THE GENERAL PROCESS FOR APPROVAL OF APPLICANT MANUALS

Similar documents
SI STAFF INSTRUCTION ORGANIZATION, USE AND REVISION

SI TRAINING PROGRAM AND TRAINING RECORDS INSPECTION FOR FLIGHT CREW MEMBER, FLIGHT OPERATION OFFICER AND FLIGHT ATTENDANT

Menimbang : a. bahwa ketentuan mengenai sertifikasi dan pengakuan organisasi perawatan pesawat udara di luar negeri

ORDER TCAA-O-OPS005A March 2013

TANZANIA CIVIL AVIATION AUTHORITY AERODROMES AND AIR NAVIGATION SERVICES. Foreword

Request for Proposals (RFP) to Provide Auditing Services

Marine Safety Center Technical Note

Standard Operating Procedures for Processing Municipal and Residual Waste General Permit Applications. Bureau of Waste Management

REQUEST FOR PROPOSAL FOR SECURITY CAMERA INSTALLATION: Stones River Baptist Church. 361 Sam Ridley Parkway East. Smyrna, Tennessee 37167

Cooperative Development of Operational Safety Continuing Airworthiness Programme. COSCAP-Gulf States. Training Course on Part VI _ DOC 8335

Maintenance Review Board PR.MRB

Request for Proposal PROFESSIONAL AUDIT SERVICES. Luzerne-Wyoming Counties Mental Health/Mental Retardation Program

FMO External Monitoring Manual

Cabin Safety Inspectors Manual

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

Request for Proposal PROFESSIONAL AUDIT SERVICES

Emory University Research Administration Services (RAS) Standard Operating Procedure

Page Issue

Universal Safety Oversight Audit Programme Continuous Monitoring Manual

Part 145 Aircraft Maintenance Organisation

GOVERNMENT OF INDIA DIRECTORATE GENERAL OF CIVIL AVIATION OPP. SAFDARJUNG AIRPORT, NEW DELHI CAR 147

POLICY AND PROCEDURES. Office of Generic Drugs and Office of Pharmaceutical Quality. Table of Contents

Identification and Protection of Unclassified Controlled Nuclear Information

Subj: ARMED FORCES HEALTH PROFESSIONS SCHOLARSHIP PROGRAM

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar. USAP-CMA Activity Process Conduct

Bureau of Waste Management

ASSIGNMENT 2. Textbook Assignment: "Publications." Pages 2-1 through

BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES

Tel.: +1 (514) ext Ref.: AN 12/51-07/74 7 December 2007

MILPERSMAN DISQUALIFICATION OF OFFICERS FOR DUTY INVOLVING FLYING

USOAP Continuous Monitoring Approach (CMA) Workshop

DEPUTY SECRETARY OF DEFENSE 1010 DEFENSE PENTAGON WASHINGTON, D.C

FWD Calibration Center Operator Certification Program

TESTING AND INSPECTION AGENCY REGISTRATION APPLICATION FORM

Embodiment of Safety Management System (SMS) requirements into Commission Regulation (EC) No 2042/2003 Part-145

LEGAL NOTICE Request for Proposal for Services

TF ID (PEACH Grant for Sub-National Public Financial Management Capacity Building Project)

PNG. Civil Aviation Rules. Part 129. Foreign Air Operator Certification

PART 21 DoD GRANTS AND AGREEMENTS GENERAL MATTERS. Subpart A-Introduction. This part of the DoD Grant and Agreement Regulations:

Request for Proposal for: Financial Audit Services

FLIGHT ATTENDANT TRAINING MANUAL

STANDARD REQUEST FOR QUOTATIONS (SRQ) (CONSULTANCY AND DESIGN)

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

201 North Forest Avenue Independence, Missouri (816) [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES

Miami Dade College Resource Development. Frequently Asked Questions

REQUEST FOR QUALIFICATIONS. Design Professional Services

Department of Defense INSTRUCTION

Grants Financial Procedures (Post-Award) v. 2.0

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

THE CIVIL AVIATION ACT (CAP. 80) THE CIVIL AVIATION (APPROVED TRAINING ORGANIZATION) REGULATIONS, 2017 ARRANGEMENT OF REGULATIONS

