MOZAMBIQUE Technical and Vocational Education and Training Project

Similar documents
Procurement Plan. Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) and (Non-

PROCUREMENT PLAN. b) Project Name: Market-led Smallholder Development in the Zambezi Valley Project

GOVERNMENT OF MAURITIUS MANUFACTURING AND SERVICES DEVELOPMENT AND COMPETITIVENESS PROJECT (MSDC) LOAN NO MU PROCUREMENT PLAN FOR THE PERIOD

Procurement Plan. Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) and (Non-

(Ist Phase 18 months )

Lao PDR: Trade Development Facility Project Procurement Plan (April 2012 March 2013)

Sample Procurement Plan

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

GESP Procurement Plan MARCH 2017

National Electrification Project (P152936) Detailed Procurement Plan

Summarized Procurement Plan

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

PROCUREMENT PLAN. A. Methods, Thresholds, Review and 18-Month Procurement Plan. 1. Procurement and Consulting Methods and Thresholds

REVISED PROCUREMENT PLAN FOR POVERTY REDUCTION FUND PROJECT, PHASE II Fund: IDA Grant No. H685-LA Revised date: 23 July 2012

SKILLS DEVELOPMENT PROJECT

Ayeyarwady Integrated River Basin Management Project (AIRBM) Procurement

2. Bank s approval Date of the procurement Plan: Revised version: June 5, Period covered by this procurement plan: 30 June June 2017

PROCUREMENT PLAN. Energy Efficiency Measures and Solar Photovoltaic Plant Project Executing Agency:

Sample Procurement Plan

NATIONAL SLUM UPGRADING PROGRAM (NSUP) LOAN No. IBRD Ln.8636; AIIB LN 004-IDN. Procurement Plan Version No.: 3 Date: March 15, 2018

Thresholds for Procurement Methods and Bank s Prior Reviews:

Access to Sustainable Energy Project (ASEP) Procurement Plan

Loan Credit No. : IDA Bank s Approval Date of the Procurement Plan : May 24, Date of General Procurement Notice : May 24, 2017

Procurement Plan Enhancing Quality of Financial Reporting (EQ-FINREP) Grant No:

2) Rivers State Works Goods Consultancy

GOVERNMENT OF INDONESIA SCHOLARSHIP PROGRAM FOR STRENGTHENING REFORMING INSTITUTIONS (SPIRIT) PROCUREMENT PLAN

Sample Procurement Plan

Second Tamil Nadu Road Sector Project PROCUREMENT PLAN

PROCUREMENT PLAN KETSANA EMERGENCY RECONSTRUCTION AND REHABILITATION PROJECT (ERRP) COVERING PROJECT PERIOD: THREE YEARS April-01,2011

Sample Procurement Plan

Andhra Pradesh Rural Water Supply and Sanitation (APRWSS) Project

PROCUREMENT PLAN N/A. Date of First Procurement Plan: 31 May 2017 Date of this Procurement Plan: 3 September 2018, Version 2

NATIONAL AFFORDABLE HOUSING PROGRAM (NAHP) LOAN No. IBRD 8717-ID. Procurement Plan Version No.: 2 Date: June 9, 2017

procurement Plan I. General

Procurement Plan dated January 2, 2013

procurement Plan I. General

PROCUREMENT PLAN. Consulting Services

ICDS Systems Strengthening & Nutrition Improvement Project (ISSNIP)

Overview of Operational Procurement. Nancy Bikondo - Omosa Procurement Specialist Procurement Policy and Services Group June 2013

Sample Procurement Plan

procurement Plan I. General

PROCUREMENT PLAN. Procurement of Goods and Works

Sample Procurement Plan

Sample Procurement Plan

GOVERNMENT OF INDONESIA SCHOLARSHIP PROGRAM FOR STRENGTHENING REFORMING INSTITUTIONS (SPIRIT) PROCUREMENT PLAN

Procurement Plan. 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] N/A

1. Project Information: Land Administration and Management Project. The IBRD Loan number is 4851 ALB. The SIDA Grant number is TF090309

KENYA NATURAL RESOURCE MANAGEMENT PROJECT - WORLD BANK FUNDED PROCUREMENT PLANS (MAY 1st JUNE 30 TH 2010) - WORKS CONTRACTS.

