PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD

Similar documents
E X P E R I E N C E A N D E X P E R T I S E. Details Of Major Completed Projects

Organiser Activity Date Start Time End Time Venue. Aljunied GRC KB Family Carnival 8-Jul-18 9:00 AM 1:00 PM Neighbourhood Park

List Of Projects Completed

American Home Assurance Company, Singapore Branch List of Approved Reporting Centres AHA 24-HOURS HOTLINE :

Stay in the pink of health with these established healthcare providers

Nos. Project & Work Scope Client

ISOTEAM LTD. HY2016 RESULTS FEBRUARY 2016

Employment Agency on the Advanced Placement Scheme? Contact Number(s) SN Employment Agency. Address

Customer Name Address 1 Address 2 Postal Code Area 133 NEW BRIDGE ROAD #02-30 CHINATOWN POINT C (SENGKANG) 10 SENGKANG

AIG Asia Pacific Insurance Pte. Ltd. List of Approved Reporting Centres

COMPANY PROFILE INTRODUCTION:

JRP & ASSOCIATES PTE LTD

FairPrice Share-A-Textbook Frequently Asked Questions (FAQ)

Commendation Winners

AXA Premium Workshops

AIG ASIA PACIFIC INSURANCE PTE. LTD. List of Approved Reporting Centres AIG 24-HOURS HOTLINE :

JTC AWARDS TENDER FOR THE DEVELOPMENT OF AN INTEGRATED BUSINESS PARK DEVELOPMENT WITH RETAIL AND HOTEL ELEMENTS AT CHANGI BUSINESS PARK

COMMUNITY CASE MANAGEMENT SERVICE

Last update: 19/02/2018 Agent Name Address Contact No AIR SINO-EURO ASSOCIATES TRAVEL PTE LTD. 1 Park Road #03-43/57 People's Park Complex

Our Ref : BCA BC Sep See Distribution. Dear Sir/Madam IMPLEMENTATION OF EUROCODES IN SINGAPORE

Proposed Acquisition of Bukit Batok Connection. 14 June 2016

KOYO COMPANY PROFILE

The Proposed Acquisition of Bukit Batok Connection and Entry into the Master Lease Agreement

45 COMMUNITY PSYCHIATRY Chiam Peak Chiang

D e s i g n A f f a i r. Company Profile. 53 S e r a n g o o n N o r t h A v e n u e 4 # S i n g a p o r e,

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

REVIEW BIM to Improve Productivity BUSINESS. Welcome to ECAS 2016 Business Review!

YS CONSTRUCTION SERVICES PTE LTD COMPANY PROFILE. Building Construction

Citibank Flexible Payment Plan. Search by Name. Please click on the menu button to access the table of contents.

Last update: 06/09/17 Agent Name Address Contact number 3 Tampines Central 1 TRADEWINDS TOURS & TRAVEL PRIVATE LIMITED #02-04 Abacus Plaza

S/N REGION AREA CLINIC NAME ADDRESS POSTAL CODE TEL NO. FAX NO MON - FRI SAT SUN PUBLIC HOLIDAY REMARKS PPC FULLERTON GETHIN JONES

Annexe A CRN: Z. Direction of travel. Last train departure time. /Southbound

Citibank Flexible Payment Plan. Search by Categories. Please click on the menu button to access the table of contents.

Company Address Tell

Loyola University Chicago ~ Archives and Special Collections

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

The National Kidney Foundation. Annual Report. 1 July 2010 ~ 30 June 2011

South and CBD No. Clinic Doctor Address Opening Hours Tel No. Fax No. Remarks

Version 21 November 2017 Page 1

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

Advanced Queue System for Polyclinics Singapore s Healthcare

SETSCO Services Pte Ltd

Crawfordville, Georgia Timeline

National Trends Winter 2016

5-Day Course for Appointed Person Lifting Operations 5 th Run

Compliance Division Staff Report

Asia Pacific International Mice and Travel Centre Pte Ltd 1 Ms 77 High Street #05-15 High Street Plaza Singapore

OPTIMUM/12/2016 CORPORATE RATE PROGRAMME O PTIMUM. BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES. by langham