Guidelines on the Keeping of Records in Respect of Medicinal Products when Conducting a Retail Pharmacy Business

Texas Commission on Environmental Quality

HAVE AGREED as follows : THE Government of the INDIA

December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport

NORFOLK AIRPORT AUTHORITY NORFOLK INTERNATIONAL AIRPORT

Ch COUNTY NURSING FACILITY SERVICES CHAPTER COUNTY NURSING FACILITY SERVICES

THE NATIONAL SPECIALIST REGISTER REGISTRATION PROCEDURES AND GUIDELINES. Section 14A: Registered Medical Practitioner Practicing As Specialist

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

Request for Proposal for: Financial Audit Services

Department of Defense DIRECTIVE

EXHIBIT A SPECIAL PROVISIONS

PART 21-DoD GRANTS AND AGREEMENTS--GENERAL MATTERS. Subpart A-Defense Grant and Agreement Regulatory System

OPNAVINST B N98 4 Jun 2018

RESEARCH GRANT AGREEMENT. Two Year Grant

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

Inspector General: External Audit

BID # Hunters Point Community Library. Date: December 20, Invitation for Bid: Furniture & Shelving

ASSE International Seal Control Board Procedures

The Office of Innovation and Improvement s Oversight and Monitoring of the Charter Schools Program s Planning and Implementation Grants

Operations Specifications

NEW COLLEGE OF FLORIDA BOARD OF TRUSTEES Meeting Date: March 7, 2015 PROPOSED BOARD ACTION BACKGROUND INFORMATION

Keele Clinical Trials Unit

Department of Defense INSTRUCTION

DPAS Defense Priorities & Allocations System for the Contractor

Winning Home, Inc. Grant Application General Guidelines GRANT PROPOSAL REQUIREMENTS AND GUIDELINES

OFFICE OF AUDIT REGION 9 f LOS ANGELES, CA. Office of Native American Programs, Washington, DC

REQUEST FOR PROPOSALS & QUALIFICATIONS TO PROVIDE Foreign Investment Compliance Analysis

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

LEXINGTON-FAYETTE URBAN COUNTY AIRPORT BOARD REQUEST FOR PROPOSALS. to provide INVESTMENT MANAGEMENT SERVICES. for BLUE GRASS AIRPORT

DOD DIRECTIVE INTELLIGENCE OVERSIGHT

II. Accuracy: Professional work is completed with due diligence and is accurate.

Critical Information Needed to Determine the Cost and Availability of G222 Spare Parts

Section VII Provider Dispute/Appeal Procedures; Member Complaints, Grievances, and Fair Hearings

THE ROTARY FOUNDATION of Rotary International 1560 Sherman Avenue Evanston, IL USA

EXPORT CONTROL PROCEDURE (ECP) #1.3: EXPORT COMPLIANCE ORGANIZATION AND EMPOWERED OFFICIAL APPROVAL OF ITAR ACTIONS Release date: April 6, 2015

EUROPEAN MILITARY AIRWORTHINESS REQUIREMENTS EMAR 147 AIRCRAFT MAINTENANCE TRAINING ORGANISATIONS

SUMMARY Transition to USOAP Continuous Monitoring Approach (CMA) ICAO Secure websites:

THE ROTARY FOUNDATION of Rotary International 1560 Sherman Avenue Evanston, IL USA

General Conditions for Grants to Development Research Supported through Denmark s International Development Cooperation

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

DoD R, December 1982

Making Submissions on Regulatory Judgments on a stage 2 inspection report - Standard Operating Procedure

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

DOD DIRECTIVE ASSISTANT TO THE SECRETARY OF DEFENSE FOR PUBLIC AFFAIRS (ATSD(PA))

Social Media Management System

Agency for Health Care Administration

Request for Proposal. Skidmore Tynan Independent School District. ERate

Transcription:

