Werrington Grade Separation Pre-Application Approach to Community Consultation

Similar documents
Seabank 3 Stakeholder and Community Consultation Strategy. Seabank 3. Stakeholder and Community Consultation Strategy. June 2013.

Meaford Energy Centre Section 47 Planning Act 2008 Statement of Community Consultation

Appendix 2 LIVERPOOL STATEMENT OF COMMUNITY INVOLVEMENT

5. This statement is being made in accordance with section 47 of the Act.

M25 junction 10/A3 Wisley interchange improvement scheme Have your say

Interim Consultation Report

In your area. Risley to Bamfurlong MA05. June Introduction

National Productivity Investment Fund for the Local Road Network Application Form

In your area. Wimboldsley to Lostock Gralam MA02. June Introduction

In your area. Garforth and Church Fenton LA16. June Introduction

1 P a g e. Applicant/Agent Protocol: A Best Practice Guide for the Processing of Major Planning Applications in Mid Ulster

In your area. Ulley to Bramley LA12. June Introduction

Abergelli Farm, Felindre, Swansea

A303 Stonehenge. Amesbury to Berwick Down. Consultation Response Form. Public Consultation February 2018

Putting patients at the heart of everything we do

NHS and independent ambulance services

England s Economic Heartland Strategic Alliance Strategic Transport Forum. 12 th February Agenda Item 4: Governance Arrangements

Methods: Commissioning through Evaluation

BARNSLEY METROPOLITAN BOROUGH COUNCIL

NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE. Health and Social Care Directorate Quality standards Process guide

Cambridgeshire Local Council Development Plan

Awarding body monitoring report for: Association of British Dispensing Opticians (ABDO)

School Visits Policy and Procedures (including EYFS)

How NICE clinical guidelines are developed

Queenswood Educational Admissions Policy Visits Policy

Framework Agreement for Care Homes in Central Bedfordshire

Greater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital

Sheffield City Region Mayoral Combined Authority. Additional evidence, such as letters of support, maps or plans should be included in an annex.

Creggan Wind Farm. Community Engagement Update Report. January Page 1 of 34

What is this document?

Educational Visits Policy

Strategic Plan

Local Energy Challenge Fund

Community involvement in wind energy: DECC guidance. Cheryl Hiles, Director, Regen SW

Specialist mental health services

Rail Delivery Group Conference

Directorate Medical Operations and Information Specialised Commissioning Nursing Trans. & Corp. Ops. Commissioning Strategy Finance

Neighbourhood Planning in Herefordshire. Stephanie Kitto Neighbourhood Planning Officer Herefordshire Council

Future Fit Consultation Plan

Communication Plan in relation to Social Work Research and Continuous Improvement Strategy

Northern Community Rail Station Adoption Fund Application Process

Smart Energy GB in Communities fund Overview June - July 2017

Internal Audit. Health and Safety Governance. November Report Assessment

Joint framework: Commissioning and regulating together

Annual Complaints Report 2014/15

2017 results (HoC library): 2

Highways Asset Management Plan

TITLE OF REPORT: Looked After Children Annual Report

Harrogate College: Land at Hookstone Road and Hornbeam Park Avenue, Harrogate College, Harrogate. Statement of Community Involvement.

Smart Energy GB in Communities fund Overview July - Sept 2018

Improving outdoor PE and sport facilities. Primary Spaces Roles and Responsibilities Tender and Installation Process

Petition 487, Quintain City Park Gate Birmingham Limited

NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE. Interim Process and Methods of the Highly Specialised Technologies Programme

Statement of Community Consultation. DCO STAGE TWO How NuGen will consult with you on its proposals

Voluntary and Community Sector [VCS] Commissioning Framework

Quality Management in Pharmacy Pre-registration Training: Current Practice

NHS HARINGEY CLINICAL COMMISSIONING GROUP EMERGENCY PREPAREDNESS, RESILIENCE AND RESPONSE (EPRR) POLICY

Match Funding your Heritage Lottery Fund Heritage Grant With a National Churches Trust Repair Grant

Smart Energy GB in Communities fund Overview May - June 2018

M4 Corridor around Newport Public Information Exhibitions Report

UCAS. Welsh language scheme

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.

