Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

Similar documents
Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands)

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2013 Budget Estimate

AIR FORCE RESERVE COMMAND

DEPARTMENT OF THE NAVY

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate

Smithsonian Institution

DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands)

FAMILY HOUSING, DEFENSE-WIDE FY 2007 BUDGET ESTIMATE. Table of Contents PROGRAM SUMMARY...FH-2 APPROPRIATION LANGUAGE...FH-3 NEW CONSTRUCTION..

Repair Project Approval

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13

Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM

AIR FORCE RESERVE COMMAND

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM

DOD DIRECTIVE DOD CONTINUITY POLICY

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005

Department of Defense INSTRUCTION

National Security Agency Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in Thoussands)

EXISTING CONDITIONS

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM

ADMINISTRATIVE INSTRUCTION

Military Construction Program

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES

2016 Major Automated Information System Annual Report

Exhibit R-2, RDT&E Budget Item Justification

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

Ammunition Peculiar Equipment

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Department of Defense

Next NGA West (N2W) AE Industry Day

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

Standard FAC Facility Ratings. A. Introduction

Department of Defense DIRECTIVE

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

CRITERIA FOR TRANSFER AND ACCEPTANCE OF DoD REAL PROPERTY

OFFICE OF THE INSPECTOR GENERAL

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

Real Property Category Codes

DEPARTMENT OF DEFENSE AGENCY-WIDE FINANCIAL STATEMENTS AUDIT OPINION

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

ARMY FAMILY HOUSING MASTER PLAN FY2015 FY2019

BY ORDER OF THE HEADQUARTERS OPERATING INSTRUCTION 10-1 SECRETARY OF THE AIR FORCE 21 October 2011 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Department of the Navy

DEPARTMENT OF THE NAVY

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Department of Defense DIRECTIVE

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011

NG-J3/7 CNGBI DISTRIBUTION: A 31 October 2014 CONTINUITY OF OPERATIONS (COOP) PROGRAM POLICY

Request for Proposals (RFP) An Alternative Fuels Assessment & Feasibility Study

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

Department of Defense DIRECTIVE

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011

Department of Defense DIRECTIVE

Department of Defense INSTRUCTION

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Military ConstructionProgram

Installation Status Report Program

Department of Defense INSTRUCTION

AIR NATIONAL GUARD Fiscal Year (FY) 2014 BUDGET ESTIMATES

THE JOINT STAFF Fiscal Year (FY) 2008/2009 Budget Estimates Research, Development, Test and Evaluation (RDT&E), Defense-Wide

Department of Defense INSTRUCTION

AMENDMENT OF SOLICITATION

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

16.01 FACILITIES SERVICES POLICY Cabinet Approval: 09/25/03 CHAPTER 2 Board of Trustees Approval: 10/08/03 POLICY 16.01

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DEPARTMENT OF THE NAVY FISCAL YEAR 2010 BUDGET ESTIMATES (BRAC 2005)

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

Bond Frequently Asked Questions

UNITED STATES ARMY SOLDIER SUPPORT INSTITUTE ADJUTANT GENERAL SCHOOL

The University of Texas at San Antonio

Information Technology

Campus Events Field Modular Buildings

A udit R eport. Office of the Inspector General Department of Defense

(Revised January 15, 2009) DISCLOSURE OF INFORMATION (DEC 1991)

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

DEC 1 b FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects Division of Dam Safety and Inspections 805 SW Broadway, Suite 550

Deputy Chief Management Officer ADMINISTRATIVE INSTRUCTION

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

Standard Development Timeline

ADMINISTRATIVE INSTRUCTION

Army Needs to Improve Contract Oversight for the Logistics Civil Augmentation Program s Task Orders

Military Construction Program

Department of Defense DIRECTIVE

Transcription:

Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page State/Installation/Project Request Request Mission No. Virginia Pentagon Reservation Secondary Uninterruptible Power At Raven Rock 8,400 8,400 C 271 Pentagon Electrical Upgrade 19,272 19,272 C 274 Total 27,672 27,672 270