LAMPIRAN PERATURAN DIREKTUR JENDERAL PERHUBUNGAN UDARA NOMOR : KP 055 Tahun 2018 TANGGAL : 5 Maret 2018 Staff Instruction SI 8900 3.32 THE GENERAL PROCESS FOR APPROVAL OF APPLICANT MANUALS Amendment : 0 Edition : 1 Date : 5 REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION DIRECTORATE GENERAL OF CIVIL AVIATION JAKARTA INDONESIA

AMENDMENT RECORD LIST Amendment No. Issue Date Reference Amdt 0 Edition 1 5 KP 055 Year 2018, Date 5 March 2018 i

FOREWORD 1. PURPOSE : This Staff Instruction is prepared for use and guidance of DGCA inspector and applicant dealing with DGCA for approving and accepting applicant manual. 2. REFERENCES : This Staff Instruction should be used in accordance with the applicable regulations. 3. CANCELLATION : Staff Instruction Number SI 8300 Amdt 4, dated 25 March 2010 Volume 1 Chapter 3 have been canceled. 4. AMENDMENT : The amendment of this Staff Instruction shall be approved by the Director General of Civil Aviation. DIRECTOR GENERAL OF CIVIL AVIATION Ttd Dr. Ir. AGUS SANTOSO, M.Sc. ii

TABLE OF CONTENT AMENDMENT RECORD LIST... i FOREWORD... ii TABLE OF CONTENT... iii CHAPTER 1 GENERAL PROCESS... 1 1. GENERAL... 1 2. INITIATION.... 2 3. APPLICATION... 3 4. EVALUATION... 3 5. DEMONSTRATION... 4 6. FINAL PROCESS... 5 7. SUMMARY OF PROCESS... 5 CHAPTER 2 APPROVAL OR ACCEPTANCE OF MANUALS... 6 1. APPROVAL... 6 2. ACCEPTANCES... 7 CHAPTER 3 RECORD AND RETENTION... 8 APPENDIX A. APPROVAL/ACCEPTANCE PROCESS FLOW DIAGRAM... 9 APPENDIX B. SAMPLE OF APPROVAL LETTER... 10 APPENDIX C. SAMPLE OF CONTROL PAGE... 11 APPENDIX D. SAMPLE OF LIST OF EFFECTIVE PAGE... 12 iii

CHAPTER 1 GENERAL PROCESS 1. GENERAL a. Generic Process. The general process of approval or acceptance of certain manual is an orderly method used by Directorate General of Civil Aviation (DGCA) inspector and applicant dealing with DGCA to ensure that such items meet regulatory standards and provide for safe operating practices. The process can result in approving or not approving, accepting or not accepting, an applicant s proposal. It is important for an inspector to understand that the process described in this section is not all-inclusive, but rather a tool to use with good judgment in conducting day-to-day duties and responsibilities. See Appendix A, Approval/Acceptance Process Flow Diagram. b. Understanding Process The following guidance provides aid in understanding and applying this process. It is essential to understand that this process may result in a decision to not approve or not accept an applicant s proposal. This process will assist in making either positive or negative determinations. This guidance is used to process applications for an initial approval or acceptance of manual or for any changes to the manual. c. Definition Accepted. Accepted is used to describe a document or manual that does not have, or is not required to have, DGCA approval. Only a portion of an applicant s manuals are required to have DGCA approval. The remaining portions are accepted by the DGCA. Applicants are required to submit the entire general manual to the DGCA for review. If the DGCA concludes that an accepted section of the general manual is not in compliance, the DGCA will notify the applicant of the deficiency. Upon notification, the applicant must take action to resolve the deficiency. Approved. When approved is used to describe a document or manual, it means that a regulation requires DGCA approval and that the DGCA has evaluated and specifically approved the document or manual. 1

