NON-MAJOR SYSTEMS OT&E

Similar documents
FIGHTER DATA LINK (FDL)

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

I n t r o d u c t i o n

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

AIR FORCE MISSION SUPPORT SYSTEM (AFMSS)

Spectrum of Testing. OPERATIONAL testing for the warfighter in the representative BATTLESPACE ENVIRONMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

JAVELIN ANTITANK MISSILE

GLOBAL BROADCAST SERVICE (GBS)

F-22 RAPTOR (ATF) BACKGROUND INFORMATION

Mr. William Sanville Project Manager Maneuver Ammunition Systems

US Special Operations Command

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

To THE DEFENSE ACQUISITION WORKFORCE

Inside the Beltway ITEA Journal 2008; 29: Copyright 2008 by the International Test and Evaluation Association

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

JOINT SURVEILLANCE TARGET ATTACK RADAR SYSTEM (JSTARS) E-8C AND COMMON GROUND STATION (CGS)

UNCLASSIFIED UNCLASSIFIED

REQUIREMENTS TO CAPABILITIES

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

MCWP Aviation Logistics. U.S. Marine Corps PCN

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

Subj: NAVY ENTERPRISE TEST AND EVALUATION BOARD OF DIRECTORS

Agenda. DoD as an Energy Consumer. Defense Energy Challenges. Adapting to a New Environment. DoD Operational Energy Strategy. Current Initiatives

UNCLASSIFIED R-1 ITEM NOMENCLATURE

WikiLeaks Document Release

FOREIGN COMPARATIVE TEST (FCT) PE D FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

Prepared for Milestone A Decision

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

LPD 17 AMPHIBIOUS TRANSPORT DOCK SHIP

Subj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC

EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA4

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Mission Based T&E Progress

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Section 7.5 PEO LS Program GROUND/AIR TASK ORIENTED RADAR

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

Defense Standardization Program Conference

UH-72A LAKOTA LIGHT UTILITY HELICOPTER (LUH)

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 4 Page 1 of 6

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

Joint Test & Evaluation Program

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

Ammunition and Explosives related Federal Supply Classes (FSC)

First Announcement/Call For Papers

DOD INSTRUCTION OPERATION OF THE DOD ENGINEERING FOR TRANSPORTABILITY AND DEPLOYABILITY PROGRAM

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Soldier Protection and Survival Systems

UNCLASSIFIED UNCLASSIFIED

Flight Controlled Mortar FCMortar

H. R. ll [Report No. 115 ll]

I n t r o d u c t i o n

Department of Defense DIRECTIVE

FY 2010 Annual Report

Middle Tier Acquisition and Other Rapid Acquisition Pathways

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

Testing and Training Challenges for the Evolutionary Aircraft Carrier Strategy

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Testing in a Joint Environment. Janet Garber Director Test and Evaluation Office Office of the Deputy Under Secretary of the Army

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Re-Shaping Distributed Operations: The Tanking Dimension

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Overview of Expeditionary Power Systems Marine Corps Systems Command Warren Clare Joint Service Power Expo August 25, 2015

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

OVERSEAS CONTINGENCY OPERATIONS (OCO)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

VADM David C. Johnson. Principal Military Deputy to the Assistant Secretary of the Navy for Research, Development and Acquisition April 4, 2017

AUSA BACKGROUND BRIEF

AGENCY: Defense Security Cooperation Agency, Department of Defense.

M&S for OT&E - Examples

155 Third Generation Maritime Fire Support (155 TMF) Robert McClure BAE Systems Global Combat Systems

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #98

Transcription:

NON-MAJOR SYSTEMS OT&E In accordance with Section 139, paragraph (b)(3), Title 10, United States Code, the Director, Operational Test and Evaluation (DOT&E) is the principle senior management official in the Department of Defense to monitor and review all operational test and evaluation in the Department of Defense. This includes Operational Test and Evaluation (OT&E) on smaller, non-major acquisition systems. Although several non-major systems, such as those directly affecting major systems and those specifically directed by Congress, are under direct oversight of DOT&E, the OT&E of most non-major systems are controlled by the Service Operational Test Agency s (OTAs). The Service OTAs are responsible for OT&E on hundreds of small programs. The Army Test and Evaluation Command is currently working on 483 Acquisition Category (ACAT) III or below programs and Navy COMOPTEVFOR retains 155. The Air Force Test and Evaluation Command (AFOTEC) retains 127 ACAT III programs under their cognizance. This is in addition to the numerous ACAT III programs managed by the Air Force s Air Combat Command (ACC), Air Mobility Command, and Air Warfare Center. None of the Service OTAs are adequately funded for this work. With priority often going to the higher profile major acquisitions, the OTAs must balance many competing demands for very scarce resources. These small programs represent some of the best examples of integrated Test and Evaluation (T&E), demonstrating very effective processes to more rapidly field new military equipment. Often, these processes are aggressive applications of the Secretary s themes we have urged for five years now early involvement by the operational testers, combining DT with OT, and combining testing and training. We are using successful examples from smaller programs to encourage the larger major system acquisitions to take advantage of the benefits of these themes. One example of non-major system OT&E reported this year was Medium Shelter System (MSS)/Family of New Portable Shelters (FOPS). This was the only non-major system T&E activity in support of a full-rate production decision reported by AFOTEC in FY00. A description of the T&E by AFOTEC follows. SYSTEM DESCRIPTION MSS is an expandable, soft wall modular shelter system supported by an aluminum frame covered with vinyl fabric. MSS provides 1,500 square feet of floor space to accommodate large work or storage areas in a bare base environment. MSS has two large vehicle doors, two personnel doors, and six windows. The shelters are designed to be transportable by air, land, and sea, and compatible with C-130 aircraft and the 463L cargo loading system. TESTING CONCEPT/METHODOLOGY This Qualification Operational Test and Evaluation (QOT&E) was conducted by employing MSS in a variety of scenarios. Real-world operations (power production, welding, aircraft generation equipment, and vehicle maintenance) were conducted in two shelters, while direct comparison testing was conducted on two other test articles. Twenty assembly cycles were performed on a fifth MSS. Testing was also done to ensure MSS was compatible with existing bare base equipment. VIII-1

