NOTIFICATION TO GLOBAL TRANSIT SINGAPORE PTE LTD FOR EARTHWORK PROCEDURES

Similar documents
Notification to Global Transit Singapore Pte Ltd for Earthwork Procedures

PART Puc 803 SYSTEM REQUIREMENTS Section Puc Procedures and Operation of Notification Center Section Puc Education and Training

Yeap Transport Pte Ltd EtonHouse School Bus Transport Registration Form (Broadrick)

CAREER TRIAL INFOKIT FOR COMPANY. Assess a jobseeker s fit via a short-term work trial for jobs paying $1,500 or more

NTU CAREER FAIR 2003 NANYANG AUDITORIUM SEPTEMBER 2003

Application form for Commissioning Generation Facility Registration by a Market Participant. including explanatory notes

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

SECTION HAZARDOUS MATERIALS HEALTH AND SAFETY PLAN

NeoOne VPN Service Specific Terms and Conditions

WMI CERTIFICATE IN TRUST SERVICES INTAKE 9 - APPLICATION FORM

Workplace Safety & Health Innovation Awards 2016 Guidelines and Application Form

MAINE STATE LEGISLATURE

SPECIALLY REGISTERED CONTRACTOR (SRC) APPLICATION FORM AN APPLICATION TO BE A SPECIALLY REGISTERED CONTRACTOR FOR

FUNDAMENTALS OF CORPORATE SECRETARIAL PRACTICE

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012

APPLICATION FOR SSG FUNDING FOR THE BCA-SMU-SSG ADVANCED MANAGEMENT PROGRAMME ON PRODUCTIVITY AND LEADERSHIP DEVELOPMENT 2017 INTAKE

Downtown Mural Grant Program Guidelines

Guidance regarding completion of the build over or near to a public sewer application form

Sewer Connection Application (S106)

SUBJECT: Garrison Policy Memorandum #17-11, Excavation Permits

Application for vehicle crossing permit

Construction CCEI Survey Support. To be assigned by Individual Task Work orders (If required)

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Adopted Amendments: N.J.A.C. 14:7-1.4, 1.8, 1.9, 1.11, 1.12, 1.14, 1.20, 1.24, 1.25, and 2.3

Application for Provisional Registration as a Joint Venture Consultant

By:Whangarei District Council. Food Businesses Grading Bylaw 2016

La Plata County Minor Oil and Gas Facility Application

Application to Access Health Records (DPA1)

SETSCO Services Pte Ltd

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT

Appendix B-1. Feasibility Study Task Order Template

REQUEST FOR PROPOSAL Digital Archiving Project

Application Form Place-and-Train Programme

Application for admission to: (Important: Tick accordingly and fill in the year of intake)

CALL FOR PROPOSALS No. GOG/08_2016/07

City of Coquitlam. Request for Expressions of Interest RFEI No Workforce Scheduling Software

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S))

Marina Strategy: Section A Request for Proposal. 1. Request for Proposal. 2. Communication. 3. Key Contacts

TERMS & CONDITIONS. 1. The maintenance work should be carried out at Pondicherry University campus and Guest House, kalapet, Puducherry.

HEALTH AND SAFETY COORDINATION PLAN - EPPING

APPLICATION FORM QUIETER CONSTRUCTION FUND (QCF)

Industrial Optimization Program: Feasibility Study

Installation Operations Sample Method Statement

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF

MEDICAL POWER OF ATTORNEY

Erasmus+: Sport Info Day

Incident & Hazard Reporting and Investigation Guidelines

MILO JUNE HOLIDAY BREAKFAST PLATTER PROMOTION

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Client name:... Billing name:... Address:... address:... ABN/ACN:... Contact name:... Phone number:... Cost register (office use):...

5-Day Course for Appointed Person Lifting Operations 5 th Run

REQUEST FOR PROPOSAL After Hours Answering Services

Unregulated Heating Oil Tank Program Guidance

Grant Application Form

POSITION DESCRIPTION

ASX CLEAR OPERATING RULES Guidance Note 9

City of Aurora Façade Improvement Matching Grant Program

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

STANDARD DRAWINGS INDEX

Medical Power of Attorney Designation of Health Care Agent 2 Witnesses. I, (insert your name) appoint: Name: Address:

PROJECT FACT SHEET PROFESSIONAL SERVICES NATURAL GAS PIPELINE ENGINEERING

ASX CLEAR (FUTURES) OPERATING RULES Guidance Note 9

Version 1, March 2015

terms of business Client Details Client name:... Billing name:... Address:... address:... NZBN/NZCN:... Contact name:... Phone number:...