2. INITIATION. a. Applicant Initiation. A person conveys to the DGCA a need that is related to its operation. This need may be a requirement for DGCA approval or acceptance. The applicant initiates the process by inquiring about the correct procedures to receive approval or acceptance from the DGCA for the change. During initial inquiries, it is important for the DGCA and the applicant to become familiar with the subject matter. If, for example, an applicant requests an approval, the inspector must take the following actions: 1) Become thoroughly familiar with existing DGCA requirements; 2) Become familiar with the appropriate technical material; 3) Accurately assess the character and scope of the proposal; 4) Determine if a demonstration is required; 5) Determine the need for any coordination requirements; 6) Ensure that the applicant has a clear understanding of the minimum requirements that constitute an acceptable submission, including that the submission should be in digital format; 7) Determine the date the applicant intends to implement the proposal; and 8) Provide all references, and access to applicable job aids. and/or electronic portal. b. DGCA Initiation. DGCA conveys to the applicant the required approval or acceptance related to its operation. For example, a DGCA inspector may require an applicant to publish, in the approved company manual, information on organization, quality system, training program. The applicant must research and understand that subject area before submitting a proposal to the DGCA for evaluation. The DGCA inspector should act in an advisory capacity to the applicant during the preparation of the submission. Such advice may include the following: 1) The necessity for a deviation, authorization, waiver, or exemption; 2) The necessity for required demonstrations; 3) Clarification of CASR, AC and SI; 4) Sources of specific technical information; and 5) Acceptable standards for submission. c. Applicant Responsibility. The common element, regardless of whether the initiated action comes from an applicant or the DGCA, is the effort expended by the applicant. 2

NOTE: It is essential for the applicant to have a clear understanding that, although the DGCA inspector may provide advice and guidance to the company, the development of the final product submitted to the DGCA is solely the responsibility of the applicant. 3. APPLICATION Applicant may apply to DGCA for approval or acceptance of manual after having adequate information as describe in the previous sub chapter. Application must be submitted with proposal as applicable. 4. EVALUATION a. Detail Evaluation. DGCA evaluate the applicant s proposal. These actions may take place entirely in the DGCA office, at the site of operations, or at both facilities. DGCA evaluation focuses on the form, content, and technical quality of the submitted proposal to determine if the information meets the following criteria: 1) Is not contrary to any applicable CASR; 2) Is not contrary to the direction provided in this SI or other safety related documents; and 3) Provides for safe operating practices. b. Evaluation Criteria. Criteria for evaluating the formal submission are available in this SI. The DGCA inspector must ensure that the documents adequately establish the applicant s capability and competence to safely conduct operations in accordance with the submitted proposal. c. Addressing Deficiencies. During the evaluation, the DGCA inspector must, in a timely manner, address any deficiencies in the submitted material before proceeding to subsequent steps. Discussion with the applicant may be sufficient to resolve certain discrepancies or questions, or to obtain additional information. It may be necessary to return certain sections of the submission to the applicant for specific changes. However, when a DGCA inspector determines that, for specific reasons, the material is deficient or unacceptable, the DGCA inspector must notify the applicant in writing and return the submission with an appropriate explanation. If the results of the evaluation are acceptable and a demonstration is required, the DGCA inspector will notify the applicant in writing to the applicant. 3

