Portsmouth Hospitals NHS Trust Winter/Surg Plan 2013/14. pg. 1

Similar documents
Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Surge Management. Prepared by NEAS Resilience,

Phil Luke, Divisional Director for Operations. Peter Adey, Director of Operations. Peter Adey, Director of Operations

Royal Devon & Exeter NHS Foundation Trust Operational Capacity and Resilience Plan

NHS England South Escalation Framework

NHS England (South) Surge Management Framework

Winter/Surge Capacity Plan 1 st December 2013 to 31 st March Position as at September 2013

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee

EMERGENCY PRESSURES ESCALATION PROCEDURES

Newham Borough Summary report

The impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve:

Monitoring Information. Agenda item: 8.2, Public Board meeting Date: 29 October Title: Capacity Plan and Escalation Framework 2014/15

Redesign of Front Door

Dear Colleague DL (2017) 19. Preparing for Winter 2017/ August 2017

NHS Portsmouth CCG 2013/14 Contract Agreements Summary. Michelle Spandley Deputy Chief Finance Officer May Improving health services

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Plan for investment of retained marginal rate payment for emergency admissions in Gloucestershire

This paper summarises the work to-date on producing a Winter Plan for 2014/15.

GOVERNING BOARD. Governing Board Assurance Framework. Date of Meeting 16 March 2016 Agenda Item No 6. Title

Patient Flow Internal Escalation

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

OPERATIONAL PERFORMANCE REPORT: March Swindon Community Health Services Overview

Appendix 1: Integrated Urgent Care Service Update. 1. Purpose

Management of surge and escalation in critical care services: standard operating procedure for adult respiratory extra corporeal membrane oxygenation

PORTSMOUTH HOSPITALS NHS TRUST URGENT CARE QUALITY IMPROVEMENT PLAN. (June 2016)

Winter Contingency Plan

NORTHERN DEVON HEALTHCARE NHS TRUST CAPACITY PLAN

Walsall Health and Social Care System Winter Plan 2017/18

RBCH Actions to meet CQC Essential Standards

Royal College of Paediatrics and Child Health Service Review Action Plan and Progress Report 26 th May 2016

NHS ENGLAND BOARD PAPER

Report to the Board of Directors 2016/17

Plans for urgent care in west Kent:

Patient Flow and Escalation Management Policy (Operational Pressures Escalation Framework) Version 1.3 Review: December 2018

Seven day hospital services: case study. South Warwickshire NHS Foundation Trust

NHS England (London) Assurance of the BEH Clinical Strategy

NHS 111 Clinical Governance Information Pack

Borders NHS Board. Appendix NHS BORDERS 2012/13 WINTER PERIOD REPORT. Aim

GRAMPIAN WINTER PLAN 2015/16

Capacity and Demand Management Plan

NHS review of winter 2017/18

The Welsh NHS Confederation response to the Health, Social Care and Sport Committee Inquiry into winter preparedness 2016/17.

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:

NHS Fife Winter Plan

NORTHERN DEVON HEALTHCARE NHS TRUST CAPACITY PLAN

NHS Harrogate and Rural District Surge and Escalation Plan 2014/2015

Seven Day Services Clinical Standards September 2017

10.1 NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY BOARD UPDATE. Date of the meeting 19/07/2017 Author

JOINT SURGE AND ESCALATION PLAN FOR THE BRISTOL, NORTH SOMERSET AND SOUTH GLOUCESTERSHIRE CLINICAL COMMISSIONING GROUPS 2013/14

REFERRAL TO TREATMENT ACCESS POLICY

Seven day hospital services: case study. University Hospital Southampton NHS Foundation Trust

SUMMARY REPORT (11) TRUST BOARD 26 November 2015

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST BOARD OF DIRECTORS. Emergency Department Progress Report

Unscheduled care Urgent and Emergency Care

NHS HARINGEY CLINICAL COMMISSIONING GROUP EMERGENCY PREPAREDNESS, RESILIENCE AND RESPONSE (EPRR) POLICY

DIVISION OF EMERGENCY MEDICINE DEPARTMENT OF ACUTE MEDICINE

Capacity and Escalation Plan for managing patient Flow in Powys Winter 2014

Report to the Board of Directors 2015/16

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018

NHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016.

