Waiver to Space Exploration Technologies Corporation of Acceptable Risk Limit for Launch

Similar documents
Federal Aviation Administration Regulations and Policies Aviation Rulemaking Advisory Committee

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Commercial Space: Questions Regarding the Legal and Regulatory Environment

vessel prepares for and actively off-loads two new Post-Panamax gantry cranes to the

National Environmental Policy Act; Center Master Plan Update; Kennedy Space Center. AGENCY: National Aeronautics and Space Administration (NASA)

HIGH. Reach for the GROUND. For the 45th Space Wing in Florida, the last Titan launch marked the end of an era. Photography by Guy Aceto

A Space Law Primer for Colorado Lawyers

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

THE WHITE HOUSE WASHINGTON. December 21, 2004

Safety Zone; Navy Underwater Detonation (UNDET) Exercise, Apra Outer Harbor, GU

Guaranteed Access to Space, Kennedy Space Center/Cape Canaveral, and Climate Change

SUMMARY: By this direct final rule, the Coast Guard is removing. the regulation for the safety zone at Snake Island, also known as

ROLLS-ROYCE PLC

SUMMARY: The Coast Guard proposes to establish a temporary safety zone for the

Subject: Defense Space Activities: Continuation of Evolved Expendable Launch Vehicle Program s Progress to Date Subject to Some Uncertainty

SUMMARY: The Coast Guard is establishing a temporary safety zone on the Upper Mississippi

[Docket No. FAA ; Product Identifier 2016-CE-004-AD; Amendment ; AD ]

Safety Zone; Unexploded Ordnance Detonation, Gulf of Mexico, Pensacola, FL

National Organic Program: Notice of Interim Instruction, Maintaining the Integrity of

DEPARTMENT OF VETERANS AFFAIRS Presumption of Herbicide Exposure and Presumption of Disability During Service For

ACTION: Temporary final rule; request for comments. SUMMARY: The Coast Guard is establishing a temporary safety zone on navigable

Applications for New Awards; Education Research and Special. AGENCY: Institute of Education Sciences, Department of

National Environmental Policy Act; Implementing Procedures; Addition of Categorical Exclusion for Real Property

SUMMARY: The Captain of the Port of New Orleans (COTP New. Orleans), under the authority of the Magnuson Act,, established

SUMMARY: The National Aeronautics and Space Administration (NASA) is issuing a final

Safety and Security Zones; New York Marine Inspection and Captain of the Port

Medicare Program; Announcement of the Reapproval of the Joint Commission as an

DOD INSTRUCTION MANAGEMENT OF LASER ILLUMINATION OF OBJECTS IN SPACE

THE SPACE GENERATION CONGRESS 2014: Perspectives from University Students and Young Professionals in the Space Sector

Agency Information Collection Activities: Proposed Collection; Comment Request; AGENCY: Federal Emergency Management Agency, DHS.

Open DFARS Cases as of 5/10/2018 2:29:59PM

Medicare Program; Announcement of the Approval of the American Association for

1 of 18 DOCUMENTS *** THIS SECTION IS CURRENT THROUGH THE AUGUST 7, 2006 ISSUE OF *** *** THE FEDERAL REGISTER ***

Processing of Merchant Mariner Credentials for those. Mariners not Requiring a Transportation Worker

AGENCY: Office of Postsecondary Education, Department of. SUMMARY: The Secretary adopts as final, without change, the

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Notice of Solicitation of Applications for the Repowering. AGENCY: Rural Business-Cooperative Service, USDA.

SUMMARY: This notice announces the intention of the Maritime Administration to provide

Anchorage Grounds; Galveston Harbor, Bolivar Roads Channel, Galveston, Texas

INTERNATIONAL AERO ENGINES AG

DHS Publishes Semiannual Regulatory Agenda

APPENDIX: FUNCTIONAL COMMUNITIES Last Updated: 21 December 2015

Applications for New Awards; National Institute on. Disability, Independent Living, and Rehabilitation Research

Security Zones; Naval Base Point Loma; Naval Mine Anti Submarine. SUMMARY: The Coast Guard is increasing a portion of an existing

Medicare Program; Extension of the Payment Adjustment for Low-volume. Hospitals and the Medicare-dependent Hospital (MDH) Program Under the

Ride the Ducks International, LLC, Receipt of Petition for. AGENCY: National Highway Traffic Safety Administration (NHTSA),

U.S. Department of Housing and Urban Development Community Planning and Development

Federal Aviation Administration Center of Excellence for Commercial Space Transportation. Year 1 Annual Report. Executive Summary.

