CORPORATE INFORMATION

Similar documents
L i s t o f P r o j e c t s

F e a t u r e d P r o j e c t s

Non Investment Properties Appendix B

APPLYING FOR: SITE AGENT / CLERK OF WORK /SENIOR SITE SUPERVISOR. Jalai Wak, 96510, Pakan, Julau, Sarawak.

NO OUTLET ADDRESS TEL SELANGOR 1 Klang No:84, Jalan Nanas (20/10/1988) Klang, Selangor Darul Ehsan

A. State: Kelantan. No Town Location/Address of Branch Location/Address of Branch (Incapacitated and not in operation)

List Of Properties As 31 December 2007

Jabatan Tenaga Kerja (JTK) Malaysia

LIST OF HOSPITALS & HOSTEL CLINICAL PLACEMENT

NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1

List of Government Clinics

GARIS PANDUAN PERMOHONAN PENGELASAN SPA DAN PUSAT REFLEKSOLOGI

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

BRANCH LOCATIONS. OCBC Bank Head Office Menara OCBC No. 18 Jalan Tun Perak Kuala Lumpur

SAFE DEPOSIT BOX PROMOTION: 50% OFF FIRST YEAR RENTAL FEE

PANEL WORKSHOPS FOR COMMERCIAL VEHICLE REPAIR

FEEL-LITE LED LIGHTING MALAYSIA

NUTTELEX MALAYSIA STOCKISTS 8TH AUGUST 2018

Document Control. Author Control. Reviewer Control. Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List

8. Selayang 81-85, Jalan 2/3A, Pusat Bandar Utara, KM 12, Jalan Ipoh, Batu Caves, Kuala Lumpur. Tel : Fax :

e-mas: LIST OF PANEL HOSPITALS FOR CROWD CARE

List of Government Clinics

PRACTICUM INFORMATION FOR SEPTEMBER 2018 PLACEMENT (A172) & FEBRUARY 2019 PLACEMENT (A181)

NO BRANCH NAME FULL ADDRESS STATE DISTRICT 1 BUTTERWORTH No. 49, Jalan Selat Pulau Pinang Seberang Perai Bandar Taman Selat Utara Butterworth 12000

Magnolia King s Confectionery Promotion 2013

SENHENG BRANCH LISTING

C O N N E C T I N G L I V E S, A C C E L E R A T I N G G R O W T H

LOOKING FOR BUYERS PLEASE CONTACT US IF INTERESTED TO PURCHASE THE UNDERMENTIONED PROPERTIES.

Station List with F1 Merchandise

Aggregates & Concrete - Soft Launch. Week 2 19-May 20-May 21-May 22-May 23-May 24-May 25-May WL 8am. Aggregates - H&S Day. 8am

Knowledge Park. AN INTEGRATED KNOWLEDGE HUB

Terms and Conditions CIMB FIESTA 2016 Count Octo Contest

LIST OF AUTHORISED DEPOSITORY AGENT ( ADA ) ACCOMPANYING THE ELECTRONIC PROSPECTUS OF GDB HOLDINGS BERHAD ( GDB OR THE COMPANY ) DATED 5 MARCH 2018

No State Address Contact. ALAM DAMAI 31-G, Jalan Damai Niaga,Alam Damai Cheras,56000 Kuala Lumpur,Wilayah Persekutuan,Malaysia

KEDAH (CONT D) Kuala Perlis (Mini) Pejabat TH Mini Kodiang Bangunan Tabung Haji PT 2475 (Mini) No 5A Tingkat Bawah

Avengers Infinity War Movie Voucher List of Participating Stations No STATION NAME STATE TGV MBO 1 PETRON TONGKANG PECAH (FI) JOHOR X 2 PETRON SKUDAI

Arahan Amalan Mahkamah Rayuan Bil 3 Tahun 2014 Pengkelasan Kod bagi Kes Semakan Sivil di Mahkamah Rayuan

Introduction: Malaysia

Registered Training Centre (RTC) in Malaysia

ALIM HARMONY, SG. PETANI HASANI EDAR, SG. PETANI PUSTAKA JITRA, JITRA PUSTAKA UNION, ALOR SETAR PUSAT BUKU GEMILANG, KULIM

