Distribution List: Northern Region. Member (PS) Central Electricity Authority Sewa Bhawan, R.K.Puram New Delhi-110 066 Chief Engineer (PSP&A I) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi-110 066 CMD POSOCO, B-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110 016 Director (Operations) Delhi Transco Ltd. Shakti Sadan, Kotla Road, New Delhi-110 002 Director(Technical) PSTCL Head Office, The Mall, Patiala 147001, Punjab. Director (Projects) PTCUL Vidyut Bhawan, Near ISBT Crossing, Saharanpur Road, Majra, Dehradun. Chief Engineer(SO&C) HVPNL Planning Directorate Shakti Bhawan,Sector-6, Panchkula-134109, Haryana Member(Power) Bhakra Beas Management Board Sector-19 B, Madhya Marg, Chandigarh - 160019 Managing Director Solar Energy Corporation of India Ltd. D-3, 1st Floor, A wing, Religare Building, District Centre, Saket, New Delhi-110017 Member Secretary NRPC 18A, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi 110 016 GM NRLDC 18-A, Qutab Institutional Area, Shaheed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi 110 016 Director(W&P) UPPTCL Shakti Bhawan Extn, 3rd floor, 14, Ashok Marg, Lucknow-226 001 Managing Director HP Power Transmission Corporation Ltd. Barowalias, Khalini, Shimla-171002 Director (Technical) RRVPNL Vidyut Bhawan, Jaipur, -302005. Development Commissioner (Power) Power Development Department Grid Substation Complex, Janipur, Jammu Chief Engineer (Operation) Ministry of Power UT Secretariat, Sector-9 D, Chandigarh - 161009
Distribution List: Connectivity/Long-term Access Applicants Shri Yogesh Kumar Sanklecha DGM Acme Solar Holdings Limited Plot 152, Sector-44, Gurgaon-122002, Haryana Ph.: 8744060601, 9891759725 Email: yogesh@acme.in sidhartha.malik@acme.in Shri Rajesh Kumar Gupta Sr. Manager Mahoba Solar (UP) Pvt. Ltd. 5th Floor, Sambhav House, Judges Bungalow Road, Bodakdev, Ahmedabad-380015, Gujrat Ph.: 9099055681,9545554934 Email:rajesh.gupta@adani.com rajasr.acharya@adani.com Shri Vivek Kodesia Head Business Developement Eden Renewable Cite Pvt. Ltd. 236 B & C, First Floor, DLF South Court, Saket, Delhi Ph.: 9717031091, 9911299520 Email: edenrenewablesindiallp@gmail.com vivek.kodesia@eden-re.com Shri Neeraj Gupta DGM ReNew Solar Power Pvt. Ltd. Commercial Block-1, Zone 6, Golf Course Road, DLF City, Phase-V, Gurugram, Haryana Ph.: 7389909907, 9542388443 Email: neeraj@renewpower.in rohit.singh@renewpower.in Shri Gaurav Soni Authorized Signatory Tata Power renewable Energy Ltd. C/o The Tata Power Company Limited, Corporate center A, Sant Tukaram Road, Carnac Bunder, Mumbai, Maharashtra Ph.: 7208099182, 9263376489 Email: gaurav.soni@tatapower.com rakeshs@tatapower.com
Minutes of 13 th Northern Region constituents meeting regarding Connectivity/LTA s in NR chaired by Member(PS), CEA held on 11/07/2018 at POWERGRID, Gurgaon 1.0 The List of the participants are enclosed at Annexure-I. 2.0 COO(CTU-Plg.), POWERGRID welcomed the participants to the 13 th meeting of Northern Region constituents regarding Connectivity/LTA applications in Northern Region. 3.0 Member (PS), CEA in the opening remarks highlighted that in the present meeting Stage-I & II Connectivity applications in Northern Region are proposed to be discussed in accordance with the Detailed Procedure notified by CERC on 15.05.2018 and requested COO (CTU-Plg) to take-up the agenda for discussion. 4.0 Minutes of the 11 th Meeting of Northern Region constituents regarding Connectivity / LTA s It was informed that the Minutes of the 11 th Meeting of Northern Region constituents regarding Long Term Access and Connectivity applications of Northern Region held on 07.06.2018 was issued vide letter 02.07.2018. As no comments were received from the stakeholders, the minutes were confirmed as circulated. 