ANNUAL COMMAND HISTORY FISCAL YEAR 2007 RCS-CHIS-6 (R4) VOLUME I of II

Similar documents
Commanding an Army Field Support Battalion

By MG Yves J. Fontaine and Joseph E. Schulz

ASC is the U.S. Army s prime logistics support command, working to

Strategy Research Project

United States Army Sustainment Command Rock Island Arsenal Advance Planning Briefings for Industry (APBI)

TWV Fleet Maintenance Challenges

Interview With Greg Kee, AMC Deputy Chief of Staff, Strategy and Concepts, G-5. Michael I. Roddin and Cynthia D. Hermes

The Future of the Army Field Support Brigade

US ARMY FIELD SUPPORT COMMAND US ARMY JOINT MUNITIONS COMMAND EXECUTIVE SUMMARY - FY 2005

STATEMENT BY GENERAL RICHARD A. CODY VICE CHIEF OF STAFF UNITED STATES ARMY BEFORE THE

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

OTHER AGENCY OVERSIGHT

June 25, Honorable Kent Conrad Ranking Member Committee on the Budget United States Senate Washington, DC

AUSA BACKGROUND BRIEF

Marine Corps Resetting the Forces

ack in the Fight n April, I Corps assumed command of Multi-National Corps-Iraq (MNC-I) from the outgoing XVIII Airborne

In 2007, the United States Army Reserve completed its

SECRETARY OF THE ARMY WASHINGTON

Life Cycle Maintenance in a War- Time Environment

Report No. D September 25, Transition Planning for the Logistics Civil Augmentation Program IV Contract

ARMY G-8

Equipping an Operational Army Reserve

The U.S. military has successfully completed hundreds of Relief-in-Place and Transfers of

US ARMY MATERIEL COMMAND

SUSTAINABLE CONTINGENCY BASE CAMP OPERATIONS

Chapter III ARMY EOD OPERATIONS

Contractors on the Battlefield. 27 February 2007

Command Logistics Review Program

a GAO GAO DEFENSE LOGISTICS Actions Needed to Improve the Availability of Critical Items during Current and Future Operations

Navy Expeditionary Combat Command Executing Navy s Maritime Strategy

Forensic Auditing for Potential Fraud ASMC 2014 PDI. Mr. Randall Exley The Army Auditor General 29 May By:

MRE 22 March April 2015 Army Sustainment

By Captain Joseph J. Caperna, Captain Thomas M. Ryder, and First Lieutenant Jamal Nasir

2004 DoD Procurement Conference

The 16th Sustainment Brigade Sustains a Strong Europe

GAO MILITARY OPERATIONS

Report on DoD-Funded Service Contracts in Forward Areas

STATEMENT OF MAJOR GENERAL BRUCE M. LAWLOR, USA COMMANDER, JOINT TASK FORCE CIVIL SUPPORT U. S. JOINT FORCES COMMAND

UNIT MOVEMENT PLANNING

HUMAN RESOURCES ADVANCED / SENIOR LEADERS COURSE 42A

Future of Logistics Civil Augmentation Program

OVERVIEW OF DEPLOYMENT CYCLE SUPPORT

THEATER DISTRIBUTION

Setting and Supporting

DRAFT. Finding of No Significant Impact. For Converting and Stationing an. Infantry Brigade Combat Team (IBCT) to an

Proper organization of the. Can the Modular Engineer Battalion Headquarters Be Multifunctional?

Association of the United States Army. Voice for the Army Support for the Soldier September 2015

BALANCING RISK RESOURCING ARMY

GAO MILITARY OPERATIONS. DOD s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight. Report to Congressional Requesters

EMERGENCY DEPLOYMENT READINESS EXERCISE (EDRE) 366 TH CBRN COMPANY

We are often admonished to improve your foxhole

Department of Defense INSTRUCTION

AMMUNITION UNITS CONVENTIONAL AMMUNITION ORDNANCE COMPANIES ORDNANCE COMPANY, AMMUNITION, CONVENTIONAL, GENERAL SUPPORT (TOE 09488L000) FM 9-38

GEN Ann E. Dunwoody is the commanding general of the

A Ready, Modern Force!