CITY OF AIRDRIE MEMORIAL POLICY GUIDELINES

Design Build Services Lake Shawnee Junior Pond Improvements

COMPANY PROFILE INTRODUCTION:

VOLUNTEER APPLICATION

Application for admission to:

LICENSE DIRECTIVE FOR RESALE AND TELECENTER IN TELECOMMUNICATION SERVICES

Community Fund Grant Application. Application Pack for Projects Seeking Infrastructure Grants

Information & Application

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

Client name:... Billing name:... Address:... address:... ABN/ACN:... Contact name:... Phone number:... Cost register (office use):...

1. Citation and commencement 2. Definitions 3. Application

REQUEST FOR PROPOSAL FOR CARPARK MANAGEMENT SYSTEM

West Bengal State University

United States Small Business Administration Office of Hearings and Appeals

A. General provisions and other electrical systems are specified in other Sections of Division 26.

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610)

APPLICATION FOR OPPORTUNITY FUND IT DEVICE SUBSIDY

POLICY ON THE CONTROL OF ASBESTOS AT WORK

REQUEST FOR SEALED PROPOSAL. ADVERTISEMENT for SIDEWALK INSTALLATION

CITY OF MOUNTLAKE TERRACE ORDINANCE NO.

Heat Pump Rebate for ENERGY STAR Most Efficient Heat Pumps

HEALTH AND SAFETY POLICY. IAC Service Group. 3 Radford Business Park Radford Crescent Billericay CM12 0DP. Tel:

GALWAY COUNTY COUNCIL MOBILITY AIDS HOUSING GRANT SCHEME APPLICATION FORM

Graduate Diploma In Mental Health (GDMH) Intake

CERTIFICATE IN PEER SUPPORT Application Form

AGSVA SERVICE LEVEL CHARTER FOR DEFENCE INDUSTRY Australian Government Security Vetting Agency and Defence Industry

REQUEST FOR PROPOSALS

Sponsorship and Exhibition Prospectus

GRANT APPLICATION FORM 1

Please Return TERMS OF BUSINESS FOR SUPPLYING TEMPORARY STAFF SERVICES 1. DEFINITIONS. 1.1 In these Terms of Business the following definitions apply:

ASBESTOS POLICY. Version: 3 Senior Managers Operational Group Date ratified: March 2016

REQUEST FOR PROPOSAL

Redevelopment Authority of Allegheny County

RADIATION EXPOSURE CONTROL PLAN

RECRUITMENT AND VETTING CHECKS POLICY

SALARIES AND REMUNERATION COMMISSION STANDARD PROCUREMENT

Transcription:

NOTIFICATION TO GLOBAL TRANSIT SINGAPORE PTE LTD FOR EARTHWORK PROCEDURES 1. Introduction With effect from 1 July 2000, The Info-Communications Development Authority of Singapore (IDA) has introduced a licensing for telecommunication cable detection workers and in compliance for section 29(1) of the telecommunication Act 1999 (the Act), contractor involving in relating to earthworks, are required to comply with the provisions of telecommunication cable detection works under the Act. The objective is to prevent damages to the underground telecommunication cables which cause disruption to telecommunication services by earthwork contractors. Thus, administration procedure for the notification of earthworks by the contractors/ principals when planning and/or working in the vicinity of Global Transit Singapore Network Plans is list herein. 2. Definition Telecommunication cables include optical fiber cables of 2 fibers to 144 fiber count and above. 3. Administration Procedure 3.1. The principals/contractors are advised to submit a location map with indicated area of works with Annex A, Request of Plant Maps to the following address through email correspondence as to check, and to purchase plant maps if required to ascertain Global Transit Singapore Network s asset: Next Generation Provider Pte Ltd Managed Service Provider on behalf Global Transit Singapore No 10, Tuas Drive 2 Unit 01-10 Singapore 638645 Telephone: 68624022 Email: support@ngp.com.sg 3.2. The principals/contractors must engage a Licensed Telecommunication Cable Detection worker (TCDW) to locate Global Transit Singapore s plant routes by appropriate detection equipment before the commencement earthwork and recommendation of digging trial holes to ascertain the services. 3.3. The TCDW must submit the detected and located plant route information to the principals/contractors and keep a set of records for future reference. 1