5.0 Proposal for grant of Connectivity to the applications received from renewable energy sources CTU informed that total 7 nos. of applications for Stage-I Connectivity and 2 nos. of applications for Stage-II Connectivity have been received online till 30 th June, 2018 which are in conformity with CERC Detailed Procedure for Grant of connectivity to projects based on renewable energy sources to ISTS on 15/05/2018. COO(CTU-Plg) informed that even though applicants are proposed to be granted connectivity to the quantum sought, they are required to construct 400kV / 220kV dedicated transmission line alongwith bays with minimum capacity of 900MW/300 MW as per Detailed Procedure for Grant of connectivity to projects based on renewable energy sources to ISTS on 15/05/2018.Thereafter, application were taken up for deliberation as per the agenda. 1
Stage-I Connectivity s 6.0 CTU informed that Acme Solar Holding Ltd applied for connectivity at 400kV Bikaner for their Acme Noorsar Solar Power Plant(1200001308) and Acme Lalsar Solar Power Plant(1200001309) of 250 MW each. It was further informed that since Connectivity is proposed at 400kV level, it is prudent to pool the power at common pooling station and connect it with Bikaner S/s through 400kV S/c line. Accordingly, it was agreed to provide Stage-I connectivity of Acme Noorsar & Lalsar Solar Power Plant through Bikaner 400 kv S/c line from common pooling station as primary connectivity location. With regard to alternate connectivity, CTU informed Bikaner-II(New) S/s is proposed, as there is no other ISTS S/s nearby to provide alternate connectivity. Applicant is requested confirm their preferred voltage level,i.e 400 kv or 200kV, at Bikaner-II(New). Applicant informed that they prefer Fatehgarh as alternate location instead of Bikaner-II(New). Towards this, CTU informed that Fatehgarh is far away(more than 100 km) from the project location (Latitude & Longitude) specified by applicant. Accordingly, Fatehgarh may not be the alternate location for this project, as the CERC regulation provides dedicated transmission line shall not exceed 100 km. Applicant informed that they may shift the project location to Fatehgarh area, if connectivity is not finalized at Bikaner. CTU informed that, in such case, applicant is required to apply afresh. After deliberations, it was agreed that alternate location for connectivity shall be at Bikarner-II (New) S/s at 400kV level. CTU further informed that connectivity at alternate location shall also be similar configuration to that of primary location, i.e Acme Noorsar & Lalsar Solar Power Plant through Bikaner-II(New) 400 kv S/c line from common pooling station. After detailed deliberations grant of Stage-I connectivity to the following applicants was agreed, as detailed below: 2
Stage-I Connectivity applications Sl. Connectivity applications near Bhadla Applicant Location Date of Connecti vity Sought (MW) Natur e of Applic ant Proposed primary location for Connectivity Dedicated Tr. System Proposed Alternative location for Connectivity / Tr. System under ISTS Dedicated Tr. System for alternative connectivity 1. 1200001306 Acme Solar Holdings Ltd. (Acme Bhadla Solar Power Plant) Jodhpur, 25.05.2018 250 Solar Acme Bhadla Solar Power Plant Bhadla 220kV S/c line Fatehgarh 400kV Pooling Station at Fatehgarh (with a provision to include 220kV level) Acme Bhadla Solar Power Plant Fatehgarh 220kV S/c line 2. 1200001312 3. 1200001370 4. 1200001471 Eden Renewable Cite Pvt. Ltd. Mahoba Solar (UP) Pvt. Ltd. Tata Power Renewable Energy Ltd. (TPREL) Jodhpur, Jodhpur, Jaisalmer, 28.05.2018 250 Solar 02.06.2018 300 Solar 28.06.2018 500 Solar Bhadla (Under Implementatio n) Eden Renewable Bhadla 220kV S/c line Mahoba Solar Bhadla 220kV S/c line TPREL 500MW Solar Power Project Bhadla 220kV D/c line Installation of 1x500MVA, 400/220kV transformer at Fatehgarh Pooling Station along with Bus Coupler and transformer bay Fatehgarh- Bhadla765kV D/c line to be operated at 400kV Eden Renewable Fatehgarh 220kV S/c line Mahoba Solar Fatehgarh 220kV S/c line TPREL 500MW Solar Power Project Fatehgarh 220kV D/c line 3
