FAS Military Analysis GAO Index Search Join FAS

Similar documents
We are sending copies of this report to the Secretaries of Defense and the Air Force.

GAO ELECTRONIC WARFARE. The Army Can Reduce Its Risks in Developing New Radar Countermeasures System. Report to the Secretary of Defense

Air Force Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

GAO. WEAPONS ACQUISITION Better Use of Limited DOD Acquisition Funding Would Reduce Costs. Report to the Secretary of Defense

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

A991072A W GAO. DEFENSE SATELLITE COMMUNICATIONS Alternative to DOD's Satellite Replacement Plan Would Be Less Costly

Department of Defense

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

GAO. PRECISION-GUIDED MUNITIONS Acquisition Plans for the Joint Air-to-Surface Standoff Missile. Report to Congressional Committees.

ARMY AVIATION Apache Longbow Weight and Communication Issues

GAO INDUSTRIAL SECURITY. DOD Cannot Provide Adequate Assurances That Its Oversight Ensures the Protection of Classified Information

GAO DEFENSE CONTRACTING. Improved Policies and Tools Could Help Increase Competition on DOD s National Security Exception Procurements

GAO DEPOT MAINTENANCE. Army Needs Plan to Implement Depot Maintenance Report s Recommendations. Report to Congressional Committees

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

GAO. DEPOT MAINTENANCE Air Force Faces Challenges in Managing to Ceiling

Subject: The Department of Homeland Security Needs to Fully Adopt a Knowledge-based Approach to Its Counter-MANPADS Development Program

Department of Defense

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

OFFICE OF THE INSPECTOR GENERAL LOW-RATE INITIAL PRODUCTION IN MAJOR DEFENSE ACQUISITION PROGRAMS

GAO DEFENSE INFRASTRUCTURE

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%

GAO. OVERSEAS PRESENCE More Data and Analysis Needed to Determine Whether Cost-Effective Alternatives Exist. Report to Congressional Committees

August 23, Congressional Committees

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

GAO. QUADRENNIAL DEFENSE REVIEW Opportunities to Improve the Next Review. Report to Congressional Requesters. United States General Accounting Office

Office of the Inspector General Department of Defense

a GAO GAO DEFENSE ACQUISITIONS Better Information Could Improve Visibility over Adjustments to DOD s Research and Development Funds

DEFENSE ACQUISITIONS. Navy Strategy for Unmanned Carrier- Based Aircraft System Defers Key Oversight Mechanisms. Report to Congressional Committees

GAO TACTICAL AIRCRAFT. Comparison of F-22A and Legacy Fighter Modernization Programs

a GAO GAO DOD BUSINESS SYSTEMS MODERNIZATION Improvements to Enterprise Architecture Development and Implementation Efforts Needed

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

a GAO GAO AIR FORCE DEPOT MAINTENANCE Management Improvements Needed for Backlog of Funded Contract Maintenance Work

General John G. Coburn, USA Commanding General, U.S. Army Materiel Command

Office of Inspector General

Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress

Other Defense Organizations and Defense Finance and Accounting Service Controls Over High-Risk Transactions Were Not Effective

MILITARY READINESS. Opportunities Exist to Improve Completeness and Usefulness of Quarterly Reports to Congress. Report to Congressional Committees

BATTLEFIELD AUTOMATION Software Problems Hinder Development of the Army's Maneuver Control System

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Information System Security

GAO DEFENSE HEALTH CARE

For More Information

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

Department of Defense

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

Request for Solutions: Distributed Live Virtual Constructive (dlvc) Prototype

GAO MILITARY OPERATIONS. DOD s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight. Report to Congressional Requesters

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

Navy Officials Did Not Consistently Comply With Requirements for Assessing Contractor Performance

GAO CONTINGENCY CONTRACTING. DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan. Report to Congressional Committees

Complaint Regarding the Use of Audit Results on a $1 Billion Missile Defense Agency Contract