SURGE PLAN (A&E Sustainability Plan) for Wolverhampton Health Economy 2013/14

SUBJECT: NHS Lanarkshire Winter Plan 2012/13

Northern Adelaide Local Health Network. Proposal for the Establishment of a NALHN Central Flow Unit: 11 September B. MacFarlan & C.

Inclement Weather Plan. Controlled Document Number: Version Number: 004. Controlled Document Sponsor: Controlled Document Lead: On: October 2017

STAFFING ESCALATION TIMELINE

Strategic Risk Report 1 March 2018

Ayrshire and Arran NHS Board

Capacity Plan. incorporating the Resourcing Escalatory Action Plan. (copy for external circulation)

Bristol, North Somerset and South Gloucestershire Clinical Commissioning Group Governing Body Meeting In- Common

Final 18/8/09 August 2009(9) Northern Trust Corporate Register of Top Risks

Summarise the Impact of the Health Board Report Equality and diversity

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report

Bedfordshire Whole System Winter

Winter Planning 2017/18. Marc Hopkinson - NGCCG Barbara Goodfellow - NuTH Nichola Fairless GHFT Simon Swallow - NEAS

Operational Focus: Performance

Urgent Treatment Centres Principles and Standards

Main body of report Integrating health and care services in Norfolk and Waveney

Urgent & Emergency Care Strategy Update

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010

Newham Borough Summary report

Greater Manchester Health and Social Care Strategic Partnership Board

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Transformation Programme Progress Report

Utilisation Management

Author: Kelvin Grabham, Associate Director of Performance & Information

DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES

Policy for Patient Access

Kingston Hospital NHS Foundation Trust Length of stay case study. October 2014

Urgent and Emergency Care Review - time to do it

21 March NHS Providers ON THE DAY BRIEFING Page 1

Richmond Clinical Commissioning Group Medical Director, Governing Body GPs and Clinical Leads Report

Strategic Risk Report 12 September 2016

EXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY Anne Gibbs, Director of Strategy & Planning

BOARD PAPER - NHS ENGLAND

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING A&E DELIVERY AND URGENT CARE BOARD UPDATE

Nottingham University Hospitals Emergency Department Quality Issues Related to Performance

Meeting of Governing Body

Urgent Care Short Term Actions to Improve Performance

NHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018

Transcription:

Portsmouth Hospitals NHS Trust Winter/Surg Plan 2013/14 pg. 1

Introduction The purpose of this winter/surg plan is to ensure that Portsmouth Hospitals NHS Trust (PHT) is prepared and co-ordinated to respond to increased service demands during winter 2013 / 2014 The PHT Winter/Surg Plan has been determined in conjunction with relevant internal and external stakeholders, and in liaison with local CCGs and Social Care Providers. The plan is considered a live document and will be updated to reflect additional service developments and service changes throughout the Winter/Surg period and to reflect decisions made during the Whole Health economy (WHE) weekly Surg Planning Conference Calls. The NHS Winter Self Assessment Checklist assists in highlighting areas of risk that must be assessed and mitigated between partner agencies to ensure operational preparedness. All areas highlighted by the Self-Assessment Checklist have been covered in this Winter/Surg Plan The advanced preparations focus around the following key areas: o Operational readiness (e.g. capacity planning, staffing, Christmas and New Year) o Escalation processes both within the Trust and health system wide o Effective working links between the ambulance service, primary care, community providers, the acute Trust and other key partners o Preventative measure such as flu campaigns and Norovirus outbreak measures o Communications This winter plan aims to assure the continuity, and successful response, of essential services at times of increased demand. The plan proposes, and facilitates, contingency arrangements to be initiated on a planned and managed basis. The aim of the plan is to provide assurance that the Trust will be able to maintain service continuity pg. 2