3.4. If the proposed excavation route/zone fall within the plant maps containing Global Transit Singapore s pipes/manholes, the principals/contractors have to notify Next Generation Provider in compliance with Section 29 (1) of the Act. Payment cheque and necessary documents for processing shall be submitted together with the notice. 3.5. Upon receipt of the notification (Annex B), Next Generation Provider will respond within 7 days, from the date of receipt, with an acknowledgement of the notification or a requirement for a site visit with the principals/contractors for further discussions and consultation and to verify that the contractor has carried out the detection of Global Transit Singapore plant routes properly and marked the detected Global Transit Singapore plant routes in the vicinity onsite. 3.6. Upon site verification with the principal/ contractors of compliance of the requirement as stated in the Notice (Annex B), Next Generation Provider shall issue a letter of recommendation for notices to permit the earthworks carried out by Principal/ contractor. 3.7. For the avoidance of doubt, if the contractor is unable to locate Global Transit Singapore s pipeline(s) and does not inform Next Generation Provider or seek Next Generation Provider s assistance to locate the pipe(s), the letter to the notice (Annex B) will not be issued and/ or if letter of notice (Annex B) is issued, will be considered void. 3.8. Each notification will expire within a month from date of acknowledgement if the intended earthworks are not carried out. Upon expired, a fresh notification is required from the principal/ contractors to notify Next Generation Provider on the new scheduled commencement date. 4. Submission and Conditions 4.1. The notice shall be submitted in standard forms: a. Annex A - Request for Plant Route Plan b. Annex B - Notification for Commencement of Earthworks 4.2. The notice shall be submitted via email to: support@ngp.com.sg 4.3. Documents necessary for Next Generation Provider for processing of the notice must accompany the notices e.g. proposed site plan with proposed trial holes and earthworks position relative to Global Transit Singapore plant route, work schedule and cable detection drawing by licensed TCDW (if applicable). 4.4. Conditions and safety measures, if necessary, will be conveyed in Next Generation Provider response. 4.5. Global Transit Singapore Pte Ltd, c/o Next Generation Provider Pte Ltd reserves the right to include additional conditions and/or modify existing conditions during the duration of earthworks if damage to cable may occur or is likely to occur. 2

5. Method of Payment 5.1. All payment related to notice should be payable to Next Generation Provider Pte Ltd. Global Transit Singapore Pte Ltd s Networks Plant Location List S/N Location Ayer Rajah Crescent Lp. 5/1S / One North Avenue/ 1 Ayer Rajah Avenue / One North Crescent / Central Exchange Green / Slim Barraks Rise Lp. 18F Commonwealth Ave Lp 111/1 / Holland Ave Lp 14 / 2 Taman Warna Lp 6 / Holland Road / Cornwall Gardens / Leedon Heights Lp 26 / Farrer Road Lp 75A 3 Adam Road Lp 46-Lp 34 / Adam Park Lp 34/9 4 Adam Park 34/9 / Adam Road / Sime Road 5 Sime Road / Lornie Road Lp 70 / Reservoir Road Lp 32 6 Reservoir Road / Leonie Road Lp 36 - Lp 4 Lornie Road Lp 4 - Lp 146 / Braddell Road Lp 198 - Lp 7 186 Braddell Road Lp 186 - Lp 176 / Bishan Flyover Lp 176 8 - Lp 146 From (LP) To (LP) S/N Location From (LP) To (LP) 1 Woodlands Checkpoint LP 543 LP 36 2 Woodlands Centre Road LP 36 LP 53 3 Woodlands Centre Road / Marsiling Road LP 3 LP 25 4 Marsiling Road / Marsiling Rise LP 25 LP 21 5 Marsiling Rise / Marsiling Industrial Estate Road 7 LP 21 LP 16 6 North Woodlands Drive / Woodlands Avenue 5 / Woodlands Avenue 9 LP 15 LP 1 7 Woodlands Avenue 2 / Woodlands Avenue 9 LP 1 8 Woodlands Avenue 9 / Woodlands Avenue 4 9 Woodlands Avenue 4 / Woodlands Industrial Pk E9 S/N Location From (LP) To (LP) 1 Jalan Ahmad Ibrahim LP 2S LP 7S 2 Jalan Ahmad Ibrahim / Tuas West Drive LP 2S LP 27 3 Tuas West Drive / Tuas Link 4 LP 36 LP 2 4 Tuas Link 4 / Tuas Avenue 7 LP 4 LP 9 5 Tuas Avenue 7 / Tuas Avenue 10 LP 9 LP 7 6 Tuas Avenue 10 / Tuas Avenue 1 LP 7 LP 7 7 Tuas Avenue 1 / Tuas Avenue 2 LP 7 LP 17 8 Tuas Avenue 2 / Tuas Avenue 3 LP 17 LP 15 3