Department of Defense DIRECTIVE

World-Wide Satellite Systems Program

GROUND RADAR AND GUIDED MUNITIONS. Increased Oversight and Cooperation Can Help Avoid Duplication among the Services Programs

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

GAO MILITARY OPERATIONS

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

Report No. D August 12, Army Contracting Command-Redstone Arsenal's Management of Undefinitized Contractual Actions Could be Improved

RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY BEFORE THE COMMITTEE ON ARMED SERVICES UNITED STATES SENATE

Information Technology

Department of Defense INSTRUCTION

GAO. ELECTRONIC COMBAT Consolidation Master Plan Does Not Appear to Be Cost-Effective. Report to Congressional Requesters

GAO FORCE STRUCTURE. Improved Strategic Planning Can Enhance DOD's Unmanned Aerial Vehicles Efforts

GAO ARMY WORKING CAPITAL FUND. Actions Needed to Reduce Carryover at Army Depots

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

Ae?r:oo-t)?- Stc/l4. Office of the Inspector General Department of Defense DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited

Preliminary Observations on DOD Estimates of Contract Termination Liability

NATIONAL AIRSPACE SYSTEM (NAS)

EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA4

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

Exhibit R-2, RDT&E Budget Item Justification

Nuclear Command, Control, and Communications: Update on DOD s Modernization

Joint Electronics Type Designation Automated System

GAO. BOTTOM-UP REVIEW Analysis of DOD War Game to Test Key Assumptions

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

Office of the Inspector General Department of Defense

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

BY ORDER OF THE 442D FIGHTER WING INSTRUCTION COMMANDER 442D FIGHTER WING COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Export-Controlled Technology at Contractor, University, and Federally Funded Research and Development Center Facilities (D )

DOD RAPID INNOVATION PROGRAM

Department of Defense DIRECTIVE

INSIDER THREATS. DOD Should Strengthen Management and Guidance to Protect Classified Information and Systems

NOTICE OF DISCLOSURE

Critical Information Needed to Determine the Cost and Availability of G222 Spare Parts

GAO IRAQ AND AFGHANISTAN. DOD, State, and USAID Face Continued Challenges in Tracking Contracts, Assistance Instruments, and Associated Personnel

a GAO GAO WEAPONS ACQUISITION DOD Should Strengthen Policies for Assessing Technical Data Needs to Support Weapon Systems

DEFENSE LOGISTICS. Enhanced Policy and Procedures Needed to Improve Management of Sensitive Conventional Ammunition

Coast Guard IT Investments Risk Failure Without Required Oversight

UNCLASSIFIED R-1 ITEM NOMENCLATURE

GAO MILITARY PERSONNEL. Number of Formally Reported Applications for Conscientious Objectors Is Small Relative to the Total Size of the Armed Forces

NEW TRAUMA CARE SYSTEM. DOD Should Fully Incorporate Leading Practices into Its Planning for Effective Implementation

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ADDITIONAL AMENDMENTS RELATING TO TOTAL FORCE MANAGEMENT (SEC. 933)

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA

OFFICE OF THE INSPECTOR GENERAL FUNCTIONAL AND PHYSICAL CONFIGURATION AUDITS OF THE ARMY PALADIN PROGRAM

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

GAO. DEFENSE ACQUISITION INFRASTRUCTURE Changes in RDT&E Laboratories and Centers. Briefing Report to Congressional Requesters.

The Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision

Transcription:

FAS Military Analysis GAO Index Search Join FAS Electronic Warfare: Most Air Force ALQ-135 Jammers Procured Without Operational Testing (Letter Report, 11/22/94, GAO/NSIAD-95-47). The Air Force continues to procure an upgraded ALQ-135 jammer despite serious performance problems, resulting in the deployment of a system with limited ability to protect F-15 aircraft from enemy weapons. The ALQ-135 is designed to transmit electronic signals that interfere with the radars controlling threat missiles and guns. The upgraded ALQ-135 is a two-band system, designated as Bands 1.5 and 3, for use on newer models of the F-15. Although testing revealed that the Band 3 had serious performance flaws, the Air Force procured almost all its total program quantity without demonstrating acceptable operational performance. Moreover, the Air Force has deferred further production of the Band 1.5. The poor condition of the ALQ-135 program is a direct result of the Defense Department's disregard of congressional expectations, its own written policy, and GAO's recommendations. --------------------------- Indexing Terms ----------------------------- REPORTNUM: NSIAD-95-47 TITLE: Electronic Warfare: Most Air Force ALQ-135 Jammers Procured Without Operational Testing DATE: 11/22/94 SUBJECT: Air Force procurement Aircraft components Air defense systems Product performance evaluation Testing Systems analysis Radar equipment Procurement evaluation Electronic warfare Procurement policies IDENTIFIER: ALQ-135 Jammer http://www.fas.org/man/gao/gao9547.htm (1 of 10) [1/9/2001 12:33:49 PM]

F-15 Aircraft F-15C Aircraft F-15E Aircraft ************************************************************************** * This file contains an ASCII representation of the text of a GAO * * report. Delineations within the text indicating chapter titles, * * headings, and bullets are preserved. Major divisions and subdivisions * * of the text, such as Chapters, Sections, and Appendixes, are * * identified by double and single lines. The numbers on the right end * * of these lines indicate the position of each of the subsections in the * * document outline. These numbers do NOT correspond with the page * * numbers of the printed product. * * * * No attempt has been made to display graphic images, although figure * * captions are reproduced. Tables are included, but may not resemble * * those in the printed version. * * * * A printed copy of this report may be obtained from the GAO Document * * Distribution Facility by calling (202) 512-6000, by faxing your * * request to (301) 258-4066, or by writing to P.O. Box 6015, * * Gaithersburg, MD 20884-6015. We are unable to accept electronic orders * * for printed documents at this time. * ************************************************************************** Cover ================================================================ COVER Report to Congressional Requesters November 1994 ELECTRONIC WARFARE - MOST AIR FORCE ALQ-135 JAMMERS PROCURED WITHOUT OPERATIONAL TESTING GAO/NSIAD-95-47 Electronic Warfare Abbreviations =============================================================== ABBREV DOD - Department of Defense http://www.fas.org/man/gao/gao9547.htm (2 of 10) [1/9/2001 12:33:49 PM]

Letter =============================================================== LETTER B-257415.2 November 22, 1994 The Honorable William V. Roth, Jr. Ranking Minority Member The Honorable David Pryor Committee on Governmental Affairs United States Senate As requested, we examined the Air Force's $2 billion program to acquire an upgraded version of the ALQ-135 jammer. The purpose of the jammer is to protect F-15 aircraft against threat weapons by transmitting electronic signals to interfere with radars used to control threat missiles and guns. This unclassified version of a classified report being provided to you focuses on whether the Department of Defense (DOD) and the Air Force took the necessary measures to ensure that the program had demonstrated acceptable performance before the jammers were produced and deployed. BACKGROUND ------------------------------------------------------------ Letter :1 The upgraded ALQ-135 is a two-band system, designated as Bands 1.5 and 3, for use on newer models of the F-15 (see fig. 1). The designations refer to two portions of the radar frequency band covered. The older F-15C aircraft is being equipped with only the Band 3 because the original ALQ-135, which is already installed, covers the frequency band of the Band 1.5. Band 3, therefore, will provide extended frequency coverage for the F-15C. The newer F-15E, which does not have the original ALQ-135, is supposed to be equipped with Band 1.5, as well as Band 3. Figure 1: <EC> ALQ-135 Jammer and F-15 Aircraft (See figure in printed edition.) We reported in 1990\1 that the Air Force had started production of several jammers, including the upgraded ALQ-135, without adequately testing their performance capability. We noted that the upgraded http://www.fas.org/man/gao/gao9547.htm (3 of 10) [1/9/2001 12:33:49 PM]