ADDENDUM. Data required by the National Defense Authorization Act of 1994

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE

MG Joe M. Ernst Assistant Deputy Commanding General USAR U.S. Army Materiel Command

GAO. OVERSEAS PRESENCE More Data and Analysis Needed to Determine Whether Cost-Effective Alternatives Exist. Report to Congressional Committees

By MG Yves J. Fontaine and MAJ Grant Morris

S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N

It s an eight-wheeled, 55,000-pound

Capabilities and Past Performance Brief FY 2017

As we close the book on one of America s longest military

Summary of u.s. oversight in iraq

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

2015 COMBINED EXCELLENCE AWARD (CLEA) WINNERS

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES

A BRIEF HISTORY U.S. ARMY INDUSTRIAL OPERATIONS COMMAND

Ammunition Peculiar Equipment

Assistant Secretary of the Army for Acquisition, Logistics, and Technology Forward Support to Unified Land Operations. May 2014

Army Needs to Improve Contract Oversight for the Logistics Civil Augmentation Program s Task Orders

Report No. D June 21, Central Issue Facility at Fort Benning and Related Army Policies

Advance Planning Briefing for Industry

The first EHCC to be deployed to Afghanistan in support

The Ability of the U.S. Military to Sustain an Occupation in Iraq

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

Completed Audits DoD OIG did not report any completed audits this quarter.

DEPARTMENT OF THE ARMY FH Reg HEADQUARTERS III CORPS AND FORT HOOD Fort Hood, Texas November 1991

CURRICULUM VITAE Douglas J. Orsi Colonel, U.S. Army Associate Provost Office of the Provost, U.S. Army War College

INTRODUCTION BACKGROUND

Duty Title Unit Location

U.S. Army s Modular Redesign: Issues for Congress

Farewell Edition. 298th to 365th Transfer of Authority Ceremony. January 8, Volume 1, Issue 11

Capital Offence June www orld.com.cbrnew

This publication is available at Army Knowledge Online (

Army Field Support Brigade

AMC s Fleet Management Initiative (FMI) SFC Michael Holcomb

HUNTSVILLE. Chief, Military Munitions Design Center Ordnance and Explosives Directorate. Center, Huntsville 21 November 2013

ADUSD Program Support Contract Support in Contingency Operations

Army Posture Statement Concept Briefing

UNCLASSIFIED NDIA. 4-6 Apr 11. Mr. James C. Dwyer Deputy Chief of Staff for Logistics, G-4. NDIA April 11 1Apr11 v4 4/14/2011 1:37 PM UNCLASSIFIED

ARMY EQUIPPING GUIDANCE 2013 THROUGH 2016

Duty Title Unit Location

FM Appendix C Life Support and Base Operations

THE ESTONIAN DEFENCE FORCES

September 30, Honorable Kent Conrad Chairman Committee on the Budget United States Senate Washington, DC 20510

THE WHITE HOUSE WASHINGTON. February 16, 2006

Association of the United States Army. Voice for the Army Support for the Soldier

Transcription:

U.S. ARMY SUSTAINMENT COMMAND ANNUAL COMMAND HISTORY FISCAL YEAR 2007 RCS-CHIS-6 (R4) VOLUME I of II History Office Headquarters, U.S. Army Sustainment Command Rock Island, Illinois 61299-6000 E-mail: ROCK-AMSAS-HI@conus.army.mil