Assurance The PHT Winter/Surg Plan seeks to provide assurance that the Trust has: Sufficient, overall capacity to meet above normal emergency demand during the winter months. Where the required level of capacity is not available, escalation measures will be put in place to elicit system wide support to ensure the safe continuation of services. Plans to source additional staff to be deployed to meet peak pressures. Plans to flex additional bed and service capacity as required to meet increased pressures Plans to ensure flow from the Emergency Department to avoid/limit ambulance queuing Clear effective communications across the Trust and the local health economy, with planned weekly WHE Surg Planning calls increasing to daily at key periods Clear and agreed internal escalation procedures, with pre-agreed triggers and links to agreed external escalation processes. Support for the implementation of the Trust Recovery Plan both Operational and Financial Work Streams An adequately staffed Duty Hospital Manager Team, functioning effectively with appropriate senior clinical and managerial support on a 24/7 basis Accountability Winter/Surg planning leads from all organisations across the WHE are responsible for leading, coordinating and implementing the necessary actions required, at an organisation level and across the local health system, to mitigate the impact of increased service demand, adverse weather conditions, Norovirus / influenza or other infection control outbreaks, and major incident / business continuity events. Plans are reviewed weekly on the WHE Winter/Surg Planning Conference Calls and their impact measured via the WHE Kitbag pg. 3

Performance Management Tool. This process is overseen by the Integrated Urgent Care Board Chaired by Simon Holmes Medical Director PHT which meets monthly, holding the local health system to account for the maintenance and delivery of services at all times Escalation The daily winter Sitrep is reported to the Department of Health via the TDA on a daily basis during the winter and is completed by the Business Intelligence Team with input and information from the Managing Director Emergency Medicine CSC. The Sitrep covers numbers of ambulance delays, numbers of beds (including escalation beds) open and any other related winter issues such as the impact of adverse weather or infection control outbreaks. The PHT Daily Operational Performance Meeting is attended by representatives from all CSCs and is chaired by the COO or OCD. This meeting allows operational level discussion about winter/surg pressures and problems within and external to the Trust the opportunity to find solutions Weekly WHE Winter/Surg Planning conference calls are set up (daily at key times of extreme operational pressure) to request help from local health and social care partners to find solutions and to help each other across organisational boundaries. Regular cold weather alerts are received by the Operations Centre, Trust Emergency Planning Lead and relevant others and are circulated as part of the regular daily operational plan or as required if action is needed sooner. A daily PHT Hospital Escalation Status is sent to the WHE Partners throughout the year following the 0945 Ops Meeting giving external partners the best chance to escalate early and widely within the local health community to secure an active response to severe operational pressure in the hospital. These actions are detailed in the Fareham and Gosport, Portsmouth & South Eastern Hampshire CCGs Whole System Escalation Levels and Actions Plan pg. 4

Fareham and Gosport, Portsmouth & South Eastern Hampshire CCGs Whole System Escalation Levels GREEN LEVEL 1: PATIENT FLOW MANAGEMENT The local health economy capacity is such that partner organisations are able to maintain patient flow and are able to meet anticipated demand within available resources. Commissioned levels of service will be decided locally AMBER LEVEL 2: MITIGATION OF ESCALATION The local health economy is starting to show signs of pressure. Focused actions are required in organisations showing pressure to mitigate further escalation. Enhanced co-ordination will alert the whole system to take action to return to green status as quickly as possible. RED LEVEL 3: WHOLE SYSTEM COMPROMISED Actions taken in Level 2 have failed to return the system to Level 1 and pressure is worsening. The local health economy is experiencing major pressures compromising patient flow further urgent actions are required across the system by all partners. BLACK LEVEL 4: SEVERE PRESSURE AND FAILURE OF ACTIONS All actions have failed to contain service pressures and the local health economy is unable to deliver comprehensive emergency care. There is potential for patient care to be compromised and a SIRI is reported by the system (led by CCG commissioners in accordance with the South Central SHA SIRI guidance). pg. 5