ALQ-135 units that had been produced were in storage because of software design problems. We recommended at that time that the Secretary of Defense prohibit the award of further production contracts until operational testing provided reasonable assurance that the jammers would meet performance requirements. We also recommended that the Secretary require that adequate internal controls be established over Air Force jammer programs to ensure that the jammers were satisfactorily tested and demonstrated acceptable performance before producing and deploying them. DOD disagreed that satisfactory performance during operational testing should be required before further production contract awards but stated that these jammers would not be allowed to proceed to full-rate production without an assessment of their operational performance. Subsequently, in the National Defense Authorization Act for Fiscal Year 1991, Congress directed that the ALQ-135 production rate not exceed minimum essential levels until the system underwent "thorough and effective" operational testing and was determined to meet or exceed all operational criteria. DOD also disagreed that additional internal controls were needed, stating that adequate internal controls were in place to ensure that systems demonstrated acceptable operational performance before full-rate production. However, of the total planned quantity of 514, the Air Force has already procured 391 and will have procured 451, or 88 percent of the total quantity, before operational testing starts. -------------------- \1 Electronic Warfare: Need to Strengthen Controls Over Air Force Jammer Programs (GAO/NSIAD-90-168, July 1, 1990). RESULTS IN BRIEF ------------------------------------------------------------ Letter :2 The Air Force has continued procurement of the ALQ-135 Band 3 despite its deficient performance, resulting in the premature deployment of systems with limited capability to protect the F-15. While developmental testing showed the Band 3 to have serious performance flaws, the Air Force has already procured most of its total program quantity without demonstrating acceptable operational performance. These performance problems are compounded by other deficiencies that are discussed in our classified report. Moreover, the Air Force has deferred further production of the Band 1.5. Information on the impact of this deferral on the F-15E's survivability has been classified by DOD. http://www.fas.org/man/gao/gao9547.htm (4 of 10) [1/9/2001 12:33:49 PM]

Acquiring nearly all the Band 3s before adequate operational testing is inconsistent with DOD policy and the rationale for the requirements in the National Defense Authorization Act for Fiscal Year 1991. Furthermore, the Conference Report on the National Defense Authorization Act for Fiscal Years 1990-91 states that the conferees did not intend to condone a continued reapproval of low-rate initial production quantities that eventually might total a significant percentage of the total planned requirement. The poor condition of the ALQ-135 program now is a direct result of DOD's disregard of congressional expectations, its own written policy, and our recommendations. BAND 3 INEFFECTIVE AGAINST SOME THREATS ------------------------------------------------------------ Letter :3 Developmental testing conducted after the Band 3 entered production has shown that the system has serious performance problems. New, but preliminary, test results compiled after the draft of this report was prepared indicate some improvement in performance; however, significant problems persist. The details of these matters are classified. MOST BAND 3 SYSTEMS PROCURED IN LOW-RATE PRODUCTION ------------------------------------------------------------ Letter :4 DOD policy governing low-rate production, as stated in DOD Instruction 5000.2, is intended to limit the acquisition of large quantities of systems until satisfactory operational testing is accomplished. Nevertheless, DOD has allowed the Air Force to procure most of its Band 3 systems without conducting any operational testing. In doing so, the Air Force has acted within the letter of the National Defense Authorization Act for Fiscal Year 1991, but not its spirit or the rationale for its requirements, and contrary to congressional expectations found in the Conference Report on the National Defense Authorization Act for Fiscal Years 1990-91. The Fiscal Year 1991 Act limited ALQ-135 production to a rate sufficient to sustain existing production capabilities at minimum essential levels until thorough and effective operational testing had been conducted and successfully completed. Previously, in the Fiscal Year 1990-91 Conference Report, which supported revised restrictions on the uses of low-rate production, the conferees stated that they did not intend to condone repetitive low-rate production quantities that eventually total a significant percentage of the total planned http://www.fas.org/man/gao/gao9547.htm (5 of 10) [1/9/2001 12:33:49 PM]