Sl. Connectivity applications near Bikaner Applicant Location Date of Connecti vity Sought (MW) Natur e of Applic ant Proposed primary location for Connectivity Dedicated Tr. System Proposed Alternative location for Connectivity / Tr. System under ISTS Dedicated Tr. System for alternative connectivity 5. 1200001308 Acme Solar Holdings Ltd. 6. 1200001309 7. 1200001431 Acme Solar Holdings Ltd. ReNew Solar Power Pvt. Ltd. Bikaner, Bikaner, Bikaner, 25.05.2018 25.05.2018 09.06.2018 250 (Sought at 400kV) 250 (Sought at 400kV) 500 (Sought at 400kV) Solar Solar Solar Bikaner (Under Implementatio n) Acme Noorsar & Lalsar Solar Power Plant Bikaner 400kV S/c line ReNew Solar Bikaner 400kV S/c line Bikaner-II (New) Bikaner-II(New)- Bikaner(Existing) 400 kv D/c Acme Noorsar & Lalsar Solar Power Plant Bikaner-II(New) 400 kv S/c line ReNew Solar Bikaner-II(New) 400 kv S/c line 7.0 It was informed that the grant of Stage-I Connectivity shall not create any right in favor of the grantee on ISTS infrastructure including bays. Stage-I Connectivity grantee shall be required to update the quarterly progress of development of their generation project and associated transmission infrastructure as per format RCON-I-M. Further Stage-I Connectivity grantee is required to secure the Stage-II Connectivity for physical connectivity with the ISTS grid within 24 months. The Stage-I Connectivity grantees who fail to apply for Stage-II Connectivity within 24 months from grant of Stage-I Connectivity shall cease to be Stage-I grantee and their fees shall be forfeited. The new substation/location, if needed to be established, shall be planned in consultation with CEA, MNRE and other stakeholders. Further, the proposed alternative locations for connectivity are yet to be discussed and shall be firmed up, if needed, in consultation with CEA and other stakeholders. Implementation of new substations and other infrastructure shall be undertaken only after grant of Stage-II Connectivity and fulfillment of all terms and conditions by the applicants including submission of Connectivity BG. Members agreed for the same. 4
Stage-II Connectivity applications 8.0 CTU informed that the following applications for grant of Stage-II connectivity have been received wherein entity has been selected through the tariff based competitive bidding carried out by MSEDCL. From the applications, it has been observed that LOA has been issued to the company (bid winner) mentioning project location. However, the applications are submitted with different project location as mentioned in LOA by exercising the Clause 3.3 of RfS where it has been mentioned that project location can be changed once at the time of achievement of Financial Closure i.e. within 7 months from date of signing of PPA. 9.0 CTU informed that ReNew Solar Power Pvt. Ltd.( 1200001432) has submitted the application for connectivity at Bikaner for 250 MW. However, as per the LOA issued to applicant by MSEDCL project location is Tuticorin, Tamil Nadu with connectivity at Tuticorin GIS ISTS S/s. Similarly, Mahoba Solar (UP) Pvt. Ltd.(1200001443) has submitted the application for connectivity at Bhadla for 200 MW. However, as per the LOA issued to applicant by MSEDCL project location is Solapur & Nagnath with connectivity at Karambh S/s & Hingoli S/s of Maharastra. Applicants informed that as per Clause 3.3 of RfS, project location can be changed once at the time of achievement of Financial Closure i.e. within 7 months from date of signing of Power PPA. Also the clarification towards this has also been submitted to CTU vide by Renew Power vide letter dated 09/06/2018 and by Mahoba Solar vide letter dated 19/06/2018, wherein they have undertaken that no other application has been made against this LOA issued by MSEDCL to them. CEA opined that change in location is as per bidding conditions by MSEDCL and accordingly above information from applicant may be considered for processing of application. After deliberations, it was agreed to grant Stage-II connectivity to the applicants. 