World Bank - Grant Reporting and Monitoring (GRM) Report. Report to Donor. Ref. TF0A2303 Reporting Period: 07/01/2016 to 06/30/2017

Similar documents
Costa Rica's Readiness Preparation Proposal Readiness Fund of the FCPF FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Costa Rica's Readiness Preparation Proposal Readiness Fund of the FCPF FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Republic of Congo: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Argentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility

Ethiopia: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Liberia FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

World Bank - Grant Reporting and Monitoring (GRM) Report

Indonesia - FCPF Readiness Preparation Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

THE WORLD BANK IBRD *IDA I WORLD BANKGROUP -

Update on Carbon Fund Progress since CF16

Grant Agreement for Republic of Sudan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF

Grant Agreement for Islamic Republic of Pakistan's Readiness Preparation Proposal Readiness Fund of the FCPF Grant No. TF018696

REDD Readiness Progress Fact Sheet COUNTRY: COLOMBIA PC15 June, R-PP Preparation and FCPF Readiness grant

RECEIVED. /?J!.. r. HE WORLD BANK DOCUMENTS. W g;,of'ffctat 0 5 JUN Ref: WB/067-Mar-18 March 12, 2018

REDD Readiness Progress Fact Sheet COUNTRY: COLOMBIA DRAFT March R-PP Preparation and FCPF Readiness grant

Readiness Fund REDD+ Country Participants Progress Report Template

Forest Carbon Partnership Facility 4f. Update on Monitoring and Evaluation (M & E) Framework

Final MRP Endorsement Date. Implementing Country/Technical Partner. Comments/Remarks

The undertaking involves 4 NGOs/CSOs under separate contract as follows:

Oromia Forested Landscape Program: Design features, Challenges & Lessons Learned

II. Background Information

Forest Carbon Partnership Facility (FCPF) Eighteenth Meeting of the Carbon Fund (CF18) June 20 June 22, 2018 AGENDA

Forest Carbon Partnership Facility (FCPF) Carbon Fund Second Meeting (CF2)

Bangladesh: Forest Investment Program (FIP) Technical Mission, October 16-20, 2016 Aide Memoire

MEXICO PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) ISR 02 COVERING PERIOD 10/ /2018

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

Central America Disaster Risk Reduction and Climate Change Adaptation Initiative Project SFLAC - SPANISH TF FOR LATIN AMERICA & CARIBBEAN

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

ANNUAL REPORT FOREST CARBON PARTNERSHIP FACILITY

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

Public Disclosure Copy

SCF-FIP Grant No. TF0A2243 FIP Investment Plan Preparation Grant for Cameroon Letter Agreement

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) MEXICO

Strategic Climate Fund Forest Investment Program Grant Agreement

Forest Carbon Partnership Facility (FCPF) Participants Committee Fifteenth Meeting (PC15)

GHANA. Mapping REDD+ Finance Flows April 2016 A FOREST TRENDS REDDX REPORT

Implementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P099369)

FRAMEWORK OPERATIONAL GUIDELINES THE DEDICATED GRANT MECHANISM FOR INDIGENOUS PEOPLES AND LOCAL COMMUNITIES (DGM)

Public Disclosure Copy

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

The World Bank Kenya GPE Primary Education Development Project (P146797)

National Programme Submission Form Nigeria

Review of PHRD TA Grants Closed in Fiscal Year 2006

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761)

December 24, Public Disclosure Authorized

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

Interim Progress Report on Activities Implemented Under. the UN-REDD Programme Fund. Report of the Administrative Agent of

Public Disclosure Copy

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

Peru Forest Investment Program Terms of Reference Third Joint Mission Lima, February 18th-22nd, 2013

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Lessons learnt from fast-start finance

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

Implementation Status & Results Benin ebenin Project (P113370)

Audit Report Grant Closure Processes Follow-up Review

Cities Alliance: Standard Operating Procedures

DEMOCRATIC REPUBLIC OF THE CONGO

UNDP-GEF Guidance GEF Annual Monitoring Process

COLOMBIA Integrated National Adaptation Program

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Procedure: PR/IN/04 May 21,2012. Procedure: Accreditation of GEF Project Agencies

Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

Update on Turkey s PMR Project

Accessing the Capacity-building Initiative for Transparency (CBIT) GEF Expanded Constituency Workshop Hammamet, Tunisia July 12, 2017

Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

Updated Proposal by Brazil and France as co-chairs of the REDD+ Partnership:

AWARDING FIXED OBLIGATION GRANTS TO NON-GOVERNMENTAL ORGANIZATIONS

The NDC Partnership working to influence country NDC implementation quality, speed, scale, and ambition

Public Disclosure Copy. Implementation Status & Results Report Philippines: Extractive Industries Transparency Initiative Implementation (P128290)

Project Information Document/ Identification/Concept Stage (PID)

Clarifications III. Published on 8 February A) Eligible countries. B) Eligible sectors and technologies

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

DIME-GAFSP First Quarterly Progress Report

The World Bank Kenya GPE Primary Education Development Project (P146797)

Implementation Status & Results Report MENA- Desert Ecosystems and Livelihoods Knowledge Sharing and Coordination Project (P130343)

Public Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)

Afghanistan Reconstruction Trust Fund Grant Agreement

with FAO for Burkina Faso 23 February 2018 Strategic Frameworks

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF HAITI - URBAN COMMUNITY DRIVEN DEVELOPMENT PROJECT (PRODEPUR) ADDITIONAL FINANCING GRANT

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

AFRICAN DEVELOPMENT BANK CONGO BASIN FOREST FUND OPERATIONAL PROCEDURES

NAMAs and the PACIFIC NAMA GUIDELINES

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND. GEF Focal Area (s): Climate Change.

REVIEW OF EIF TRUST FUND MANAGER OPERATING TOOLS AND PROCEDURES

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING MADAGASCAR SCALING RENEWABLE ENERGY PROGRAM (SREP) INVESTMENT PLAN (IP)

TRUST FUND FOR STATISTICAL CAPACITY BUILDING GUIDELINES AND PROCEDURES TFSCB ADMINISTRATION UNIT

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

INDONESIA FOREST INVESTMENT PROGRAM (FIP)

Cities Alliance: Standard Operating Procedures

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

LOW-CARBON INNOVATION FUND (LCIF) Program Guidelines

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971)

Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)

Transcription:

Assignment: TF0A2303 Third Grant Agreement for Costa Rica's Readiness Preparation Proposal - Readiness Fund of Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility Task Team Leader: 00000444456 Approving Manager: 00000253690 - Stavros Papageorgiou - Valerie Hickey Summary Information TF Status ACTV Recipient Country Costa Rica Executed By Recipient Managing Unit 9272 - GEN04 Grant Start Date / End Date 06/29/2016 to 09/29/2019 Original Grant Amount 5,580,000.00 Grant Amount 5,580,000.00 Outstanding Commitments 0.00 Cumulative Disbursements 585,121.41 as of 06/30/2017 Disbursed 07/01/2016 to 06/30/2017 585,121.41 Donor TF602001 - MULTIPLE DONORS This GRM report includes the following sections: Overview, Components, Outcome, Execution, Program(FCPFR), Disbursements. Page 1 of 8