FY 2007 Executive Summary The US Army Sustainment Command began FY2007 at what was first thought to be a culmination of change due to Army Logistics Transformation; however, the command continued to transform and evolve throughout the year. On 1 October, 2006 The US Army Sustainment Command (ASC) activated and the US Army Field Support Command was inactivated. More than a name change, the unit headquartered at Rock Island, Illinois transformed and gained missions to become the CONUS Theater Support Command while also maintaining globally deployed Army Field Support Brigades. The Distribution Management Center officially activated to provide materiel and distribution management to all CONUS forces as well as back up support to deployed forces. The ASC saw growth in over 200 military spaces which significantly changed the face of the workforce at Rock Island from 95% Army Civilians to only 65% Army Civilians. Structure Changes Less than two weeks into the Fiscal year the 401 st Army Field Support Brigade and the 402 nd Army Field Support Brigade (AFSB) activated as MTOE units with the inactivation of the TDA Army Field Support Brigade Southwest Asia and the Army Field Support Brigade Iraq. These activations continued to change the face of Army Materiel Command s forward presence with the first MTOE brigades in AMC. Not only did the brigade headquarters become fully deployable, but their readiness status was reported to Department of the Army level along with all other MTOE combat units. These changes followed the activation of the first MTOE battalions, the 900 th and 901 st Contingency Contracting Battalions in July 2006, and preceded the activation of the 408 th, 409 th, and 410 th Contracting Support Brigades and the 902 nd Contingency Contracting Battalion on 16 September 2007. At the end of the fiscal year the ASC commanded five MTOE brigades, three MTOE battalions, and a plethora of MTOE contracting teams, as well as five TDA Army Field Support Brigades and one additional Contracting Support Brigade that was standing up. In July permanent orders were published directing the 16 October 2007 activation of the MTOE 406 th and 407 th Army Field Support Brigades and the 411 th Contracting Support Brigades. In anticipation of shifting missions from AMC CONUS to the 406 th and 407 th, AMC CONUS was disestablished and ASC Forward was established. In addition the Field Logistics Readiness Directorate was transferred from FORSCOM to ASC. In sum, the long transformation of the command at Rock Island from a predominantly industrial command supplemented with the Army Prepositioned Stock mission, to a fully deployable command directing MTOE units in direct support of global contingencies was nearly complete with orders published and timelines established even if the final changes would not take place until FY2009. One of the less operational tasks involved in establishing the new MTOE brigades and battalions was creating heraldic devices. Each MTOE brigade is authorized a shoulder sleeve insignia and a distinguished unit insignia (DUI) as well as brigade colors. The battalions are authorized a distinguished unit insignia and battalion colors. From October 2006 through September 2007 eleven brigade patches and fourteen DUIs were designed. These heraldic devices are shown below along with designations of if they were final or in draft at the end of FY 2007.

In addition to the organizational changes, a focus on documenting and replicating the multitude of new units, missions, budgets, and personnel strengths (military, DA Civilian, and contractor) was instituted with the 27 July 2007 arrival of MG Robert M. Radin as the new ASC commander. During MG Johnson s command tour he focused on filling gaps, meeting new mission requirements, and adapting the command almost on the fly to meet changes. Unfortunately, while that method did support the Army and ARFORGEN in the short term, it did not set the groundwork for long term stability within the command, formalization of doctrine, funding streams, or most efficient use of resources. MG Radin spent the last quarter of FY2007 laying the foundation for resource, structure, and doctrinal changes to be implemented in FY2008.

One important symbol on ongoing structural change was the addition of new Senior Executive Service positions to the command. Mr C. Redding Hobby was sworn in as the SES responsible for Field Support Operations in March 2007. Mr. Lee Thompson joined the command in May 2007 as the SES responsible for the LOGCAP Program. Mrs. Kathryn T.H. Szymanski also joined the ASC last year as Chief Counsel. She arrived 23 April 07 to fill the space vacated with the retirement of Mr Tony Sconyers in January. Mission Support The organizational and process changes noted above were simply ways to transform the command and better support an Army at war. The ASC continued to support the war effort globally, with a focus on SWA, while also supporting Army processes to RESET forces returning from the fight and as they prepared to deploy into SWA. ASC units and LOGCAP programs in SWA sustained the engaged force while all other ASC units became even more deeply involved in taking property accountability, inspecting, determining best repair methods, providing training equipment, tracking parts, and sustaining readiness. Below are highlights of the some of these major mission areas. In SWA the ASC managed the establishment, growth and success of a massive effort to further improve armor protection on HMMWVs. From a cold start sites were established, supply chains created, and contractors brought on board to add armor and gunner protective kits to HMMWVs in Iraq and Afghanistan. This program, begun in November 2006, installed over 14,000 Objective Frag Kit 5 and 10,000 Gunner Protective Kits over the course of the FY at over a dozen sites. SWA units also continued to improve Route Clearance Vehicle readiness, and protect fuel tankers. The spray on army program in the 402 nd area completed its 1,000 th tanker in FY 2007. Armor upgrades for SWA were also executed in CONUS to prepare vehicles and units deploying as part of the surge. Armor was added at Ft Stewart, Georgia, Ft Lewis, Washington, and New Boston, Texas. Operations began less than two weeks after notification using Field Logistics Readiness Center contracts. Over 300 vehicles were armored to include FMTVs, HEMTTs, HETs and PLS. As the FY wrapped up ASC began to manage processing and fielding of Mine Resistant Ambush Protected vehicles. This fielding was rapidly accelerated due to demands for better protection for Soldiers from roadside bombs. Because of the acceleration many parts, manuals, and procedures were not in place as the FY ended. While fielding and sustaining the MRAP, the 401 st also had to work through parts shortages and the development of test & diagnostic and maintenance procedures. In the 401 st area improvements continued to be made in the size, location, and fill of Army Prepositioned Stocks. The 401 st issued APS sets from Kuwait and then began to rebuild. In Afghanistan the 401 st established an APS set at Bagram and began to expand its footprint on the east side of the runway to create enduring APS facilities for maintenance and inside storage. As the War on Terror in Afghanistan regained more focus, the 401 st also established tire rebuild facilities, howitzer maintenance, Theater Sustainment Stocks, and RTCH and forklift repair programs. In Iraq the 402 nd AFSB managed the establishment and stand-up of the Taji National Depot as part of the process to create an Iraqi national maintenance capability.