Annex A Request for Plant Maps Global Transit Singapore c/o Next Generation Provider Pte Ltd No 10, Tuas Drive 2, Unit 01-10 Telephone: 68624022 Singapore 638645 Email: support@ngp.com.sg Project Title: (Please attach a clear location plan with the area of interest demarcated & a plan from the local street directory) Principal Company: Contact Person s Name: Tel / HP No: Fax No: Requesting Company: Company Address: Tel / HP No: Fax No: We confirm that the above information is correct and accurate. While Next Generation Provider will endeavor to provide updated copies of plant map, we understand Next Generation Provider reserves the right to make any amendments to the maps without prior notice and that the purchase of the map(s) does not in any way affect our obligations under the Telecommunications Act 1999 or any other relevant legislation or regulations. * Cost of Plant Map S$10.70 (including prevailing GST) per A3 size drawing. Name: Signature/ Date: Company's Stamp: 4

Annex B Notice of Commencement of Earthworks within the Vicinity of Global Transit Singapore Telecommunication Cables Global Transit Singapore c/o Next Generation Provider Pte Ltd No 10, Tuas Drive 2, Unit 01-10 Singapore 638645 Telephone: 68624022 Email: support@ngp.com.sg For Internal Use Only Case Ref No Date Received Remark Contractor s Particular: (Name in Full) Designation: Mobile No: NRIC/ Fin No Tel No: Fax No: 2. Site Supervisor s Particular NRIC/ Fin No (Name in Full) Mobile No: Fax No: 3. Contract s Detail Principal: Project Officer: Tel No: Contract Period: Contract No: (to indicate if applicable) Mobile No. Work Order No TCDW s Particular (Name in Full) Mobile No License No NRIC/ Fin No Tel No Work Details Proposed Earthwork s Location (indicate nearest street address and landmark) Duration from: Nature of earthworks: 0 Open Trench Excavation 0 Sinking of earth rod, casing of tubes 0 Boring, Dredging, Jacking, leveling, Piling or Tunneling 0 Soil Investigation 0 Others (Please specify) Pipe Affected: Cable Affected (No of ways identified) Identified by TCDW 5

Manhole Affected: Distance of work area boundary from cable plant: Depth of earthworks: Actual Commencement of Date (DD/MM/YY): Estimated Completion Date (DD/MM/YY): (identified by TCDW) m m Declaration a. Plant route plan have been obtained from c/o Next Generation Provider b. Cable detection was conducted at site by above declared and appointed TCDW c. Cable Locations/ routes were marked out at site by TCDW/ contractor d. My staff and myself have been briefed by TCDW on prevention measures of cable damages e. I have brief the supervisor (s), workers and excavator operation (s) on precaution and preventive measures to be taken to prevent cable damages f. All earthworks to be stop when telecommunication cables are damaged and Next Generation Provider to be notified immediately I hereby declare that I know and understand my duties under provisions of the Telecommunication Act and the information given in this notice and any attached documents is true, correct and complete. During the duration of the earthworks, I shall make myself readily contactable at the mobile number given in this notice. Name and Job title Date / contractor s signature/ company stamp Fees A fee of $85.60 will be charged including with call out of consultation services for each Notice for Commencement of Earthworks processed by Next Generation Provider Payment is to be made by Company Cheque ONLY Payment will be payable to Next Generation Provider Pte Ltd For Internal Uses Only Name/ Signature of Officer Date Plant Affected Duct/ Manhole/ Fiber Cables Diversion Required? NGP site supervision required? Site Consultation? *Yes/ No *Yes/ No *Yes/ No Please attach the following records together with your notice Cable Detection Drawing (From your TCDW) (where applicable) A sketch showing your proposed site plan The work schedule of your project Work Methodology Statement 6

