II. Accuracy: Professional work is completed with due diligence and is accurate.

Similar documents
FMO External Monitoring Manual

STUDY INFORMATION POST-IRB APPROVAL FDA DEVICE (IDE) SPONSOR AND INVESTIGATOR RESPONSIBILITY (21 CFR 812)

Façade Improvement Program and Development Incentive Program Review

Document Title: File Notes. Document Number: 024

THE CODE. Professional standards of conduct, ethics and performance for pharmacists in Northern Ireland. Effective from 1 March 2016

REPORT 2016/106. Audit of management of implementing partners at the International Trade Centre FINAL OVERALL RATING: PARTIALLY SATISFACTORY

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants

Document Title: Version Control of Study Documents. Document Number: 023

2016 RECYCLING BUSINESS DEVELOPMENT GRANTS REQUEST FOR PROPOSALS N.C.

Practice Review Guide

INVITATION TO BID (Request for Proposal)

Practice Review Guide April 2015

Bureau of Waste Management

Reproductive Technology Accreditation Committee TECHNICAL BULLETIN 7 PUBLIC INFORMATION, COMMUNICATION AND ADVERTISING AUSTRALIAN CLINICS.

Document Title: GCP Training for Research Staff. Document Number: SOP 005

Pre-registration. e-portfolio

ACTIONS/PSOP/001 Version 1.0 Page 2 of 6

POCKET GUIDE TO THE ACCREDITATION STANDARDS (ISO 15189:2014)

Procedure for handling applications for authorisation and review reports under REACH

An Invitation: Establishing a community forest with the U.S. Forest Service

Trial Management: Trial Master Files and Investigator Site Files

Document Title: Informed Consent for Research Studies

BDWW-GP-1 Number Fish Habitat Enhancement Structures N Days 43. BDWM-GP-6 BDWM-GP-7 Agricultural Minor Road Crossings and Ramps N 43

Unofficial copy not valid

SAMPLE GRANT GUIDELINES to be added to our notification list for information about future cycles.

ISDN. Over the past few years, the Office of the Inspector General. Assisting Network Members Develop and Implement Corporate Compliance Programs

ACCESS TO HEALTH RECORDS POLICY & PROCEDURE

Webb-Waring Biomedical Research Awards

Auditing of Clinical Trials

General Permit Number. Description

REQUEST FOR PROPOSAL AUDITING SERVICES. Chicago Infrastructure Trust

Land and Property Investment Fund (LPIF) Project Lifecyle APPENDIX 37

MANAGEMENT OF PROTOCOL AND GCP DEVIATIONS AND VIOLATIONS

Document Title: Site Selection and Initiation for RFL Sponsored Studies Document Number: 026

Request for Proposal PROFESSIONAL AUDIT SERVICES

Points to Consider regarding the Notification and Publication of Package Insert Language

SAMPLE GRANT GUIDELINES

Glasgow East End Carers Respite Service Support Service Care at Home Academy House 1346 Shettleston Road Glasgow G32 9AT Telephone:

Document Title: Research Database Application (ReDA) Document Number: 043

MDUFA Performance Goals and Procedures Process Improvements Pre-Submissions Submission Acceptance Criteria Interactive Review

Guidelines and Instructions: Breathing as One: Allied Health Research Grants

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

2018 GRANT GUIDELINES Accepting Applications May 10, 2018 June 28, 2018

PROFESSIONAL STANDARDS FOR MIDWIVES

STANDARD ADMINISTRATIVE PROCEDURE

Standard Operating Procedure (SOP) Research and Development Office

Monitoring Medicaid Managed Care Organizations (MCOs) and Prepaid Inpatient Health Plans (PIHPs):

NN SS 401 NEURONEXT NETWORK STANDARD OPERATING PROCEDURE FOR SITE SELECTION AND QUALIFICATION

Guidelines on the Keeping of Records in Respect of Medicinal Products when Conducting a Retail Pharmacy Business

Accelerated Translational Incubator Pilot (ATIP) Program. Frequently Asked Questions. ICTR Research Navigators January 19, 2017 Version 7.