The Logistics Civil Augmentation Program (LOGCAP) continued to support the GWOT, primarily in SWA but also through exercise support. The January 2007 Surge of forces required a parallel surge in LOGCAP support. Some installations in Iraq that were being closed were reopened. LOGCAP contractors suddenly had to reverse course and re-establish services as well as expand in other areas. In Afghanistan LOGCAP services were pushed to smaller and smaller installations as Forward Operating Bases were established in hot spots. In addition, with a peak of anti-coalition efforts in both countries, LOGCAP had to expand and improve detainee detention camps. At its height in FY2007, 59,895 LOGCAP contractors supported 75 base camps, 59 forward operating bases, 94 dining facilities, 30 force provider modules, one detainee camp, two Aerial Ports of Debarkation (APOD), one Sea Port of Debarkation (SPOD), four Chief of Mission operations, two Multinational Coalition Division sites, and 27 ice plants in Southwest Asia. In SWA LOGCAP was valued at over $5 billion in FY2007. The LOGCAP IV Support Contract was awarded in February 2007 to SERCO, Inc of Virginia Beach, VA. This contract is intended to prepare plans and manage operations for the executing contractors. On 27 June 2007 the LOGCAP IV Operating Contract was awarded to three contractors- DynCorp International LLC, Fluor Intercontinental, Inc, and Kellogg, Brown and Root (KBR) Services. The contracts were suspended after seven protests were upheld by GAO. The command continued to expand the Left Behind Equipment mission in FY2007. In addition to LBE being executed by all CONUS AFSBs, the 405 th AFSB in Germany took over management of LBE from USAREUR with a proof of concept test using the 2/1 AD LBE. In CONUS the 406 th AFSB established their LBE program in March 2007 and by the end of the FY was responsible for over 17,000 pieces of equipment valued at over $98 million. In Europe the 405 th reduced its footprint in Kosovo with the closure of Eagle Base and Boynton Field and the transition of those facilities to the Bosnian government. The 405 th also continued support of retrograde by moving over 4,000 pieces of rolling stock from Europe to CONUS as part of the Army drawdown in Germany. The brigade managed the agricultural cleaning and shipment of Class VII. Finally, the 405 th took over the Logistics Contract Management Office (LOCMO) from HQ USAREUR in order to centralize management of all sustainment contracts under one office. In addition to the contracting work done in direct support of LOGCAP, the ASC Acquisition Center continued to support the ASC mission in a variety of areas. The Acquisition Center awarded multiple contracts for maintenance support to ARFORGEN as well as sustainment maintenance in SWA. The Chemical Demilitarization Contracting Division achieved the landmark of having almost 50% of the chemical stockpile destroyed at the end of FY2007. The Aberdeen facility was completely demolished after finishing VX destruction, eliminating 1107 ton containers. The Center awarded over $9.2 billion between almost 4,000 contracting actions. Excellence in the Acquisition Center was recognized when two employees were awarded the prestigious Frank S. Besson, Jr. Award for Contracting Excellence. Mr John Kaddatz and LTC Jay Carr were both honored. The Distribution Management Center (DMC) reached nearly full mission capability over the course of FY2007. The DMC became a critical player in ARFORGEN and support to Active and Reserve Component forces alike. Property accountability and maintenance management

