Summary of. Overview. existing law. to coal ash. billion in FY. funding in FY 2013 FY 2014

Similar documents
The FAST Act: Update on Surface Transportation Legislation. December 16, 2015

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act

SUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014

MAP-21: Overview of Project Delivery Provisions

MAP-21 and Its Effects on Transportation Enhancements

Please complete your phone connection now:

DCHC MPO Funding Source Overview & Guidance draft January 2015

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

SAFETEA-LU. Overview. Background

KYOVA Interstate Planning Commission

Appendix 5 Freight Funding Programs

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY

2018 Call for Projects Guidebook

Falling Forward: A Guide to the FAST Act

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government

Federal Financing of Transportation in Texas

Appendix E Federal and State Funding Categories

SAFETEA-LU s IMPACTS ON ODOT MARCH 2006

2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds

Transportation Alternatives Program (TAP) Recreational Trails Program (RTP)

Appendix E: Grant Funding Sources

TRANSPORTATION. The American County Platform and Resolutions

AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21

9. REVENUE SOURCES FEDERAL FUNDS

Moving Ahead for Progress in the 21 st Century (MAP-21)

2007 Annual List of Obligated Projects

9. Positioning Ports for Grant Funding and Government Loan Programs

Funding the Federal-Aid Highway Program

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads

Fixing America s Surface Transportation Act

GDOT & Federal-Aid Highway Financing

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

WELCOME TO THE KALAMAZOO AREA TRANSPORTATION STUDY

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E.

Transforming Transportation Through Innovation

Federal Highway Administration Future of Highway Funding

2018 STP & CMAQ Project Selection Process

The American Recovery and Reinvestment Act of Enacted February 17, 2009

Regional Transportation Plan: APPENDIX B

Making the MOST. of MAP-21. A Guide to the 2012 Federal Transportation Law And How to Use it for Positive Change in Your Community

Section 1201: Requirements for Traveler Information

Navigating MAP 21. Securing Federal Funding for Community Walking & Biking Projects

August 3, Laura Mester Chief Administrative Officer Michigan Department of Transportation

DOT FUNDING OPPORTUNITIES FOR TRANSPORTATION ASSETS

Statewide Performance Program (SPP) Interstate and National Highway System (NHS) Pavement

Section 6 Federal Programs

STIP. Van Argabright November 9, 2017

Division A Federal Aid Highways And Highway Safety Construction Programs

FUNDING SOURCES. Appendix I. Funding Sources

Megan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017

Support the House provision (Section 1100) establishing a Critical Commerce Corridors Program.

GAO HIGHWAY SAFETY IMPROVEMENT PROGRAM. Further Efforts Needed to Address Data Limitations and Better Align Funding with States Top Safety Priorities

Transportation Funding Terms and Acronyms Unraveling the Jargon

LPA Programs How They Work

Overview of the Regional Transportation Improvement Program

Federal Public Transportation Program: In Brief

FFY Transportation Improvement Program

Purpose. Funding. Eligible Projects

MAP-21 and Project Delivery: A Legal Perspective

APPENDIX H: PROGRAMMING POLICY STATEMENT

CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

VERMONT AGENCY OF TRANSPORTATION. FY2018 Budget. Joe Flynn, Secretary of Transportation House Appropriations Committee February 27, 2017

NAPA Overview. Dan Gallagher, Chairman National Asphalt Pavement Association 2017 WAPAConference

PROJECT SELECTION Educational Series

AGC of TEXAS Highway, Heavy, Utilities & Industrial Branch

The Fiscal 2018 Omnibus Spending Bill

Memorandum. Date: May 13, INFORMATION: Transportation Alternatives (TA) Set-Aside Implementation Guidance (Revised by the FAST Act)

Brownfields Conference Oklahoma City, OK May 22, What is FHWA?

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area

Module 2 Planning and Programming

The House and Senate overwhelmingly approved the legislation. The vote in the Senate was 91-7 and in the House of Representatives.