Public Health Accreditation Board. GUIDE to National. Public Health Department. Accreditation

Quality Assurance/Quality Control Procedures for Environmental Documents

Document Number: 006. Version: 1. Date ratified: Name of originator/author: Heidi Saunders, Senior Portfolio Coordinator

SAMPLE - Medical Staff Credentialing and Initial Appointment Policy

Standards conduct, accountability

Working document QAS/ RESTRICTED September 2006

Appl Code. WOSC GP-05 Utility Line Stream Crossings NEW General Permit 05 50

APPENDIX D CHECKLIST FOR PROPOSALS

The official manual of the Sheriff's Department of the County of Los Angeles is hereby established and is titled "Manual of Policy and Procedures.

Standard Operating Procedures for Processing Municipal and Residual Waste General Permit Applications. Bureau of Waste Management

STANDARDS & MANUALS. Accreditation Revised February 2015 Interim Changes Highlighted

Document Title: Research Database Application (ReDA) Document Number: 043

Risk Assessment. Version Number 1.0 Effective Date: 21 st March Sponsored Research

Standard Operating Procedure (SOP) for Reporting Serious Breaches in Clinical Research

Request For Proposal; Off The Road Used Tire Weights. Issued by Ontario Tire Stewardship

Request for Proposal # Housing Services Corporation. Web and Graphic Design Services. Housing Services Corporation

Application Form. Green Infrastructure Fund

Values Accountability Integrity Service Excellence Innovation Collaboration

Performance audit report. Department of Internal Affairs: Administration of two grant schemes

20 STEPS FROM STUDY IDEA INCEPTION TO PUBLISHING RESEARCH/ Evidence-Based Practice

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610)

Request for Proposal PROFESSIONAL AUDIT SERVICES. Luzerne-Wyoming Counties Mental Health/Mental Retardation Program

Clinical Compliance Program

Institutional Review Board (previously referred to as Human Participants Research Board) Updated January 2004

Grants to Institutions

SAMPLE FELLOWSHIP GUIDELINES to be added to our notification list for information about future cycles.

New South Wales Nurses and Midwives Association

Standard FAC Facility Ratings. A. Introduction

Report of the Auditor General to the Nova Scotia House of Assembly

managing or activities.

Grants Financial Procedures (Post-Award) v. 2.0

Colonias Infrastructure Board Resolution

P r o g r a m Community Stewardship Incentive Program (CSIP) Grant

Audit of Engage Grants Program

Request For Proposal; Stockpile Tire Cleanup. Issued by Ontario Tire Stewardship

TNI Environmental Laboratory Program- Accreditation Procedure

IACUC Policy 09: Researcher Non-Compliance

AHP Application Getting Started Application Tips

CIP Cyber Security Incident Reporting and Response Planning

Responsible pharmacist requirements: What activities can be undertaken?

Revalidation for Nurses

Section F: Committee of Adjustment: Minor Variance and Consent Applications

!!!!!!!!!!!!!!!!!!!!!!!!!!! For Physician Assistant Practitioners in Australia !!!!!!!!!!!!!!!!!! !!! Effective from September 2011 Version 1

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM

ASSE International Seal Control Board Procedures

2018 FELLOWSHIP GUIDELINES Accepting Applications May 10, 2018 June 28, 2018

Farm Data Code of Practice Version 1.1. For organisations involved in collecting, storing, and sharing primary production data in New Zealand

Document Title: Document Number:

Revalidation Annual Report

European Aviation Safety Agency Doc # Approval Date PR.CAP Name Validation Date. Verified by: Ralf ERCKMANN Validated 24/06/2015

Transcription:

SOP Title: Registered Forestry Professional Due Diligence Practise of Department Staff SOP No: 2008-1 Date: August 1, 2008 Purpose: To outline reasonable due diligence expectations for department staff reviewing and approving validated forest management submissions required by the Alberta Forest Management Planning Standard (FMPS), Annex 2 Role of Regulated Forestry Professionals (RFP) in Forest Management. Responsibilities: I. Professionalism: Alberta believes that RFPs will act in the professional manner described in the Code of Ethics (Code) and Standards of Practise of each College. A RFP is responsible and accountable for displaying conduct that his/her peer group of professionals would characterize as being ethical. Although ethics are subjective and abstract in nature, detailed guidance as to what ethical behaviour encompasses is embodied in each College s Standards of Practise. Meeting the obligation for professional conduct requires that RFPs display honest, respectful and dignified behaviour. RFPs are advised to be familiar with the Code. II. Accuracy: Professional work is completed with due diligence and is accurate. This principle applies to RFPs submitting work as well as those reviewing and approving work. The definitions of the terms accurate and due diligence are included in the definitions attached. Submissions that are accurate and prepared with due diligence enable unencumbered review processes. Submitting RFPs demonstrate accuracy by completing checklists. Reviewing RFPs demonstrate due diligence by sampling to assess the accuracy of checklists. Final Version Page 1 of 6 Owner: W.Machan

Procedure: 1) Document Submissions: The FMPS - Annex 2 lists the forest management documents that RFPs shall validate, and includes the type of review (acceptance or appraisal) Alberta will conduct to approve the document. Checklists shall normally be used to declare the accuracy of submissions in instances where submissions are complex (e.g. the land base description in an FMP). In instances of simpler submissions (e.g. reforestation reports), validation by an RFP is sufficient because it assures accuracy. Table 1 summarizes the key factors related to each submission. These checklists are available at the following web address: http://www.srd.alberta.ca/managingprograms/forestmanagement/regulatedfores tryprofessionals.aspx 2) Document Reviews Timelines Alberta will use for the two types of document review are as follows: a. Document approvals are issued where Alberta s review determines the document acceptable. Reviews shall be completed within 30 working days of being received. Where reviews reveal no significant issues in the opinion of the reviewer, approvals shall be issued within that same 30 day period. Note: Forest management plan reviews shall be completed within 100 working days of being received. (See FMPS Interpretive Bulletin Forest Management Planning Roles, Responsibilities and Approval Authorities). b. - Documents are deemed approved on the date that Alberta recognizes receipt of the work. Alberta shall notify the company recognizing receipt within five working days of submission unless Alberta finds the document incomplete or inaccurate. Where this occurs, the document is returned for correction and resubmission. The review timelines for the re-submission shall be the same as for the initial submission. The extent of the review may vary by submission and document type. Final Version Page 2 of 6 Owner: W.Machan

3) Variances from Standards or Plans Only the manager accountable for document approval shall authorize variances from standards or plans (see Table 1). Changes to approved plans (e.g. Annual Operating Plans (AOP)) are to be approved by the accountable manager. Amendment mechanisms exist in the operating ground rules to address changes in AOP s. 4) Alberta s Review For all submissions, reviewers shall first assess completeness and then check for significant errors. The extent of the review is to be determined through consultation between the reviewing RFP and the accountable manager. Submissions submitted for acceptance are generally simple submissions of information (e.g. regeneration surveys). The standards for such submissions are normally included in various government policies (e.g. Regeneration Survey Manual). Validation conveys assurance of submission accuracy and thus the reviewing RFP need only check to see that the submission is validated and/or any checklist required states that all requirements have been met. Documents requiring appraisal are more complex. The reviewing RFP shall prepare and file a brief report as per the following guidance: a. briefly document the rationale for selecting the factors to evaluate b. describe the results of the assessment the accuracy of information submitted for factors selected; c. in consultation with the accountable manager determine the outcome of the appraisal (management decision); and d. briefly document the appraisal results and decision rationale, including reviewer names and dates, and retain on file. Validated Checklists a. Where a review of the submitting RFP s validated checklist finds it incomplete, the reviewing RFP shall return the checklist and the submission to the submitting RFP for completion and resubmission. b. Where the submitting RFP s validated checklist indicates the submission is complete, the reviewer shall spot check the submission to confirm its completeness. Final Version Page 3 of 6 Owner: W.Machan