were two important functions. With the addition of the FLRC DMC was able to incorporate visibility of their missions into total Army materiel management. For example, DMC was able to direct disposition of over 2,000 pieces of Class VII to fills gaps after the FLRD recovered the items from Defense Reutilization and Marketing Office sites. The DMC also took over the customer assistance function for SARSS-2. Between LBE, RESET, Add-on-Armor, Pre- Deployment Training Equipment, and other missions, DMC had oversight of more than $500 million in FT2007. The Army Prepositioned Stocks (APS) program continued to support the current GWOT while preparing for future contingencies. The APS Strategy 2013 was published and provided for a Heavy Brigade Combat Team equipment set to be pre-positioned in APS-2. The plan was to locate the HBCT in Livorno, Italy. Over 1400 pieces of equipment were received in FY07. APS-3 became the focal point of a massive effort by DA to build an Infantry Brigade Combat Team (IBCT) at Fort Hood, TX and a Heavy Brigade Combat Team (HBCT) at Fort Riley, KS using equipment downloaded from four ships assigned to the Army Strategic Flotillas (ASF) I and IV. The expansive staging area at the Charleston Naval Weapons Station enabled a total of 423 tracked vehicles, 2075 wheeled vehicles, and 1389 trailers to be downloaded in just over 4 weeks from the USNS Watson, USNS Watkins, USNS Charlton, and USNS Dahl. The ASC also continued support to the National Guard Bureau in FY2007. In FY2007 the NGB received direct funding to conduct Home Station Field RESET of redeploying ARNG units to reduce the workload on mobilization station Director of Logistics (DOL) maintenance operations. The ASC coordinated the transfer of over 500 assets to five states. The impacts of mobilization, harvesting of equipment for Theater Provided Equipment, and historical equipment shortages left the ARNG without critical assets needed to effectively posture the states in hurricane prone regions to provide rapid response capability in the event it was needed. ASC and NGB coordinated on the transfer of over 600 items including HMMWVs, generators, light sets, and trailers to five states from FORSCOM assets. The NGB Liaison Officer at ASC was critical in coordinating support and cooperation between ASC and the NGB. Support Missions The entire ASC staff continued to support the ASC field missions during the course of FY2007. One key example was the Public Affairs Office (PAO) that shaped the message to the public during what at times was a very difficult year for public perception of ASC missions. Over the course of FY2007 the PAO fielded 122 media queries of which more than 67% were related to LOGCAP. The PAO also prepared 46 separate news releases and media advisories during FY2007, to a total of 309 different media outlets and wrote 80 speeches. The PAO was also responsible for responding to Congressional Inquiries. In FY2007 they handled 68 Congressional inquiries of which 76% were related to LOGCAP. In addition to the PAO, the History Office also assisted in responding to the general public and other government entities. The History Office responded to forty-one historical inquiries and logged over 225 hours of effort. The vast majority of the inquiries were from government agencies such as the EPA, Defense Ammunition Center, Corps of Engineers, and the Army Environmental Law Center.

The staff also worked to improve efficiency in supporting and executing missions. The Lean Six Sigma Office was established and began to train Green and Black Belts and export LSS across the command. As the HQ implemented its LSS program, the subordinate units were often ahead of the headquarters. The 403 rd implemented LSS principles and was able to improve to meeting 99% of annual maintenance production goals. The 407 th AFSB used LSS principles to improve efficiency in managing C4RSI maintenance during the ARFORGEN process. The ASC G2 used LSS to study workload allocation and identify appropriate manpower levels to meet all missions. The ASC G8 also established a LSS team in order to determine ways to improve a wide variety of processes. In the area of personnel management HQ ASC implemented the National Security Personnel System (NSPS). The G1 created a NSPS Team, developed training packages, trained leadership, and pushed the NSPS automated tool before converting 150 HQ ASC personnel from the General Schedule to NSPS. Only leadership and inherently governmental position were converted during the first phase due to grievances filed against the national level system by varying employee unions. As the FY ended the headquarters was completing a Mock Pay Pool to test the system and was preparing for a real evaluation and pay pool cycle to begin on 31 October. The activities and accomplishments listed above are just a sample of the many ways the US Army Sustainment Command supported the Army at home and abroad during FY2007. The details are broken out by staff and subordinate command in the volumes of this FY 2007 Annual Command History. As the command grew into new missions and improved and documented older missions it also grew in maturity and self-confidence in its ability to meet the heavy demands placed upon it by the Army Materiel Command and the Department of the Army. In FY2007 the Army Sustainment Command transformed and continued the transformation process begun a decade ago when it first assumed the Army War Reserve mission. From sometime frenetic activity and discovery learning in 1997, to being AMC s 911 service as General Kern called Army Field Support Command, to being a far flung, MTOE and TDA mixed, key and trusted player in Army logistics, the Army Sustainment Command in FY2007 continued to support the Army at war. At the same time ASC ensured that it was postured for the next phase of discovery learning as the Army continues to transform to defend the nation.