AGENDA. Regional Transportation Council Thursday, September 13, 2018 North Central Texas Council of Governments

Intentional blank page. Los Angeles County Metropolitan Transportation Authority

Stimulus Funding and Transportation

Deval Patrick, Governor Timothy P. Murray, Lieutenant Governor Jeffrey B. Mullan, Secretary of Transportation and Chief Executive Officer

APPENDIX 5. Funding Plan

Section 130 Program Overview and Update. James (Jim) Dahlem FHWA Office of Safety Washington, DC

INTRODUCTION... 1 OVERVIEW... 2 SECTION I: FUND LISTING AND ELIGIBILITY CHART... 5 SECTION II: FUNDING SOURCE DESCRIPTIONS... 8

Arkansas Transportation Alternatives Program (TAP-2015) & Recreational Trails Program (RTP-2015) Application Seminars

TIGER & FASTLANE: AN INSIDE LOOK AT NEW OPPORTUNITY

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for

HB2 Quick Guide To view the latest version of the HB2 Policy Guide:

The FAST Act: New Department of Transportation Tribal Self-Governance Program and Tribal Transportation Provisions

Transportation Improvement Program. Mid-America Regional Council Transportation Department

POLICIES RELATING TO FEDERAL HIGHWAY FUNDING

Fiscal Year 2018 Competitive Funding Opportunity; Grants for Buses and Bus Facilities Infrastructure Investment Program

MAP-21: An Analysis. The Trust Fund

SMART SCALE Policy Guide

Highway and Light Rail Public-Private Partnerships in the U.S.: Protecting the Public Interest

Overview of Presentation

South Dakota Department of Transportation. State Planning & Research Program for Local Governments

Section Policies and purposes

State of Nevada Department of Transportation Transportation Alternatives Program (TAP)

Section 6 Federal Programs

REPORT TO MAYOR AND COUNCIL

TRANSPORTATION. All levels of government should cooperate in setting minimum standards for highway improvements.

The Future of the Federal Role in Transportation

Section 6. The Transportation Plan

Transcription:

H.R. 4348, THE MOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY ACT CONFERENCE REPORT Summary of Key Highway and Research Provisions The following summary is intended to highlight thee highway and research titles of MAP 21. It does not include the transit or motor carrier safety provisionss of the bill. Overview Summary. MAP 21 funds the surface transportation programs at roughly current levels through September 30, 2014. The bill includes an extension of existing law through the end of FY 2012, withh the programmatic and structural changes coming into effect for fiscal years 2013 and 2014. MAP 21 continues the ban on Congressional earmarks. Provisions Not Included. The billl does not include any federal mandates on pavement design methods there were proposed in the House of Representatives and US Senate. The bill does not include thee Senate s rail title. The House passed Keystone XL Pipeline authorization and provisions related to coal ash were also not included. Programs Authorized. The bill authorizes funds for highway, transit, highway safety, motor carrier safety, and research programs. For Federal aid highway programs, the bill authorizes $40.56 billion inn FY 2013 and $40.625 billion in FY 2014. The bill also included extensions of thee Secure Rural Schools and Payments in Lieu of Taxes program. Funding Levels. Current Federal aid provides: highway program funding in FY 2012 is $39.144 billion. The billl o $39.699 billion in FY 2013 o $40.256 billion in FY 2014