10.0 With regard to implementation of bays, CTU informed that as per clause 5.3.1 of CERC Detailed Procedure for Grant of Connectivity to projects based on Renewable sources : Quote : For the connectivity system, the dedicated transmission line including line bays at generation pooling station shall be under the scope of the applicant and the terminal bays at the ISTS sub-station shall be under the scope of transmission licensee owning the ISTS sub-station subject to compliance of relevant provision of tariff policy. Unquote : 5
Accordingly, the bays for above projects at ISTS substation are to be implemented after deliberation in various forums viz. Standing Committee, Regional Power Committee, National Committee on Transmission(NCT) and Empowered Committee on Transmission(ECT). Further, the representative from PTCUL stated that, as the above bays are to be implemented for transfer of power from to Maharastra, thus there should not be any financial implication on other Northern Region beneficiaries. Based on decision in these Committees, the bays may have to be implemented through TBCB/through regulated tariff mechanism. It was informed that after following due procedure, it may not be feasible to complete the bays by July 19/Oct 19 (schedule given by the applicant). It was further deliberated that as per CERC detailed procedure dated 15/05/2018, Wind power developers who have emerged successful in the bidding conducted by Central/State Government designated agency, before coming into force of this Procedure, shall have the option to implement the bays associated with their dedicated lines at the ISTS Substation. Considering the time lines of implementation of bays under ISTS, it was suggested by the applicants that even Solar Generators/Solar Park Developers should also have the option of implementing the bay on their own. CTU informed that in case applicants are agreed to implement the bays on their own cost, the matter shall be taken up with CERC. Applicants informed that they will discuss the issue with their management and will revert by 13/07/2018 regarding implementation of bays by themselves. CTU informed that they will wait till 13/07/2018 regarding confirmation from application towards implementation of bays by themselves. In case of non-receipt of confirmation by due date for implementation by themselves, application shall be processed for grant and intimation shall be issued with implementation of bays under ISTS after following due procedure and no further correspondence shall be entertained. In case, applicant confirm that they will take up the implementation of bays by themselves at their own cost, CTU may take up the matter with CERC for inclusion of option to applicant for implementation of bays at ISTS S/s by applicant also. In view of the above, grant of Stage-II connectivity to the applicants was agreed as detailed below subject to above deliberations: Sl. Connectivity applications near Bikaner 1. 1200001432 Applicant Location Date of ReNew Solar Power Pvt. Ltd. Bikaner, 09.06.2018 Quantum of Stage-I Sought (MW) 500 (Stage-I : 1200001431) Stage-II Connectivity Sought (MW) 250 Quantum won in SECI/State bids (MW) MSEDCL 250 Proposed location for Grant of Stage- II Connectivity Bikaner Dedicated Tr. System ReNew Solar Bikaner 400kV S/c line 6