OVERVIEW Overall Assessments Grant Objectives: The objective of the Additional Funding grant is to assist the Recepient in carrying out the Readiness preparation Activities. Overall progress from 07/01/2016 to 06/30/2017 with regard to Achieving Grant Objectives: Comment: FONAFIFO continues to make significant progress in achieving Grant Objectives with Grant Activities supporting all major aspects of REDD+ Readiness, including REDD+ strategy development, development of safeguard instruments, forest emissions reference levels, and national forest monitoring systems, preparing the country for the Results-Based Payments phase of REDD+. Overall progress from 07/01/2016 to 06/30/2017 with regard to Implementation of Grant Financed Activities: Comment: This report represents the first GRM of the REDD+ Readiness Additional Funding Grant for Costa Rica. Disbursements have been picking-up relatively slow since Grant effectiveness due to the need to build the Recipient's capacity in the Bank's new procurement framework and system (STEP), and will have to accelerate next fiscal year. Despite this, FONAFIFO has made important achievements through implementation of grant activities this fiscal year. Key highlights include: ##The REDD+ Secretariat housed within FONAFIFO has been fully staffed and a new National Coordinator of the REDD+ Strategy has been assigned after the retirement of the previous one. ##The National REDD+ Strategy has been finalized and validated with stakeholders, including a specific chapter on Indigenous Peoples. ##A REDD+ Ministerial Decree has been published setting the governance framework for the implementation phase of the National REDD+ Strategy. ##The Implementation Plan of the National REDD+ Strategy has been drafted and is being finalized, including a chapter on Indigenous Peoples. ##A draft of the Benefit-Sharing Plan has been prepared and is being consulted internally among institutions. ##An analysis of forest degradation has been carried out, at the request of the FCPF donors, and the Forest Reference Level of Costa Rica#s ER-Program has been updated accordingly. ##A revised version of the Emission Reductions Program Document (ERPD) has been prepared and sent to the FCPF donors for their review and eventual acceptance of Costa Rica#s ER Program in the Carbon Fund portfolio. ##Consultations with Indigenous Peoples have concluded the information and pre-consultation stages and entered the final stage. A Ministerial Directive has been published establishing a Ministerial Committee on Indigenous Peoples. ##The ESMF has been updated to reflect the latest versions of the National REDD+ Strategy and its Implementation Plan, as well as comments received by the WB task team specialists. ##A set of indicator and their respective measurement methodologies have been defined to monitor progress with non-carbon benefits related to the National REDD+ Strategy. ##The design of the National Forest and Land Use Monitoring System (SICMOCUTE, for its acronyms in Spanish) has reached its final stages and Terms of References can now be drafted for its development and support by the grant. Grant follow-up and structure Description and context of Grant: Costa Rica#s Participation Agreement with the FCPF was signed in October 2008. After successfully presenting its Readiness Project Idea Note (R-PIN), the country received a formulation grant (TF94486) in June 2009 for the amount of US$ 200,000 in order to prepare its Readiness Preparation Proposal (R-PP). Costa Rica#s R-PP was subsequently approved during the 6th Meeting of the FCPF in Georgetown, Guyana, in June 2010. It identifies a broad set of activities aimed at strengthening the technical and institutional capacities of a variety of stakeholders for enabling the country to participate in future REDD+ mechanisms. Following a due diligence process by the World Bank as the Delivery Partner, Costa Rica signed a Supplementary Readiness Preparation Grant Agreement in June 2012 (TF012692), in the amount of US$ 3,600,000 (i.e. the original REDD+ Readiness Preparation grant). The objective of the Grant was to assist Costa Rica in carrying out its Readiness Preparation Activities as described in its R-PP. The original grant was successfully closed on September 30, 2015 with the latest GRM providing a satisfactory rating. The original Grant managed to achieve its objectives, with the key result being the presentation Page 2 of 8