Funding Sources. In addition to extending federal fuel excise taxes through September 30, 2016, the bill utilizes a number of new funding sources, including pension reforms and a transfer of the portion of the gasoline tax that currently goes into the Leaking Underground Storage Tank Trust Fund into the Highway Trust Fund (HTF). The bill does not include any long term fixes for the solvency of the Highway Trust Fund. The Congressional Budget Office predicts that under the conference report, the HTF will be insolvent in both the Highway Account and the Mass Transit Account by FY 2015. Core Highway Programs National Highway Performance Program. The new NHPP program combines three former programs: Interstate Maintenance, National Highway System, and Bridge. The program aims to improve conditions and performance on the 161,000 mile National Highway System, with a focus on state of good repair activities and a requirement that States develop a risk based asset management plan. o The Secretary is directed to conduct a rulemaking to establish performance standards for the minimum condition of pavement and bridges on the NHS. For pavements, the Secretary shall establish minimum standards for operating pavement management systems, minimum levels for the condition of the pavements, and the data elements necessary to collect and maintains standardized data to carry out the performance based approach. States failing to meet these targets over time will be required to spend a portion of both their NHPP funds, and their Surface Transportation Program funds, to address their shortfalls. The rulemaking must be complete within 18 months. Surface Transportation Program. The STP program is similar to prior iterations, providing very broad eligibility for States and local governments. MAP 21 removes the requirement that 10 percent of funds be spent on transportation enhancements. The bill continues to require sub allocation to areas based on population, but lowers the percent from 62.5 percent to 50 percent. This lower percentage for local governments is offset by the removal of the 10 percent offthe top transportation enhancements funding. The program also includes the off system bridge set aside, requiring States to spend money equivalent to what they spent in FY 2009 on bridges not on the federal aid system. 2

Highway Safety Improvement Program. The HSIP program continues to fund infrastructure based safety projects. States will be required to meet safety performance targets over time and will be required to spend a portion of their funds to address any shortfalls. The high risk rural road program is altered, and States that see their rural roadway fatalities rise over a two year period will be required to use a portion of their funds to address this problem. States that do not have an increase in rural road fatalities will not be subject to this requirement. Congestion Mitigation and Air Quality Program. CMAQ funds will continue to support projects to reduce emissions in maintenance and non attainment areas. The Senate proposal to sub allocate this program down to the local level was not retained in the conference report. The prohibition on spending CMAQ funds on single occupancy vehicle capacity was retained. The bill modifies the diesel retrofit priority to require, that in PM2.5 nonattainment areas, States prioritize projects proven to reduce PM2.5, including diesel retrofits. States may also elect to fund retrofits for construction equipment, but this is not a requirement. National Freight Policy. MAP 21 does not direct funding to a new freight grant program as proposed in the initial Senate bill. Instead, the bill provides an increased federal share for freight projects 95 percent for projects on the Interstate system, and 90 percent for other projects. The Secretary is directed to designate a new national freight network, to include up to 27,000 miles of highways that are critical to the movement of freight, and a national freight plan will be developed. The bill also encourages the creation of State freight plans and advisory committees. Project Expediting Early ROW Acquisition. Right of way can be acquired prior to the completion of NEPA, provided that it does not have an adverse environmental impact, limit the choice of alternatives, or prevent the lead agency from making impartial decisions. The land cannot be developed prior to the completion of NEPA, and if the land is purchased with federal funds and is not used for a federal transportation projects, the State will refund FHWA from its apportionments. Contracting Efficiency. State DOTs can award a two phase contract to a construction manager or general contractor for preconstruction and construction services, and this may be done prior to the completion of NEPA. 3

Innovative Project Delivery. For projects funded under the National Highway Performance Program, the Surface Transportation Program, and the Metropolitan Planning Program, the State may choose a 100 percent federal share for projects, programs, or activities that 1) improve work zone safety, 2) decrease long term costs of maintaining highways, 3) accelerates project delivery, or 4) reduces congestion. Examples include in place recycling, intelligent compaction equipment, innovative contracting methods, or early completion incentives for contractors. Accelerated Decisionmaking. The bill includes new environmental dispute resolution authority for the Secretary. It also includes financial penalties for any agency that does not approve permits or licenses within a certain period of time. Limitations on Claims. The bill shortens the window when legal disputes may be brought against a project from 180 days to 150 days. Acceleration of Completion of Complex Projects. The bill requires the Secretary to complete complex projects within four years, and includes financial penalties for a failure to meet this deadline. NEPA Delegation. The bill makes permanent the ability of the Secretary to delegate NEPA authority to States, and removes the limitation that only five States may receive this authority. This authority is expanded to transit, rail, and multi modal projects, but provides the option for transit agencies to request a waiver to the Secretary. The bill does not allow for reciprocity between NEPA and State environmental processes. State and Federal Environmental Law Reciprocity. The bill does not establish a pilot program to allow for State environmental laws to be substituted for federal laws, provided that the laws are substantially similar. Instead the Government Accountability Office is required to complete a two year study on the issue. Categorical Exclusions for Projects. The bill would categorically exclude from NEPA a number of types of projects, including: projects within the operational right of way, those impacted by emergencies and disasters, projects with less than $5 million in federal funds, and projects with total costs of less than $30 million and have less than 15 percent federally share. 4