PROCUREMENT PLAN. Implementing Agency: N/A. Date of First Procurement Plan: 28 January 2008 Date of this Procurement Plan: 26 March 2014, Rev.

PROCUREMENT PLAN. Basic Data

RCIP-4 Comoros, Procurement Plan

Goods and Equipment List Item Narosec BuginyaNARL ABI Bulindi KAZARDNASARIMbararaNAFORI Ngetta Nabuin NaCRRI

Project Information Country: Austria

GHA/WATTFP/G01/ , NCB Post Prior Plan 22 Feb Mar Jun 2010 Actual 30 Jun Aug 2010

Grant Assistance for Grass-Roots Human Security Projects Embassy of Japan in Mozambique Information 2016

Commissariat à la Promotion des Investissements

1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project

Procurement Plan. US$ 1. ICB and LIB (Goods) All contracts procured under ICB

Procurement Plan. I. General. 1. Project Information Country: Malawi Project Name: Lilongwe Water and Sanitation Project Project ID: P163794

Procurement Plan Attachment 2

PROCUREMENT PLAN. Consulting Services

Global Partnership on Output-based Aid Grant Agreement

Kerala State Transport Project II (P130339)

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments International Competitive Bidding (ICB) for Works $25,000,00

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services

CIVIL ENGINEER EXPERT

Financing Agreement CONFORMED COPY CREDIT NUMBER 4201-ET. (Rural Capacity Building Project) between FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA.

EU Local and Regional Competitiveness Project TERMS OF REFERENCE TECHNICAL COMMITTEE ARCHITECT EXPERT

Financing Agreement. (Zanzibar Basic Education Improvement Project) between THE UNITED REPUBLIC OF TANZANIA. and

between ARAB REPUBLIC OF EGYPT and

Project Name: Land Titling Project II. ANNUAL PROCUREMENT PLAN FOR PROJECT YEAR V Covering the Period from October to September 2008

TERMS OF REFERENCE TECHNICAL COMMITTEE BUSINESS DEVLEOPMENT EXPERT

World Bank Consultant Guidelines and Business Opportunities

MALAWI P IRRIGATION, RURAL LIVELIHOODS & AGRICULTURAL DEVELOPMENT PROJECT (IRLADP) Revised Procurement Plan for 9 months

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF SUSTAINABLE ENERGY FINANCE PROGRAM GLOBAL ENVIRONMENT FACILITY (GEF) GRANT TO THE

Document of The World Bank

PROCUREMENT PLANFOR THE FY OF NGRBP

Letter No: JA-204/JSDF/IV/2010 April 29, 2010

Project Administration Manual

Emerging Labor Market Data Sources towards digital TVET: The case of Mozambique

BANGLADESH National Agricultural Technology Project (NATP): Phase 1 [IDA Cr. No BD and IFAD Cr. No. 739 BD] PROCUREMENT PLAN FY to 2013

The New Direct Assistance Scheme Funding for Private Sector Firms

Norwegian Trust Fund Grant Agreement

Republic of Marshall Islands: Ebeye Water Supply and Sanitation Project

Trust Fund Grant Agreement

AFRICAN DEVELOPMENT FUND MALAWI

Afghanistan Reconstruction Trust Fund Grant Agreement

.DOCUMENTS OFFICIAL. TF 0 1Lf63

PROCUREMENT PLAN. Basic Data Project Name: Transport Connections in the Northern Mountainous Provinces Project

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-48980) ON A CREDIT IN THE AMOUNT OF SDR 19.3 MILLION (US$30 MILLION EQUIVALENT) TO THE