2. DATE 1. COMPONENT FY 2010 MILITARY CONSTRUCTION PROJECT DATA REPORT CONTROL SYMBOL Raven Rock Mountain Complex (RRMC) Secondary Uninterruptible Power Source 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 811 8,400 9. COST ESTIMATES UNIT COST COST ITEM U/M QUANTITY ($000) ($000) PRIMARY FACILITY 6,942 UNINTERRUPTABLE POWER SUPPLY COMPONENTS LS (6,480) MECHANICAL COOLING COMPONENTS LS (308) MISCELLANEOUS FINISHES LS (21) MISCELLANEOUS MATERIALS AND HANDLING LS (133) SUPPORTING FACILITIES 13 BUILDING FOUNDATION SYSTEM LS (0) SITE UTILITIES (ELECTRIC, WATER, SEWER, GAS & STEAM) LS (0) CIVIL CONDITIONS (SOIL TREATMENT/REMEDIATION) LS (0) PAVING, WALKS, CURBS & GUTTERS LS (0) SITE IMPROVEMENTS / DEMOLITION (D) LS (13) ESTIMATED CONTRACT COST 6,955 SUBTOTAL 1 6,955 DESIGN 918 SUBTOTAL 2 7,873 SUPERVISION, INSPECTION & OVERHEAD (6.5%) 512 SUBTOTAL 3 8,385 TOTAL REQUEST 8,385 TOTAL REQUEST (ROUNDED) 8,400 10. DESCRIPTION OF PROPOSED CONSTRUCTION Provide a Secondary Uninterruptible Power Source (UPS) facility for Raven Rock Mountain Complex. The project will allow the facility to support Continuity of Operations Planning (COOP) for the Office of the Secretary of Defense (OSD) and the Joint Staff (JS), and provide for the 2N redundancy requirement based on current and future anticipated facility mission loads. This work will provide additional UPS for critical mission functions. Current UPS capacity is inadequate to meet mission requirements; this project will furnish and install new UPS and associated equipment and infrastructure to meet mission redundancy requirements. Actual capacity is classified. The project will include: Selective demolition; removal of hazardous materials; new, additional UPS in the same configuration as the existing UPS system; dedicated double-ended secondary unit substation to serve the new UPS equipment; dedicated medium voltage feeders from the East and West Power Plants; distribution; dedicated air-handling units to cool the UPS equipment room (chilled water primary cooling and direct-expansion backup cooling) N + 1 units; condensing units; lighting; and miscellaneous power and controls requirements to support the system. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE 271

1. COMPONENT FY 2010 MILITARY CONSTRUCTION PROJECT DATA (Continuation) 2. DATE REPORT CONTROL SYMBOL Raven Rock Mountain Complex (RRMC) Secondary Uninterruptible Power Source 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 811 8,400 11. REQUIREMENT: ADEQUATE: SUBSTANDARD: X PROJECT: Construction a new Secondary UPS and associated infrastructure, lighting, power, controls, etc. REQUIREMENT: This work is required to meet 2N redundancy requirements in support of the RRMC mission (classified). CURRENT SITUATION: The existing UPS System does not have the required capacity to support the mission based on the projected future facility loads. RRMC must limit the connection of new computer servers to the existing UPS. Identified capacity is classified. IMPACT IF NOT PROVIDED: The facility s emergency power systems will not be able to support the RRMC in the event of an electric power loss. ADDITIONAL: All applicable codes will integrated into this project. 12. SUPPLEMENTAL DATA: a. ESTIMATED DESIGN DATA: (1) STATUS: (a) DATE DESIGN STARTED NOV 2009 (b) PERCENT COMPLETE AS OF JANUARY 2010 15% (c) DATE DESIGN EXPECTED TO BE 35% COMPLETE FEB 2010 (d) DATE DESIGN EXPECTED TO BE 100% COMPLETE APR 2010 (e) PARAMETRIC COSTS TO DEVELOP COSTS MODIFIED DESIGN/BUILD (f) TYPE OF DESIGN CONTRACT (g) AN ENERGY STUDY AND LIFE CYCLE COST ANALYSIS WILL BE DOCUMENTED DURING FINAL DESIGN. (2) BASIS: (a) STANDARD OR DEFINITIVE DESIGN (b) WHERE DESIGN WAS MOST RECENTLY USED (3) TOTAL DESIGN COST (c)=(a)+(b)+(e) (a) PRODUCTION OF PLANS AND SPECIFICATIONS 3.5% 546 K (b) ALL OTHER DESIGN COSTS 3.0% 294 K (c) TOTAL 252 K (d) CONTRACT 0 K (e) IN-HOUSE 0 K COST OF REPRODUCTION OF PLANS AND SPECIFICATIONS 1.1 M (4) CONSTRUCTION AWARD DATE NA (5) CONSTRUCTION START APR 10 (6) CONSTRUCTION COMPLETION DATE MAR 11 b. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROCURED FROM OTHER APPROPRIATIONS: none 13. SIGNATURES: Date Date DEBORAH A. MEREDITH Acting Director, Engineering HUGH T. SMITH Colonel, USA Commanding DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE 272