Bury Health and Wellbeing Board. Annual Report for 2016/17

WMCA Board. Date 8 December Report title Midland Metro Wednesbury to Brierley Hill Extension - Submission of Transport and Works Act Order

Integration Scheme. Between. Glasgow City Council. and. NHS Greater Glasgow and Clyde

Regional assistance programs

Statement of Arrangements and Guidance on Patient and Public Participation in Commissioning

Workforce Development Fund

Agreement between: Care Quality Commission and NHS Commissioning Board

PATIENT AND SERVICE USER EXPERIENCE STRATEGY

Report to the Merton Clinical Commissioning Group Board

Industrial Collaborative Awards in Science and Engineering (icase) studentships

The safety of every patient we care for is our number one priority

Adults and Safeguarding Committee 19 March Implementing the Care Act 2014: Carers; Prevention; Information, Advice and Advocacy.

Report to Cabinet. 19 April Day Services for Older People (Key Decision Ref. No. SMBC1621) Social Care

BIRMINGHAM CITY COUNCIL PUBLIC REPORT

Guide to the Continuing NHS Healthcare Assessment Process

What is this Guide for?

Level 2: Exceptional LEP Review Visit by School Level 3: Exceptional LEP Trigger Visit by Deanery with Externality... 18

East Anglia Devolution Research

Leeds West CCG Governing Body Meeting

Beddington Community Fund Scheme Terms of Reference

Our next phase of regulation A more targeted, responsive and collaborative approach

xxxxxx xxxxxx VOLUME 5: FOLDER 1 Consultation Report Chapter 1. Introduction

The UK ACI Professional Development Programme 2016

Reservist Policy (Grey & Green Book) HRPOL023. OFFICIAL Ownership: Employee Resources Date Issued: 15 th March 2017 Version: 2.

Transport NI York Street Interchange APPENDIX A PROJECT BRIEF

Outcome 1: Improved health and well being The council is performing: Excellently

Central Bedfordshire Council. Determination of Proposal to Commission New Middle School Places in Leighton Buzzard

Quality of Care Approach Quality assurance to drive improvement

North Ayrshire Council Tenancy Support Housing Support Service

Grants for the Arts How to apply. 15,000 and under

Assets, Regeneration and Growth Committee 16 March 2016

Site Safety Plus. Site Management Safety Training Scheme Refresher (SMSTS-R) Course appendix H

Agree to the submission of the LHS and the action plan to the Scottish Government in September 2017,

Annual Review and Evaluation of Performance 2012/2013. Torfaen County Borough Council

North Cumbria University Hospitals NHS Trust Proposed Acquisition by a Foundation Trust. Stakeholder Event Wednesday, 12 October 2011

Joint Application Form for Activities Affecting Water Resources in Minnesota

Patient Safety. At the heart of all we do

Standards of proficiency for registered nurses Consultation information

Transcription:

Werrington Grade Separation Pre-Application Approach to Community Consultation Document reference Author 140365-ARP-CON-022 Network Rail Date August 2016 Revision number 4

CONTENTS Page 1 Executive Summary 1 2 Network Rail: Who We Are 3 3 The Project 4 3.2 The options previously consulted on 5 3.3 The preferred option 6 4 Consent for the Scheme 8 5 Approach to Community Consultation 9 5.1 Introduction 9 5.2 Overarching public consultation and engagement strategy 10 5.3 Stage 1: Two engineering options - completed summer 2014 11 5.4 Stage 2 - Pre-application Public Consultation: Single preferred option - autumn 2016 13 5.5 Stage 3: Information round: The final scheme and application 14 6 Consultation Tools and Techniques 15 7 Summary of Consultation Activities 17 8 Reporting on the Consultation 19