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

Sample Procurement Plan

Operational Programme Enterprise and Innovation for Competitiveness (OP EIC)

AFRICAN DEVELOPMENT FUND MOZAMBIQUE UNILÚRIO - SUPPORT TO SKILLS DEVELOPMENT FOR AGRICULTURE AND INDUSTRY PROJECT

MINISTRY OF HEALTH SERBIA HEALTH PROJECT - additional financing. Estimated cost in 000 EUR. Contracted. Type. CS Blank IC 7

Guidelines to Consultant

CooperantesCaixa. RULES FOR NGOs CALL FOR APPLICATIONS 2018

Egypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014

Global Environment Facility Trust Fund Grant Agreement

HUMAN RESOURCES COMPTON COMMUNITY COLLEGE DISTRICT JOB CLASSIFICATION CHART - FAMILY 1

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MOZAMBIQUE Technical and Vocational Education and Training Project I. General 1. Project information: PROCUREMENT PLAN Mozambique, Technical and Vocational Education and Training Project - P087347, Credit No. IDA 4156 2. Bank s approval Date of the procurement Plan: February 10, 2006 3. Date of General Notice: Not Available 4. Period covered by this procurement plan: May 1, 2006 December 31, 2007 II. II. Goods and Works and non-consulting services. 1. Prior Threshold: Prior Threshold 1. ICB (Goods) US$ 250,000 All 2. NCB (Goods) US$ 50,000 US$ 250,000 One contract only 3. ICB (Works) US$ 1,000,000 All 4. NCB (Works) US$ 50,000 US$ 1,000,000 One contract only 2. Prequalification: N/A 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines): N/A Goods 4. Reference to (if any) Project Operational/ Manual: Attached 5. Any Other Special Arrangements: None 6. s with s and Time Schedule 25/06/QIC Equipment for EI de ICB Prior Q4-2007

27/06/QIC 28/06/QIC 29/06/QIC 30/06/QIC 31/06/QIC 35/06/QIC Pemba Equipment for Instituto Comercial e Industrial da Beira Equipment for Instituto Industrial de Maputo Equipment for CFP da Beira Equipment for CFP de Maputo Equipment for CFP de Nampula Furniture for Instituto Industrial de Maputo ICB Prior Q3-2007 ICB Prior Q1-2007 ICB Prior Q1-2007 ICB Prior Q3-2007 ICB Prior Q3-2007 ICB Prior Q3-2007 08/06/PIU Vehicles purchase NCB Q2 2006 26/06/QIC Equipment for Instituto Comercial de Maputo NCB Q4 2007 32/06/QIC Furniture for EI de Pemba NCB Q4 2007 34/06/QIC Furniture for Instituto Comercial e Industrial da NCB Q3 2007 Beira 36/06/QIC Furniture for CFP da Beira NCB Q3 2007 01/06/FUN IC - GI - 1.500.000,00 USD/ per cycle Other - Grant Prior Q3-2006 01/06/PIU Furniture Shopping Q2-2006 02/06/FUN IC - IM - 10,000 brochures Shopping Q3-2006 02/06/PIU Computers Shopping Q2-2006 03/06/FUN IC - IM - 150 manuals Shopping Q3-2006 03/06/PIU Printers Shopping Q2-2006 04/06/PIU Photocopier Shopping Q2-2006 05/06/PIU Switchboard and phones Shopping Q2-2006 06/06/PIU Fax Shopping Q2-2006 07/06/PIU Other equipment Shopping Q2-2006 33/06/QIC Furniture for Instituto Comercial de Maputo Shopping Q3-2007 37/06/QIC Furniture for CFP de Maputo Shopping Q4-2007 38/06/QIC Furniture for CFP de Nampula Shopping Q4-2007 2

