Logistics 101 Today s Battlefield Reality 21 March Todd Ostheller AAI Corporation

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE

Phase I Submission Name of Program: Project Liberty

The Beginning. GEN Kern s Memo, 20 Aug 02 Creating Lean A Mgmt Tool for the Future. there is potential for great progress.

Apache Fire Control LM MFC Supplier Summit TM

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

An Overview of PEO AVIATION. Huntsville Aerospace Marketing Association. Paul Bogosian PROGRAM EXECUTIVE OFFICER AVIATION

Performance-Based Logistics

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

UNMANNED SYSTEMS T&E Challenges & Opportunities. Dr. James Streilein February 2008

Eyes of the Army U.S. Army Roadmap for UAS Foreword

TWV Fleet Maintenance Challenges

PM Close Combat Systems Briefing for: Precision Strike Association. June 2009

USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain

Accelerating Networked Sensors & Fires

LTG James D. Thurman DCS G-3/5/7 Department of the Army 6 January 2010

MANPACK300 DEPLOYING THE FUTURE IN LIVE TRAINING

Contractors on the Battlefield. 27 February 2007

U.S. ARMY MATERIEL COMMAND

COMMITMENT. & SOLUTIONS Act like someone s life depends on what we do. MUM-T for the Abrams Lethality Enabler UNPARALLELED

Joint Unmanned Aircraft System Center of Excellence

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Armed Unmanned Systems

Victory Starts Here!

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit

Legacy Tanker Division

U.S. Army Training and Doctrine Command (TRADOC) Analysis Center (TRAC)

Stryker Brigade Combat Team. Brad Drake BCT ILS Manager General Motors Defense (519) Ext

NASC 0766 Combat Aircraft Survivability and Threat Lethality

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

STATEMENT OF RADM ANTHONY L. WINNS DEPUTY CHIEF OF NAVAL OPERATIONS DEPUTY DIRECTOR, AIR WARFARE AND BGEN MARTIN POST ASSISTANT DEPUTY COMMANDANT

Tank Automotive Research, Development & Engineering Center (TARDEC)

UNCLASSIFIED NDIA. 4-6 Apr 11. Mr. James C. Dwyer Deputy Chief of Staff for Logistics, G-4. NDIA April 11 1Apr11 v4 4/14/2011 1:37 PM UNCLASSIFIED

Blue on Blue: Tracking Blue Forces Across the MAGTF Contemporary Issue Paper Submitted by Captain D.R. Stengrim to: Major Shaw, CG February 2005

Single Integrated Ground Picture

Shadow 200 TUAV Schoolhouse Training

NDIA Ground Robotics Symposium

OC-ALC/LK. Contractor Logistics Support (CLS) CLS. DOD Maintenance Symposium. Maintenance in Theatre & CLS. 28 Oct 2003

Unmanned Aerial Vehicle Operations

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

REQUEST FOR INFORMATION (RFI) RFI Number: DHS Robotic Aircraft for Public Safety

UNCLASSIFIED R-1 ITEM NOMENCLATURE

GLOBAL BROADCAST SERVICE (GBS)

Yemen ISR CONOPS and Capabilities

Report to Congress on Distribution of Department of Defense Depot Maintenance Workloads for Fiscal Years 2015 through 2017

DEFENSE SECURITY COOPERATION AGENCY TH STREET SOUTH, STE 203 ARLINGTON, VA

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

DEPARTMENT OF THE ARMY

Logistics Research & Engineering Directorate. Alan Galonski Chief, Future Concepts Division 1 1

Tobyhanna Army Depot. Overview

Integrating System Safety into Forward Deployed Theater Operations

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

We provide innovative solutions that protect and save lives.

Distribution Statement A Approved for public release; distribution unlimited.

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

US Marine Corps Tactical Wheeled Vehicle Strategy Update Briefing to NDIA Tactical Wheeled Vehicle Conference 2 February 2009

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

JAGIC 101 An Army Leader s Guide

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

USMC CONVENTIONAL AMMUNITION STRATEGIC PLAN

PLAN. U.S. Army Communications-Electronics Command CECOM VISION CECOM MISSION

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

FIGHTER DATA LINK (FDL)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

Towards a Robotics Strategy

Briefing for Industry

2016 Major Automated Information System Annual Report

DEPARTMENT OF THE ARMY

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

The Critical Link Workshop

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

STATEMENT BY GENERAL RICHARD A. CODY VICE CHIEF OF STAFF UNITED STATES ARMY BEFORE THE

The Post-Afghanistan IED Threat Assessment: Executive Summary

HQMC 7 Jul 00 E R R A T U M. MCO dtd 9 Jun 00 MARINE CORPS POLICY ON DEPOT MAINTENANCE CORE CAPABILITIES

GAO ARMY WORKING CAPITAL FUND. Actions Needed to Reduce Carryover at Army Depots

MQ-8B FIRE SCOUT. Operational Scenario. MQ-8B Fire Scout Air Vehicle Specifications United States Navy

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

The Western UAS Symposium

Impact of the War on Terrorism on the USAF

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION

2017 Annual Missile Defense Small Business Programs Conference

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARS 2004 San Diego, California, USA

2016 Major Automated Information System Annual Report

Background AEF Vision

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

DoD Unmanned Systems Integrated Roadmap

Transcription:

Logistics 101 Today s Battlefield Reality 21 March 2007 Todd Ostheller AAI Corporation 1