1 Executive Summary 1.1.1 This documents sets out the approach to community consultation for the. Before undertaking widespread consultation a copy of this document will be made available online at www.networkrail.co.uk/werrington and the approach discussed and agreed with Peterborough City Council. 1.1.2 As part of Network Rail s funding from the government the Secretary of State for Transport has recognised the importance of improving capacity and reducing journey times on the East Coast Main Line between Scotland, the North East, Yorkshire, Eastern England and London. 1.1.3 In combination with the proposed introduction of new rolling stock, other schemes on the East Coast Main Line (ECML), and the revision of the existing timetable, this project will help to deliver additional capacity on the East Coast Main Line. 1.1.4 The proposed project will involve the construction of a rail chord (line) to provide a new connection between the Stamford lines, to the west of the ECML, and the Great Northern Great Eastern (GNGE) rail lines, to the east of the ECML. 1.1.5 This existing crossing movement causes constraints on the existing timetable as the freight trains, and occasional passenger service, have to pass over the high speed East Coast lines. This project will remove this conflict. 1.1.6 Network Rail is planning to submit an application for an Order under the Transport and Works Act (TWA) to the Secretary of State for Transport in December 2016 for the dive-under scheme. This type of application is commonly used for railway projects where third party land and powers to operate a railway are required. The TWA would grant planning (and associated) permissions for the works together with approval to compulsory purchase (temporary and permanent) land required to deliver and operate the scheme. 1.1.7 A two stage approach has been adopted to consultation. The first stage included early consultation with the public and stakeholders on the scheme options held in summer 2014 and an information round held in October 2015. A second stage of public consultation on the preferred option is proposed for September 2016, in advance of the application being submitted in December 2016. In addition, phased consultation has and will continue with relevant statutory bodies, outlined in section 5.1.6. Page 1

1.1.8 Public consultation is being undertaken in accordance with the strategy and programme set out in this document. The approach and findings of the consultation will be documented and reported in a consultation report which will form part of the TWAO application. 1.1.9 The scheme is an Environmental Impact Assessment (EIA) Development and as such, a comprehensive EIA is currently being undertaken and the application will be accompanied by an Environmental Statement under the Infrastructure Planning (Environmental Impact Assessment) Regulations 2009. This document will demonstrate any environmental impact the development could have, including but not exclusively, impact on visual amenity, noise, vibration, and community, amongst others. The document will also show how Network Rail intends to mitigate any impact highlighted. Page 2

2 Network Rail: Who We Are 2.1.1 Network Rail owns and operates Britain s rail infrastructure. We run, maintain and develop Britain s tracks, signalling systems, rail bridges, tunnels, level crossings, viaducts and many key stations. We strive to provide Britain with a safe, reliable and efficient railway fit for the 21st century. 2.1.2 Following reclassification as an arm s-length central government body in 2014, we retain the commercial and operational freedom to manage Britain s railways infrastructure within regulatory and control frameworks. Our framework agreement 1 with the Department for Transport sets out how we interact in terms of financial management and corporate governance. 2.1.3 Network Rail s income comes from three sources: direct grants from the Department for Transport and Transport Scotland; charges for track access levied on the passenger and freight train operators that use our network; and income from our commercial property. 2.1.4 We receive our government funding in five-year blocks known as control periods. We are currently in Control Period 5 (2014 to 2019). 1 Department for Transport, Network Rail framework agreement, 1 September 2014 https://www.gov.uk/government/publications/network-rail-framework-agreement Page 3

3 The Project 3.1.1 Central government has asked the rail industry to develop plans to increase capacity and reduce journey times between London and key northern cities including Leeds, Newcastle and Edinburgh. This will be achieved through a combination of Network Rail infrastructure improvements, new rolling stock and the introduction of a new, revised timetable. 3.1.2 The project would see the creation of a new chord to provide a new connection between the Stamford lines, to the west of the East Coast Main Line (ECML), and the Great Northern Great Eastern (GNGE) rail lines, to the east of the ECML. 3.1.3 Known as the, this infrastructure will enable freight services to leave the Stamford lines or the East Coast, and join the GNGE lines without crossing the high speed ECML at ground level. The existing crossing movement causes constraints on the existing timetable as the freight trains, and occasional passenger service, have to pass over the high speed East Coast lines; its removal will help to create increased capacity for additional services on the ECML. Figure 1: Location Plan Page 4