Decisive action must be taken to recover capacity. Communications The Trust Communication Team are prepared to work across WHE Partners and local media agencies to provide communication the local area concerning staying well and keeping out of hospital during winter. Specific Comms will be tailored if required to support the Infection Control Team as required if an out break is suspected or confirmed. The Comms Team also have in place robust plans to keep internal, including Carillion FM Services and external stakeholders informed in the event of severe weather to support the Trust s Business Continuity Plans Severe Weather Planning Severe Weather Alerts are received from the Met Office by the Operations Centre, Trust Emergency Planning Lead and relevant others via email and disseminated via the Operations Centre detailing the potential for severe winter weather and triggering action(s) as required Arrangements for managing the consequences of severe weather are documented in the business continuity plans for each department. Carla Bramhall, recently appointed to the role of Business Continuity Lead is currently reviewing all CSC Business Continuity Plans, to obtain assurance on the resilience of locally held and Trust Wide plans (HR, Transport, Carillion FM Services, Procurement etc) these will then be added to this plans as required pg. 6

Infection Control The Trust has a strong Infection Prevention and Control Service which provides a walk round surveillance on a twice a day basis and also monitors infection control concerns via Vitalpac. At times of heightened alert, such as during an infection control outbreak within the Trust, the Infection Prevention and Control Team will provide a presence at the daily operational meetings at 0945hrs, 1230hrs and 1700hrs. There is also an on call service which can be accessed via the Hospital Duty Manager 24/7 The Trust Infection Prevention and Control Team will be able to provide advice on the risk assessment of patients due to be discharged to care homes / residential settings from wards/areas affected by suspected or confirmed viral gastroenteritis. The aim is to ensure effective infection control measures are in place without any unnecessary delays to discharge. Infection Prevention and Control Policies to support Winter/Surg Planning can be accessed via the Trust s Intranet Site Scheduled Care The management of the 18 weeks target continues to be a challenge for PHT and it is essential that Winter/Surge pressures do not impact on achievement of the RTT and Cancer Recovery Plans The Trust s Operational Framework and Escalation Policy for the management of beds and escalation areas over the winter period must reflect the need to protect elective bed stock. The framework will seek to balance the need to protect elective capacity with the requirement to continue to manage peaks of unscheduled care demand and the impact of Norovirus, flu and adverse weather conditions. pg. 7

The weekly Waiting List Assurance meeting will scrutinise progress against the Trust s 18 weeks/rtt performance and manage any variation from agreed targets A & E Recovery Monies A & E Recovery Monies allocated to the WHE make up part of the Winter/Surg Planning allowing additional services to be provided to support the increased demands of winter. The successful bids were as follows: Funding agreed Service Provision Lead Organisation 307,172.00 300,000.00 140,000 210,000 Additional experience sr Clinical staff in ED over the weekends Integrated Urgent Care Centre in ED Additional weekend Psch support for ED Continuing Healthcare /integrated provision between health and social care PHT CCG Solent HCC/DOM care/ 160,000 Community Assessment lounge Southern, Solent pg. 8

200,000 In reach support Solent (and Southern Health) 110,000 Cams Ridge GP alliance PHT/CSC Plans to support Winter/Surg Peaks in Demand Staffing Resource Lead Timeline Additional 3 rd ED Consultants on Sat & Sun 1100 1900 ED Consultant shift pattern altered to extend on site presence until 0000 Sat & Sun Nursing rotas over holiday periods overseen by Deputy Director of Nursing Vacancy factor across CSCs reduced with the commencement of newly qualified RNs prior to the commencement of winter Paediatric nursing staff who work annualised hours flexed up to provide additional capacity across paediatric team Respiratory High Care to increase staff to open up to 10 beds (usually 6) during periods of increased demand Emergency Medicine Completed CSC MD Emergency Medicine Completed CSC MD Deputy Director of Monthly Nursing CSC Heads of Nursing 01/10/13 W & C Head of Nursing Medicine Head of Nursing As demand requires As demand requires pg. 9