Asia Key Economic and Financial Indicators 16-May-17

UNIVERSITY OF DAYTON DAYTON OH ACADEMIC CALENDAR FALL Incoming First Year students move into UD Housing

SCAL Safety Initiatives

Greatearth Uniting every strength Transforming skylines and landscapes in Asia Engineering a greater future

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results

S/N REGION AREA CLINIC NAME ADDRESS POSTAL CODE DOCTORS TEL NO. FAX NO MON - FRI SAT SUN PUBLIC HOLIDAY REMARKS PPC

PROPINSIGHT A Detailed Property Analysis Report

ISOTeam achieves modest revenue growth in HY2017; order book at a record S$107.1 million

8:30AM-1:00PM 2:00PM-6:00PM DR R KANNAN DR JULIAN PNG DR CHUAH JITT TENG DR LEE JIN HWA

Asia Key Economic and Financial Indicators 13-Sep-16

The Toyota Foundation 2018 International Grant Program Application Form

Case Study BACKGROUND. Recovering Ambulance Linen. Larry J Haddad, CLLM Textile Management Consultant. Midwest Region

NEWS RELEASE. Page 1 of 5

EDITORIAL MISSION MOBILE APP PRINT DIGITAL SOCIAL MEDIA. Scan here to TradeCards Global website. Available on Google Play & the App Store

Outreach for Core Project

Media Kit Impulse The Magazine for the German-speaking Community in Singapore German Association Deutsches Haus

Benchmark. Middle East hotel benchmark survey report

Friday, June 21, 13. Building better communities through the arts

Various activities were organized this year, which include boat trip, golf day, technical visit to KMB Kowloon Bay Depot, professional seminars and ex

Quality Management Report 2017 Q2

Guide to WSH (MHI) Regulations

* Passenger includes electronic and hydraulic elevators ** Pieces of equipment designated as 'unknown' do not receive a certificate of operation

Egypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014

Westport High Proposal Presentation

Employment & Unemployment

Employment & Unemployment

Year : 2010 / Ongoing

Water Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program. City of Dallas Water Utilities February 13, 2012

Consortium of Singapore Press Holdings and Kajima Development Pte Ltd awarded Bidadari site

SAFRA SWIM FOR HOPE DRAWS RECORD NUMBER OF PARTICIPANTS TO RAISE FUNDS FOR CHARITY

Patient Experience: Good to Great!

Change Management at Orbost Regional Health

Approaches to reducing DNA and CNA

There being a quorum, the meeting was called to order at 7.35pm. MA welcomed the elected council members.

Employment & Unemployment

Year. Figure 5.2

CAREGIVER BASICS 101 A RESOURCE GUIDE FOR NEW CAREGIVERS

LESS RESTRAINT LESS FALL PROJECT IN KH

BRANCH OFFICES BOTSWANA

List of Assessors for bizsafe Exemplary Award 2018

Big Data & Effective Utility Programs

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

Mosque Key Staff Meeting 27 Nov 2008, Thursday. Pre-Employment Screenings: Medical Security

SHATEC INSTITUTES YOUNG CHEFS AND ALUMNI WIN COVETED AWARDS AT THE PRESTIGIOUS FHA2010 CULINARY CHALLENGE

Kentucky Sepsis Summit. August 2016

EMBASSY OF THE PHILIPPINES, SINGAPORE LIST OF ACCREDITED EMPLOYMENT AGENCIES. Updated as of 16 August 2017

Workflow. Optimisation. hereweare.org.uk. hereweare.org.uk

1136 Dupont Street - Zoning Amendment Application - Preliminary Report

Design for Safety for Professionals (DfSP) 25 th run (Two Day DfSP Certifiable Course)

OKP Holdings Limited posts net profit of S$3.5 million on revenue of S$33.9 million for the first quarter ended 31 March 2010

Change - Announcement of Appointment::APPOINTMENT OF INDEPENDENT NON-EXECUTIVE DIRECTOR SUNTEC REAL ESTATE INV TRUST - SG1Q T82U

Transcription:

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD PROJECT Consultant Main Contractor CONTRACT VALUE (S$) CONSTRUCTION PERIOD 6 Storey Multi- User warehouse development at Lot 99821T, MK 27 at 27 Harrison Road SCE Consultant KH Builder <500K Jun 2006 - Nov 2006 5 Storey Single User Warehouse development comprising coldrooms & warehouse and ancillary office at Lot 606 PT, MK 6 at Fishery Port Road Aston Consuling Engineers Jian Huang Construction 500K to 1M Aug 2006 - Mar 2007 New extention of a 14 storey hotel at Lot Mount Elizabeth Road 544PT at Meinhardt China Construction <500K Aug 2006 - Mar 2007 8 Storey Single-User warehouse with showroom and ancillary office at Lot 2731, MK 17 at Lorong 4 Toa Payoh YF Chan WY Steel Construction <500k Jan 2007 - Sep 2007 New Artshow Exhibition Centre at Lot 4104V, MK13 at Changi North MM Engineering Eng Lim Construction <500K Mar 2007 - Jun 2007 4 Storey Light Industrial Multi- User factory Development at LOT 06130P, MK23 at Ubi View HCE Engineers Jian Huang Construction 500k to 1M Apr 2007 - Dec 2007 4 Storey Factory Complex with 2 storey Warehouse at Lot 1463T, MK 07 at 3A Joo Koon Circle AY Consultant Mei Zhou Constructon <500k May 2007 - Aug 2007 7 Storey Single User Industrial building with 3 level of carpark at Lot 05919, MK13 at Tai Seng Link Chong & Lee Shimizhu Corporation <500k Jul 2007 - Nov 2007 A&A to Greenridge Secondary School at Bukit Panjang Ring Road SCE Consultant Wellteck Construction <500k Sep 2007 - Jan 2008 A&A to existing Mosque at Lot 6600, MK27 at Parade Road 451 Marine Keon Engineering Advance Construction <500k Oct 2007 - Dec 2007 A&A to Bedok South Secondary School at Lot 10388W, MK27 at 1 Jalan Langgar Bedok DE Conultants Master Contract <500K Mar 2008 - Jun 2008 4 Storey Light Industrial Single- User Industrial Development at Lot 2557C, MK 31 at 3 Loyang Way ECAS -EJ KH Builder <500K Mar 2008 - Aug 2008

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD 2 Storey Industrial Building at Lot 01738T, MK31 at 32 Loyang Way AY Consultant Erecon Construction 500k to 1M Jun 2008 - Sep 2008 6/7 Storey business park development with 1 basement carpark at Lot 02807P, Mk 03 at 77 science Park Drive P&T Consultants Eng Lim Construction <500k Aug 2008 - Feb 2009 43 Storey residential with commercial at 1st storey at Lot 256 TS 2 at 15 Mccallum Street KTP Consultants China Construction <500K Nov 2008 - Feb 2010 11 Storey Apartment block with 2 basement carparks at Lot 697 TS 24 at No. 20 Paterson Road KC Siew Engineering Consultants Green Aces <500K Jan 2009 - Sep 2009 3 Storey Ramp-up multi -user industrial development at LOT 3388M, MK7 at Tuas Avenue 11 TC Sin & Associates Soil Build 1M to 1.5M Jan 2009 -Nov 2009 7 Storey business park development at Lot 04122N, MK 03 at Science Park Road HCE Engineers Eng Lim Construction 1M to 1.5M Mar 2009 - Aug 2009 A&A existingnaval Base Secondary School 01187P, MK 19 at Yishun Ring Road at Lot R&K Chiu Teng Construction <500K Apr 2009 - Oct 2009 2-Sty Dwelling House at Lot 01944A TS 24 at Chatsworth Rd 12D SA&P Associates Authentic Builder <500K Apr 2009 - May 2009 1 Block 3/4 storey building, 1 Block of 2 storey building and 8 blocks of single storey building at Lot 01622M, MK12 at Sungei Gedong Road E2000 Prelim Construction <500k Jun 2009 - Nov 2009 34/43 Storey Bulding with 3 storey commercial podium and 25/34 Storey residential flats at Lot 966 TS 27 at Scotts Road KTP Consultants Shimizu Corporation < 500K Sep 2009 - Nov 2010 A&A to Kendal Building at Lot 041122N, Science Park Road MK03 at EPM Consultants OAS Engr < 500K Jan 2010 - Jun 2010 17 Storey Residential Flat Building with basement carpark at Lot 5313, MK 17 at Woodleigh close E 2000 Eng Lim Construction <500k Feb 2010 - Mar 2010