and endorsement of the country#s Readiness Package during the 20th meeting of the FCPF Participants Committee on November 2015, receiving a very positive evaluation by the donors and paving the way for an Emission Reductions Payment Agreement (ERPA) under the FCPF Carbon Fund. The results of the participatory self-assessment process carried out as part of the R-Package preparation provided an opportunity to benefit from comments from a variety of stakeholders on the country#s progress towards REDD+ readiness, and to identify remaining gaps and further needs to be strengthened with the support of Additional Funding. In this context, Costa Rica#s request for FCPF Additional Funding for an amount of US$5M was approved in July 2014 during the 17th Meeting of the FCPF#s Participants Committee. An undisbursed amount of US$ 583,139.58 (rounded up to US$ 580,000) from the original Grant was rolled over in the proposed Additional Grant. The Additional Funding will reinforce ongoing processes initiated under the original grant, contributing to the consolidation of the National REDD+ Readiness process beyond the R-Package presentation and therefore ensuring a solid foundation for the implementation of the National REDD+ Strategy and a follow-up operation through the ERPA. Expected follow up (if any): Follow up Bank project/loan/credit/grant Comment on follow up: Follow-up will be through an Emissions Reduction Payment Agreement (ERPA). Shortly after submitting its R-PP, Cost Rica expressed its interest in participating as a pilot country in the FCPF Carbon Fund, and submitted an Emissions Reduction Project Idea Note (ER-PIN) during the 5th Meeting of the Carbon Fund Participants (CFPs), in September 2012. After addressing the key issues raised by the CFPs, Costa Rica became the first country to include its ER-PIN in the Carbon Fund pipeline through a Letter of Intent (LOI) signed with the World Bank on September 10, 2013 for an amount up to US$60 million (amended in November 2015 for 16 additional months. Consistent with this two-phase structure of the FCPF, the Readiness Preparation grants have been executed in parallel with the preparation of an Emission Reductions Program (ER-P) under the Carbon Fund. Costa Rica#s Emission Reductions Program Document (ERPD) was presented and approved during the 14th Meeting of the FCPF Carbon Fund Participants in Paris, France, on June 2016, conditional to the inclusion of forest degradation in the carbon accounting of the ER Program. A revised ERPD including forest degradation was submitted by Costa Rica on July 2017 and is currently under review by CFPs. ERPA signature is expected by FY18 and would be among the first to be signed in LAC and worldwide. End Date of Last Site Visit: Restructuring of Grant: No restructuring foreseen thus far. OUTCOME Comments on outcome achieved from 07/01/2016 to 06/30/2017 The main outcome achieved during this period has been the publication of a Ministerial REDD+ Decree (signed by the President and the Minister of Environment and Energy) which defined the framework and governance arrangements for the implementation phase of the National REDD+ Strategy. In addition, the inclusion of forest degradation in Costa Rica's Forest Reference Level and the submission of a revised ERPD to the Carbon Fund Participants has been another major achievement. The Implementation Plan of the National REDD+ Strategy has continued to be defined, including a specific chapter on Indigenous Peoples, and consultations with IPs have entered their final stage. Grant Outcome Indicators Grant outcome indicators are listed below. Page 3 of 8

Consolidation of the National REDD+ Readiness phase. REDD+ Readiness advanced 09/30/2015 REDD+ Readiness advanced 06/30/2017 Target REDD+ Readiness completed 05/29/2019 Strengthening management arrangements for transitioning from Readiness to Implementation of the National REDD+ Strategy. Arrangements for REDD+ Readiness in place 09/30/2015 Arrangements for REDD+ implementation defined 06/30/2017 Target Arrangements for REDD+ implementation in place 05/29/2019 Consolidation of the consultation and capacity building process with key stakeholder groups. Stakeholder platform in place and consultation ongoing 09/30/2015 Permanent stakeholder platform has been defined and consultation are ongoing. 06/30/2017 Target Permanent stakeholder platform and consultation finalized 05/29/2019 Strengthening the implementation framework of the REDD+ Strategy, including through increasing the involvement of the private and public sector and making targeted adjustments to the PES program. Draft National REDD+ Strategy available 09/30/2015 National REDD+ Strategy has been finalized and implementation framework under development. 06/30/2017 Target National REDD+ Strategy finalized and implementation framework strengthened 05/29/2019 Page 4 of 8

