Kevin Downs and Keith Jones. The Royal Derby Hospital

Similar documents
Arrendale Digital Dictation at Royal Derby Hospital

Purpose of the Report: Update to the Trust Board on the clinically-led Trauma and Orthopaedic GIRFT review. Information Assurance X

Ambulatory Care Model

OPTIONS APPRAISAL PAPER FOR DEVELOPING A SUSTAINABLE AND EFFECTIVE ORTHOPAEDIC SERVICE IN NHS WESTERN ISLES

NAME SPECIALTY PLEASE NOTE THAT THE CONSULTANT SURGEONS RUN A 4 WEEK ROLLING ROTA OF ACTIVITY. (HENCE THE 'BUSY' JOB PLAN)

Delayed discharges and unplanned admissions from the Day Care Unit at Mater Dei Hospital, Malta

WHY OFFER SAME DAY DISCHARGE FOR NON-RECONSTRUCTIVE BREAST CANCER SURGERY?

Summarise the Impact of the Health Board Report Equality and diversity

Enhanced Recovery Programme

Digital Dictation Project

Clinical Use of Blood The AIM II Trial. Challenges of Near-Live Organisational Blood Use Monitoring

Seven Day Working: in Practice Clinicians Perspective. Jonathan Vickers Consultant surgeon Dec 2015

Inguinal hernia repair integrated care pathway (ICP)

Having a staging laparoscopy

St Peter s Hospital. Guildford Road Chertsey, Surrey KT16 0PZ Anaesthetic Department Direct Line: College Tutor: Dr Robert Menzies

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

THE FUTURE OF YOUR HOSPITALS: Planned Care site

You have been admitted with a hip fracture

Glangwili Hospital General Surgery (including Colorectal) ~ Recruitment ~

Hereford Hospitals NHS Trust

We plan. We achieve.

Example Care Pathways

USING FRAM IN A CHILDREN S SURGICAL UNIT

Student Nurses. [Type text] Wellington Operating Theatre

Section G - Aseptic Technique. Version 5

Having an Oesophageal Dilatation

Percutaneous Endoscopic Gastrostomy (PEG)

Bedside Shift Reporting

Craigavon Area Hospital Profile

Overview of Presentation

Lab Quality Confab Process Improvement Institute. New Orleans, LA. John Waugh 11/3/2015

Burton Hospitals NHS Foundation Trust

CYSTOSCOPY AND DILATATION (IN WOMEN)

Enhanced Recovery: Measurement for Improvement Monthly Data Submission Guidance. Version 1.0

INFORMATION FOR PATIENTS

Implementing Carecast: The UCLH Experience. Kevin Jarrold Director of Information Management & EPR Project Director

THE ROYAL NATIONAL ORTHOPAEDIC HOSPITAL NHS TRUST QUALITY ACCOUNTS 2011/12

Reducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove.

Standard of Care for MTC inpatients

PLANNED CARE THEATRE OPERATIONAL POLICY

Percutaneous Endoscopic Gastrostomy (PEG) Tube Insertion

Aire Logic and Leeds Teaching Hospitals Trust: Taking on the Interoperability Challenge

The operation will take several hours and you will stay in the recovery room until you are ready to return to the ward.

Neurosurgery. Themes. Referral

Ref: FOI/CAD/ID April Freedom of Information Act 2000

Author: Kelvin Grabham, Associate Director of Performance & Information

Learning Opportunities Directory for students nurses during practice placements at the Countess of Chester Hospital NHS Foundation Trust

Percutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent

ACUTE CARE BUSINESS UNIT THEATRE OPERATIONAL POLICY

North Shore Private Hospital

Percutaneous Transhepatic Cholangiogram (PTC) and Biliary Stent

INSPECTION/EXAMINATION OF THE URETER ± BIOPSY

Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance

Exploring the clinical opportunities of ABM: Evaluating models of care for improved efficiency & provision of care

Policy Summary. Policy Title: Policy and Procedure for Clinical Coding

Epsom and St Helier University Hospitals NHS Trust

Unscheduled care Urgent and Emergency Care

Ambulatory emergency care Reimbursement under the national tariff

We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.

@ncepod #tracheostomy

Unannounced Theatre Inspection Report

From Go-Live to HIMSS Level 6 in 10 months The Royal Children s Hospital EMR experience

RIGHT HEMICOLECTOMY. Patient information Leaflet

Undergoing a Percutaneous Endoscopic Gastrostomy (PEG) Tube procedure

Royal Cornwall s implementation plan: A Chief Pharmacist s perspective

We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.

