STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS

Similar documents
Project number: Project Title: Recreation Center Expansion and Student Wellness Center

Project number: GC Project Title: The Lane Center for Academic Health Sciences

Ricardo Flores Magón Academy New PK 8 School Architect/Engineer Services Request for Qualifications/Proposal

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

Chabot-Las Positas Community College District

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

Galesburg Public Library, Galesburg, IL

STATE OF COLORADO STATE BUILDINGS PROGRAMS

Colquitt Regional Medical Center

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

University of California, Merced Central Plant/Telecommunications Reliability Upgrade

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR PROPOSAL (RFP) Police Department Building Construction Manager at Risk, Guaranteed Maximum Price August 30, 2016

REQUEST FOR PROPOSALS FOR ADMINISTRATION BUILDING REMODELING

ANNUAL REQUEST FOR QUALIFICATIONS Design Related Consulting & Support Services

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS)

Request for Proposals for Construction Manager at Risk Watertown Community Center

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

Chabot-Las Positas Community College District

Request for Qualifications Construction Manager at Risk Contract

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS

CAMPBELL UNION HIGH SCHOOL DISTRICT

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201

REQUEST FOR QUALIFICATIONS WASTEWATER FACILITY PLAN

Proposed Project The selected consultant will work closely with the project management team and the appointed committee for:

QUALIFICATIONS QUESTIONAIRE REQUEST FOR PROPOSALS BY THE GUILFORD COUNTY BOARD OF EDUCATION FOR CONSTRUCTION MANAGER AT RISK

ARCHITECTURAL SERVICES COLLEGEWIDE

BARNEGAT TOWNSHIP SCHOOL DISTRICT 550 BARNEGAT BOULEVARD NORTH BARNEGAT, NEW JERSEY (609) FAX (609)

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, :00 P.M.

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Request for Qualifications

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

Request for Qualifications Construction Manager

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

WILLIAMSON COUNTY PURCHASING DEPARTMENT SOLICITATION Utility Coordination and Utility Engineering Services

ENABLING CONSTRUCTION PROJECTS FOR THE SOUTH TERMINAL REDEVELOPMENT PROGRAM CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR (CM/GC) CONTRACT NO.

REQUEST FOR QUALIFICATIONS. Design Professional Services

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1

Gainesville City School System

REQUEST FOR PROPOSALS FOR AS-NEEDED BRIDGE INSPECTION AND LOAD RATING SERVICES FOR MOVEABLE BRIDGES AND FIXED RAILROAD BRIDGES

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS ASU PROJECT DESIGN PROFESSIONAL DP (CMAR) 11976

REQUEST FOR PROPOSALS

LIFT STATION 41 SCADA UPGRADE RTU REPLACEMENT DESIGN SERVICES

B Request for Proposal for. Qualified Firms. Financial Advisory Services. Grossmont-Cuyamaca Community College District

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

This request for qualifications seeks the following type of service providers:

PROJECT: AUDIO VISUAL DESIGN/BUILD DATE: October 9, 2018 MERRIAM COMMUNITY CENTER

Florida School for the Deaf & the Blind

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

Owner s Project Manager Selection

Morgan Hill Unified School District

Proposals must be received in the Office of the City Manager no later than 2:00 p.m. on March 21, 2018.

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

Request for Qualifications

Request for Qualifications For the Rockwall County Jail Space Use/Needs Assessment. RFQ# RFQ Due Date: April 6, 2018

REQUEST FOR QUALIFICATIONS PROFESSIONAL ARCHITECTURAL SERVICES

Architectural Services

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington

Request for Statements of Qualifications Architectural Services. University of California, Merced Classroom and Academic Office Building

UNIVERSITY OF CALIFORNIA, MERCED

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS

A. Project Description

TOWN OF WINDERMERE REQUEST FOR PROPOSALS Race Timing & Event Services

TORNILLO ISD REQUEST FOR STATEMENTS OF QUALIFICATION FOR ARCHITECTURAL SERVICES FOR 2016 BOND PROJECTS RFQ NO

REQUEST FOR QUALIFICATIONS FOR INFORMATION TECHNOLOGY AND SUPPORT SERVICES MASTER SERVICE AGREEMENT(S)

REQUEST FOR QUALIFICATIONS

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS FACILITIES DEVELOPMENT & OPERATIONS DEPARTMENT CAPITAL IMPROVEMENTS DIVISION

REQUEST FOR PROPOSAL Community-Wide Survey

Department of Military Affairs. Construction Facility Management Office PROFESSIONAL QUALIFICATIONS SUPPLEMENT (PQS)