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD 7 Storey Multi -User light Industrial Factory Development at Lot 03441X at Arumugam Rd BC Koh & Partners Boustead <500K Feb 2010 - Jun 2010 4 Storey block of Corporate Office at Lot 12947P, MK18 at Raffles Institute Lane Aston Consulting Engineers Tang Engineering <500K Jun 2010 - Aug 2010 4 Storey Factoty with ancillary office at Lot 01910L, MK 31 at 53 Loyang Drive T&T Engr consultants G Engineering <500K Ju1 2010 - Aug 2010 Experimental Power Grid Centre at Lot 1046M, MK 34 at Pesek Road CWM Consulting Engineers Erecon Construction <500k Dec 2010 - Apr 2011 2 Storey Single User Cold Room with mezzaine at Lot 1687T, MK6 at 12 Fishery Port Road Aston Consulting Engineers Jing Hong Construction <500K Mar 2011 - Aug 2011 4 Storey Industrial Building at Lot 501M, MK11 at 4 Sungei Kadut St 2 AY Consultant Budder Pride <500k Apr 2011- Jun 2011 6 Storey Single User Clean & Light Industrial Building at Lot 02142P at 38 Alexandra Terrace BC Koh & Partners Boustead Projects <500k Jun 2011 - Jul 2011 3 Storey Single User Industrial development at Seletar Aerospace Heights BC Koh & Partners Boustead Projects <500k Jun 2011 - Jul 2011 4 Storey detached factory buiding at Lot 02608V, MK13 at 30 Senoko South Rd Aston Consulting Engineers Jing Hong Construction <500k Nov 2011 - Feb 2012 Single User Industrial Development comprising 4 blocks of single storey workshop and 1 block of 4 storeyworkshop ancillary office at Lot 02938P, MK06 at Jurong Port Road SC W oh Consulting Engineers Erecon Construction <500k Feb 2012 - Apr 2012 2 Storey single User general Industrial development at Lots 03851W, MK 07 at Pioneer Rd/ Tuas West Avenue BC Koh & Partners Boustead Projects <500k Mar 2012 - Apr 2012 6 Storey Multi-User LightIndustrial Development with substaion at Lot 03106k, MK 24 MK 24 at Lorong 23 Geylang LSW Consulting Engineers CKR Contract Services <500k Mar 2012 - Sep 2012 Proposed Erection Of A 9-Storeys Multiple-User Clean And Light Industrial Development With Mezzanine Floor At 1St Storey Comprising 380 Flatted Factory Units And Ancillary Staff Canteen On Lot 05890W Mk13 At Woodlands Close, Woodlands Drive 64, And Woodlands Avenue 12 (Woodlands Planning Area) CGM Engineering Consultants OKH Holdings Pte Ltd <500k July 2012-May 2014