c. Where the submitting RFP s validated checklist indicates the submission is incomplete but the reviewer determines the explanations for this are acceptable, the reviewer shall recommend approval to the accountable manager. d. Where the reviewer determines the explanations for the incomplete submission are not acceptable, the reviewer shall return the submission for correction and resubmission. For some acceptance submissions (i.e. regen survey tally cards, ARIS), re-submission may not be feasible so action plans under the Forest Operations Monitoring Program, or if serious, enforcement may be necessary. 5) Conduct The reviewing RFP shall carry out meaningful discussions with the submitting RFP on any questions or concerns regarding the submission. Where issues cannot be resolved between the reviewing and submitting RFPs, the accountable manager shall resolve the issue with the responsible manager of the submitting agency. 6) Forest Operations Monitoring Program (FOMP) The Department shall use the FOMP to monitor the execution of approved AOPs and to verify the accuracy of submissions. 7) Launching Complaints with Regulatory Colleges Where the reviewing RFP believes a submitting RFP is not practicing in a professional manner, the following shall apply: a. The reviewing RFP shall review the Code of Ethics and Standards of Practice for the responsible College to ensure complete understanding of the obligations for professionals practicing forestry in Alberta. b. The reviewing RFP may launch a complaint to the responsible professional forestry College as an individual; or c. The reviewing RFP may recommend the department launch a complaint to the responsible professional Forestry College. Where items b or c. (above) are chosen, the reviewing RFP shall treat this privileged information in a confidential manner and immediately seek guidance from the Senior Forester, Enforcement, Forest Management Branch. Final Version Page 4 of 6 Owner: W.Machan

The Senior Forester, Enforcement shall consult the Senior in Forest Management Branch who is the content expert on the issue to ensure that the standards or plans are being interpreted correctly. For example, concerns with an Annual Operating Plan shall be referred first to the Senior of Forest Operations in FMB. Should the Senior Forester, Enforcement recommend the department launch a complaint to a College, the accountable Senior in FMB and the Area Program will review the recommendation. The managers shall jointly agree to the department s most appropriate course of action. Where the managers agree to launch a complaint, a letter addressed to the responsible College shall be prepared for signature by the Executive Director, FMB. Attachments: 1. Alberta Definitions 2. Table 1 Summary of Forest Management Submissions and Review Supporting References: Alberta Forest Management Planning Standard Annex 2 Records: n/a Authorities: Alberta Forest Management Planning Standard Written by: Approved by: Robert Stokes Original Signed D. (Doug) A. Sklar, Executive Director Forest Management Branch Date to be reviewed: April 1, 2011 Final Version Page 5 of 6 Owner: W.Machan

ALBERTA DEFINITIONS Term Accountable Accurate Accuracy Submission Due Diligence Meaningful Discussion Definition in the context of this SOP The employee of Alberta with delegated approval authority for applicable standards or submissions. - Is free of errors or omissions and is submitted on time. It is recognized that mistakes will occur occasionally. Prompt notification and correction of mistakes when discovered is the appropriate action. - Deviates from the Standard only within acceptable limits, as specified by Alberta. Technical standards and tolerance limits in existing Acts, regulations, policies, directives, guidelines, ground rules and approved plans will be amended from time to time by Alberta. - Contains sufficient information to be readily understood. Complete documentation and explanation of work is demonstrated. The characteristic of being accurate and prepared with due diligence All information provided in any format (e.g. digital, hard-copy, multimedia) prepared by or for the proponent to fulfill a regulatory, policy or other requirement, obligation or commitment to Alberta. - Taking and documenting steps to ensure the desired outcome is achieved or the chances of a negative consequence or outcome are minimized. - Ensuring completeness, correctness, consistency and repeatability. - Demonstrating how conclusions were reached. - Using mechanisms such as but not limited to checklists and standard operating procedures, to demonstrate that appropriate procedures were followed and to ensure that no relevant steps or considerations were missed. - Keeping and maintaining appropriate files and filing systems as well as document retention policies and practices. Discussion in good faith, with honest communication and an open exchange of relevant information before decisions are made. Information has been presented, it is understood by the recipient, and the recipient s questions, concerns or issues have been addressed. Final Version Page 6 of 6 Owner: W.Machan

