REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY

Similar documents
REQUEST FOR QUALIFICATIONS HONDO, TEXAS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR PROPOSALS FOR A COMMUNITY DEVELOPMENT BLOCK GRANT WRITER/ADMINISTRATOR

CLEVELAND COUNTY NORTH CAROLINA REQUEST FOR QUALIFICATIONS

WILLIAMSON COUNTY PURCHASING DEPARTMENT SOLICITATION Utility Coordination and Utility Engineering Services

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

Request for Qualifications. Architectural Firms

Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements

City of South Padre Island Request for Proposals (RFP) Due Date: Wednesday, September 4 th, 2013 at 2:00pm

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 38 EFFECTIVE DATE: MAY 1, 2017 REVISION #4: MARCH 1, 2017

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

January 19, To Whom It May Concern:

Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

BASIN CITY WATER AND SEWER DISTRICT Request for Qualifications

Time is of the essence, and any proposal received after the announced time and date for submittal will not be considered.

TORNILLO ISD REQUEST FOR STATEMENTS OF QUALIFICATION FOR ARCHITECTURAL SERVICES FOR 2016 BOND PROJECTS RFQ NO

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT: CIVIL ENGINEERING SURVEYING, ENVIRONMENTAL AND FIELD SERVICES

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018

REQUEST FOR QUALIFICATIONS (RFQ) FOR BUILDING INSPECTION SERVICES RFQ #17-030

Request for Qualifications Construction Manager

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

This RfP is also available on the CEMCO website under the Community Tab:

Request for Qualifications B Hazardous Material Surveying, Testing and On-Site Observation Firms. RFQ Due Date: October 1, :00 P.M.

NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

All proposals must be received by August 30, 2016 at 2:00 PM EST

Caledonia Park Playground Equipment

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

Request for Proposals (RFP) Consulting and Design Services for Solar Photovoltaic Systems for Iowa City Facilities September 22, 2017

REQUEST FOR PROPOSALS FOR INFORMATION TECHNOLOGY SUPPORT SERVICES

RFP. Professional Services (As Needed) To Whom it May Concern:

EDGEWOOD INDEPENDENT SCHOOL DISTRICT

REQUEST FOR QUALIFICATIONS -ENGINEERING DESIGN SERVICES -

Town of Derry, NH REQUEST FOR PROPOSALS PROFESSIONAL MUNICIPAL AUDITING SERVICES

REQUEST FOR PROPOSALS EXECUTIVE SEARCH FIRM January 5, 2018

REQUEST FOR QUALIFICATIONS. Design Professional Services

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP

REQUEST FOR LETTERS OF INTEREST

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017

Carey Park Playground Equipment. Submission Deadline July 13, :00 a.m. (CST)

Page 1. Date: January 24, Housing Authority of Travis County REQUEST FOR QUALIFICATIONS FOR LEGAL SERVICES SOLICITATION NO.

TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS

Multi-Purpose Paper Bid No. PR10-B14

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT CONSULTANT SERVICES

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT MARKETING AND BRANDING PLAN

Copiers. Contact Information: Gordon County Attn: Purchasing Director 201 North Wall Street Calhoun, Georgia 30701

The Town will manage the project, administer funding and review project material.

FIRST AMENDED Operating Agreement. North Carolina State University and XYZ Foundation, Inc. RECITALS

Below are five basic procurement methods common to most CDBG projects:

Arizona Department of Education

City of Malibu Request for Proposal

Muskegon Community College Request for Proposal General Contractor for Remodel of Planetarium

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Request for Proposals (RFP) INNOVATIVE FINANCING STUDY FOR THE INTERSTATE 69 CORRIDOR

CLEVELAND COUNTY NORTH CAROLINA INVITATION TO BID

REQUEST FOR PROPOSAL INFORMAL BID PROFESSIONAL ENERGY AUDIT SERVICES FOR THE HOUSING REHABILITATION PROGRAM

The District is looking for the architectural firm to provide the following (not listed in order of preference):

REQUEST FOR APPLICATIONS

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

FLORIDA DEPARTMENT OF TRANSPORTATION

REQUEST FOR PROPOSAL

REQUEST FOR QUALIFICTIONS MARKETING AND PUBLIC RELATIONS FOR YEAR ENDING DECEMBER 31, 2018 ISSUED BY: Suffolk County Industrial Development Agency

BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES

CONTRACT FOR THE PROVISION OF MUNICIPAL ENGINEERING CONSULTING SERVICES TO THE CITY OF AVON, OHIO

Disadvantaged Business Enterprise Supportive Services Program

Background. B. Issuing Office

REQUEST FOR PROPOSALS FOR FOOD INDUSTRY CLUSTER STUDY & STRATEGY

REQUEST FOR STATEMENT OF QUALIFICATIONS PROFESSIONAL CONSTRUCTION INSPECTION SERVICES FOR

GREENVILLE-SPARTANBURG AIRPORT DISTRICT REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL PLANNING, DESIGN AND CONSULTING SERVICES

Georgia Lottery Corporation ("GLC") PROPOSAL. PROPOSAL SIGNATURE AND CERTIFICATION (Authorized representative must sign and return with proposal)

Montgomery County Intermediate Unit 2 West Lafayette Street Norristown, Pa 19401

REQUEST FOR PROPOSALS RFP # December 7, 2010 Proposals Due on January 7, 2011 at 4:00 pm

REQUEST FOR QUALIFICATIONS TO PROVIDE PROFESSIONAL ENGINEERING SERVICES CITY OF DADE CITY, FLORIDA. CLOSING DATE: September 19, :00 p.m.

KDOT Procurement Guidelines for STP/CMAQ Funded Planning, Education, and Outreach Projects Effective 10/1/12

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS

TOPIC: CONTRACTS STATE OF MISSISSIPPI DEPARTMENT OF EDUCATION SECTION 17.0 PAGE 1 OF 49 EFFECTIVE DATE: JULY 1, 2018 REVISION #4: JULY 1, 2018

SEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT

REQUEST FOR PROPOSALS CITY OF PORT LAVACA

Board of Regents State of Iowa. For CONSULTING SERVICES FOR A SEARCH TO IDENTIFY CANDIDATES FOR THE NEW PRESIDENT FOR THE UNIVERSITY OF NORTHERN IOWA

COMMUNITY ACTION CORPORATION OF SOUTH TEXAS COMPETITIVE PROPOSAL TEEN PREGNANCY PREVENTION IMPLEMENTATION EVALUATION PROPOSALS DUE: May 26, 2017

REQUEST FOR QUALIFICATIONS for Vancouver Life Sciences Building Pre-Design/Programming Services

City of Somersworth, New Hampshire OFFICE OF THE FINANCE DIRECTOR

November 16, 2015 I. INTRODUCTION

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR A REGIONAL GREEN WASTE PROCESSING FACILITY

Agency of Record for Marketing and Advertising

REQUEST FOR PROPOSALS

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Transcription:

REQUEST FOR QUALIFICATIONS FOR CONSULTING ENGINEERING SERVICES 18-401-02 LLANO COUNTY LLANO COUNTY 1447 E. State Highway 71, Unit B Llano, TX 78643 325-247-3783 1

TABLE OF CONTENTS Page Introduction 3 Section 1: RFQ Submittal and Closing Date 3 Section 2: Inquires 4 Section 3: General Work Statement and Delivery Schedule 4 Section 4: RFQ Contents 6 Section 5: Proposal Evaluation and Consultant Selection 7 Section 6: General Information 8 2

INTRODUCTION Llano County, hereinafter known as the County, is seeking the services of a qualified Consulting Civil Engineering Firm(s) to provide engineering services for the Planning, Preliminary Engineering, and Construction Engineering for various county road and bridge projects, drainage projects, county facilities, floodplain consultation and general engineering consultation including subdivision regulation as the need arises. The contract is anticipated to start October 1, 2018 and will cover a period of three years with an option for renewal for two additional years. The County reserves the right to amend this contract for additional time if it is in the best interest of the County. Separate work orders will be developed for each County project. Llano County reserves the right to select a different Consulting Engineer for these County projects if it is in the best interest of the public to do so as determined by the Llano County Commissioners Court. Section 1: RFQ Submittal and Closing Date Seven copies of the RFQ must be received by 2:00 pm local time on July 30th, 2018 at which time the RFQs will be publicly opened and read aloud in the conference room of the county auditor located at 1447 E. State Highway 71, Llano. RFQs may not exceed 20 pages. Neither late nor faxed submittals will be acceptable. Firms submitting RFQs not in compliance with Section 4 will be considered non-responsive. RFQs must be addressed to the following: PLEASE MAIL YOUR REQUEST FOR QUALIFICATIONS TO: LLANO COUNTY Attn: COUNTY AUDITOR 1447 E. STATE HIGHWAY 71, UNIT B LLANO, TEXAS 78643 FEDEX, UPS/HAND DELIVERED PACKETS SHOULD BE ADDRESSED TO: LLANO COUNTY AUDITOR/PURCHASING AGENT 1447 E. STATE HIGHWAY 71, UNIT B LLANO, TEXAS 78643 3