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

TECHNIQUES, AND PROCEDURES, AND OF MILITARY RULES OF ENGAGEMENT, FROM RELEASE UNDER FREEDOM OF

Department of Defense INSTRUCTION. DoD Commercial Air Transportation Quality and Safety Review Program

December, 2017 Request for Proposals for Airport Business and Financial Consultant At Savannah/Hilton Head International Airport

FOIA PROCESS EXECUTIVE SUMMARY

NOAA s Licensing of CubeSats as Private Remote Sensing Space Systems under the National and Commercial Space Policy Act

Youth Homelessness Demonstration Program Frequently Asked Questions

REGION III REGIONAL RESPONSE TEAM GUIDANCE FOR LIMITED JONES ACT WAIVERS DURING POLLUTION RESPONSE ACTIONS

Agency Information Collection Activities: Notice of Intent to Renew Collection. SUMMARY: The Commodity Futures Trading Commission ( CFTC or

Defense Federal Acquisition Regulation Supplement: Micro- AGENCY: Defense Acquisition Regulations System, Department of

DOD MANUAL DOD MILITARY MUNITIONS RULE (MR) IMPLEMENTATION PROCEDURES

National Maritime Security Advisory Committee; SUMMARY: The National Maritime Security Advisory Committee

Safety Zones, Facilities on the Outer Continental Shelf in the. SUMMARY: The Coast Guard proposes to establish safety zones

Technical Revisions to Update Reference to the Required Assessment Tool for. State Nursing Homes Receiving Per Diem Payments From VA

SUPERSEDED. [Docket No. FAA ; Directorate Identifier 2009-NE-37-AD; Amendment ; AD ]

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

Military Radar Applications

Call for Applications for the International Buyer Program Select Service for Calendar Year 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Polar-Orbiting Op Env Satellite. FY 2011 Total Estimate. FY 2011 OCO Estimate

DEPARTMENT OF TRANSPORTATION. AGENCY: Federal Highway Administration, U.S. Department of Transportation.

DEPARTMENT OF VETERANS AFFAIRS Special Home Adaptation Grants for Members of the Armed Forces and Veterans with

Speaking Event Information Form Lt Gen Greaves

If a 20% Match Is Required:

Pierce County Comprehensive Emergency Management Plan EMERGENCY SUPPORT FUNCTION (ESF) 20 DEFENSE SUPPORT FOR CIVILIAN AUTHORITIES

Commercial Human Spaceflight

Medicaid Program; Deadline for Access Monitoring Review Plan Submissions. AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS.

SPACE POWER DELIVERING SPACE & MISSILE CAPABILITIES TO AMERICA AND ITS WARFIGHTING COMMANDS

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

Report No. D December 16, Air Force Space and Missile Systems Center's Use of Undefinitized Contractual Actions

Determination and declaration regarding emergency use of in vitro diagnostic tests for

Revision of Executive Order Privacy and Civil Liberties Information Paper 1

Transportation and Marketing Program; Notice of Extension and Request for Revision of a

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Billing Code DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT. 24 CFR Parts 3280, 3282, and [Docket No. FR-6075-N-01]

Drawbridge Operation Regulation; Sturgeon Bay, Sturgeon Bay, WI. ACTION: Interim rule with request for comments.

LOW-INCOME HOME ENERGY ASSISTANCE

RESERVOIR LEGISLATION IN NORTHERN IRELAND

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE SAFETY CENTER

Critical Information Needed to Determine the Cost and Availability of G222 Spare Parts

[Docket ID ED-2014-OPE-0035; CFDA Number: B.] Proposed Priority - Foreign Language and Area Studies

TNI Environmental Laboratory Program- Accreditation Procedure

Special Local Regulation; Fautasi Ocean Challenge Canoe Race, Pago Pago Harbor,

DOD INSTRUCTION , VOLUME 575 DOD CIVILIAN PERSONNEL MANAGEMENT SYSTEM: RECRUITMENT, RELOCATION, AND RETENTION INCENTIVES

The French Space Operation Act

ACTION: Solicitation of nominations to serve on the Task Force on Apprenticeship Expansion.