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD 10 Storey Multi-User lightindustry building Comprising of warehouse with mezzanine floor on 1st storey (1 unit ) and factory (18 units) at Lot 00446L, MK 24 at 124 Lorong 23 Geylang LSW Consulting Engineers KH Builder <500k Aug 2012 - Sep 2012 26 Storey Commercial Bulding comprising of 20 Storey offices, 5 storey with 1 basement retail and 2 basement carpark at Lot 08630V, MK 5 at Boon Lay Way RSP Engineers Shimizu Corporation <1.0M Aug 2012 - Apr 2013 4 Storey detached factory building to existing 1 Storey and 2 Storey detached factory at Lot 1701A, MK 13 at 17 Senoko Crescent Aston Consulting Engineers Jing Hong construction <500k Aug 2012 - Oct 2012 9 Storey Multi - User clean and light industrial development with mezzanine floor at 1st Storey comprising 380 flatted factory units and ancillary staff canteen at Lot 05890W, MK 13 at Woodlands Avenue 12 CGM Engineering Consultants OKH Construcyion Above 1.5M Nov 2012 - Nov 2013 4 Storey Single User Warehouse Development with ancillary office at Lot 04180N, MK07 at Tuas Bay Drive Aston Consulting Engineers CCM Indurial Above 1.5M Nov 2012- May 2013 Proposed Erection Of 9-Storey Multi-User Industrial Development (Light Industry) On Lot 01885V Mk01 At 201 Henderson Road (Bukit Merah Planning Area) Lsw Consulting Engineers BuildTech Construction Pte Ltd <1.0M Oct 2012-2015 PROPOSED ERECTION OF PART 2/PART 9-STOREY INDUSTRIAL BUILDING ON LOTS 00679W, 01824X & 04181N MK06 AT 24 & 24A CHIA PING ROAD. A Y Consultants Etong Construction Pte Ltd <500k June 2013-Jan 2014 Proposed Alteration & Addition And Erection Of 2 Extension Blocks Of 6/8 Storey Teaching Facilities With A Basement Indoor Multi-Purpose Hall And Auditorium, Swimming Pool And Carparks To The Existing 6-Storey Block D Of Stamford American International School On Lots 10185W Mk 17 At Upper Serangoon Road (Toa Payoh Dgp) Ckm Consultants Pte Ltd KH Builders Pte Ltd <500k Jun 2013 - Dec 2013 ndustrial Development With 1 Level Basement Carpark On Lot CGM Engineering Consultants BHD Construction Pte Ltd <500k Feb 2014 - Nov 2014 Proposed Erection Of Asphalt Plant, Aggregate Bunker, Single Storey Workshop And 4-Storey General Industrial Building On Lot 00297W (Plot A2126 & A2126A) Mk11 At 3 Sungei Kadut Drive) A Y Consultants YGD Construction Pte Ltd <500k Jan 2014 - May 2014 Proposed Amendment To Approved A0659-00225-2012- St04 For Proposed Erection Of A Block Of 7-Storey Multiple User Light Industrial Building (Total 87 Units) With Covered Carparks, Rooftop Swimming Pool, Function Room, Gym, Tennis Court And Communal Facilities On Lot 10505C Mk 24 At Aljunied Road For M/S Fragrance Biz Space Pte Ltd. (Geylang Planning Area) Js Tan & Associates BuildTech Construction Pte Ltd <1.0M May 2013 - Nov 2014

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD Proposed Additions & Alterations To Existing 2-Storey Single-User Factory Building Involving Additional Cold Room At 1St Storey, 2Nd To 4Th Storey Factory With Ancillary Office On Lot 01960N Mk06 At 7A Chin Bee Drive ( Jurong West Planning Area) Aston Consulting Engineers Jing Hong Engineering Construction PTE LTD <500k Aug 2013 - May 2014 Proposed Erection Of Single-Use General Industrial Development Comprising A Block 5-Storey Factory Building And A Block 6-Storey Factory With Temporary Ancillary Workers' Dormitory(For 468 Workers) On Lot 04155W Mk06 At 17 Soon Lee Road (Jurong West Planning Area) Aston Consulting Engineers LA Building Engineering Pte Ltd <500k Mar 2014 - Nov 2014 Proposed A&A To Existing Single Storey/2-Storey Industrial Buildings Involving Erection Of 4-Storey Industiral Building, Underground Tanks & Substation On Lot 07847W, Plot A 0296500, Mk05 At 2 Tanjong Penjuru A Y Consultants Qing Feng Construction Pte Ltd <500k Dec 2013 - Oct 2014 Proposed Additions & Alterations (Including 2Nd Sty Extension) To Existing Part Single / Part 3-Storey Factory Development (Blk 3) On Lot 4086A Mk 7 At 9 Gul Road WRX Engineers Pte.Ltd. KH Builders Pte Ltd <500k Sep 2013 - Oct 2014 Proposed Erection Of Part 2/Part 9-Storey Industrial Building On Lots 00679W, 01824X & 04181N Mk06 At 24 & 24A Chia Ping Road. A Y Consultants Poplar Construction Pte Ltd <500k Nov 2014-2015 Proposed Erection Of A Part 1-Storey / Part 3-Storey Single- User Industrial Development (Business 2) On Lot 3934L Pt Mk 07 At Tuas South Avenue 2 YH Liew Consulting Engineers Boustead Projects Pte Ltd <500k Nov 2014 - Dec 2015 Proposed Erection Of A Single-User General Industrial Factory With Ancillary Office And Temporary Ancillary Workers Dormitory (For 21 Persons) On Lot 04670N Mk 07 At Tuas South Street 6 Aston Consulting Engineers H P Construction & Engineering Pte Ltd <500k Sep 2014-2015 Proposed Erection Of 5-Storey Warehouse Development On Lot 03403M, Mk5 At 53 Penjuru Road. (Jurong East Planning Area) A Y Consultants Beijing Construction Engineering Group Co.Ltd. Above 2.0M Sep 2014-2015 Proposed New Extension And Addition & Alteration to Existing Factory On LOT 03860A MK 05 Singapore 609029( Jurong East Planning Area) SYT Consultant Qing Feng Construction Pte Ltd <500K May 2015-2015 79 Joo Koon -Proposed Additions & Alterations Of A New 4- Storey To Existing 3-Storey Factory And New Extension of 4- Storey Factory Aston Consultant Malayan Daching Company Pte Ltd <500K May 2015-2015 PROPOSED PART 2/PART 4 INDUSTRIAL BUILDING ON LOT 00473V MK 07 AT 5 JOO KOON ROAD SINGAPORE 628969 (PIONEER PLANNING AREA) A Y Consultants YGD Construction Pte Ltd <500k NOV 2015 - FEB 2016 PROPOSED ERECTION OF A NEW 10-STOREY SINGLE USER INDUSTRIAL BUILDING WITH EXISTING JTC TYPE D6 FACTORY ON LOT 01797W MK 31 AT 50 LOYANG WAY WRX Engineers Pte.Ltd. KH Builders Pte Ltd <500k JUN 2015 - FEB 2016