Survey of Categorical Exclusions. The Secretary is directed to consult with transportation and transit agencies at all levels to make recommendations on new activities to be categorically excluded. Other Programs and Issues PNRS/ Mega Projects. The bill authorizes $500 million for FY 2013 (subject to General Fund appropriations) for the Projects of National and Regional Significance Program to fund high cost surface transportation projects. The bill uses the PNRS program structure first authorized in SAFETEA LU, which established a rigorous Full Funding Grant Agreement (FFGA) process similar to the transit New Starts program. This FFGA process was not used in the prior bill through because all PNRS funding had been earmarked. States, tribes, and transit agencies would be eligible applicants. TIFIA. The bill includes a substantial increase in the Transportation Infrastructure Finance and Innovation Act (TIFIA) program, increasing it from $122 million in FY 2012 to $750 million in FY 2013 and to $1 billion in FY 2014. The bill would increase the Federal share of TIFIA projects from 33 to 49 percent, and would allow support for programs of related projects. Tolling. The bill would expand the ability of states to use tolls on federal aid highway capacity projects, provided the number of toll free lanes remains the same as before construction. The bill does not include a Senate provision that would have reduced federal formula funding to states that sell or lease existing highways to the private sector. Bicycle and Pedestrian Provisions. The bill removes the dedicated Safe Routes to School, Recreational Trails, and Transportation Enhancements program. It creates a new program called Transportation Alternatives that is funded through a 2 percent takedown of the core highway programs. In addition to bicycle and pedestrian projects, these funds can be used for building roads or costly environmental mitigation. Half of the funds are sub allocated to local areas. The States half of the funds can be flexed away to other types of highway projects not included in the Transportation Alternatives program. The bill also sets aside a portion of the funds for Recreational Trails; however, State can opt out if they so choose. Truck Size and Weight. The bill included a two year study to examine the issues related to increased truck size and weight. 5

Veterans Preference. Contractors working on Federal aid highway projects are encouraged to make a best faith effort in the hiring of veterans who have the requisite skills and abilities to perform the construction work. Research and Education Overview. The bill authorizes $115 million annually in FY 2013 and FY 2014 for the Highway Research and Development Program. The bill authorizes and additional $62.5 million annually in FY 2013 and FY 2014 for Technology and Innovation Deployment Program. Funding for research programs will be available until expended and the cost share of a project is 80% federal unless otherwise determined by the Secretary. Prize Competitions. The Secretary may use up to 1 percent of the funds made available under section 51001 of the Transportation Research and Innovative Technology Act of 2012 to carry out a program to competitively award cash prizes to stimulate innovation in basic and applied research and technology development that has the potential for application to the national transportation system. Research and Technology Development and Deployment. The Secretary must carry out research, development, and deployment activities that encompass the entire innovation lifecycle. The term innovation lifecycle means the process of innovating through: o the identification of a need; o the establishment of the scope of research to address that need; o setting an agenda; o carrying out research, development, deployment, and testing of the resulting technology or innovation; and o carrying out an evaluation of the costs and benefits of the resulting technology or innovation. 6

