Update: 9/23/15 CPDC 101 Jumpin Jeopardy Architecture & Engineering (A & E) Questions [Gag Name: Architecture and Ninja Nearing] $100 - Answer True or False to the following question: [Warm-Up Round] The CSU has a total of 10 campuses. $200- Answer True or False to the following question: High rise buildings can be found on at least seven CSU campuses. $300- Answer True or False to the following question: It is OK to use AIA agreements for CSU projects because they are compatible with other CSU design documents. $400- Answer True or False to the following question: The CSU is statutorily authorized to act as its own Building Official. $500- Select the correct multiple choice answer(s): Which campus currently wears the crown for the highest climbing wall in the system? A. Long Beach B. Fullerton C. San Diego D. Pomona E. San Jose Page 1 of 7
CPCD 101 Jumpin Jeopardy F. Sacramento CM Questions [Gag Name: Construction Mis-Management]: $100 - Answer True or False to the following question: OCIP projects start at $15 M and above. $200 - Answer True or False to the following question: The role of the Deputy Building Official should be separated from the role of the Construction Administrator to avoid any inherent conflicts of interest. $300.00 - Select the correct multiple choice answer(s): Which one of the following is not part of the recommended delivery methods for CSU construction projects? A. Design-Build B. CM Agent / Multiple Prime C. JOC D. Design-Bid-Build E. Construction Manager at Risk F. Collaborative Design-Build G. Task Order-Construction Agreement $400.00 - Select the correct multiple choice answer(s): The purpose for a major capital project checklist is for which of the following reasons? A. CPDC s checklist to confirm campus compliance with SUAM. B. To be used on some major capital projects as the campus so chooses. C. It is to be used as a guide for campuses from the program phase through post-construction. D. Will not be requested as a part of the post project performance report. E. All of the above. Page 2 of 7
$500.00 - Select the correct multiple choice answer(s): The Campuses delegation authority to manage their own construction projects is based on which of the following? A. Proper budget management of all phases of a project. B. Assuring that appropriate internal Controls are in place. C. The Campuses shall prequalify all major capital contractors. D. The campuses shall submit to a post project review and audit. E. All of the above Facilities Planning Questions [Gag name: Facilities No-Planning]: $100 Answer True or False to the following question: Unless delegated to the Chancellor or President, or their designee, all capital projects require approval from the Board of Trustees. $200 - Answer True or False to the following question: Analysis of the environmental impact of a project is at the discretion of the campus and is dependent upon the size and cost of the project? An environmental analysis is required for all projects as part of the California Environmental Quality Act but the level of analysis depends on the potential environmental impact of the project. $300 Select the correct multiple choice answer: Who sets the categories and criteria for the type of projects to be proposed for funding during the annual capital outlay call for programs? A. The Campus President B. The Board of Trustees C. There are no criteria set during the annual call for programs Page 3 of 7
CPCD 101 Jumpin Jeopardy $400 - Select the correct multiple choice answer(s): What factors are typically considered when CPDC prioritizes Systemwide capital projects? A. Projected demand based on a feasibility study B. The current utilization of existing space and facilities C. Seismic and other life safety issues in existing facilities D. Funding availability and funding source E. All of the above $500 Select the correct multiple choice answer(s): Which should be the first action in developing a capital outlay project? A. Commissioning a Feasibility Study B. Determining the budget C. Determining the scope D. Determining the schedule Facilities Operations Questions [Gag Name: Facilities Neglect] $100- Select the correct multiple choice answer(s): What is the CSU system-wide total square footage of state-supported space? A. 7.5M B. 19.7M C. 31.2M D. 49.3M $200- Select the correct multiple choice answer(s): Which facilities benchmarking survey allows campuses to compare their operating costs and staffing levels across 450 institutions of higher learning both in the US and Canada? A. Facilities Information Records Management System (FIRMS) Page 4 of 7
B. Capital Planning Database (CPDB) C. APPA Facilities Performance Indicators (FPI) D. Space and Facilities Database (SFDB) $300- Select the correct multiple choice answer(s): Which annual survey tool is used to calculate campus backlog of deferred maintenance and capital renewal forecasts? A. FRRM B. Facilities Replacement and Renewal Model C. Sightlines Capital Renewal Model D. All of the above $400- Select the correct multiple choice answer(s): Which organization currently holds a Master Enabling Agreement (MEA) for Facilities Condition Assessment at $0.058 / Sq. Ft.? A. APPA B. ISIS C. JOC D. Sightlines $500- Select the correct multiple choice answer(s): What is the name of the organization responsible for the maintenance, upkeep and repair of the campus? A. Facilities Management B. Plant Operations C. Facilities Operations D. All of the Above Land Use Planning & Environmental Review (LUPER) Questions [Gag Name: You threw me for a LUPER] $100 - Answer True or False to the following question: Real property information system-wide is available on CPDC CSYOU webpage. Page 5 of 7
CPCD 101 Jumpin Jeopardy $200- Answer True or False to the following question: The primary element affecting the viability of obtaining funding for a building project is the magnitude of the budget for the project. $300- Answer True or False to the following question: Town and gown relationships basically amount to schmoozing and don t really have a positive effect on the development of the campus master plan. $400- Answer True or False to the following question: Because of technical submittal requirements and a rigorous process, land acquisition efforts which involve parking or housing funds must be managed by the Department of General Services rather than CSU. $500- Select the correct multiple choice answer(s): Which of the following statements regarding campus master plans is correct? A. Academic growth and development are their cornerstones B. The needs of campus life are addressed. C. They are a living document, which require updating D. All of the above Page 6 of 7
Bonus: World renowned architect Sir Norman Foster has designed several world class projects including the Hong Kong Chek Lap Kok Airport and the Gurkin Office tower in London. For which CSU campus did Sir Norman provide a design concept for? Choices: Broome Library, CSU Channel Islands Physical Science Tower, CSU Los Angeles Warren Hall Replacement Building, CSU East Bay Performing Arts Theater Foyer, Cal Poly San Luis Obispo Broome Library, CSU Channel Islands Page 7 of 7