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR:

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

REQUEST FOR PROPOSALS

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

SACRAMENTO COUNTY REQUEST FOR PROPOSAL OPERATIONAL REVIEW Voter Registration and Elections DEPARTMENT

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

REQUEST FOR PROPOSAL (RFP) # FY

EDGEWOOD INDEPENDENT SCHOOL DISTRICT

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

Transcription:

STATE OF COLORADO OFFICE OF THE STATE ARCHITECT STATE BUILDINGS PROGRAMS REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES For The University of Colorado Colorado Springs For The Recreation Center Expansion and Student Wellness Center, Project 13-020

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES TABLE OF CONTENTS ADVERTISEMENTS I. INTRODUCTION A. Project Description/Minimum Requirements/Project Delivery B. Selection Process 1. Mandatory Pre-Submittal Conference 2. Architect/Engineer/Consultant Submittals 3. Screening Panel/ Short List 4. Oral Interviews C. Schedule II. SUBMITTAL REQUIREMENTS A. Project Team B. Firm Capabilities C. Prior Experience D. Project Approach E. Work Location APPENDICES Appendix A: Appendix A1: Appendix A2: Appendix B: Appendix C: Appendix D: Preliminary Selection/Evaluation Form Interview Selection/Evaluation Form Final Ranking Matrix Architect/Engineer/Consultant Contract (Standard or CM/GC Format) Certification and Affidavit Regarding Unauthorized Immigrants Acknowledgment and Attestation Form RFQ (Rev.7/2010)

ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES REQUEST FOR QUALIFICATIONS DEPARTMENT OF HIGHER EDUCATION_ I. INTRODUCTION A. PROJECT DESCRIPTION The Recreation Center was constructed in 2007 and was the second LEED Goldcertified recreation center in the country. Between fall of 2007 when the Recreation Center opened, and the fall of 2011, student enrollment increased by 21% placing a significant strain on the facility. In early fall of 2011, UCCS conducted a survey of students to in order to gauge student interest in an expanded recreation center as well as determine from the students the areas of the center they are most interested in expanding. In the spring of 2012, UCCS students voted to increase their student fees in order to expand the Recreation Center and recreation services. A portion of the recreational services expansion includes the addition of an outdoor recreational field. This portion is being done under a separate contract and is not included in this project. The Recreation Center Expansion Program Plan has been endorsed and approved by the Chancellor and her Leadership team and has received approval by the University of Colorado Board of Regents. Pending approval of the University of Colorado Board of Regents (expected submission date is April, 2013) UCCS intends to include in the Recreation Center Expansion additional square footage to house the Student Wellness Center. The Student Wellness Center will provide combined space for the Student Health Center and Student Counseling Services which are currently housed in two separate locations. The health center is located in the Public Safety Building and the Counseling Center is located in Main Hall. The recreation center expansion entails an addition of approximately 35,997 GSF to the existing 54,000 SF structure and a partial renovation of approximately 12,600 SF of existing space. The addition to the recreation center will include: 6940 assignable square footage to weight and fitness 2796 assignable square footage to a 50 person fitness studio A double collegiate court gymnasium with 340 spectator seating, ASF of 13,050 Additional wet locker rooms, minimum ASF of 1600. If funding and design allow, an increase to ASF for this purpose is desirable. Conversion and remodel of the current gymnasium to a multi-activity court, currently ASF of 12,600 1400 ASF for an intercollegiate athletics fitness space Page 1

The Student Wellness Center will entail the construction of 11,608 GSF to include: 6 wet exam rooms at 120 ASF each for a total of 720 ASF 2 director offices at 200 ASF each for a total of 400 ASF 1 manager office at 150 ASF 1 wet lab at 350 ASF 2 gender neutral restrooms for patient use only at 60 ASF each for a total of 120 ASF 5 provider offices at 120 ASF each for a total of 600 ASF 2 group therapy rooms at 500 ASF each for a total of 1000 ASF 15 therapy rooms at 135 ASF each for a total of 2025 ASF 1 waiting area at 600 ASF 1 reception area at 700 ASF 1 records/storage at 300 ASF Should The Student Wellness Center receive Board of Regent approval, the combined area of new construction (Recreation Center and Wellness Center) will total 47,605 SF. The Recreation Center and Student Wellness expansion will be designed to LEED Gold standards. However, more importantly, design and educational aspects will be built into the facility that will allow students to understand the impact of their living environment. These learning experiences will include both building and site sustainable design. The University anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. Through the use of an Architect and a Construction Manager/General Contractor, a Guaranteed Maximum Price (GMP) will be established in conjunction with UCCS. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, and constructability, and will work with the Architect throughout the value engineering phases of the project. The selection process for the CM/GC will begin following the selection of the Architect. B. SELECTION PROCESS The selection of an architect/engineer/consultant will be conducted in accordance with the Colorado Revised Statutes, 24-30-1401 et. seq. The process will involve two stages: submittals will be screened and scored. A limited number of firms will be short listed and invited to participate in oral interviews. The [agency/institution] will attempt to negotiate a contract with the highest ranked firm following the interview segment. Following is additional information relative to the selection process: 1. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to tour the site and to have University staff available to discuss the project. Firms preparing submittals Page 2