In order to assure your packet is fairly considered, it must be submitted in properly sealed envelope, clearly marked on the left hand corner with the numbers 18-401-02. Envelopes containing qualifications that are unmarked or marked otherwise may be opened prematurely. Section 2: Inquiries 2.1 Questions that arise prior to the RFQ deadline shall be addressed to the following: Llano County Attn: County Auditor 1447 E. STATE HIGHWAY 71, UNIT B Llano, TX 78643 325-247-3783 2.2 Consultants may be directed to submit questions in writing to Ms. Cindy Lent or her designee no later than seven days prior to the submittal date. Substantive questions and answers will be provided to all RFQ recipients. Section 3: General Statement of Work and Delivery Schedule 3.1 General Work Statement The objective of this work is to assist Llano County with the design and construction of a variety of projects as the need arises. Projects may include, but are not limited to, the following: 1. Road improvement projects. 2. Bridge projects. 3. Public Roadway improvement projects. 4. General public works projects such as drainage improvement projects, county facilities, etc. 5. Provide engineering advice and consultation on floodplain issues, county land development and subdivision regulations. 3.2 Consultant s Responsibilities The scope of work to be performed by the Consultant for various County projects may include engineering services relating to the Planning, Preliminary Engineering, and Construction Engineering of the projects. A detailed Scope of Work will be provided for specific projects. Services to be provided may include some of, but not limited to, the following: 1. Assist the County with development and planning projects. 2. Prepare preliminary project costs. 4

3. Assist the County in the financial planning for projects. 4. Meet with the County and representatives of local, state, and federal agencies as necessary. 5. Prepare conceptual designs and review the designs with the County and applicable agencies and prepare preliminary cost estimates based on the conceptual design. 6. Proceed with final design after the County has approved the conceptual design. 7. Complete the necessary mapping and detailed design of the projects, prepare detailed drawings, specifications, and contract documents, and make approximate estimates of the anticipated final costs based on the final designs. 8. Perform surveys and assist in negotiations for land rights when required. 9. Attend public meeting and/or conferences with the County and representatives of other agencies and interested parties. 10. Provide detailed drawings, specifications, and other contract documents stamped by a Registered Professional Engineer to the County and any other agency from which approval must be obtained prior to advertisement for bids. 11. Attend bid openings, tabulate bid proposals, analyze the bids, check bid forms and bonds, check quantities in the bids, and assist the County in negotiating and awarding the contracts. 12. Advise and assist County officials with periodic review, editing and modification of subdivision regulations. Attend public meetings and provide input to meeting participants as needed. 13. Attend bid openings, tabulate bid proposals, analyze the bids, check bid forms and bonds, check quantities in the bids, and assist the County in negotiating and awarding the contracts. 14. Meet with the County and contractors in preconstruction conferences. 15. Keep the County informed concerning progress of the work and attend meetings held by the Agency, regulating agencies, and contractor as they relate to the project. 16. Review shop and working drawings furnished by the contractor. 17. Provide general review and inspection of the contractor s work as construction progresses. 18. Provide construction staking as required. 19. Provide material testing services as required. 20. Review the contractor s requests for progress payments and advise County as to the extent of the work accomplished as of the date of the request. 21. Prepare change orders. 22. Provide County with Record Drawings and as Constructed Plans. 23. Make final inspection of projects and report same to County and any other applicable agency. 24. Assist with the preparation of environmental review records or impact statements. 25. Assist in obtaining permits, applications, etc., as necessary for the work. 5