procurement of a system. Despite this, the Air Force did not conduct operational testing as expected under the 1991 legislation, but continued to approve repetitive low-rate production. By the time operational testing is scheduled to start, practically all the Band 3 systems will have already been procured. The Air Force started production of the Band 3 in 1986 while the system was in early development. Subsequently, because of the magnitude of the problems detected in developmental testing, the Air Force deferred the scheduled operational testing to mid-1995. Nevertheless, the Air Force continued production of the Band 3 and started deploying the systems to operational forces in 1990. MUCH OF POTENTIAL BENEFIT OF BAND 3 OPERATIONAL TESTING HAS BEEN LOST ------------------------------------------------------------ Letter :5 DOD's policy, DOD Instruction 5000.2, emphasizes the need for timely testing to reduce risks and to estimate system operational effectiveness and suitability.\2 The policy provides that operational test results are an important consideration in making key decisions to proceed with the acquisition of systems. The DOD policy further indicates that operational test results not only indicate how well a system will work, but can also identify ineffective and unreliable systems before they are produced. However, because the Air Force will have procured most of the planned systems, the operational testing planned to start in mid-1995 will do little to reduce risk. Much of the potential benefit of operational testing has already been lost. The Air Force still needs to conduct some operational testing to determine whether the system will function effectively in a realistic operational environment. However, other aspects of the system's performance, such as its reliability, maintainability, and logistical supportability, can be assessed at the operational units to which the system has been deployed. Curtailment of planned operational testing of the ALQ-135 Band 3 could reduce test cost, currently estimated at about $5.8 million. -------------------- \2 Operational effectiveness refers to the ability of a system to accomplish its mission in the planned operational environment. Operational suitability is the degree to which a system can be placed satisfactorily in field use considering such factors as reliability and maintainability. http://www.fas.org/man/gao/gao9547.htm (6 of 10) [1/9/2001 12:33:49 PM]

BAND 1.5 DEFERRAL LEAVES AIRCRAFT VULNERABLE ------------------------------------------------------------ Letter :6 After an initial procurement of eight units, the Air Force decided in 1988 to defer further procurement of the Band 1.5 because of the problems encountered on the Band 3 program. The Air Force planned to focus on completing development of the Band 3 and then provide the Band 1.5 later. However, solving the Band 3's problems is taking much longer than expected, and the Band 1.5 is still in a deferred status. Information on the impact of this deferral on the F-15E's survivability has been classified by DOD. According to Air Force officials, the Band 1.5 is a high priority, but currently an unfunded requirement. The Air Force estimates that completing development of the Band 1.5 would cost $43 million and production of the required 184 units would require another $382.6 million. The Air Force has jammer pods available that provide protection in the frequencies covered by the Band 1.5. These pods can be used by other tactical aircraft, such as the F-16. However, despite the problems with the Band 3 and the expected cost of acquiring the Band 1.5, the Air Force does not plan to use any other jammer alternatives, such as the ALQ-131 pod jammer, for protecting the F-15E aircraft. The Air Force considers the Band 1.5 the only viable option to provide the F-15E full jammer coverage. RECOMMENDATIONS ------------------------------------------------------------ Letter :7 We affirm our previous recommendation that the Secretary of Defense establish adequate internal controls over all Air Force electronic warfare programs to ensure that systems are satisfactorily tested and demonstrate acceptable performance before producing and deploying them. In particular, we recommend that if the ALQ-135 Band 1.5 program is to proceed, the Secretary prohibit any further procurement of the Band 1.5 until the Air Force demonstrates satisfactory performance of the system during operational testing using the eight units it already has procured. We also recommend that the Secretary require a cost-effectiveness analysis to determine the best approach to provide jammer protection for the F-15E. If the best approach is determined to be other than the upgraded ALQ-135, to include the Band 1.5, the Secretary should http://www.fas.org/man/gao/gao9547.htm (7 of 10) [1/9/2001 12:33:49 PM]