must attend and sign-in in order to have their submittals accepted. The presubmittal conference will be held at: University Center, Room 116 University of Colorado Colorado Springs 1420 Austin Bluffs Parkway Colorado Springs, CO 80918 Tuesday March 5 th, 2013 at 10:00 am 2. Architect/Engineer/Consultant s Submittals: Specific requirements for submittals and scoring criteria are detailed in II. SUBMITTAL REQUIREMENTS. In order to facilitate review, only electronic submittals will be accepted. Submittals my not exceed 30 pages. Submittals must be received at: Attn: Rhea Taylor Campus Services Building, Room 211 University of Colorado at Colorado Springs 1420 Austin Bluffs Parkway Colorado Springs, CO 80918 rtaylor@uccs.edu Deadline for receipt (whether mailed, e-mailed or hand delivered) is: March 15, 2013 at 2:00 pm. Late submittals will be rejected without consideration. The University of Colorado Colorado Springs and the State of Colorado assume no responsibility for costs related to the preparation of submittals. 3. Screening Panel/Short List: Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) respondants will be interviewed. 4. Oral Interviews. It is anticipated that oral interviews will be conducted during the week of April 15, 2013. Interviews will be conducted at: The University of Colorado Colorado Springs. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with the University. Page 3

C. SCHEDULE Following is a detailed schedule of events for the RFQ process and an outline of the schedule for the balance of the project. Advertisement February 25, 2013 RFQ Document Available February 25, 2013 Mandatory Pre-submittal Conference March 5, 2013 Date Email Questions Due March 7, 2013 Answers Due to all Firms March 11, 2013 RFQ Submittal Due March 15, 2013, 2pm Submittal Screening March 15 to March 29, 2013 A/E Interview List Released March 29, 2013 A/E Oral Interviews (as scheduled) Week of April 15, 2013 A/E Selection April 19, 2013 Negotiation of A/E Contract April 19 to April 29, 2013 Contract Approval (projected) No later than April 29 Anticipated Design Start April 20, 2013 Anticipated CM/GC Start June 7, 2013 Anticipated Construction Start/Finish April 1, 2014/ August 1, 2015 Page 4

II. SUBMITTAL REQUIREMENTS Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. Following are elements that will be used to evaluate each firm's qualifications: A. PROJECT TEAM Identify the project principal, the project manager, key staff and subconsultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project. Qualifications and relevant individual experience. Unique knowledge of key team members relating to the project. Experience on projects as a team. Key staff involvement in project management and on-site presence. Time commitment of key staff. Qualifications and relevant subconsultant experience. B. FIRM CAPABILITIES Are the lines of authority and coordination clearly identified? Are essential management functions identified? Are the functions effectively integrated? (e.g., subconsultants role delineated)? Current and projected work load. Note: Organization charts and graphs depicting your capacity may be included. C. PRIOR EXPERIENCE Use this portion of your submittal to describe relevant experiences with the project type described in this RFQ document and various services to be provided. Experience of the key staff and firm with projects of similar scope and complexity. Demonstrated success on past projects of similar scope and complexity. References. Note: Include the name and current telephone number of the owner s project manager for every project listed. Page 5

D. PROJECT APPROACH For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues: Budget Methodology/Cost Control. Establish and maintain estimates of probable cost within owner's established budget. Control consultant contract costs Coordinate value engineering activities Quality Control Methodology. Insure State procedures are followed Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (ASHRAE/IES 90.1-1989) and the specification of energy efficient materials, systems, and equipment Insure the project is designed for durability and maintainability Schedule. Manage the required work to meet the established schedule E. WORK LOCATION Describe where the prime and subconsultants will do the key work elements of this project. Proximity of firms office as it may affect coordination with the State's project manager and the potential project location. Firm's familiarity with the project area. Knowledge of the local labor and material markets. Page 6