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

Department of Defense DIRECTIVE

Standard Operating Procedures for Registration of Environmental Consultancy Offices in Abu Dhabi

Coast Guard Sector, Marine Inspection Zone, and Captain of the Port Zone

This matter comes before the Council on Affordable. Housing ("COAH" or "Council") on the application of Mendham

CANADIAN INTERUNIVERSITY SPORT LETTER OF INTENT FREQUENTLY ASKED QUESTIONS

Transcription:

This document is scheduled to be published in the Federal Register on 08/27/2013 and available online at http://federalregister.gov/a/2013-20726, and on FDsys.gov [4910 13] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Waiver to Space Exploration Technologies Corporation of Acceptable Risk Limit for Launch AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of waiver. SUMMARY: This notice concerns a petition for waiver submitted to the Federal Aviation Administration (FAA) by Space Exploration Technologies Corporation (SpaceX) to waive a limit that the risk to the public from the launch of an expendable launch vehicle not exceed an expected average number of 0.00003 casualties (E c 30 x 10 6 ) from far field blast overpressure. The FAA grants the petition, but limits collective risk to an expected average number of 0.0001 casualties. FOR FURTHER INFORMATION CONTACT: For technical questions concerning this waiver, contact Charles P. Brinkman, Licensing Program Lead, Commercial Space Transportation - Licensing and Evaluation Division, 800 Independence Avenue, S.W., Washington, DC 20591; telephone: (202) 267-7715; e-mail: Phil.Brinkman@faa.gov. For legal questions concerning this waiver, contact Laura Montgomery, Manager, Space Law Branch, AGC-250, Office of the Chief Counsel, Regulations Division, Federal Aviation Administration, 800 Independence Avenue, SW., Washington, DC 20591; telephone (202) 267-3150; e-mail: Laura.Montgomery@faa.gov. SUPPLEMENTARY INFORMATION: Background 1

On July 10, 2013, SpaceX submitted a petition to the FAA s Office of Commercial Space Transportation (AST) requesting a waiver for a launch from Vandenberg Air Force Base (VAFB) of a Falcon 9 Version 1.1 (v1.1) launch vehicle carrying, a Canadian scientific and research satellite called Cassiope, and several small secondary payloads. SpaceX requested a waiver of 14 CFR 417.107(b)(1), which prohibits the launch of an expendable launch vehicle if the total expected average number of casualties (E c ) for the launch exceeds 0.00003 for risk from far field blast overpressure. The FAA licenses the launch of a launch vehicle and reentry of a reentry vehicle under authority granted to the Secretary of Transportation in the Commercial Space Launch Act of 1984, as amended and re-codified by 51 U.S.C. Subtitle V, chapter 509 (Chapter 509), and delegated to the FAA Administrator and the Associate Administrator for Commercial Space Transportation, who exercises licensing authority under Chapter 509. SpaceX is a private commercial space flight company. It has initiated activities with the U.S. Air Force's EELV Program to become a certified launch service provider for National Security space missions. In addition, SpaceX launches commercial payloads such as Cassiope. This petition for waiver addresses an upcoming flight that SpaceX plans to undertake transporting the Cassiope satellite and several small secondary payloads to earth orbit. This will be the first launch by SpaceX from VAFB. It will also be the first flight of the Falcon 9 v1.1 vehicle, which is larger and has greater thrust and payload capacity than SpaceX s Falcon 9 vehicle. SpaceX s Falcon 9 v1.1 launch vehicle will launch from VAFB and place the Cassiope satellite into a near-polar orbit. The launch vehicle will also carry five secondary payloads to the same orbit. The first stage will coast after stage separation, and then perform an experimental burn with three engines to reduce the entry velocity just prior to entry. Prior to landing in the 2