Table 1 - Summary of Forest Management Submissions and Review * Submission Type or (appraisal Submission Checklist/Form for an FMP is 100 working days, 30 for appraisal, 5 for acceptance) Standards Approving Comments FMP Senior RFP, Responsible RFP checklists FMPS Exec Director FMB Validating RFP's can rely on complete checklist for documentation Yield projections Vegetation Inventory Landbase Descritpion Section 4 of Annex 1 of FMPS Section 2.0 of Annex 1 of FMPS Section 3.0 of Annex 1 of MPS Senior Resource Analysis Section FMB Senior Resource Analysis Section FMB Senior Resource Analysis Section FMB Silviculture Strategies Forecasting Harvest planning Annual Monitoring reports Stewardship Reports Annual Operating Plan General Development Plan Compartment Assessment Final Harvest Plan Road & Fire Control Plan Reforestation Program Template under development Template under development FHP Checklist Section 5.9.1 and 5.9.2 of Annex 1 of FMPS Section 5.0 of Annex 1 of FMPS Section 5.7 and 6.0 of annex 1 of FMPS As required by approved FMP and/or operating groundrules for the area As required by approved FMP and/or operating groudnrules for the area Section 3.5 Section 3.3 Section 3.2 Section 3.4 Section 11.2, and 10.3 Sections 8.1 and 8.2 Senior Reforestation Section FMB Senior Forest Planning Section FMB Senior Operations Section FMB Area Senior Forest Planning Section FMB Senior Forest Planning Senior, Operations Section FMB must approve ground rule variances. Major AOP amendments after the plan is approved require approval. Minor Amendments are notification only. Details found in the ground rules. Table 1 - Summary of Forest Submissions and Review 12/23/2010

Table 1 - Summary of Forest Management Submissions and Review * Submission Type or (appraisal Submission Checklist/Form for an FMP is 100 working days, 30 for appraisal, 5 for acceptance) Standards Approving Comments Scaling Population Plan Timber Production audits Community Timber Manufacturer Certified Statement of Operations Reforestation Data - ARIS Submission Regeneration Survey Tally Cards Field Operations Inspection Reports Herbicide Reports Partial Cutting Proposals Form 262 Checklist TM Form 262 As addressed in Letter of Understanding for audit Checklist for certified statement ARIS RFP Validation Statement with digital ARIS submission Scaling Manual and Section 116.2 of the TM Regulation Appended to Checklist ARIS Industry Operations Manual - Mandatory Elements Regen Survey Cover Sheet Appendix 7 of Survey Manual Monthly summary forms and Field inspection forms for individual cutblocks and roads. See Appendix 1 and 2 of FMB Directive 2006-04 (Forest Operations-Compliance and Enforcement) Herbicide Checklist Herbicide Reference Manual Partial Cut Checklist (under development) * Note that this list varies from the listing in Annex 2 but are the currently relevant forestry submissions. Partial Cutting Guidelines - supplement to the Alberta Forest Management Planning Standard Senior Timber Production, Auditing and Revenue Section Senior Timber Production, Auditing and Revenue Section Senior Timber Production, Auditing and Revenue Section Senior Reforestation Various component to be validated by RFP or company accounting representatives Submission is digital on May 15 annual, but signed Validation Letter must be submitted at the same time. Companies can develop their own forms as long as the information in 2006-04 is captured. Covers submissions for commercial thinning, understorey protection, Firesmart, and other partial cutting (ie. seed tree reforestation) Table 1 - Summary of Forest Submissions and Review 12/23/2010