency (DCMA), moving from leased space to Fort Lee. The site of the new construction has been identified with construction costs estimated at about $35 million. DCMA has no certified manning document the level of manning is controlled by the O&M budget. Actual personnel data was not available at the time of our visit. The data provided in formulating the DOD recommendation for DCMA was 431 civilians 43 Military and 56 contractors. In Addition, there is an international piece of DCMA with 52 civilians and 11 military. The current strength of DCMA is 620 personnel and is predicted to stay at that level though 2010. The POC for DCMA is Col. Jamie Adams at (703) 428-1729 Officials agreed to update cost and savings estimates based on revised requirements.

Y OF OB-C BASED ON FORT LEE AND A-SIS OF A D D I T I O N 0 The proposed DeCA consolidation will generate additional personnel savings and require less military construction than originally estimated. The additional personnel savings are due to the planned efficiencies within DeCA which are projecting an additional savings of 36 positions than estimated within the BRAC recommendation. The reduced military construction is the result of fewer positions required and because the additional construction will be a wing on an already existing structure rather than a new stand alone building. Fort Lee officials estimate a requirement for an additional 84,200 square feet wing rather than the proposed 205,600 square feet building. Fort Lee initially estimated $54 millioin in military construction costs to house the projected population increase at DeCA. The BRAC recommendation estimated $35.4 million in military construction costs for the DeCA consolidation. Based on the revised DeCA requirements, Fort Lee has revised its construction estimate to $30 million. The accuracy of the military construction estimates at Fort Lee and within the BRAC scenario are questionable because the $35.4 million BRAC estimate includes costs for quality of life construction such as dental, chapel, child care, fitness, recreation center and exchange facilities that are not normally required for an increase in civilians working on the base. The accuracy of the revised $30 million military construction estimate by Fort Lee is questionable because it includes the construction of a storage facility not identified within the BRAC scenario. Additionally, the estimate is based on a requirement of 84,200 square feet which includes 140 contractors. DeCA officials estimate that only 55 contractors are required to be housed in the DeCA on base facility. * Denotes individual responsible for completing the memorandum

2521 CLARK STMET SUITE 600 ARhYNGT'ON, VIRGINIA 22202 DAF: July 7,2005 I I 0 TIME: 11:W AM - ll:15am ) I\ MEMORANIDUM OF PHONIE CONVERSATION I I Conversation with: Defense Commissary Agency (DECA), Headquarters, Fort Lee Virginia I SUBJECT: Consolidation of DECA at Fort Lee (H&SA -26) PARTICIPANTS: Mr. Cecil Saunders, BRAC Coordinator, (804) 7348414 Commission Staff: Tom Pantelides, Senior Analyst ~ r iaunders! called in response to my questions during our June 2'7' meeting at Fort Lee. He said Fort p e had revised its estimate of construction costs based on a requirement for an additional 84,200 square feet wing rather than the proposed 205,600 square feet building. The new estimate for the additional construction is $30 million which includes the cost of additional storage curre)ntly in World War I1 buildings. Additionally, he found that only 55 of the 140 contractors in the estimated 84,200 square feet wing, e required to be co-located in the DeCA building at Fort Lee. I 1

2521 CLARK STREET, SUITE 600 ARLZNGIFON, VZRGdNIA 22202 DATE: June 20,2005 TIME: 3:00 PM - 3:30PM MEMORANDUM OF PHONE CONVERSATION Conversation with: Defense Commissary Agency (DECA), Headquarters, Fort Lee Virginia. SUBJECT: Consolidation of DECA at Fort Lee (H&SA -26) PARTICIPANTS: Mr. Cecil Saunders, BRAC Coordinator, (804) 7348414 Commission Staff: Tom Pantelides, Senior Analyst PHONE SUMMARY: Mr. Saunders said that he had a spreadsheet showing the numbers of personnel being affected by the recommended consolidation. He also explained that a reengineering study performed prior to BRAC recommended the consolidation. The consolidation would have occurred irrespective of BRAC. Mr. Saunders explained the plan was to consolidate the San Antonio, Virginia Beach and Sacramento locations into existing facilities at Fort Lee and to continue to lease the space outside of the gate. He said that the plan was to ask contractor personnel that now occupy about 140 spaces in the headquarters building to move out of the building. He estimates that DECA has leased space for 23 1 personnel. The consolidation requires an additional building of 90,000 Square Feet to house 354 people. The extra space for the new site is required because it will be used to house personnel from consolidated spaces. He estimates 53 from San Antonio, 69 from Norfolk and 123 from Sacramento will be consolidated at Fort Lee. We agreed to discuss the consolidation further, possibly B Fort Lee next week.