1. COMPONENT 2. DATE DoD FY 2010 MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONSTRUCTION COST INDEX Raven Rock Mountain Complex 1.02 6. PERSONNEL a. AS OF (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL b. END FY 7. INVENTORY DATA ($000) a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATGEGORY (1) CODE (2) PROJECT TITLE (3) SCOPE 8.4 8.4 b. COST ($000) DESIGN START STATUS COMPLETE 811 Secondary UPS 1 EA 8.4 11/2009 04/2010 9. FUTURE PROJECTS Power Plant Modernization, Phase III Power Plant Modernization, Phase IV 10. MISSION OR MAJOR FUNCTIONS Provide a Secondary Uninterruptible Power Source (UPS) facility for Raven Rock Mountain Complex. The project will allow the facility to support Continuity of Operations Planning (COOP) for the Office of the Secretary of Defense (OSD) and the Joint Staff (JS), and provide for the 2N redundancy requirement based on current and future anticipated facility mission loads. This work will provide additional UPS for critical mission functions 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. Air Pollution 0 B. Water Pollution 0 C. Occupational Safety and Health 0 273

2. DATE 1. COMPONENT FY 2010 MILITARY CONSTRUCTION PROJECT DATA REPORT CONTROL SYMBOL Pentagon Reservation, Virginia Upgrade Electrical System 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 9. COST ESTIMATES 811 19,272 UNIT COST COST ITEM U/M QUANTITY ($000) ($000) PRIMARY FACILITY via Dominion Virginia Power Utility Contract 12,441 69kV Substation Building and transmission feeder (High Side) LS (11,849) CONTINGENCY (5%) (592) PRIMARY FACILITY via Design-Build Contract 3,994 15kV Switchgear Building and distribution feeder to loads (Low Side) LS (3,804) CONTINGENCY (5%) (190) SUBTOTAL (HIGH SIDE AND LOW SIDE) 16,435 DESIGN/BUILD FEE 1,644 SUBTOTAL 18,079 SUPERVISION, INSPECTION & OVERHEAD (6.6%) 1,193 TOTAL REQUEST (ROUNDED) 19,272 10. DESCRIPTION OF PROPOSED CONSTRUCTION Primary facility is a new electrical substation housed in a partially underground reinforced concrete enclosure, a 69kVA utility supply feeder, 13kV switchgear, and electrical service to the Pentagon. Supporting work includes demolition of an existing retaining wall and paved surface; remediation of excavated soil; site utilities; replacement of existing paving, walks, curbs, and gutters disturbed by construction; and site improvements above and adjacent to the enclosure structure (required to blend with existing infrastructure). Anti-terrorism/force protection measures shall be incorporated in accordance with criteria prescribed in the current UFC regulations. Facility shall be designed in accordance with the National Electrical Code, National Fire Protection Association Life Safety Code, Standards of Seismic Safety for Federally Owned Buildings, Unified Facilities Criteria, and the Uniform Federal Accessibility Standards (for site improvements). High Side will be contracted through Dominion Virginia Power (DVP- local electric utility) to design and install the 69kV transmission line, 69kV switchgear, the 69-13.8kV transformer, 13.8kV underground ducts to the 13.8kV switchgear and high voltage substation. Low Side will be constructed by a separate Design-Build Contractor who will design and install the 13.8kV switchgear, downstream distribution and underground medium voltage substation including power to the H&RP to be provided via spare empty conduits in the existing 3/17 duct bank. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE 274