Sl. Connectivity applications near Bhadla 2. 1200001443 Applicant Location Date of Mahoba Solar (UP) Pvt. Ltd. Jodhpur, Nadu 19.06.2018 Quantum of Stage-I Sought (MW) 300 (Stage-I : 1200001370) Stage-II Connectivity Sought (MW) 200 Quantum won in SECI/State bids (MW) MSEDCL 200 Proposed location for Grant of Stage- II Connectivity Bhadla Dedicated Tr. System Mahoba Solar Bhadla 220kV S/c line 11.0 It was informed that the Stage-II Connectivity grantees are required to the sign the Transmission Agreement within 30 days from the date of intimation of Grant of Stage-II Connectivity and shall furnish the applicable Connectivity Bank Guarantee (Conn-BG), no extension shall be granted on any ground and in case of failure to sign the Agreement and / or to furnish the Conn-BG, Grant of Stage-II Connectivity shall be revoked without any prior notice. Further, grant of Stage-I/Stage-II Connectivity shall not entitle an applicant to inter-change any power with the grid unless it obtains LTA/MTOA/STOA for power transfer requirements, in case of LTA, it may require further transmission system strengthening. Therefore, the applicants are advised to apply for the LTA to enable power transfer to its beneficiaries on long term basis. Also as per the prevailing Transmission Planning Criteria of CEA, N-1 contingency criteria may not be applied to the immediate connectivity of wind/solar farms with the ISTS/Intra-STS grid. CTU further informed the Stage-II Connectivity grantee shall furnish progress of the monitoring parameters on quarterly basis in the format given at FORMAT-RCON-II-M by the last day of each quarter. Failure to update progress of the monitoring parameters shall be considered as adverse progress and in such case CTU shall approach the Commission for appropriate directions. Further, the Stage-II Connectivity grantees shall be required to complete the dedicated transmission line(s) and pooling sub-station(s) within 24 months from the date of intimation of bay allocation at existing or new / under-construction ISTS sub-station. If the grantee fails to complete the dedicated transmission line within the stipulated period, the Conn-BG of the grantee shall be encashed and Stage-II connectivity shall be revoked. Members agreed for the same. 7
Annexure-I List of participants of 13 h Meeting of Northern Region Constituents regarding LTA and Connectivity applications in Northern Region as per Detailed Procedure for Grant of Connectivity to projects based on Renewable Sources Sl. Name and Organization Designation Central Electricity Authority (CEA) 1. Shri P S Mhaske Member (PS) 2. Shri Ravinder Gupta Chief Engineer (PSP&A-I) 3. Shri B. S. Bairwa Director (PSP&A-II) Northern Regional Power Committee (NRPC) 4. Shri Sovaran Singh EE 5. Shri Manish Maurya AE Power Grid Corporation of India Limited (POWERGRID) 1. Shri Subir Sen COO (CTU-Planning) 2. Shri Kailash Rathore GM (Engg.-S/s) 3. Shri Mukesh Khanna GM (CTU-Planning) 6. Shri Rajesh Verma CM (CTU-Planning) 7. Shri Anil Kumar Meena CM (CTU-Planning) 8. Shri Kashish Bhambhani CM (CTU-Planning) 9. Shri VMS Prakash Deputy Manager (CTU-Planning) 10. Shri Dibyendu Engineer (CTU-Planning) 11. Shri Yatin Sharma Engineer (CTU-Planning) Power System Operation Corporation Limited (POSOCO) 1. Shri Phanisankar C Sr. Engineer PTCUL 1. Shri H.S. Hyanki SE 8
Connectivity/LTA Applicants 1. Shri Neeraj Gupta DGM ReNew Power Limited 2. Shri Rohit Singh Manager ReNew Power Limited 3. Shri Saurav Bagchi Head Tata Power Renewable Energy Pvt. Ltd. 4. Shri Saurabh Shrivastav Head Tata Power Renewable Energy Pvt. Ltd. 5. Shri Rajesh Kumar Gupta DGM Mahoba Solar (UP) Pvt. Ltd. 6. Shri Dipak Panchal Manager Mahoba Solar (UP) Pvt. Ltd. 7. Shri Monil Thakur Vish Wind Pvt. Ltd. 8. Shri Siddhartha Medhi Director Vish Wind Pvt. Ltd. 9. Shri M. Krishna Kumar Sr. Advisor Vish Wind Pvt. Ltd. 10. Shri Praveen Tamak Manager Mahoba Solar (UP) Pvt. Ltd. 11. Shri Sudhir Pathak Vice President Acme Solar Holdigs Ltd. 12. Shri Yogesh Sanklecha DGM Acme Solar Holdigs Ltd. 13. Shir Siddhartha Malik Sr. Manager Acme Solar Holdigs Ltd. 14. Shri Rohit Singh Manager Eden renewable Cite Pvt. Ltd. 15. Shri Prabir Mohanty Engg. Head Eden renewable Cite Pvt. Ltd. 9