water, it will perform a second experimental burn with one engine to impact the water with minimal velocity. The second stage will coast and then perform an experimental burn to depletion. The preliminary calculation of E c for far field blast overpressure shows that the launch would exceed the 0.00003 limit imposed by section 417.107(b)(1) under anticipated weather conditions for a daytime launch in September. Atmospheric conditions at the launch site during the anticipated time of launch increase the far field blast overpressure risk. The presence of inversion layers at VAFB is common, and results in the reflection of shock waves from an explosion. This reflection of shock waves can cause greater damage than would otherwise be caused without the reflection from the inversion layer. Chances of advantageous weather conditions during the day in September that would allow a launch that meets the FAA s risk requirements are virtually zero percent. 1 The Falcon 9 v1.1 is a new launch vehicle. The U.S. Air Force has determined that its overall failure probability is nearly fifty percent for each of the first two launches. AST has determined that the Air Force s calculation of probability of failure satisfies the requirements in part 417. Weather conditions during the day in September are likely to be unfavorable and delays may last for days. SpaceX, therefore, seeks a waiver of this risk requirement. Waiver Criteria: Chapter 509 allows the FAA to waive a license requirement if the waiver (1) will not jeopardize public health and safety, safety of property; (2) will not jeopardize national security and foreign policy interests of the United States; and (3) will be in the public interest. 51 U.S.C. 50905(b)(3) (2011); 14 CFR 404.5(b) (2011). 1 In calculating this percentage, the FAA relies on the standard model developed by the 30 th Space Wing from observation of Mission Flight Control Officer response times to initiate flight destruction of a malfunctioning launch vehicle. The 30 th Space Wing uses this standard time for its analysis. 3

Sections 417.107(b)(1) Waiver Petition Section 417.107(b)(1) prohibits the launch of a launch vehicle if the E c for the flight exceeds 0.00003 for any of the following three risks: (1) impacting inert and impacting explosive debris, (2) toxic release, and (3) far field blast overpressure. For reasons described below, the FAA waives the restrictions in section 417.107(b)(1) to allow SpaceX to conduct a flight with the E c resulting from far field blast overpressure exceeding 0.00003 as long as total E c for the three hazards combined does not exceed 0.0001. The FAA is not waiving the E c requirement for impacting inert and impacting explosive debris or for toxic release. Launch of the Falcon 9 Vehicle The FAA waives the far field overpressure risk requirement of section 417.107(b)(1) because the Falcon 9 v1.1 launch will not jeopardize public health and safety or safety of property, a national security or foreign policy interest of the United States, and is in the public interest. i. Public Health and Safety and Safety of Property The Falcon 9 v1.1 launch is the first launch of the v1.1 vehicle, and the first SpaceX launch from VAFB. Although the risk from far field blast overpressure is likely to exceed 0.00003, the estimated risks for debris and toxic release are very low. Based on preliminary calculations performed by the U.S. Air Force for SpaceX, the collective risk to the public from the Falcon 9 v1.1 launch will be less than 0.0001 approximately forty percent of the time during September. 2 NASA, the U.S. Air Force and other U.S. National Test ranges use 0.0001 as the expected casualty limit across all three hazards as their criterion See U.S. Air Force Instruction 91-217, Space Safety and Mishap Prevention Program (2010); NASA Procedural Requirements 2 The FAA assumes the standard model developed by the 30 th Space Wing from observation of Mission Flight Control Officer response times to initiate flight destruction of a malfunctioning launch vehicle. The 30 th Space Wing uses this standard time for its analysis. 4

8715.5 Rev A, Range Flight Safety Program (2010); Range Commanders Council (RCC) Standard 321-10, Common Risk Criteria Standards for National Test Ranges (2010). If the Falcon 9 v1.1 s collective risk were to exceed 0.0001 expected casualties, SpaceX would not launch until conditions improved sufficiently for the risk of the launch to satisfy the limits allowed by the waiver. The increase in the E c for the first launch of the Falcon 9 v1.1 vehicle from VAFB is largely attributable to two factors. First, the launch will take place from VAFB. VAFB is located in California, and frequently experiences unique weather conditions that exacerbate far field blast overpressure from a launch. An inversion layer, an atmospheric region with a warmer temperature than the region below, is common much of the year at VAFB. The presence of an inversion layer could increase damage caused by an explosion because an inversion layer may reflect the shock wave from an explosion back towards the ground. By reflecting the shock wave back towards the ground, surrounding buildings, and particularly glass windows, may experience greater pressure, which could cause greater glass breakage. Second, the estimated probability of failure to the Falcon 9 v1.1 is high because it is a new launch vehicle. There is no way to reduce this estimated failure probability, which is derived from the historically high number of launch failures in new vehicles. This probability of failure is one of the most critical variables in the E c calculations. This waiver for the risk from far field blast overpressure is consistent with the Air Force total risk threshold for E c of 100 x 10-6 for risks from debris, toxic release, and far field blast overpressure combined. The current E c requirement for U.S. Government launches from U.S. National Test Ranges is 0.0001, which, because it comprises debris, toxics, and overpressure, means that the federal launch ranges permit the risk attributable to overpressure to exceed the 5