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

No.of Bed : 29 No.of Bed : 68 No.of Bed : 242

Page 1 of 8. No PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

Bandar Baru Air Itam No. 37, Jalan Angsana Bandar Baru Air Itam Pulau Pinang Tel : Fax :

No. Store Name Address 1. GIANT HYPERMARKET BANTING LOT 555 PERSIARAN KOTA SERI LANGAT KOTA SERI LANGAT, BANTING, KUALA LANGAT SELANGOR

Telefon Pejabat(Kuala Lumpur): Pengurus: Setar) Faksimili Pejabat(Kuala Lumpur):

MINISTRY OF TRANSPORT MALAYSIA

Capacity Building for Geospatial Information Management in Malaysia (Case Studies in JUPEM)

Untuk kerja-kerja pelancaran 'U Beam' dan kerja-kerja yang berkaitan dengan MRT

Direktori Maklumat SME Contact

Kajang Tel: Fax: Perak Darul Ridzuan Ipoh Tel: Fax:

NOTICE OF PROPOSED RECOMMENDATIONS FOR FEDERAL AND STATE CONSTITUENCIES IN THE STATE OF SELANGOR AS REVIEWED BY THE ELECTION COMMISSION IN 2018

Positioning Your SME Business for Expansion with a Corporate Factory

Click to edit Master text Kubor styles Second level Third level Fourth level Fifth level

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

THE SCENARIO OF TRAINING OFFERED BY PUBLIC TRAINING INSTITUTIONS IN 2016

FEM/SEN3/SALI BPG NO.EDISI : 03 NO. SEMAKAN : 07 TARIKH KUATKUASA : drp. 30

LATAR BELAKANG BACKGROUND. Kelab Maya Sahabat Ar Rahnu

List of Government Clinics. 1 Alor Gajah MLK001 Klinik Kesihatan Padang Sebang Kg. Padang Sebang Alor Gajah

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Assessment on Students Socio-Scientific Understanding: A Research Report

TERMS AND CONDITIONS CIMB F.I.R.S.T Grab Promotion Code Campaign

INDUSTRIAL TRAINING BRIEFING

PHR NO. STORE NAME ADDRESS

FACILITATION FUND UNIT KERJASAMA AWAM SWASTA JABATAN PERDANA MENTERI

NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA

Kampung Baru Gunung Rapat, 31350, Ipoh, Perak.

CURRICULUM VITAE MOHD ANWAR BIN AZMI 5-1B, JALAN PANDAN 3/10, PANDAN JAYA KUALA LUMPUR, MALAYSIA

Bahagian II. Daftar Projek Pembinaan Mengikut Nama Kontraktor. Oktober 2010

Page 1 of 8 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

When Dreams Take Flight. Cover Rationale

WIRA UKUR CONSULTANT is a fully bumiputra owns and professional licensed land surveyor which was incorporated on 22 nd October 1990.

Mesra - List of Participating Stations N0 Station

FEM/SEN3/SALI BS(PM&TM) NO.EDISI : 03 NO. SEMAKAN : 07 TARIKH KUATKUASA : drp. 60

Court & Land Office auction listing. Page 1 of 8

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR DAN LEBUHRAYA BARU PANTAI

-2SD +2SD -3SD -2SD -3SD -2SD

2017 July. The impact of Penang Transport Master Plan on its real estate

ROSLIZAWATI CHE AZIZ /

Vortex Simplified Brochure Close Size: 20cm(w) X 27cm(h)

Page 1 of 10 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Terms & Conditions The following sets out the terms and conditions applicable to the Campaign ( T&Cs ):-

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Mrazzi Printable Property Listing Date: 09-Jul-2014

First and foremost, I hope this message finds you well in the best of health and business endeavors.

Positioning Your SME Business for Expansion with a Corporate Factory

stage 2 stage map Sungai Petani - Georgetown 158.1km Thursday 25 February 2016 SUNGAI PETANI GEORGETOWN Sg. Karangan 28.1km Teluk Bahang 128.