DOs DOS AND DON TS WHEN CARRYING OUT EARTHWORKS 1. Do contact Next Generation Provider Pte Ltd before commencement of work for the development project to: 1.1. Obtain Global Transit Singapore s service layout plant plan; 1.2. Arrange site meeting for briefing by Next Generation Provider Pte Ltd; and 1.3. Discuss with Next Generation Provider Pte Ltd on whether to divert or support of Global Transit Singapore s Services that are affected by the development. 2. Do carry out the following procedures prior to commencing excavation, piling, soil investigation or earthworks: 2.1. Refer to Global Transit Singapore s service layout plant plan; 2.2. If the position of the earthworks to be carried out is within a distance of 15meters which refers to the perpendicular distance between the linear line of sight of manholes as shown below, earthwork contractors are required to submit an Notification Commencement of Earthworks ( NCE ) to Global Transit Singapore E.g. Between 2 manholes E.g. Between a few manholes Earthwork Boundary Earthwork Boundary 15m 15m 15m 15m Earthwork Boundary Earthwork Boundary 2.3. Engage an IDA licensed cable detection worker to carry out cable detection and notify Global Transit Singapore 7 days before the commencement of earthworks which are within the vicinity of any telecommunication cables in accordance with section 29(1) of the Telecommunications Act 1999; 2.4. Do wait for Global Transit Singapore s replies within 7 days of notification before commencement of earthworks; 2.4. Must carry out trial holes at suitable locations by manual digging to expose Global Transit Singapore s plants at sites; and seek assistance from Global Transit Singapore to ascertain the location of Global Transit Singapore s plants if plants cannot be located; 2.5. Carry out trial holes by manual digging when working in or near the vicinity of Global Transit Singapore s services to determine the depth and the alignment of Global Transit Singapore s Services; 2.6. Seek assistance from Next Generation Provider to ascertain the location of Global Transit Singapore s Services; 2.7. Provide visible markings (such as poles, tapes, painting and etc.) indicating the actual position of Global Transit Singapore s Services 7

within the construction site and inform Next Generation Provider for site inspection; 3. Do note that the time required carrying out plant diversion ranges from 6 to 18 months. Such requirement shall be taken into consideration during the planning stage of the project. 4. Do submit to Next Generation Provider the method of support and protection to those exposed Global Transit s Services for approval in the case that Global Transit Singapore s Services are to be supported during the construction work at site. 5. Do sever tree roots before grubbing the tree stump. 6. Do inform Next Generation Provider on the dismantling of supports. 7. Do inform Next Generation Provider on the back filling procedure over Global Transit Singapore s services. 8. Do disseminate information regarding Global Transit Singapore s service layout to your main contractor, subcontractors or excavator operators as it has been found that poor or lack of communication is one of the main causes of damage to Global Transit Singapore s Services. 9. Do note that the depth of Global Transit Singapore s Services varies due to the site conditions. 10. Do submit a work schedule where works are to be carried out in the vicinity of Global Transit Singapore s Services. 11. Do report immediately on any damage done at telephone no. 97887533, as early report could reduce the cost of the damage. 12. On request, Next Generation Provider can arrange to give a presentation to the developer, project consultant and main contractors to provide detailed information of all the Global Transit Singapore s Services within the work site and the precautions to be taken by the contractors while working at the site, 13. Do note the consequences of damaging Global Transit Singapore s Services. Under the IDA Amended Act 1998 (TAS ACT) Sections 85 and 85A, the offender is liable on conviction to a fine not exceeding $1,000,000 or to imprisonment for a term not exceeding 3 years or both. Moreover, the progress of site work will suffer delay. For further enquiry, please contact: Next Generation Provider Pte Ltd Managed Service Provider on behalf Global Transit Singapore No 10, Tuas Drive 2 Unit 01-10 Singapore 638645 Telephone: 68624022 Email: support@ngp.com.sg 8

DON'TS 1. Do not dig trial holes with JCB or excavator. 2. Do not carry out any excavation, soil investigation, piling or earthworks in the vicinity of Global Transit Singapore s line without confirming the actual positions of Global Transit Singapore s Services. 3. Do not open any Global Transit Singapore s manhole and pedestal box. 4. Do not cover up any Global Transit Singapore s manhole and pedestal box with earth or building materials. 5. Do not fence up any Global Transit Singapore s manhole and pedestal box inside your work area. 6. Do not grab up tree stumps without first severing the roots, 7. Do not take for granted that Global Transit Singapore s lines are in a straight run. 8. Do not cover up damages but report them immediately. 9. Do not dismantle any support for Global Transit Singapore s Services without informing Next Generation Provider. 10. Do not assume that the depth of Global Transit Singapore s Services is not deeper than 1.5 meters. 11. Do not remove any concrete encasement around Global Transit Singapore s pipeline after exposing it without any written prior approval from Next Generation Provider is given. 9