Appendix A STATE BUILDINGS PROGRAMS PRELIMINARY SELECTION/EVALUATION FORM ARCHITECT/ENGINEERING/CONSULTANT SERVICES QUALIFICATION BASED SELECTION (This form is to be used in the first step, i.e.short listing, of an architectural/engineering/consulting services selection process.) Evaluator #: Date: Name of Firm: Name of Project: Recreation Center Expansion and Student Wellness Center RFQ REFERENCE MINIMUM REQUIREMENTS Y N If the minimum requirements have not been met, specify the reason(s): Acknowledgment and Attestation included: Y N SCORE (PROJECT SPECIFIC QUALIFICATIONS): Weight 1 x Rating 2 = Score 1. PROJECT TEAM Qualifications and relevant individual experience. x = Unique knowledge of key team members relating to the project. x = Experience on projects as a team. x = Key staff involvement in project management and onsite presence. x = Time commitment of key staff. x = Qualifications and relevant subconsultant experience. x = 2. FIRM CAPABILITIES Are the lines of authority and coordination clearly identified x = Are essential management functions identified? x = Are the functions effectively integrated (e.g., subconsultants roles delineated?) x = Current and projected work load. x = 3. PRIOR EXPERIENCE/PERFORMANCE

Experience of the key staff and firm with projects of similar scope and complexity. x = Demonstrated success on past projects of similar scope and complexity. x = References. x = 4. PROJECT APPROACH Budget methodology/cost control. x = Quality control methodology. x = Schedule maintenance methodology. x = 5. WORK LOCATION Proximity of firm s office as it may affect coordination with the state's project manager and the potential project location. x = Firm's familiarity with the project area. x = Knowledge of the local labor and material markets. x = TOTAL SCORE: 3 NOTES: 1. Weights are to be assigned prior to evaluation and are to be consistent on all evaluation forms. 2. Rating: 1 = Unacceptable 2 = Poor 3 = Fair 4 = Good 5 = Excellent 3. Total score includes the sum total of all criteria. A passing score (as a percentage of the total points available) is to be established prior to selection (if applicable).

Appendix A1 STATE BUILDINGS PROGRAMS INTERVIEW SELECTION/EVALUATION FORM ARCHITECTURAL/ENGINEERING/CONSULTANT SERVICES QUALIFICATION BASED SELECTION (This form is to be used in the second step, i.e. oral interview, of an architectural/engineering/consulting services selection process.) Center Evaluator #: Date: Name of Firm: Name of Project: Recreation Center Expansion and Student Wellness Center SCORE (OVERALL QUALIFICATIONS) 1 : Weight 2 x Rating 3 = Score 1. PROJECT TEAM x = 2. PROJECT MANAGEMENT x = 3. PROJECT APPROACH x = 4. PRIOR EXPERIENCE x = 5. WORK LOCATION x = TOTAL SCORE: 4 NOTES: 1. Agencies are encouraged to include additional criteria that reflect the unique characteristics of the project under each category to help determine the submitter's overall qualifications. 2. Weights are to be assigned prior to evaluation and are to be consistent on all evaluation forms. 3. Rating: 1 = Unacceptable 2 = Poor 3 = Fair 4 = Good 5 = Excellent 4. Total score includes the sum total of all criteria.

APPENDIX A2 STATE BUILDINGS PROGRAMS FINAL RANKING MATRIX QUALIFICATION BASED SELECTION (This form is to be used to rank and determine the most qualified architectural/engineering/consulting services firm in a selection process.) FIRM QUALIFICATIONS SCORE 1 CUMULATIVE 2 TOTAL SCORE RANK 3 EVAL #1 EVAL #2 EVAL #3 EVAL #4 EVAL #5 EVAL #6 NOTES: 1. Insert total score from each evaluator's PRELIMINARY SELECTION AND INTERVIEW SELECTION/EVALUATION FORM only. 2. Add all evaluators' total scores to determine the cumulative score. NOTE: Each firm's cumulative total score should be as a percentage of the total points available. 3. Rank all firms with the highest scoring firm being the most qualified.

APPENDIX B ARCHITECT/ENGINEER/CONSULTANT CONTRACT (STANDARD OR CM/GC FORMAT)

APPENDIX C CERTIFICATION AND AFFIDAVIT REGARDING UNAUTHORIZED IMMIGRANTS

APPENDIX D ACKNOWLEDGEMENT AND ATTESTATION FORM By responding to these guidelines, the respondent(s) certify that he/she has reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification. I certify and declare that the foregoing is true and correct. Subscribed on at, Date City, State of, County State Applicant or Corporate Officer Signature Date Witness Date NOTE: Use full corporate name and affix corporate seal (if available). (Seal) `