The options previously consulted on 3.2.1 Network Rail examined several options for removing the conflicting moves over the ECML. These included options to the north, south, and east of Peterborough, and options at Peterborough station itself. Whilst certain options satisfied the operational requirements of the railway, they were subsequently discarded due to issues of construction, maintainability, or cost. 3.2.2 Two potential solutions for this new section of railway were identified and previously consulted on in summer 2014. These are as follows: - Fly-over: This option would provide a new section of railway, leaving the Stamford lines on the west side of the East Coast Main Line, to the GNGE (Great Northern/Great Eastern Joint Line between Werrington and Doncaster via Lincoln) line on its way to Spalding. With an overall length of around 3km, it would start near the Bretton Industrial Area, climb up to cross the ECML on a new skew bridge before continuing at a high level to cross the A15 (Werrington Parkway) and Lincoln Road. It would fall to meet the GNGE before its second bridge under the A15. - Dive-under: This option would also provide a new section of railway, leaving the Stamford lines to the GNGE. It would leave the ECML at approximately the same point as the flyover, would pass under the ECML and then under the A15 before climbing up to ground level and joining the GNGE between the two A15 bridges. Its overall length outside of the current railway boundary would be around 1.5km. Page 5

The preferred option 3.3.1 The two potential options were presented to stakeholders and the public for consultation in summer 2014. Around 400 members of public attended community consultation events in the local area. Consultees were asked if they had a preference for either the dive under or the flyover. The responses were in favour of the dive-under with 69% of respondents stating this as their preferred option. 3.3.2 Following this consultation, Network Rail completed surveys of the area, and spoke to statutory stakeholders about the plans. A number of topics were considered when deciding upon which option to progress to further design and have as the preferred option, including (but not exclusively): Consultation feedback (both public and technical); Technical requirements; Environmental (including visual impact); Cost; Maintenance; Constructability; Hydrology; and Utilities in the area 3.3.3 Based on the factors above, the dive-under option was selected as the preferred option for the project and has been taken forward for further development. 3.3.4 Further work has been progressed on the dive-under, including how Network Rail intend to build the chord, which this is ongoing now the main design and build contractor has been appointed. At a high level, works are likely to include: Highway amendments at access and exit points; Extension of Gas Works Lane to the West of A15; Large excavation underneath the ECML; Temporary site compounds for the duration of the build; Hydrology assets to be moved (Brook Drain for example); Page 6

Figure 2: The preferred dive-under option *indicative alignment Page 7

4 Consent for the Scheme 4.1.1 In order to build the new section of the railway, some of the construction activities will require Network Rail to secure additional land. As a result Network Rail will be submitting an application for a Transport and Works Act Order (TWAO) to secure the necessary permissions and powers for construction and operation of the project. 4.1.2 The TWAO would cover all elements of the dive-under scheme, including those elements within and outside of Network Rail land ownership, and would provide Network Rail with planning consent and the power to secure the additional land required. 4.1.3 The application under the Transport and Works Act Order will be submitted to the Secretary of State in December 2016. 4.1.4 The scheme will require an Environmental Impact Assessment (EIA) to be submitted alongside the application. The EIA will assess the potential environmental impact of the development on a number of factors, likely to include, noise, visual and air quality impacts. We consult on environmental information during the various stages of consultation. 4.1.5 We will closely monitor the results of the EIA survey work to fully understand how the scheme could impact on neighbouring land and properties. Page 8

5 Approach to Community Consultation Introduction 5.1.1 Network Rail is committed to early and thorough consultation with the local community and interested stakeholders. Before drawing up detailed plans we aim to provide people living and working in the vicinity of the scheme of the proposed works with an opportunity to shape the scheme. 5.1.2 The benefits of pre-application consultation include the following: It provides people with an opportunity to comment on and submit opinions about the emerging proposal It generates feedback to help influence the detail of the proposal and associated mitigation measures It helps to identify those who could be affected by the scheme, and provide them with accurate information to help reduce any potential uncertainty. 5.1.3 A two stage approach has been adopted to public consultation, including early consultation on two options with local people and stakeholders between summer 2014 and October 2015 and a second stage of public consultation on the preferred option that will be carried out in September 2016, in advance of the application being submitted in December 2016. 5.1.4 The approach and findings of Stage 1 consultation: Two engineering options is set out in section 5.3. 5.1.5 The approach to Stage 2 pre-application consultation: Single preferred option is set out in section 5.4. 5.1.6 In addition, phased consultation has and will continue to be carried out with relevant statutory bodies including Peterborough City Council, Environment Agency, Natural England, Historic England, local utility suppliers including drainage boards, gas, water and electricity suppliers, amongst other key stakeholders. 5.1.7 The approach and findings of the pre-application consultation will be documented and reported in a consultation report, which will form part of the TWAO application. Page 9