FAA s risk threshold. See Air Force Instruction 91-217, Space Safety and Mishap Prevention Program (2010). The U.S. Air Force approved a government launch of a Titan, where the risk ranged from 145 to 317 in a million. Dept. of the Air Force Memorandum, Overflight Risk Exceedance Waiver for Titan IV B-30 Mission, (Apr. 4, 2005). Additionally, the FAA granted a waiver on April 17, 2012, for risk from debris up to 0.000130 for a Falcon 9 launch from Cape Canaveral Air Force Station. Waiver of Acceptable Risk Restriction for Launch and Reentry, Notice of Waiver, 77 FR 24556 (April 24, 2012). Again, risk was largely a result of a relatively high failure probability that is unavoidably attached to a new launch vehicle. Based on the fact that risk will remain very low, and will be limited to the requirement for government launches (E c of less than 0.0001), granting a waiver in this case would not jeopardize public health and safety or safety of property. ii. National Security and Foreign Policy Implications The FAA has identified no national security or foreign policy implications associated with granting this waiver. iii. Public Interest The waiver is consistent with the public interest goals of Chapter 509. Three of the public policy goals of Chapter 509 are: (1) to promote economic growth and entrepreneurial activity through use of the space environment; (2) to encourage the United States private sector to provide launch and reentry vehicles and associated services; and (3) to facilitate the strengthening and expansion of the United States space transportation infrastructure to support the full range of United States space-related activities. See 51 U.S.C. 50901(b)(1), (2), (4). With a requirement that E c be less than 0.00003 for far field blast overpressure, launch availability for the Western Range is estimated to be virtually zero percent due to atmospheric 6

conditions at the launch site and the high failure probability necessarily assigned to a new launch vehicle. This would certainly make the launch site impractical for commercial launches, at least of new launch vehicles. Granting a limited waiver for risk from far field blast overpressure as long as the risk for all three risks does not exceed 100 x 10-6 increases launch availability for the first launch of Falcon 9 v1.1 at VAFB to approximately forty percent for September, depending on detailed analytical assumptions concerning flight termination action. VAFB is the most suitable U.S. launch facility for supporting the launches of satellites by large vehicles into polar orbits. Granting this waiver makes VAFB a viable site for commercial launches, helping to sustain the launch capacity for U.S. launch providers, thereby supporting the industrial base and lowering overall launch costs for commercial customers and the U.S. Government. Additionally, the proposed launch is consistent with the principles and goals of the 2010 National Space Policy, which emphasizes the importance of developing a robust domestic commercial space transportation industry and acquiring commercial space services to meet United States Government requirements. The development of commercial launch service providers is crucial because, as noted in the 2010 National Space Policy, United States access to space depends in the first instance on launch capabilities. To that end, SpaceX has applied to the U.S. Air Force's EELV Program to become a certified launch service provider for National Security space missions. In accordance with the Air Force's approved New Entrant Certification Guide, SpaceX is required to demonstrate its compliance with EELV program requirements, including successfully demonstrating launches of the launch vehicle being proposed for certification. In the certification approach being taken under the New Entrant Certification Guide, SpaceX is required to successfully launch three Falcon 9 launch vehicles, the first of which is planned to be the Cassiope mission from VAFB. Each flight of the Falcon 9 builds 7

heritage for this vehicle, which will be used by the United States Government. NASA has already contracted with SpaceX for Cargo Resupply Services missions from CCAFS using Falcon 9 v1.1. Accordingly, proceeding with the proposed launch is in the public interest. Issued in Washington, DC on August 19, 2013. Kenneth Wong, Licensing and Evaluation Division Manager, Commercial Space Transportation. [FR Doc. 2013-20726 Filed 08/26/2013 at 8:45 am; Publication Date: 08/27/2013] 8