5. DEMONSTRATION a. Applicant s Demonstration. When determined the requirements of demonstration, DGCA observe and evaluate the applicant s demonstration of its ability to perform in accordance with the procedures, guidelines, and parameters described in the formal proposal. This steps is an operational evaluation of the applicant s ability to function in accordance with the proposal evaluated in previous step. Some examples of required demonstrations include the following: 1) Training programs; 2) Proving tests; 3) Emergency evacuation demonstration; 4) All-weather terminal operations; and 5) Air navigation operations. b. Evaluation of Demonstration. The DGCA inspector must plan for the conduct and observation of the demonstration to include such factors as participants, evaluation criteria, and sequence of events. 1) During these demonstrations, it is normal for minor discrepancies to occur. Discrepancies are often resolved during the demonstration by obtaining commitments from responsible company officials. The DGCA inspector responsible for overseeing a demonstration must evaluate each discrepancy in terms of its overall impact on the applicant s ability and competence to conduct the proposed operation. The DGCA inspector must stop the demonstration if they observe deficiencies or unacceptable levels of performance. The DGCA inspector must identify the general process for approval or acceptance, to which the applicant must return, or decide to terminate the process entirely when it is clear that continuation would not result in approval or acceptance. 2) For example, if an emergency evacuation demonstration is unsatisfactory due to equipment failure (e.g., a slide fails to inflate), it may be appropriate to require the applicant to repeat the process as necessary and conduct another demonstration. If the demonstration is unacceptable because crewmembers were unable to perform their assigned duties, it may be appropriate to advise the applicant that the process is now terminated pending review and evaluation of the applicant s emergency training program, and that the applicant may need to repeat the process (submit a new proposal). 4

c. Acceptable Demonstration. If the DGCA evaluation of the applicant s demonstrated ability is acceptable, the process continues. The demonstration process must be repeated when the demonstration is not acceptable. NOTE: An applicant must not be authorized to conduct any particular operation until all airworthiness and operational requirements are met, and the applicant is clearly capable of conducting a safe operation in compliance with DGCA regulations and safe operating practices. 6. FINAL PROCESS Directorate General of Civil Aviation will give approval or acceptance to the application when the process is satisfactory. Approval or acceptance are described in Chapter 2 of this SI. 7. SUMMARY OF PROCESS The general operational approval or acceptance process, as described, is referenced with the specific task requirements for each applicable job function. It is important for the DGCA inspector to understand the concepts inherent in the process, the overall interrelationship of the steps, and that this general process is not all inclusive, but a tool to be used in the DGCA inspector s day-to-day duties and responsibilities. 5

CHAPTER 2 APPROVAL OR ACCEPTANCE OF MANUALS 1. APPROVAL Approval is granted by DGCA letter, with additional issuance of control page and sign the List of Effective Page. Any change to these manuals shall be reported to the Director General of Civil Aviation (DGCA) for approval. Approval of an applicant s proposal may be accomplished by issuing approval letter and control page signed by concerned Deputy Director, List of Effective Page of the manual signed by Principal Operation Inspector (POI)/Principal Airworthiness Inspector (PAI) or by Certification Project Manager (CPM) during initial certification process. The following are approvals granted by the DGCA : 1) Air Operator Certificate and Operating Certificate i. Operation Manual (Part General; Aircraft Operating Information; Area, Routes and Aerodrome; Training) ii. Maintenance Program iii. Minimum Equipment List iv. Aircraft Flight Manual 2) Approved Maintenance Organization i. Approved Maintenance Organization Manual ii. Quality Control Manual 3) Pilot School i. Training Procedure Manual 4) Aircraft Maintenance Training Organization i. Training Procedure Manual 5) Training Center i. Training Procedure Manual 6) Design Organization i. Design Organization Manual 7) Manufacturing Organization i. Quality Manual In addition to letter of approval, DGCA will issue control page and sign the List of Effective Page. 6

2. ACCEPTANCES Other proposals, submissions, or requests not requiring specific DGCA approval but required to be submitted to the DGCA are items that are presented for acceptance. Any change to these manuals shall be reported to the Principal Operation Inspector (POI) / Principal Airworthiness Inspector (PAI) for acceptance. Acceptance of an applicant s proposal may be accomplished by signing List of Effective Page of the manual by Principal Operation Inspector (POI) / Principal Airworthiness Inspector (PAI) or by Certification Project Manager (CPM) during initial certification process. The following are acceptance granted by the POI/PAI or CPM : 1) Air Operator Certificate and Operating Certificate i. Company Maintenance Manual ii. Safety Management Manual iii. Other (ie; Flight Attendant Manual, Weight and Balance Manual) 2) Approved Maintenance Organization i. Safety Management Manual 3) Pilot School i. Safety Management Manual 4) Aircraft Maintenance Training Organization i. Safety Management Manual 5) Training Center i. Safety Management Manual 6) Design Organization i. Safety Management Manual 7) Manufacturing Organization i. Safety Management Manual 8) Synthetic Training Devices i. Quality Manual 7