Twilight and weekend cover planned for increase in Radiology Demand over and above extended day over and following Festive Period MD Clinical Support CSC 20/12/13 Discharge Planning Roll out of Nurse Led Criteria for discharge CSC Heads of Nursing 10/13 Additional Consultant discharge round Sat & Sun across Medical Wards Develop and agree SOPs with external partners to reduce number of medically stable patients in acute beds Link nurses from MAU and MOPRS to work robustly with Community In Reach Team to expedite community triaged patients from acute beds Chief of Service Medicine Completed CSC Matron for Discharge 10/13 Emergency Medicine and MOPRS Heads of Nursing Completed Additional transport requested for key periods of demand Matron for Discharge 30/11/13 Capacity within complex Discharge Team to be increased across Medicine and MOPRS Wards Establish Outlier SHO and Nurse/Case Manager Team to ensure early review & discharge of outliers Additional cardiology Procedure Lists to be timetabled across Festive Period and early Jan to expedite discharge (21st & 28 th Dec and 4 th & 11 th Jan) Review IDB process, Terms of Reference, Chair & meetings to ensure maximum impact Medicine Head of Nursing Medicine Head of Nursing MD MOPRS & Medicine CSC MD MOPRS & Medicine CSC 30/10/13 31/10/13 10/11/13 10/10/13 pg. 10

Severe Weather Contingency Policy updated and disseminated Business Continuity Lead Commenced date extended to 20/11/13 Establish a group email for Met Office Updates & implement dissemination process Business Continuity Lead Completed Communications Plan to support refreshed. New technology i.e. Twitter added to Director of Completed reach maximum audience Communications HR to re issue staff guidance expectations to attend work in severe weather HR 31/10/13 MSK CSC Plan updated to reflect changes to CSC and patient pathway Links with internal & external partners (Carillion, Portsmouth City & Hampshire County Council, Highways Agency) refreshed to ensure robust preparations in place Flu Planning MKS GM/Head of Nursing Business Continuity Lead/PHT Estates Lead/Carillion 20/10/13 Commenced date extended to 20/11/13 Flu Plans in place from each CSC to ensure maximum uptake of vaccination OH/CSC MDs 12/10/13 Weekly tracking of uptake in place for dissemination across CSC Management OH Weekly till Dec 2013 Teams Clinical staff within each CSC being trained to undertake vaccinations within CSC OH/CSC Heads of Commenced 20/09/13 Nursing OH Team has a planned rota of out reach clinics to Trust wide clinical areas OH Completed pg. 11

Prioritisation being given to front line clinical staff OH n/a Robust Communication Programme to support Director of Communications Completed will be reviewed throughout Flu Campaign Pandemic Flu Plan refreshed Infection Control Team Completed Update trainers on Fit Testing for masks Infection Control Team 20/10/13 Additional capacity Bed rebalancing including additional winter beds in final draft (linked to Newton Bed COO 20/10/13 tbc Managing Workstream) Finalise and implement winter bed capacity plan including staffing Director of Nursing 20/10/13 tbc Open winter bed capacity Director of Nursing 30110/13 Additional clinic slots to be allocated to emergency patients daily across all Chief of Service Medicine 20/10/13 specialties CSC Commence additional Ambulatory Sensitive Conditions Pathways within MAU Chief of Service 01/11/13 Emergency Medicine CSC Increase in diagnostic capacity over winter period with extended working until 2000 MD Clinical Support CSC As demand requires across Radiology department Pharmacy Locums to provide additional cover over the weekends MD Clinical Support CSC As demand requires pg. 12