PROJECTS COMPLETED IN SINGAPORE BY EFORCE ENGINEERING PTE LTD Proposed Additions & Alterations To Existing CONCORD Primary School with Erection of 6 storey class room Block and Indoor Sports Hall at No 4 Choa Chu Kang Ave 4. R J CROCKER Consultants QBH PTE LTD <500k Aug 2015 - Mar 2016 PROPOSED ERECTION OF A NEW 2 STOREY SINGLE USER WAREHOUSE BUILDING ON LOT 0462A MK 07 (PLOT A22274) AT 35 JOO KOON ROAD (PIONEER PLANNING AREA) Js Tan & Associates Lai Yew Seng Pte Ltd <500k MAR 2016 - MAY 2016 PROPOSED NEW ERECTION OF A 2-STOREY DETACHED DWELLING HOUSE WITH BASEMENT, AN ATTIC AND A SWIMMING POOL ON LOT 94511N, MK 26 AT 32 SIGLAP PLAIN, SINGAPORE 456021 (BEDOK PLANNING AREA) GNG CONSULTANTS PTE LTD V-TECK CONSTRUCTION PTE LTD <500k FEB 2016 -APR 2016 PROPOSED ERECTION OF A 3 STOREY CHURCH WITH A BASEMENT CARPARK ON LOT 99453C MK 10 AT 12 GALISTAN AVENUE (BUKIT BATOK PLANNING AREA) Span consultants JTA CONSTRUCTION PTE LTD <500k APR 2016 -JUN 2016

Project : Smouha Dream - Egypt CLI ENT LOCATI ON :Mr,ALIDHAB :ALEXANDRI AEGYPT CONTRACTOR :EFORCEENGI NEERI NG AREA :20, 000M2 SCOPE :POSTTENSI ONI NGWORKS

Project : Dar Al Hamd Building, 2B+G+11- Egypt Client Location Area Scope : Sami El Hussini : Mansoura, Egypt :14,400 M Square : Post Tension Works

Project : Building 713, Louran, Egypt Client : Heights realstates investments Location : Alexandria, Egypt Area : 15300 M Square Scope : Post Tensioning Works

Project: Qamarayt El Shatby - Egypt Client Location Area SCOPE : Saber Abo Zaid : Alexandria, Egypt : 6000 M Square : POSTTENSIONINGWORKS

Project : Al Takwa Tower, Egypt Client Location Area Scope : Al Takwa Co : Mansoura, Egypt : 8.000 M Square : Post Tension Works

Project : Titanic Hotel extensions, Egypt Client Location Area Scope : Marshal Tourist Co : Hurghada, Egypt : 2.000 M Square : Post Tension Works