CHAPTER 3 RECORD AND RETENTION Each sub directorate within DAAO is responsible for record and retention of applicable documentation during the process of manual acceptance or approval. Sub Directorate of Standardization is responsible to record and retention of the documentation for approval or acceptance of manual for air operator, maintenance organization, aviation training organization, synthetic training device. Sub Directorate of Maintenance is responsible to record and retention of the documentation for approval or acceptance of manual for air operator, maintenance organization, aviation training organization related with maintenance aspect. Sub Directorate of Aircraft Operations is responsible to record and retention of the documentation for approval or acceptance of manual for air operator, maintenance organization, aviation training organization related with aircraft operations aspect. Sub Directorate of Aeronautical Product is responsible to record and retention of the documentation for approval or acceptance of manual for manufacturing organization. Sub Directorate of Engineering is responsible to record and retention of the documentation for approval or acceptance of manual for design organization. Package document for approval are as follows: 1. Approval letter 2. Control page 3. Evaluation checklist 4. Manual including its List of effective page Package document for acceptance are as follows: 1. Manual including its List of effective page 2. Evaluation checklist The documentation must be maintained in the IMSIS Data Base. The documentation record must be retained as long as the revision valid. 8

APPENDIX A. APPROVAL/ACCEPTANCE PROCESS FLOW DIAGRAM APPLICATION DETAIL EVALUATION Yes No REQUIRED DEMONSTRATION Yes DEMONSTRATION SATISFACTION? No No APPROVED OR ACCEPT Yes APPROVAL: APPROVAL LETTER, CONTROL PAGE AND SIGNATURE OF LEP ACCEPTANCE: SIGNATURE OF LEP RECORDING (IMSIS) 9

APPENDIX B. SAMPLE OF APPROVAL LETTER Our Ref : Tangerang, (Date) To : Mr. Tangke Sarungalo JOE Air Gedung Dharma Wanita Jl. Padjajaran no : 102 Bandung, 16969 Jawa Barat Indonesia Tel. : Fax : Email : Subject : REVIEW FOR THE APPROVAL OF CONTINOUS AIRWORTHINESS MAINTENANCE PROGRAM Dear Mr. Sarungalo, I refer to the submission of the above mentioned document for review and approval on 5 January 2018. The document submitted has been reviewed and found in compliance with the Civil Aviation Safety Regulation Part 121. and is Approved. Faithfully Yours, AL ROKHMAN On Behalf of Director of DAAO Deputy Director of Standardization cc. : Director of DAAO 10

APPENDIX C. SAMPLE OF CONTROL PAGE CONTROL PAGE TITLE PAGE Rev. DATE CONTROL PAGE CP 1 00 February, 2018 LIST OF EFFECTIVE PAGES 1 00 February 01, 2018 The Continuous Airworthiness Maintenance Program (CAMP) BOEING 737-8 MAX has been reviewed and found to meet all applicable requirements set forth in the Aviation Act No. 1 Year 2009 and Civil Aviation Safety Regulations (CASR). This CAMP is approved for use by PT. JOE Air with the understanding that Director General of Civil Aviation (DGCA) may require further revisions to this Manual as regulatory requirements or airworthiness standard are amended. Any change to these manuals shall be reported to the Director General of Civil Aviation (DGCA) for Approval. Tangerang, February 2018 On behalf of the Director of Airworthiness and Aircraft Operations AL ROKHMAN Deputy Director of Standards 11

APPENDIX D. SAMPLE OF LIST OF EFFECTIVE PAGE LIST OF EFFECTIVE PAGE Chapter Page No Revision No Date of Revision PT. JOE Air ACCEPTED BY DGCA SARWO KUAT QUALITY MANAGER LATIP TAMBAYONG AIRWORTHINESS INSPECTOR 12