Timothy E. Barker Architect / Managing Director / Partner-In-Charge, Design EDUCATION YEARS OF EXPERIENCE REGISTRATIONS/CERTIFICATIONS Bachelor of Architecture, 1986 21+ with Paradigm Registered Architect: Missouri University of Kansas 6+ with other firms (1986-1993) Graduate Studies in Philosophy, 1981-1983 Bryn Mawr College Bachelor of Arts, 1981 Boston College Summa Cum Laude, Phi Beta Kappa EXPERIENCE AND QUALIFICATIONS Tim is one of the founding partners of. He has extensive experience as a project principal, project manager, planner, project designer, programmer, writer, graphic designer, photographer, and team leader on a variety of architectural, urban planning, campus planning, medical campus planning, graphics, and interior design projects. Mr. Barker has diverse experience, as evidenced by his leading role in the following selected projects: UNIVERSITY & ACADEMIC South Brookings Offices for Dean of Faculty of Arts & Sciences, Washington University, St. Louis, Missouri (2010-2011) Olin Library Reading Room Remodeling, Washington University, St. Louis, Missouri Project Principal and Associate Designer for the programming study / verification of student competition entry for the University s central library. Women s Building / Student Financial Services Planning Study, Washington University, St. Louis, Missouri Project Principal for programming and planning study of this original campus building Sever Hall Master Planning Study, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the planning study for this original campus building Cupples II Master Planning Study, Washington University, St. Louis, Missouri (2009) McMillan Hall Remodeling, Washington University, St. Louis, Missouri (2004-2005)
Ridgley Hall, Romance Languages Administrative Offices, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the renovation of these departmental offices. (2004). Duncker Hall Hurst Lounge and Adjacent Areas, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the renovation of Hurst Lounge. (2004) North Brookings Hall, Student Financial Services Office, Washington University, St. Louis, Missouri Project Principal, Planner, Designer, Documents for the renovation of the University s Student Financial Services Offices. (2003) Academy Building, School of Education, Washington University, St. Louis, Missouri Project Principal and Planner for this building conversion study executed for the University s School of Education. (2003) Cupples I Room 203 Computer Lab, Washington University, St. Louis, Missouri Project Principal, Planner, Designer, Documents for the renovation of this lab for the Math Department. (2002) Busch Hall Room 10 Private Office, Washington University, St. Louis, Missouri Project Principal, Planner, Designer and Documents for the renovation of a storeroom to an office for the retired founder of the University s Women s Studies department. (2001). Psychology Building Laboratory Design, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the renovation or new construction of researcher s Lab Suites many different projects (1999-2007) South Brookings Hall Arts & Sciences Administrative Offices, Washington University, St. Louis, Missouri Project Principal, Planner, Designer, Documents for the renovation of high-profile administrative offices, including the Dean s suite. Mallinckrodt Hall Performing Arts Department Offices, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the renovation of the Performing Arts Administrative Offices (2000) Monsanto Hall Biology Department Computer Lab, Washington University, St. Louis, Missouri Project Principal, Planner, Designer, Documents for the renovation of a lobby and highly sensitive computer lab space. (2000). Stix International House, Washington University, St. Louis, Missouri Project Principal, Planner, Designer, Documents for the renovation of this historic campus building for use by the Office for International Students, (1999) Rebstock Hall Planning Study, Washington University, St. Louis, Missouri Project Principal, Planner and Designer for the utilization and space planning and renovation of this original campus building (1998) St. Charles County Community College*, Cottleville, Missouri Planner and Associate Designer for this new campus Master Plan (1988-1989) MASTER PLANNING & URBAN / CAMPUS DESIGN Dierberg Educational Foundation Living History Farm, Hermann, Missouri Project Principal; Master Planning Consultant and Designer for this combination of new and renovated / historic structures, encompassing approximately 112 acres at the east end of this historic Missouri River community. Elements include a new Creamery & Visitor s Center, renovation of historic buildings as Exhibits and Interpretive Facilities, and integration of related infrastructure (roads, utilities, etc.). (2005-Present). Gutenberg Corridor, Hermann, Missouri Project Principal; Master Planning Consultant and Architect for selected elements in the development of this downtown cultural corridor. Our involvement ranged from planning layout of new roadway, parking, and landscape development in this three-block section of Hermann s historic downtown.