6 Overarching public consultation and engagement strategy Programme Stage 1 consultation: Two engineering options Feedback analysis and dissemination Announcement of the preferred option Dates Summer 2014 Summer 2014 October 2015 October 2015 Stage 2 pre-application consultation: Single preferred option Feedback analysis and dissemination Submission of Transport and Works Act Order September 2016 September November 2016 December 2016 Page 10

Stage 1: Two engineering options - completed summer 2014 6.1.1 Early consultation was undertaken with people living in the vicinity of the proposed works as well as interested parties from the wider area. 6.1.2 Two engineering options for the project were showcased along with initial emerging environmental information. 6.1.3 The Stage 1 consultation provided an opportunity to inform stakeholders and the public about the options and gather feedback on the proposals. 6.1.4 Around 400 people attended consultation events in the local community. The feedback received was collated and analysed and used to help inform the selection of the preferred option. 6.1.5 Of the 142 hard copy/online responses received 47% of respondees strongly supported Network Rail s plans to improve passenger services on the ECML, while 30% agreed, 11% were undecided, and 11% disagreed or strongly disagreed (1% did not answer. 6.1.6 69% of respondees preferred the dive-under option, 18% the fly over and 13% were undecided. OPTION PREFERENCE RESULTS undecided 13% fly over 18% dive-under 69% Figure 3: The results of the stage one consultation feedback for the two options presented: the fly over and dive-under options Page 11

6.1.7 Based on several factors, including the consultation feedback, the dive-under option was selected as the preferred option for the scheme. 6.1.8 The preferred option was announced in October 2015 and two public drop-in sessions were held at the Hodgson Community Centre. 6.1.9 Since then, further work has been done to develop the detail of the proposals for the single preferred option and the updated proposals will undergo further consultation in September 2016. Page 12

Stage 2 - Pre-application Public Consultation: Single preferred option - autumn 2016 6.2.1 Consultation on the detailed design of the proposed scheme will be carried out with people living in the vicinity of the site as well as other interested parties. 6.2.2 This stage will explore the detail and gather further feedback on the single-preferred option, proposed construction methods and the preliminary environmental information. This stage will also help to address any queries before the plan for the dive under option is finalised. 6.2.3 The feedback submitted will be used to help inform the detail of the final application. 6.2.4 The consultation event dates and times will be announced at least two weeks ahead of the first event. 6.2.5 Following the events, feedback provided will be analysed and used to inform the final scheme that is submitted in the TWAO. We will update online materials and disseminate updated information about the final plans to stakeholders. Page 13

Stage 3: Information round: The final scheme and application 6.3.1 The final application documents will be made available for stakeholders and the local community to view at the time of submission. At this stage we will carry out the following: Update the website Update information for councillors / key stakeholders / Parish Councils Update information for residents Media announcements. Page 14

7 Consultation Tools and Techniques 7.1.1 A range of informative and consultative techniques have been used throughout the delivery of the strategy which are summarised in the table below. Consultation Methods Mail shots Mail shots have been undertaken to provide people living in roads that neighbour the proposed site with information about the scheme and details of the consultation / public exhibitions. Those interested outside this area have been targeted by media releases. Public exhibitions Public exhibitions to provide information and listen to the public. Public exhibitions are planned on a range of days and times of the day so that as many people as possible could attend. Consultation materials and techniques Rail information sheets Exhibition panels Briefing note Feedback forms and questionnaires Network Rail project materials Telephone helpline We provide a 24-hour telephone helpline service. The representatives were fully briefed on the scheme ahead of each stage of consultation and are being updated during the duration of the project. Written comments and feedback Written comments have been submitted online via the Network Rail website and to the project email address. A record of comments raised via the helpline number has been reviewed as part of the consultation process. Written comments have also been submitted to the project postal address. Project web pages Information about the scheme and forthcoming consultation events was included on Network Rail s website. This includes a summary of the proposal and relevant documentation. The information is being amended as the scheme evolves. This will be updated in advance of the stage two consultation. 24-hour telephone helpline: 03457 11 41 41 Web page address: www.networkrail.co.uk/ werrington Project overview Drawings / maps Any relevant reports Page 15