Works * and Years 05/06/QIC Rehabilitation of EIC Nampula ICB Prior Q3-2007 06/06/QIC Rehabilitation of EA Mocuba and EA Lichinga ICB Prior Q4-2007 07/06/QIC Rehabilitation of EIC Inhambane ICB Prior Q3-2007 11/06/QIC Rehabilitation of II Maputo ICB Prior Q1-2007 * 01/06/QIC Rehabilitation of EI Pemba NCB Prior 02/06/QIC Rehabilitation of CFP Nampula and of CFP Beira NCB Prior 03/06/QIC Rehabilitation of IIC Beira NCB Prior 04/06/QIC Rehabilitation of IC Maputo and of CFFP Electrotecnica Maputo NCB Prior and Years Q1 2007 Q1 2007 Q1 2007 Q1 2007 08/06/QIC 09/06/QIC 10/06/QIC Works - Continuation * Adaptations to Institutions for installation of Equipment PIU Adaptations to Institutions for installation of Equipment School 1 Adaptations to Institutions for installation of Equipment School 2 and Years Shopping Prior Q3-2008 Shopping Prior Q3-2008 Shopping Prior Q3-2008 III. Selection of Consultants 1. Prior Threshold:: Selection Prior Threshold 1. Competitive s (Firms) US$ 100,000 2. Single Source (Firms) N/A 3 Individual Consultants US$50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract for construction design and supervision and US$ 100,000 for other types of assignments, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3

3. Any Other Special Selection Arrangements: None 4. Consultancy Assignments with Selection s and Time Schedule Consulting Firms Amount in US$ Selection Prior/ 04/06/IAC Job Market Observatory CQ Q3-2006 07/06/IAC Proposal for Decentralized System for the Management of Training Institutions Development (SDGIF) CQ Q4-2006 Amount in US$ Selection Prior/ 02/06/PIU Auditing LCS Prior Q1 2008 Amount in US$ Selection Prior/ 01/06/FUN Establishment and Capacity Building for Management of the Fund 01/06/IAC Creation of the National Authority for TVET 01/06/PIU Technical Assistance (UIP) QCBS Prior Q1-2008 01/06/QIC Rehabilitation of EIC Nampula, EIC Inhambane and II Maputo 01/06/QTS Training Based on Standards of Competence in ADMINISTRATION AND MANAGEMENT 02/06/FUN Capacity Building of the Potential Beneficiaries of the Donations/grants (North) 02/06/IAC Information Management System QCBS Prior Q3-2007 02/06/QIC Rehabilitation of EA Mocuba and EA Lichinga 02/06/QTS Training Based on Standards of Competence in TOURISM AND HOSPITALITY 03/06/FUN Capacity Building of the Potential Beneficiaries of the Donations/grants (Centre) 4

03/06/IAC 03/06/QIC 03/06/QTS 04/06/FUN 04/06/QIC 04/06/QTS 05/06/FUN 05/06/IAC 05/06/QIC 05/06/QTS 06/06/IAC 06/06/QIC 08/06/IAC 09/06/IAC 11/06/IAC Marketing and Communication System Rehabilitation of EIC Nampula, EIC Inhambane and II Maputo Training Based in Standards of Competence in AGRICULTURE AND AGRO- INDUSTRY Capacity Building of the Potential Beneficiaries of the Donations/grants (South) Rehabilitation of EA Mocuba and EA Lichinga Training Based in Standards of Competence in INDUSTRIAL MAINTENANCE Capacity Building of the Potential Beneficiaries of the Donations/grants (Maputo City) Monitoring and Evaluation System Implementation of the new Training of Trainers model Development of the National System for Qualifications and Training Proposal for Funding Mechanisms Development (Baseline) Definition of the Professional Orientation System (EFC) Implementation of a Decentralized Management Model Communication and Social Marketing Strategy for the transformation of subject based training into standards of competence based training (pilot inst.) Individuals Consultants Amount in US$ Selection Prior/ 01/06/FUN Short-term expertise for proposal preparation 01/06/PIU Exec Officer/Director 5