Gutenberg Corridor, Hermann, Missouri, Cont d. Facing Gutenberg Street are the Hermann Hofgarten (city park and reception venue), the Lager Haus, the Tin Mill Brewery, and a new Amtrak Passenger Station, all projects planned and designed by Mr. Barker. (2005-Present). Neighborhood Markers & Graphics, Tower Grove Heights, St. Louis, Missouri Project Principal; Planner and Designer for neighborhood ornamental streetscape elements / markers & signage. (2009). Cardinal Glennon Children s Hospital Main Campus Entry Planning, St. Louis, Missouri Project Principal; Planner and Designer for new ornamental hospital campus entry. (2005). Washington University Arts & Sciences Central Campus Planning Study, Washington University, St. Louis, Missouri Project Principal; Master Planner and Designer for development of a strategic planning study of Arts & Sciences buildings on the University s west quadrangle. Study encompassed all floors of January Hall, Ridgely Hall, and Duncker Hall. (2002). Beauvais Manor Master Planning, St. Louis, Missouri Project Principal; Planner and Designer for major renovation of 188 bed skilled nursing facility. (2000-2002). Fontbonne University Arts & Sciences Campus Planning / Building Utilization Study, Fontbonne University, St. Louis, Missouri Project Principal; Master Planner and Designer for an assessment of the University s core buildings, including the East Building, Science Building and Auditorium. Planning work included programming and redesign of the Communications Disorders, Education, Special Education, Business Administration, Theater, Chemistry and Biology Departments. (1999-2000). Tiffany Neighborhood Streetscape Improvements, St. Louis, Missouri Project Principal; Planner and Designer for gates, markers, graphics, banners, landscape concept planning, street and sidewalk renovation, and integration with neighboring Hospital Master Planning. (1993-1995). Cardinal Glennon Children s Hospital Campus Master Plan,* St. Louis, Missouri. Lead Planner for medical campus master plan, including revisions to all parking; vehicular, main, secondary, tertiary and service entrances; Medical Office Building; Emergency Services; Helipad; Inpatient Room Wing, Renovated Surgery Center; remodeled Outpatient Services. (1990-1993). Moose Lake Regional Treatment Center Campus Master Plan,* Moose Lake, Minnesota Lead Planner and Designer for Psychiatric Hospital Campus Master Plan, including Site Planning; new Residential & Treatment Centers; new Plant; and associated Landscaping Concept. (1989-1991). CORPORATE Headquarters Building, Helmkamp Construction Company, East Alton, Illinois Project Principal, Planner and Designer for the renovation of a 20,000 square foot office building (2011) Corporate Headquarters, Benjamin F. Edwards & Co., Clayton, Missouri Project Principal, Planner and Designer for test-fits, site selection and ultimate renovation of a 15,000 square foot office building Commercial Lending Offices, First Bank, San Francisco, California Project Principal, Planner and Designer for the renovation of a 4,000 square foot office suite
Office & Laboratory Building Renovation and Addition, CMA Recycling Corporation Meretec Plant, East Chicago, Indiana Project Principal and Designer for renovation and addition to an existing 6,000 GSF, three-story office and laboratory building. (2008-Present) First Bank Executive Offices, Clayton, Missouri Project Principal for 8,000 square foot gut renovation (2008-2009) First Bank Data Center and Computer Services Backup Operations Center, Hermann, Missouri Project Principal for 114,000 square foot gut renovation (2006-2007) First Bank Operations Headquarters and Data Center, St. Louis, Missouri Project Principal for 125,000 square foot gut renovation (2004-2005) FINANCIAL SERVICES First Bank Branch Expansion / Remodeling, Project Principal and Designer for locations listed below (sampling of actual projects): Creve Coeur, Missouri (1998-2000); Arnold, Missouri (2000); Four Seasons Plaza (2001); Twin Oaks (2002); Ellisville, Missouri (2002); Quincy, Illinois (2002-2004); O Fallon, Illinois (2002); Lake St. Louis, Missouri (2004); Florrisant, Missouri (2004); Clayton, Missouri (2005); Newport Beach, California (2005-2008); Walnut Creek, California (2007-2008); San Francisco, California First Bank New Branch, Project Principal and Designer for locations listed below (sampling of actual projects): Farmington, Missouri (2004-2005); Vandalia, Illinois (2006); O Fallon, Illinois (2006); Webster Groves, Missouri (2007); 710 Olive Street St. Louis, Missouri (2007); Dardenne Prairie, Missouri (2007); 20 North Clark Chicago, Illinois (2007); Chinatown San Francisco, California (2007); Elmhurst, Illinois (2007); Corona, California (2007-2008); Houston, Texas (2007); Chinatown Los Angeles, California (2007); Brentwood, California (2007); Lincoln (Sacramento), California (2007); Oceanside, California (2007); San Diego, California (2007); Chester, Illinois (2008-2009); Salem, Illinois (2008-2009) Bank Prototype Planning and Design, First Bank, St. Louis, Missouri Project Principal, Lead Planner and Designer for Retail Branch Bank Prototype OTHER Hermann Amtrak Passenger Depot, Hermann, Missouri Project Principal, Planner and Designer for a new Train Station and Visitor s Center, (2009) Hermann Hofgarten, Hermann, Missouri Project Principal, Planner and Designer for this City Park, Outdoor Reception Area and Pavilions, (2005-2008) Hermann Creamery and Visitor s Center, Dierberg Operating Foundation, St. Louis, Missouri Project Principal, Planner and Designer for a 9,800 square foot new Specialty Cheese Production, Sales, and Educational Facility (2006-Present) Accessibility Surveys, Building Assessments, & Remedial Recommendations, First Bank, (54 California Branches) Project Principal, Planner and Designer for the renovation of a 20,000 square foot office building (2011) * Denotes experience while with other firms.
WRITING EXPERIENCE Contributor, Tower Grove Heights Gazette, St. Louis, Missouri Most recent article, Original Occupants, featured in the Fall, 2014 edition. Riding St. Louis Riverfront Trail, appeared in the Spring, 2009 edition CIVIC Member, Citizen s Advisory Committee for the City/Arch/River downtown St. Louis development project, 2013 through 2015 WORK HISTORY Paradigm Architects Founding Partner 1993-present SMP (Stone, Marricini, Patterson) Planner / Project Designer 1989 1993 Pearce Corporation Project Designer 1986 1989 Robert Bennett, Architect Assistant 1983 1984 REFERENCES James S. Dierberg, Chairman, First Banks 135 N. Meramec Clayton, MO 63105 jim.dierberg@fbol.com 314-854-4664