Project updates and flyers Letters have been used to update the public and stakeholders on the detail of the scheme, promote consultation events and invite feedback from people that are unable to attend the exhibitions and meetings. The letters include details of the project hotline number and web-link. Letter will be sent in advance inviting people to take part in the stage two consultation. Letters Freepost feedback facility Stakeholder and third party events / activities Stakeholder and Parish Council meeting As part of the early consultation it was offered, and where able, meetings were attended which were organised by stakeholders to update people on the proposal and invite feedback. These briefings included Parish Councils. This method of consultation is ongoing throughout the duration of the project. A second round of residents meetings will take place at the beginning of the stage two consultation in September 2016. Council meetings Presentations and Q&A sessions were offered to councillors at various stages of the project. This provided an opportunity to update members on the progress of the scheme and to work through any issues at the earliest opportunity. A follow-up briefing session will take place on 30 August 2016 in advance of the stage two public consultation. Media relations activity Media announcements The media provides a useful way of promotion of the scheme and publicising consultation events. Press releases were issued to the local media through print, broadcast and online outlets. This was supplemented with advertising at early stages of the project. Stage two events will be publicised through the same channels. Briefing notes Maps / plans Feedback forms Presentations Briefing notes Press releases Adverts Letters Page 16

8 Summary of Consultation Activities 8.1.1 The table below summarises the key features of the stage 1 & 2 public consultation for the scheme. Stage/Date Stage 1: Early Consultation on the Options Summer 2014 Summary of Activity Meetings with councils and key stakeholders (including Parish Councils) Information letters and flyers issued Project information uploaded onto www.networkrail.co.uk Public exhibition road show/drop-in sessions held in 4 local venues MP briefings. Analysis of consultation feedback Announcement of the preferred scheme October 2015 Stage 2: The preferred option September 2016 Analysis took place during the consultation (to consider early representations) and immediately after the consultation (to consider late representations). Feedback was analysed and understanding issues raised and feedback used to inform the selection of a single alignment. Press announcements Feedback forms, email address and project hotline number Meetings have also been held with interested community groups and parish councils as and when required in addition to MP and councillor briefings. These included Peterborough City Council, Environment Agency, National Grid, the Peterborough and North West Cambridgeshire MPs, Werrington Residents Association, local businesses, and the Werrington North, Glinton & Wittering, Bretton and Newborough local councillors. Information events took place in October 2015 to provide the community with information on the preferred option, following the stage one consultation events in 2014. A round of pre-application public consultation will take place in September 2016 including briefing to key stakeholders and community groups, this will allow us to collect views relating to the detail of the selected scheme, Page 17

update the scheme stakeholders and address any queries before the plan for the dive-under option is finalised. Analysis of consultation feedback Following the events, feedback provided will be analysed and used to support the TWAO application submission. Information round: The final scheme Early 2017 Update website Update information for councillors / key stakeholders / Parish Councils Update information for residents Media announcements Page 18

9 Reporting on the Consultation 9.1.1 A full consultation report will be submitted to support the TWAO application summarising the activity carried out and the feedback submitted. It will set out an overview of how the scheme has been amended in response to consultation and, if necessary, explain why certain aspects of the scheme has not been changed in response to certain comments. 9.1.2 The consultation report will form part of the formal application documentation pack and will be available to view when the application is submitted. The consultation report and a summary will be made available in public libraries, council offices in the local area and on the project webpage. Page 19

Appendix 1 Map for stage one consultation Consultees within the red line area were notified of the consultation through direct mail. Relevant consultees outside of this area were notified of consultation through ward councillors, news releases, and online information. Page 20

Appendix 2 Map for stage two consultation Consultees within the red line area will be notified of the consultation through direct mail. Relevant consultees outside of this area will be notified of consultation through ward councillors, news releases, and online information. The boundary has been amended in consultation with Peterborough City Council, to reflect the potential impacts of the preferred option. Page 21