Developing a Reference Level for the inclusion Sustainable Forest Management and Forest Degradation in the National REDD+ Strategy. Draft Forest Reference Level for deforestation and enhancement of carbon stocks 09/30/2015 Forest Reference Level for Deforestation and Enhancement of forest carbon stocks finalized. Reference Level for forest degradation and sustainable management of forests under development. 06/30/2017 Target Forest Reference Level for all five REDD+ activities established 05/29/2019 Consolidation of the National Forest Monitoring System, including through strengthening the forest information systems of FONAFIFO, SINAC, and CIAgro. Process for establishment of National Forest Monitoring System established. 09/30/2015 Techncial design and specifications of the National Forest Monitoring System defined. 06/30/2017 Target National Forest Monitoring System established. 05/29/2019 COMPONENTS Output and Implementation by Component Component 1. Organization, Consultation, and Grievance Redress Status: Planned Output: Actual Output: Under Implementation (i) staffing of REDD+ Secretariat; (ii) REDD+ Decree published; (iii) consultations on the National REDD+ Strategy. finalized; (iv) stakeholder platforms established (i) REDD+ Secrtariat staffed; (ii) REDD+ Decree published; (iii) consultations with IPs are protracted; (iv) stakeholder platforms defined in REDD+ Decree. Component 2. Development of the REDD+ Strategy Status: Planned Output: Actual Output: Under Implementation (i) National REDD+ Strategy finalized; (ii) Implementation Plan finalized; (iii) ESMF finalized; (iv) draft Benefit Sharing Plan developed; (v) ToRs for Registry developed With the exception of the National REDD+ Strategy which was finalized, the rest of the outputs advanced satisfactorily but were not finalized Page 5 of 8

Component 3. Development of a Reference Level Status: Planned Output: Actual Output: Under Implementation Inclusion of forest degradation and sustainable management of forests in the National Forest Reference Level A preliminary reference level for forest degradation was established and methodological improvements defined for the development of Terms of Reference. Component 4. Design of a Monitoring and Verification System Status: Planned Output: Actual Output: Under Implementation the National Forest Monitoring System (NFMS) for REDD+ is established. advances were made in finalizing the techncial design and specifications fo the NFMS for the development of Terms of Reference. Comment on planned and actual Output Comment on component implementation progress Component 1. Organization, Consultation, and Grievance Redress Subcomponent 1a. National Readiness Management Arrangements. A Ministerial Decree on the implementation phase of the National REDD+ Strategy has been published, which marks an important milestone in the National REDD+ Readiness process. In addition, the National REDD+ Secretariat has been fully staffed again after the closing of the original grant. However, the social specialist has not been properly replaced and his tasks were taken over by the communications specialist who does not have the relevant background to address the complex IP issues in Costa Rica. This will be addressed prior to the next supervision mission. Subcomponent 1b. Consultation and Participation Process. Activities during this period have concentrated in finalizing the consultation of the National REDD+ Strategy before the publication of the REDD+ Decree, and advancing the consultations with Indigenous Peoples based on their own national IP consultation plan. IP consultations have now entered in its final stage (after the information and pre-consultation stages). Component 2. Development of the REDD+ Strategy Subcomponent 2a. Assessment of Land Use, Land Use Change Drivers, Forest Law, Policy, and Governance. This subcomponent was completed with support from the original grant. Subcomponent 2b. REDD+ Strategy Options. The National REDD+ Strategy has been finalized, including a specific chapter on Indigenous Peoples. An Implementation Plan and Financial Strategy were developed to operationalize the National Strategy, which are currently being finalized. Specific activities as planned during the preparation of the Additional Grant have not been initiated yet though. Subcomponent 2c. REDD+ Implementation Framework. ToRs for the development of the National REDD+ Registry have been drafted and are under review by the Bank. Other activities have still not initiated. Subcomponent 2d. Social and Environmental Impacts. No activities are foreseen to be financed under this subcomponent. The ESMF is being finalized with contributions from the REDD+ Secretariat. Component 3. Development of a Reference Level. Progress has been made by developing a preliminary assessment of emissions for forest degradation and defining the methodological improvements to finalize it. However, the specific activities under this subcomponent as planned during the preparation of the Additional Grant have not been initiated yet. Terms of Reference are Page 6 of 8