26. Assist the County with property surveys, property plats, legal descriptions, and other items necessary for negotiating for land rights and easements. 27. Assist with the preparation for and appearances before courts and boards on matter of litigation related to the projects. 28. Furnish consultations necessary to correct unforeseen project difficulties after County accepts the work. 29. May provide a warranty inspection eleven months after the County accepts the project and prior to the expiration of the contractor s one year warranty. 30. Insure compliance with applicable state and federal requirements and regulations specific to each project in accordance with funding sources. 31. Insure that the person in charge of the project is a Texas Professional Surveyor and/or Texas Professional Civil Engineer and include the name and registration number of each. 32. Provide and use all safety equipment including, but not limited to, hard hats, safety vests, and clothing required by applicable state and federal regulations. 33. Review of engineering plans submitted for new subdivisions including drainage, storm run-off, sewer and septic systems. 34. Review of engineering plans for any large commercial facilities planned in the county. 35. Floodplain Management engineering review and interaction with FEMA and TxDOT. 36. Floodplain violation input. 37. Engineering review of roads and bridge projects including review county road plans for non-paved roads and seal coating. 38. Review platting and surveys for storm water run-off as needed. 39. Advise and assist County regarding Review county road plans for non-paved roads and seal coating, bond issues and state and federal grant programs. Section 4: RFQ Content Requirements 4.0 No Fee Schedule Costs will not be evaluated as part of the selection process. Costs will be negotiated after a Proposer is selected. A Preliminary Salary and Fee Schedule for any Proposer selected for contract negotiations, must be submitted within five (5) days of the Proposer s notification of selection. 4.1 Consultant s Capabilities/Experience/References Max Score 25 Outline the firm s capabilities and experience with regard to the requested services. The response should address the following: Experience with similar projects. Provide references. Internal procedures and/or policies related to work quality and cost control. Management and organizational structure. 6

Capability to perform the work for the duration of the contract. 4.2 Project Team Max Score 25 Outline the firm s personnel who would work with the County. The response should address the following: Extent of principal involvement Names of key members who will be performing the work on these projects and their responsibilities. Qualifications and relevant individual experience, including sub-consultants. Project manager s experience with similar projects and interdisciplinary teams. 4.3 Method of Approach Max Score 25 Outline the firm s approach to working with the County on County projects. 4.4 Understanding of Requested Services and Local Area Max Score 25 Outline the firm s understanding of the requested services and local area. The response should address items such as expertise and familiarity with local conditions that could affect project construction success such as local materials sources, weather conditions, geology, local contracting resources, etc. Section 5: Proposal Evaluation and Consultant Selection 5.1 Evaluation Process Statements of Qualifications submitted on time will be reviewed against the Pass/Fail criteria. SOQs meeting those criteria will be forwarded to an evaluation committee for scoring against the evaluation criteria and ranking. The outcome of the evaluations may, at the County s sole discretion, result in (a) note to a Proposer(s) of selection for tentative contract negotiation and possible award; or (b) further steps to gather more information for further evaluation. This often means notice of placement on an interview list with time and date of the interview. The selection process may be canceled if the County determines it is in the public interest to do so. 5.2 Evaluation Criteria 7

Each proposal will be judged as a demonstration of the consultant s capabilities and understanding of the services requested. Evaluation factors and maximum points will be as follows: Criteria A. Consultant s Capabilities /Experience/ Reference Maximum Score B. Project Team 25 C. Method of Approach 25 D. Understanding of Requested Services and 25 Local Area Total Maximum Score: 100 25 Section 6: General Information 6.1 The County may require any clarification of change it needs to understand the selected consultant s project approach. 6.2 The successful consultant must have Worker s Compensation Insurance covering work in the State of Texas. The successful consultant must also submit documents addressing insurance, non-collusion, tax law, debarment, and conflict of interest as part of the personal services contract. 6.3 The County reserves the right to reject any or all proposals, and is not liable for any costs the consultant incurs while preparing or presenting the proposal. 6.4 The County reserves the right to cancel this RFQ upon a good cause finding. 6.5 The County will award a contract to the consultant(s) whose proposal, in the opinion of the County Commissioners, would be most advantageous to the County. 6.6 The selected consultant will be required to assume responsibility for all services outlined in the RFQ, whether the consultant or a sub-consultant produces them. 6.7 Llano County does not discriminate in selection of service providers on the basis of race, color, religion, ancestry, national origin, political affiliation, sex, age, marital status, sexual orientation, physical or mental disability, or any other inappropriate reason prohibited by law or policy of the state or federal government. 8