NOTABLE RESULTS MSS was found to be operationally effective and suitable. Twenty-two deficiencies were documented during QOT&E. All were resolved by ACC and the program office prior to production. Most deficiencies were related to the vehicle doors. MSS also exceeded the Key Performance Parameter of a 25 percent airlift sortie reduction over the existing system. MSS reduced the airlift footprint by 66 percent. CONTRIBUTION/INFLUENCE QOT&E HAD ON THE PRODUCTION DECISION MSS QOT&E ensured that the best product possible was fielded. LESSONS LEARNED/TEST LIMITATIONS Recommend all data analysis be completed prior to the Deficiency Review Board (DRB). The DRB was held immediately following the field events, and not all data analysis was complete. Upon completion of the data analysis, additional deficiencies were discovered that needed to be coordinated with key offices thus delaying publication of the final report. The following tables document some of the other non-major systems OT&E activities conducted by the Service OTAs. (These tables are limited to those T&E activities reported in FY00 that were intended to support full-rate production decisions.) VIII-2

NAVY SYSTEM NAME ACAT TEST DATES EFFECTIVE SUITABLE SURVIVABLE HARM Blk III III 12/98-9/99 Yes No S-3 Critical Avionics IVT 8/99-10/99 Yes Yes Upgrade C-2A Aircraft Block IV 9/99-4/00 Yes Yes Upgrade H-60 Armed Helo III 8/99-12/99 Yes Yes Tomahawk Cruise III 10/99-12/99 Yes Yes Missile Joint Warning and III 11/99-12/99 Reporting Network Joint Services Imagery Processing System III 12/99 Yes Yes Ship s Signal IVT 11/99-12/99 Yes Yes Exploitation Equipment Cooperative III 12/99 Yes No OUTBOARD Logistics Update Financial Air IVT 12/99-2/00 No No Clearance Transportation System Acoustic Rapid COTS III 7/99-11/99 Potentially Potentially Insertion EOA Closed Loop IVT 2/00 Yes Yes Degaussing Submarine High Data IVT 2/00-3/00 Rate Antennae Submarine LF/VLF IVT 3/00-4/00 Yes Yes Receiver Marine Mammal IVT 7/00 System Thin Line Towed III 8/00 Array Acoustic Intercept III 8/00 Receiver Non-Gasoline Burning III 9/00 Outboard Engine Acoustic Rapid COTS Insertion III 2/00 VIII-3

SYSTEM NAME 12 Gauge Shotgun Non-Lethal Ammunition 25 mm, Armor- Piercing Fin Stabilized Discarding Sabot- Tracer (APFSDS-T), M919 Cartridge with Swiss Munitions Extruded/Impregnated (EI)-Propellant 3-KW Tactical Quiet Generator (TQG) Air & Missile Defense Work Station (AMDWS) Software Version 1.0 Type I High Mobility Multi-purpose Wheeled Vehicle (HMMWV) Cargo Bed Cover (CBC) Jt Firefighter Integrated Response Ensemble (J-FIRE) Glove Modernized Demolition Initiators XM151 & XM152 Boosters and XM152 Inert Booster Movement Tracking System (MTS) Palletized Load System Container Roll-In/Out Platform (PLS-CROP) Portable Vehicle Arresting Barrier (PVAB) XM95 Rifle Launched Non-Lethal Munition (RLNLM) ARMY TEST ACAT DATES EFFECTIVE SUITABLE SURVIVABLE III 4/99-6/99, YES YES No issues 9/ 99 IV 6/98-6/99 YES YES III 11/98-8/99, 4/99-5/99 III Continuous Evaluation III 5/95-12/95, 5/99-8/99, 11/99-12/99 YES YES YES YES YES YES YES YES YES III 10/99, 1/00 YES YES YES IV 7/99-10/99 YES YES YES III 4/00 YES YES, with limitations NO IV Various YES YES FY98/99 III III Various FY99 Various FY99, 1/00 YES YES E3 survivable; other survivability YES, with caveat YES No issues VIII-4

SYSTEM NAME Joint Service Combat Shotgun MARINE CORPS TEST ACAT DATES EFFECTIVE SUITABLE SURVIVABLE III 4/00 Yes Yes Notes: 1) MCOTEA and OPTEVFOR do not breakout survivability for separate treatment. Survivability is addressed as a component of Operational Effectiveness. 2) Operational Effectiveness and Suitability findings above were reflective of the system at the time of test. The system presented for the MS-III full-rate production decision often has changes incorporated as a result of the IOT&E experience. VIII-5

VIII-6