1. COMPONENT FY 2010 MILITARY CONSTRUCTION PROJECT DATA (Continuation) Pentagon Reservation, Virginia Upgrade Electrical System 2. DATE REPORT CONTROL SYMBOL 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 811 19,272 11. REQUIREMENT: 1 Substation Each ADEQUATE: SUBSTANDARD: PROJECT: This project will provide enhanced reliability to the electrical system supplying the Pentagon Reservation. REQUIREMENT: The details of this project are divided into two parts: The high voltage substation portion of the project is unclassified and the medium voltage distribution is classified SECRET. In classified references Electrical Upgrade" dated March 31, 2005 and related "Balanced Survivability Assessment", copies of which can be provided upon request, detailed requirements are provided. These studies examined all aspects of the Pentagon reservation's electrical systems and recommended a strategic plan to enhance them. CURRENT SITUATION: The existing electrical system does not provide the level of reliability recommended in the above studies. IMPACT IF NOT PROVIDED: To understand the impact of not providing this facility, the reviewer should refer to the classified studies. Without constructing this facility, the Pentagon Reservation will be unable to achieve the level of reliability recommended in the studies. ADDITIONAL INFORMATION: All cost items on Page 1 (to include escalation, design/build fee, SIOH, and contingency) other than "supporting facilities" are extracted from the study's parametric cost estimate. The TERF line item refers to "Tax Effect Recovery Factor" and is intended to reimburse a utility for taxes incurred on income generated by their portion of construction. This is a mandatory cost, since a utility firm must complete a portion of this project. TERF is further explained in the study and is regulated by the Federal Energy Regulatory Commission (FERC). 12. SUPPLEMENTAL DATA: b. ESTIMATED DESIGN DATA: (1) STATUS: (a) DATE DESIGN STARTED Jan 2010 (b) PERCENT COMPLETE AS OF JANUARY 2010 0% (c) DATE DESIGN EXPECTED TO BE 35% COMPLETE April 2010 (d) DATE DESIGN EXPECTED TO BE 100% COMPLETE June 2010 (e) PARAMETRIC COSTS TO DEVELOP COSTS (ESTIMATE INCLUDED IN CLASSIFIED STUDY) YES (f) TYPE OF DESIGN CONTRACT DESIGN/BUILD (g) AN ENERGY STUDY AND LIFE CYCLE COST ANALYSIS WILL BE DOCUMENTED DURING FINAL DESIGN. (2) BASIS: (a) STANDARD OR DEFINITIVE DESIGN (b) WHERE DESIGN WAS MOST RECENTLY USED (3) TOTAL DESIGN COST (c)=(a)+(b)+(e) (a) PRODUCTION OF PLANS AND SPECIFICATIONS 6% 0.986 M (b) ALL OTHER DESIGN COSTS 4% 0.658 M (c) TOTAL 1.644M (d) CONTRACT DESIGN/BUILD (e) IN-HOUSE NO COST OF REPRODUCTION OF PLANS AND SPECIFICATIONS 0.050 M (4) CONSTRUCTION AWARD DATE NA (5) CONSTRUCTION START (Design/Build starting 35%) April 2010 (6) CONSTRUCTION COMPLETION DATE December 2011 b. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROCURED FROM OTHER APPROPRIATIONS: none 13. SIGNATURES: Date Date Bob Cox Director of Engineering Wade Shankle, PE Engineering Manager DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE 275

1. COMPONENT 2. DATE FY 2010 MILITARY CONSTRUCTION PROGRAM 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONSTRUCTION COST INDEX Pentagon Reservation, Arlington, Virginia 20301-1155 OSD/DAM 1.042 (Pentagon Renovation CI) 6. PERSONNEL a. AS OF (1) PERMANENT (2) STUDENTS (3) SUPPORTED OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN OFFICER ENLISTED CIVILIAN (4) TOTAL b. END FY 7. INVENTORY DATA ($000) a. TOTAL ACREAGE b. INVENTORY TOTAL AS OF c. AUTHORIZATION NOT YET IN INVENTORY d. AUTHORIZATION REQUESTED IN THIS PROGRAM e. AUTHORIZATION INCLUDED IN FOLLOWING PROGRAM f. PLANNED IN NEXT THREE PROGRAM YEARS g. REMAINING DEFICIENCY h. GRAND TOTAL 8. PROJECTS REQUESTED IN THIS PROGRAM a. CATGEGORY (1) CODE (2) PROJECT TITLE (3) SCOPE 811 9. FUTURE PROJECTS Upgrade Electrical System 19,272 19,272 b. COST ($000) DESIGN START STATUS COMPLETE 19,272 01/10 12/11 Anticipates 2.0 Years for Construction 10. MISSION OR MAJOR FUNCTIONS Project Description: This project enhances reliability for the electrical system supplying the Pentagon Reservation. The existing electrical system does not provide an adequate level of reliability. The studies Electrical Upgrade and Balanced Survivability Assessment examined all aspects of the Pentagon reservation's electrical systems, recommended a strategic plan to enhance them, and contain detailed requirements to accomplish upgrades. The details of this project are divided into two parts: The high voltage substation portion of the project is unclassified and the medium voltage distribution is classified SECRET. The primary facility is a new electrical substation housed in a partially underground reinforced concrete enclosure, a 69kVA utility supply feeder, 13kV switchgear, and electrical service to the Pentagon. Supporting work includes demolition of an existing retaining wall and paved surface; remediation of excavated soil; site utilities; replacement of existing paving, walks, curbs, and gutters disturbed by construction; and site improvements above and adjacent to the enclosure structure (required to blend with existing infrastructure). Anti-terrorism/force protection measures shall be incorporated in accordance with criteria prescribed in the current UFC regulations. Facility shall be designed in accordance with the National Electrical Code, National Fire Protection Association Life Safety Code, Standards of Seismic Safety for Federally Owned Buildings, and the Uniform Federal Accessibility Standards (for site improvements). 11. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. Air Pollution 0 B. Water Pollution 0 C. Occupational Safety and Health 0 DD FORM 1390, JUL 1999 PREVIOUS EDITION IS OBSOLETE 276