expected in Q3 of FY18. Component 4. Design of a Monitoring and Verification System. The technical specifications for the design of the National Forest Monitoring System (NFMS) have been developed in collaboration with other partners. However, the specific activities under this subcomponent as planned during the preparation of the Additional Grant have not been initiated yet. Terms of Reference are expected in Q3 of FY18. EXECUTION Bank project related to the grant Project ID / Name: Project Status: Global Focal Area: Product Line: P123702 - Costa Rica FCPF REDD Readiness Lending Climate change CN - Carbon Offset Implementing agency and contact details Agency: Contact: Address: National Forest Financing Fund (FONAFIFO) Jorge MArio Rodriguez (Executive Director) San Vicente, Moravia-San Jose, Costa Rica Phone: 800-3662-3436 Email: Website: PROGRAM www.fonafifo.go.cr Program Specific Questions 1. Describe progress in how the Grant activities are being coordinated with other REDD+-related initiatives, including those funded by Describe progress in how the Grant activities are being coordinated with other REDD+-related initiatives, including those f FONAFIFO has been actively coordinating activities with other donors providing support to the REDD+ Readiness process such as UNREDD, GIZ, USAID, and NORAD, among others. UNREDD in particular has been actively supporting the design of the non-carbon benefits monitoring indicators as well as activities related to the private sector; and USAID has provided significant expertise on MRV, while support from GIZ is phasing out. 2. Describe any important changes in the technical design or approach related to the Grant activities. No significant changes in the technical design so far. 3. Describe progress in addressing key capacity issues (implementation, technical, financial management, procurement) related to this Grant. There are two key capacity issues so far: (i) procurement, due to the new framework and system at the Bank; the PIU has received training and disbursements are now picking up; (ii) the social scientist that was part of the REDD+ Secretariat has left the PIU due to contract discontinuity and has not been replaced yet; the communications specialist has taken over the tasks of the social specialists, but the required technical expertise is lacking. From the Bank side, the social specialist has left the Bank and a new social specialist has recently been assigned to the project who will with the counterpart on the social issues. 4. Describe progress in addressing social and environmental issues (including safeguards) related to the Grant. Is the SESA conducted in accordance with the Common Approach? Social and environmental issues have been addressed through a Strategic Environmental and Social Assessment (SESA) following FCPF guidelines and the Common Approach since the World Bank is the Delivery Partner. The final SESA report was approved by Page 7 of 8

the Bank as part of the R-Package development, and was the basis for identifying the RED+ policies and actions that were included in the National REDD+ Strategy. 5. Is the ESMF prepared in accordance with the Common Approach? Based on the SESA and the National REDD+ Strategy, a final draft of the ESMF has been produced in accordance with the Common Approach (since the World Bank is the Delivery Partner) and is currently under review by the task team specialists, after which it will undergo through public consultation prior to Appraisal of the ERPA. 6. Describe progress in stakeholder consultation, participation, disclosure of information, and the FGRM related to this Grant. Significant progress has been made with regards to social aspects and indigenous peoples consultation, including the following: (1) a large number of consultation workshops and participatory activities with all stakeholder groups identified during the SESA; (2) Analytical Studies; (3) a specific consultation plan for Indigenous Peoples; (4) Communication Strategy; and (5) Grievance Redress Mechanism. THE National REDD+ Strategy has been fully consulted with all stakeholders, with the exception of the particular case of the Indigenous Peoples which has entered its final stage. DISBURSEMENTS Disbursements Summary in USD Date From Date To Planned Cumulative Planned Period Actual Cumulative Actual Period 01/01/2016 06/30/2016 0.00 0.00 0.00 0.00 07/01/2016 12/31/2016 0.00 0.00 500,000.00 500,000.00 01/01/2017 06/30/2017 0.00 0.00 585,121.41 85,121.41 07/01/2017 12/31/2017 0.00 0.00 1,189,115.07 603,993.66 01/01/2018 06/30/2018 0.00 0.00 1,189,115.07 0.00 07/01/2018 12/31/2018 0.00 0.00 0.00 0.00 01/01/2019 06/30/2019 0.00 0.00 0.00 0.00 07/01/2019 12/31/2019 0.00 0.00 0.00 0.00 Page 8 of 8