RTT Recovery Planning and Trajectory Development: A Cambridge Tale

Day Case and Short-stay Surgery Benchmarking Review. Taunton and Somerset NHS Foundation Trust December 2009

ecardio Cardiology Suite

Scope of Practice for Student Nurses - Undergraduate & Entry to Professional Practice

Information Leaflet for Hospital Personnel

Aneurin Bevan Health Board. Improving Theatre Performance

SURGICAL RESIDENT CURRICULUM FOR NORTH CAROLINA JAYCEE BURN CENTER. Residency years included: PGY1 _X PGY2 PGY3 _X PGY4 PGY5 Fellow

The PCT Guide to Applying the 10 High Impact Changes

Tracheostomy ward decannulation. Information for families. Great Ormond Street Hospital for Children NHS Trust

Inpatient orders and Physician Certification MUST BE authenticated PRIOR to discharge No EXCEPTIONS.

Unannounced Inspection Report

Epsom and St Helier University Hospitals NHS Trust

Sheffield Teaching Hospitals NHS Foundation Trust

National Theatres Project Report

The PCT Guide to Applying the 10 High Impact Changes. A guide from NatPaCT

CYSTOSCOPY AND URETHRAL BULKING INJECTIONS

WAITING TIMES AND ACCESS TARGETS

4/9/18. Disclosure Information. Objectives

Annual General Meeting 17 September 2014

WAITING TIMES AND ACCESS TARGETS

SACRAL NERVE STIMULATION (NEUROMODULATION)

Royal Liverpool Children s NHS Trust Alder Hey Rapid Discharge Pathway for End of Life Care

Mediastinal Venogram and Stent Insertion

Mediastinal Venogram and Stent Insertion

Christa Pardue, MBA, MT(AMT) - Director of Laboratory Services University Healthcare System, Augusta, GA

TRUST BOARD SEPTEMBER Surgical Services Reconfiguration

MEATAL/URETHRAL DILATATION

HCAI Data Capture System User Manual. Case Capture: Main Data Collections

DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES

Laparoscopic Radical Nephrectomy

Managing Access by Generating Improvements in Cannulation

Process Mapping Tool Kit

INTERNAL VALIDATION REPORT (MULTI-DISCIPLINARY TEAM)

Costing healthcare in Germany

Transcription:

Kevin Downs and Keith Jones The Royal Derby Hospital

Facts About Our Hospital The Royal Derby Hospital is the newest hospital in the East Midlands 334 million has been invested in the development Annual budget of around 475 million Officially opened in April 2010 by Her Majesty The Queen and His Royal Highness The Duke of Edinburgh. We now care for more than 180,000 people as inpatients, outpatients, emergency patients and day cases. This equates to around 1,000,000 visits from patients each year. There are 1,159 beds in our 50 wards (Inc. 4 wards from our London Road site) And 200 of them are in single rooms with en-suite facilities Over 8,000 employees We have 35 operating theatres, plus a number of suites

Available At Derby Now A quick re-cap All information tracked to individual Patient and can feed the electronic record; 1. Products Tracked to Patients across all 40 clinical rooms (Inc. store rooms) 2. Full Traceability of Trays and Instruments Infection Control 3. Full Traceability of Staff and Location Scheduling / Productivity 4. Data that enables; Consultant to Consultant discussion Clinical and Product Variance / Training /LoS/PRE-OP information SUI Resolution What actually happened in theatre? Reduced Clinical admin Ordering/Writing up/duplication of data/accuracy improved Case Carts and Product Standardisation imminent Financial - Conservative savings of 1m pa consumables Coding Improvement 1m pa

Implementation Plan and Timescales Initial Planning stages - Commenced November 2013 Roll out to General Theatres - April 2014 9 theatres multiple specialties General Day case Theatres - December 2014 3 theatres multiple specialties Radiology January 2015-2 suites Cardio Catheter Labs May 2015-2 suites Urology day case August 2015 2 theatres Ophthalmology - Sept 2015 3 theatres Hand Theatres November 2015 3 theatres Gynae and Children's January 2016 6 theatres Trauma and Orthopaedics June 2016 8 theatres WARDS /Outpatients - Ward 403 Pilot August 2016 All theatres now Live! 38 Theatres inc. suites and a trial on a ward complete. Endoscopy went live for a clinical trial 12 months ago. 97,000 theatre episodes have been recorded to date

Apply GS1 standards at Derby; Patient : GS1 wristbands to capture & identify the right patient Product: GS1 GTIN s to identifying & trace the right products Place: GS1 GLN to identify the right location Process: GS1 standards in the NHS and patient care

Our Theatre Data Capture Device: Patient: Scan Wristband (GS1 GSRN) Timers: Knife to skin, time in recovery Location: Records locations (GLN s) Staff: Who is present. (GSRN) Procedure: Operations linked to OPCS codes In Theatre: Questions Anaesthetic: Type used Devices: Products, Trays & Implants used (GTIN s) Including Lot, Batch and expiry data Inventory: Enables automatic ordering