Improving Infrastructure Integrity. The Secretary must carry out and facilitate highway and bridge infrastructure research and development activities that include the following activities and content: o to increase the reliability of lifecycle performance predictions used in infrastructure design, construction, and management; o to improve the ability of transportation agencies to deliver projects that meet expectations for timeliness, quality, and cost; o to reduce user delay attributable to infrastructure system performance, maintenance, rehabilitation, and construction; o to improve highway condition and performance through increased use of design, materials, construction, and maintenance innovations; o to reduce the environmental impacts of highway infrastructure through innovations in design, construction, operation, preservation, and maintenance; o research to develop more durable infrastructure materials and systems; o advanced infrastructure design methods; o accelerated highway and bridge construction; o performance based specifications; o construction and materials quality assurance; o comprehensive and integrated infrastructure asset management; o sustainable infrastructure design and construction; o hydraulic, geotechnical, and aerodynamic aspects of infrastructure o improved tools, technologies, and models for infrastructure management, including assessment and monitoring of infrastructure condition; o studies on the effectiveness of fiber based additives to improve the durability of surface transportation materials in various geographic regions; o technology transfer and adoption of permeable, pervious, or porous paving materials, practices, and systems that are designed to minimize environmental impacts, stormwater runoff, and flooding and to treat or remove pollutants by allowing stormwater to infiltrate through the pavement in a manner similar to predevelopment hydrologic conditions. 7

Lifecycle Cost Analysis Study. The General Accountability Office (GAO) must conduct a study and issue a report within one year of the best practices for calculating lifecycle costs and benefits for federally funded highway projects, which shall include, at a minimum, a thorough literature review and a survey of current lifecycle cost practices of State departments of transportation. The report shall contain a summary of the latest research on lifecycle cost analysis; and recommendations on the appropriate period of analysis, design period; discount rates; and use of actual material life and maintenance cost data. In carrying out the study, the GAO shall consult with the American Association of State Highway and Transportation Officials, appropriate experts in the field of lifecycle cost analysis, and appropriate industry experts and research centers. Strengthening Transportation Planning and Environmental Decisionmaking. The Secretary must carry out research to minimize the cost of transportation planning and environmental decisionmaking that includes the following activities and content: o to reduce the potential impact of highway infrastructure and operations on the environment; o to accelerate construction to reduce congestion and related emissions; o to reduce the impact of highway runoff on the environment; and o creation of models and tools for evaluating transportation measures and transportation system designs, including the costs and benefits. Technology and Innovation Deployment Program. The Secretary must carry out a technology and innovation program relating to all aspects of highway transportation including pavements, environment, and construction with the goals of significantly accelerating the adoption of innovative technologies, providing leadership and incentives to demonstrate state of the art technologies, constructing longer lasting highways and improving sustainability. The Secretary shall carry out demonstration programs, provide technical assistance and training, and develop tools and methods to adapt proven practices and technologies as standard practice. 8

Accelerated Implementation and Deployment of Pavement Technologies. The Secretary shall establish and implement a program to promote, implement, deploy, demonstrate, showcase, support, and document the application of innovative pavement technologies, practices, performance, and benefits. The goals of the accelerated implementation and deployment of pavement technologies program shall include the deployment of new, cost effective designs, materials, recycled materials, and practices to extend the pavement life and performance and to improve user satisfaction; the reduction of initial costs and lifecycle costs of pavements, including the costs of new construction, replacement, maintenance, and rehabilitation; the deployment of accelerated construction techniques to increase safety and reduce construction time and traffic disruption and congestion; the deployment of engineering design criteria and specifications for new and efficient practices, products, and materials for use in highway pavements; the deployment of new nondestructive and real time pavement evaluation technologies and construction techniques; and effective technology transfer and information dissemination to accelerate implementation of new technologies and to improve life, performance, cost effectiveness, safety, and user satisfaction. In fiscal years 2012 through 2013, $12 million annually is made available to carry out this program. This document was prepared by the National Asphalt Pavement Association with assistance from Van Scoyoc Associates. Any question of comments should be sent to Jay Hansen at jhansen@asphaltpavement.org. 9