AAI UAS Warfighter Support Pioneer 400 600 Max GW: 463 lbs. Max payload wt: 100 lbs. Endurance: 5 hrs Max GW: 447 lbs. Max payload wt: 66 lbs. Endurance: 5 hrs Max GW: 583 lbs. Max payload wt: 91 lbs. Endurance: 12-14 hrs TUAV OSGCS / HMMWV Aerosonde 4 G-MAV 200 Max GW: 375 lbs. Max payload wt: 65 lbs. Endurance: 7-8 hrs ER/MP OSGCS / 5 Ton Truck Max GW: 35 lbs. Max GW: 13 lbs. Max P/L wt: 7 lbs. Max P/L wt: 2 lbs Endurance: 10-12 hrs Endur: 0.7 hrs Next Generation OAV-II One System Remote Video Transceiver Max GW: 625-700 lbs. Max payload wt: 110-225 lbs. Endurance: 6-10 hours Max GW: 172 lbs. Max P/L wt: 16 lbs. Endur: 2.5 hrs 2

Tactical UAS 2006 Major Accomplishments Maintained combat system availability > 93% Reduced mishap rate by 59% Reduced system support costs by 25% Trained and fielded 19 new platoons Flew 70,000 combat flight hours in 2006 Flew 15,000 combat missions in 2006 Deployed first system to OEF 12Mar07 72 72 Air Vehicles Combat Stats 30,414 Sorties 143,241 Hours >96% Availability 39 AAI FSR s In Country Factory Floor to OIF in Record Time Top Top Operational Operational Challenges Challenges 1. 1. Increased Increased OPTEMPO OPTEMPO with with additional additional surge surge 2. 2. Limited Limited bandwidth bandwidth for for UAS UAS operations operations 3. 3. Desire Desire for for increased increased situational situational awareness; awareness; convoy convoy and and force force protection protection 4. 4. Mixed Mixed airspace airspace flight flight operations operations 5. 5. Single Single fuel fuel on on the the battlefield battlefield initiative initiative 6. 6. Integrated Integrated US US Army Army UAS UAS field field support support 3

Response to increased OPTEMPO Expanded production facilities Increased FSR training Additional BIT team staffing Mishaps per 100khr 1800 1600 1400 1223 1200 1000 800 532 600 346 400 219 145 200 100 0 2002 2003 2004 2005 2006 * 2007 Year * 2006 contains 2 months of actuals and 10 months of predicted Incidents per 100000 hrs 90000 80000 70000 60000 50000 40000 30000 Flight Hours 20000 10000 0 Flight Hours Development of predictive models Flight hours predictions Impact to Spares/Repair of Repairables Reliability growth curve Establishment of FRA in Balad, Iraq PBL Contracting mechanism Add l in-country contractor support 4

Increased Situational Awareness Laser Pointer/Designator/Range Finder Fielded Laser Pointer option to assist in identification of targets Developing Integrated EO/IR payload with Laser Designator/Rangefinder Improved Laser Guided weapons response times, reacting quickly to dynamic insurgent activities. Payload combines Designator with Laser Range Finder (LRF) to improve Target Location Error (TLE) Optical / IR performance maintained at high quality video in same payload as Laser Designator 5

Air Vehicle Operator Position Air Vehicle Operator Position Situational Display Situational Display 9 High Resolution Monitor 9 High Resolution Mission Payload Operator Position Monitor Mission Payload Operator Position One System Roadmap 1996-2005 2006 IGNAT Block II Army FCS USN 2007 2008 Block II II ERMP IGNAT Army FCS TCDL USMC 7 Configurations Logistical requirements (Manuals, Software Maintenance, PLL) Multiple Training requirements Limited Situational Awareness SA at Brigade Software Commonality Telemetry Waveform Training Logistics Architecture SA at Platoon IGNAT Commonality Common Cockpit Philosophy leads to: Reduced logistical requirements Common Training/Standardization Open ended architecture (accepts FCS) Maximizes situational awareness technology Army FCS Raven ERMP Increased Operational Effectiveness Airworthiness Cost Savings/ Avoidance Raven USN Weight: 350 lbs Range: 40 Km USMC Weight: 65 lbs Range: 125 Km erminal BFT Army FCS ransceiver USMC BFT 6

Performance Based Logistics Support The Warfighter requires READINESS not transactions PBL Phase I May 2003 Jan 2004 - Cost Plus Fixed Fee Jan 2004 Oct 2004 - Cost Plus Fix Fee with Incentives The Cost Plus phase s provide the opportunity to evaluate true cost and to determine the right incentives to support the Fixed Price phase. Provides the time to validate and verify the metrics and Data Collection processes. The key is the data collection and analysis. SHADOW TUAS HAS USED A PHASED PBL IMPLEMENTATION STRATEGY PBL Phase II Oct 2004 Sept 2007- Cost Plus With Incentives PBL Phase III Oct 2007 - Fixed Price, Performance Based, Award Term (With Performance Board) MTBSA Ao O R CWT FSR Stock Avail Better System Operational Readiness/Availability Increased MTBSA Reduced logistics footprint Higher overall system readiness levels Full PBL MTTR MTBF MTBEFF KPP Logistics Performance Pyramid The key is the validation of metrics with a verified data collection system 7

Reset/Repair of Repairables Reset/Repair of Repairables Initiatives Completed lean manufacturing improvements in Hunt Valley factory. Established partnership arrangements with US Army Depots Tobyhanna Army Depot Scranton, PA Letterkenny Army Depot Chambersburg, PA Corpus Christi Army Depot Corpus Christi, TX Super FSR at FRA (Balad) for expanded repair capabilities. Instituted CONUS EO/IR Payload repair facility in Rome, New York (Opened in June 2006) 8

Integrated US Army UAS field support OIF/OEF UAS Sustainment Plan 9