BIG STEVE Co-Morbidities Recording

Location ID Catalogue Mgmt. Patient ID Inventory Mgmt. Purchase to Pay Product Recall Patient Identification: htrak Theatre Scanning Solution Developing the solution to force positive patient identification

Our Ward Data Capture Device: No need for multiple devices Embedded in existing eobs Location: Records locations Staff: Who is present and carrying out the task Procedure: Task Captured Ward: Additional data available Devices: Products, (GTIN s) Future scope; Workflow / efficiency notifications Training / Infection data Patient path way easily documented

A high Level Patient Pathway Patient Ref 20026307 Elective Radiology Theatre Pt admitted for Elective Gastrostomy insertion @ 10.40hrs Pt admitted for Elective Gastrostomy insertion@15.27hrs 26 / 07/16 27/07/16 12/08/16 19/08/16 22/08/16 23/08/16 15/08/16 17/08/16 04/09/16 07/09/16 Ward Replacement of Tracheostomy tube @14.56hrs Suction of Tracheostomy @11.43 Suction of Tracheostomy @12.09 Suction of Tracheostomy @18.18 Change of Urinary Catheter @12.12 Suction of Tracheostomy @05.32 Suction of Tracheostomy @10.28 Emergency Operation for revision of Tracheostomy @ 08.27 Suction of Tracheostomy @09.52 Suction of Tracheostomy @06.40 Suction of Tracheostomy @ 16.23 & 19.25 IV cannulation @16.19 Emergency theatre Diagnostic endoscopic exam of Pharynx, larynx, oesophagus and biopsy of lesion @16.39 Data from PatienTrak would have all other nursing interactions e.g. Observations, fluid balance etc.

Full traceability across our theatres and suites; Product Recall; PC: H7493926224300 LOT:18787023 Built in to BAU Derby Process

Full traceability across our theatres and suites;

Once Identified the Patient Case Study

Full Product Traceability: Additionally Costing and Income for Procedures

Location ID Tray Traceability Infection Control Pre Scanning Solution: CJD Instances Reported Patients Notes Reviewed Trays Identified Min. 50 hour review per patient Cannot be 100% confident that ALL patients who subsequently came into contact with the contaminated trays could be identified CJD Instances Reported Catalogue Mgmt. Patient ID Inventory Mgmt. htrak Reviewed Purchase to Pay Product Recall 50 hours work per patient Low confidence in results Trays Identified NOW: 30 minutes to identify ALL affected trays and patients High level of confidence in the findings as all information electronically captures Affected Patients Identified 30 mins work for all patients High confidence in results Tray Analysis: Infection Control Traceability Audit Report Affected Patients Identified

Test Case Study CJD Scare Trays and Instruments Four Patients; Identified Patient Tray and Instrument used Other Patients affected?

Providing consultants with detailed Pre-op notes, prior to carrying out surgery Knowledge of implants prior to procedure: How many plates / screws are in already Types of screw heads to expect The right equipment to hand Not going in blind!

Driving Product Recalls when faulty products are identified - BARIATRICS Patient 1 - Arrives at Darlington for removal of faulty product fitted at Derby previous day - following Additional device failure during Derby procedure Patient 2 Arrives at Derby for removal of same faulty product, operated on in London. Patient 3 Operated on in Derby and removal of faulty product in Derby. Derby: Can trace product and batch in Seconds. Can identify location of store room where other faulty products are located

Submitted Evidence: Laparoscopic Cholecystectomy Consumable Costs and Consultant Variation Consultant Description Avg Consumable Cost Avg No of Products Avg No of Staff Avg Minutes No of Procedures Lower Quartile Upper Quartile Varian ce Std Deviation Avg LoS Max LoS Min Los Cons A 285 82 5 181 1 285 285 0-3.00 3.00 3.00 Cons B 239 74 7 127 3 232 250 37 19 1.00 1.00 1.00 Cons C 231 70 6 123 6 192 255 160 59 1.83 5.00 1.00 Cons D 227 70 6 98 9 197 248 146 45 1.56 6.00 1.00 Cons E 223 70 5 100 11 216 235 120 31 1.27 4.00 1.00 Cons F 218 69 6 93 6 203 238 60 24 1.00 1.00 1.00 Cons G 209 62 6 79 8 192 231 103 38 1.63 4.00 1.00 Cons H 188 64 7 90 9 164 224 149 53 1.25 2.00 1.00

Submitted Evidence: Reporting Data System Cons A Cons B Cons C Cons D Cons E

Thank You for Listening