Pharmacy allocated to winter ward when opened and to support additional flex beds MD Clinical Support CSC As demand requires in use Additional hours in Pathology to match increase in demand MD Clinical Support CSC As demand requires Paediatric Unit works flexibly over winter to accommodate increase in demand and uses A8 Surgical ward to outlie medical pts. CAU accommodates Day surgery cases. Additional critical care beds opened to accommodate increase in demand with emphasis of escalation process to ensure transfer ready patients are pulled form ITU in a timely fashion Additional Consultant capacity in Children s Assessment Unit to support increase in respiratory attendances/admissions Profiling of electives over the Festive Period to accommodate increase in emergency admissions Escalation Processes W & C Head of Nursing 31/10/13 MD CHAT CSC 01/11/13 MD W & C CSC Flexible within Job Plans to meet increase in demand Surgery CSC MD 01/12/13 Internal PHT Policies currently being reviewed Business Continuity Lead 20/10/13 Timings & format of Operations Meetings re arranged to reflect Escalation Policy Emergency Medicine CSC MD SMT for approval 10/13 Patient Flow Teams re organised to support Trust Recovery Plan Emergency Medicine 30/10/13 CSC MD Daily performance matrix measures agreed (Kitbag) COO/Emergency Completed pg. 13

Medicine CSC MD Weekend planning process reviewed Emergency Medicine Completed CSC MD Portsmouth and South East Hampshire Whole Systems Escalation and Actions Emergency Medicine Completed Document agreed by all parties including escalation to Black CSC MD Dissemination to On Call Directors and OOHs Teams Business Continuity Lead 10/10/13 Weekly/daily WHE Tele conferences arranged to reflect peak periods of demand/escalation Christmas/New Year & early January Senior Management rotas completed to ensure maximum cover Agree process for completion of daily Sitrep Infection Prevention and Control Infection Control Team to refresh surveillance, education & plans to support an increase in Norovirus Emergency Medicine Completed CSC MD CSC MD Team 30/10/13 Emergency Medicine CSC MD Completed Infection Control Team 20/1013 pg. 14

PHT Trust Recovery Plans As well as the Winter/Surg Plans the Trust Recovery Plan demonstrates a number of new or redesigned services/actions being introduced or enhanced to support safe and timely flow across the Unscheduled Care Pathway and will in turn create capacity at times of peaks in demand Unscheduled Care: front door and process - Key Actions Convert MAU to AMU receiving all medically expected/triaged patients and incorporate re-established medical take Increase 7-day consultant cover for ED proportionate to demand Ensure specialty consultant rounds start at 0800 7- days per week Adapt junior doctor working patterns for the totality of medicine (inc MAU) to deliver 7-day working and a 24/7 medical take Extend provision of Ambulatory Assessment capacity through MAU with input/contribution from medical specialties Implement Integrated Urgent Care Centre Create capacity in MAU to commence new services with the reduction of Medically Fit /Community patients pulled from acute beds by Solent and Southern In Reach Team commencing 1 st Oct pg. 15

Rebalance beds between medicine and surgery Improve visibility of bed state real time across the hospital Develop policy on outlying versus escalation beds Unscheduled Care: Back Door - Key Actions Ensure that all patients have a clear documented and communicated Medical Plan Ensure there is a clearly documented and communicated Estimated Day of Discharge (EDD) for every patient High quality information on social circumstances of patient to be gathered on admission to help with the identification of complex discharges Improve education and training of staff in relation to patient discharge Improve quality of MDT information Improve ward referral process and response to referrals Improve the management of the IDB PTL pg. 16

Roll out of criteria led discharge Additional morning consultant discharge lounge at weekends Working with and holding partners to account pg. 17

pg. 18

pg. 19

pg. 20

pg. 21