01/06/QIC Elaboration of plans for repair and acquisition of equipment 01/06/QTS Advisor for Qualifications and Training 02/06/FUN External Performance Evaluation IC Q3-2007 02/06/PIU Deputy Director 02/06/QIC Elaboration of plans for tools and consumables distribution (EFC Admin and Management) 03/06/FUN External Assessor for Administration and Management 03/06/PIU Industrial Maintenance Technician 03/06/QIC Repair of existing equipment (EFC Admin and Management) 04/06/FUN External Assessor for Tourism and Hospitality 04/06/PIU Tourism Technician 04/06/QIC Preventive maintenance programmes (EFC - Admin and Management) 05/06/FUN External Assessor for Industrial Maintenance 05/06/PIU Agriculture Technician 05/06/QIC Implementation of preventive maintenance programmes (EFC - Admin and Management) 06/06/FUN External Assessor for Agriculture 06/06/PIU Management Administration Technician 06/06/QIC Consultores para elaboração de Manuais( EM Admin and Management) 07/06/PIU Training of Trainers/Managers Technician 07/06/QIC Elaboration of plans for repair and acquisition of equipment 08/06/PIU Monitoring and Evaluation Specialist 08/06/QIC Elaboration of plans for tools and consumables distribution 09/06/PIU FUNDEC Manager 6

09/06/QIC Repair of existing equipment 10/06/PIU FUNDEC Assistant Manager Preventive Maintenance 10/06/QIC Programmes (EFC Hotel Trade and 11/06/QIC Implementation of Preventive Maintenance Programmes 12/06/PIU Institutional Development Specialist IC Q2-2006 12/06/QIC Consultores para elaboração de Manuais(t (EM Hotel Trade and 13/06/PIU HIV/Gender Specialist 13/06/QIC Elaboration of plans for repair and acquisition of equipment 14/06/PIU Specialist 14/06/QIC Elaboration of plans for tools and consumables distribution (EFC Industrial 15/06/PIU Assistant 15/06/QIC Repair of existing equipment (EFC Industrial 16/06/PIU Finance Specialist 16/06/QIC Preventive Maintenance Programmes (EFC - Industrial 17/06/PIU Finance Assistant 17/06/QIC Implementation of Preventive Maintenance Programmes (EFC - Industrial 18/06/PIU Civil Engineers 1 18/06/QIC Consultores para elaboração de Manuais ( (EM Industrial 19/06/PIU Civil Engineers 2 19/06/QIC Elaboration of plans for repair and acquisition of equipment (EFC Agriculture) 20/06/PIU Exec Assistant 20/06/QIC Elaboration of plans for tools and consumables distribution (EFC Agriculture) 21/06/PIU Secretary 1 21/06/QIC Repair of existing equipment (EFC Agriculture) 22/06/PIU Secretary 2 7

22/06/QIC Preventive Maintenance Programmes (EFC - Agriculture) 23/06/PIU Reception & Phone operator 23/06/QIC Implementation of Preventive Maintenance Programmes (EFC - Agriculture) 24/06/PIU Driver 24/06/QIC Consultores para elaboração de Manuais( EM Agriculture) 25/06/QIC 26/06/QIC 27/06/QIC 28/06/QIC 29/06/QIC 30/06/QIC Rehabilitation of EI Pemba Rehabilitation of IIC Beira, of CFP Beira and of CFP Nampula Rehabilitation of IC Maputo and of CFFP Electrotecnica Maputo Rehabilitation of EI Pemba Rehabilitation of IIC Beira, of CFP Beira and of CFP Nampula Rehabilitation of IC Maputo and of CFFP Electrotecnica Maputo wb222820 C:\Documents and Settings\wb222820\Desktop\Mozambique - TVET Project (P087347) - Plan v2.doc 05/02/2006 7:53:00 PM 8