stop currently planned procurement of Band 3 systems for F-15Cs and use existing F-15E Band 3 systems to meet the F-15C requirements. Finally, we recommend that the Secretary limit planned operational testing of the ALQ-135 Band 3 to effectiveness issues only, since most of the systems have already been procured. Data needed to evaluate the system's operational suitability characteristics, such as reliability and maintainability, can be obtained during exercises by the tactical units to which it has been deployed. AGENCY COMMENTS ------------------------------------------------------------ Letter :8 DOD concurred or partially concurred with most of the findings and recommendations in this report. In particular, DOD indicated that electronic warfare programs should be properly tested before initiating production, but acknowledged that the Air Force had procured the majority of the ALQ-135 systems without performing an operational evaluation. With regard to repetitive low-rate production approvals that lead to the acquisition of a large percentage of the total planned procurement, DOD said that the Office of the Secretary of Defense was undertaking a review to determine what steps might be taken to establish adequate controls to ensure that systems demonstrate acceptable performance before they are produced and deployed. DOD disagreed with our recommendation for a cost-effectiveness analysis to determine the best approach to provide jammer protection for the F-15E. DOD maintained that the Band 1.5 is not a new program requiring such an analysis. However, the fact that the Band 1.5 has been an unfunded requirement for several years prompts the question of whether the Air Force really considers the Band 1.5 to be high priority for the F-15E. Because of this and the substantial cost remaining to be incurred for the Band 1.5, we continue to believe that a cost-effectiveness analysis should be done to examine other alternatives for adequately protecting the F-15E. DOD's detailed comments and our evaluation of them are classified and, thus, are not included in this version of the report. SCOPE AND METHODOLOGY ------------------------------------------------------------ Letter :9 We performed our work at the Air Force's F-15 System Program Office, Wright-Patterson Air Force Base, Ohio; Directorate of Electronic http://www.fas.org/man/gao/gao9547.htm (8 of 10) [1/9/2001 12:33:49 PM]

Combat, and Directorate of Operational Test & Evaluation, Office of the Secretary of Defense, Washington, D.C.; Headquarters, U.S. Air Force, Washington, D.C.; Air Combat Command, Langley Air Force Base, Virginia; Air Warfare Center and Development Test Center, Eglin Air Force Base, Florida; Warner Robins Air Logistics Center, Robins Air Force Base, Georgia; and Northrop Electronic Systems Division, Rolling Meadows, Illinois. In evaluating ALQ-135 performance, we reviewed developmental test results to date. We also discussed the test results and potential performance issues, including those relating to deferral of the Band 1.5, with Air Force representatives responsible for acquiring, testing, using, and logistically supporting the ALQ-135 and DOD officials responsible for oversight of electronic warfare systems acquisition. Our review was performed from March 1993 through August 1994 in accordance with generally accepted government auditing standards. ---------------------------------------------------------- Letter :9.1 As arranged with your office, unless you announce the report's contents earlier, we plan no further distribution until 30 days after its issue date. At that time, we will send copies to appropriate congressional committees; the Secretaries of Defense and the Air Force; the Chairman of the Joint Chiefs of Staff; and the Director of the Office of Management and Budget. Please contact me at (202) 512-4841 if you or your staff have any questions concerning this report. Major contributors to this report are listed in appendix I. Louis J. Rodrigues Director, Systems Development and Production Issues MAJOR CONTRIBUTORS TO THIS REPORT =========================================================== Appendix I NATIONAL SECURITY AND INTERNATIONAL AFFAIRS DIVISION, WASHINGTON, D.C. --------------------------------------------------------- Appendix I:1 Charles A. Ward http://www.fas.org/man/gao/gao9547.htm (9 of 10) [1/9/2001 12:33:49 PM]

ATLANTA REGIONAL OFFICE --------------------------------------------------------- Appendix I:2 Jackie B. Guin CINCINNATI REGIONAL OFFICE --------------------------------------------------------- Appendix I:3 Terrell L. Bishop John M. Murphy, Jr. Terry R. Parker http://www.fas.org/man/gao/gao9547.htm (10 of 10) [1/9/2001 12:33:49 PM]