Investor Presentation 2013

11 D Mart Air Tawar 05 (Felda 57)(Onepay) - Kota Tinggi, Johor Johor. 9 D Mart Air Tawar 03 (Felda 134)(Onepay) - Kota Tinggi, Johor Johor

BRANCHES OPEN ON SATURDAY, 11 MARCH 2017 FOR DEBIT CARD REPLACEMENT

Application of methods of Westernmost Point and Multiple Reference Points in determining zone-based prayer time: A study in Selangor

Level 1-2, Wisma BU 8, No.11, Lebuh Bandar Utama, Bandar Utama, Petaling Jaya, Selangor

JABATAN JARINGAN INDUSTRI & MASYARAKAT Industry Partnership and Community Relation Department. PROGRESS REPORT UMP (until end of 2016)

PROFIL SYARIKAT. Profil Syarikat. ILHAM Management Consultants Sdn Bhd ( U) Perkhidmatan:

Provider Name Address Line 1 Address Line 2 City Province Phone Fax Provider Type Kedah Medical Centre

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR 29 JUN 2018

Participating Authorised Dealers State Mall / Area Address

Issues for Urban Design and Master Planning in Seberang Perai

SENARAI PERUNDINGAN BAGI TAHUN PUSAT PENGAJIAN KEJURUTERAAN AWAM

Transcription:

INTRODUCTION

INTRODUCTION CORPORATE INFORMATION Company Name Business Address : Wiranda (M) Sdn. Bhd. (302843-H) : 3374 Jalan 18/31, Taman Sri Serdang, 43300 Seri Kembangan, Selangor Darul Ehsan. Telephone No. : 03-8942 3413/3495 Facsimile No. : 03-8948 5912 E-mail Branch : wiranda_sdnbhd@hotmail.com : Lot 87 Tingkat Atas, Bukit Payong, 21400 Marang, Terengganu Tel / Fax : 09-619 1859 Incorporation Date : 7 th June 1994 Registered with : Ministry of Finance (MOF) 465-00011737 / 357 02001682 Petroliam Nasional Berhad L-302843-H Bumiputera Status (MOF) BP 058128 Department of Environment F 00072 Directors : 1. Abdul Wahid bin Ghazali B. A. (Hons) Sociology/Geography UKM, 1976 M. Sc. Environmental Planning/Urban and Regional Analysis University of Miami, Ohio, 1980 (DOE Registered EIA Consultant No. CS0019) 2. Dr. Mohammad Ismail bin Yaziz B.Sc. (University of Adelaide, South Australia) Cert. Advanced Immunology, (Chelsea College, University of London) Ph.D Environmental Sanitation Sewage Treatment, University of Surrey) (DOE Registered EIA Consultant No. CS0158)

INTRODUCTION 3. Ir. Anuar bin Ramle B.Eng (Civil) - UTM, 1978 M.Eng (Geotechnical), Asian Institute of Technology, Bangkok, Thailand (1988) Professional Engineer, Board of Engineers, Malaysia (BEM) (1992) (DOE Registered EIA Consultant No. CS0409) 4. Kalsom binti Mohamad B.Sc in Architecture, UTM (1984) Ms. in Architecture (University of Sheffield) (1996) Equity Structure Banker : 100% Bumiputera (Malaysian) : CIMB Bank Berhad, Seri Kembangan Branch Malayan Banking Berhad, Taman Sri Serdang Branch Company Secretary : Peninsular Corporate Consultants Sdn. Bhd. Auditor : Halim, Ahmad & Co. Advocate & Solicitor : Noraini & Norasmadi

INTRODUCTION FAST, EFFICIENT & AFFORDABLE WIRANDA (M) SDN. BHD. (WSB) was created out of the above principles for our valued clients. WSB comprises of a group of committed and able technical consultants, in ensuring high standard professional services to our clients. WSB is directly linked with experts from professional firms and institutions at national and international levels. The establishment of WSB is in line with the national aspiration towards the development of a more environmental caring society. At WSB, we strongly believe in delivering more than what the client expect. This will show in our effort and result. You will find that the result will be greatly satisfying as it is fast, efficient and yet affordable in line with our objectives: To provide advisory and consultancy services to both government and private agencies; VISION Contributing to the balance of the country s development with environmental conservation through consultation and training. WSB s commitments to our clients business excellence and community awareness are essential ingredients for our-long term growth. To excel in our field of expertise; To link ourselves with other experts in aiding the nation to achieve high environmental and social standard.

INTRODUCTION OUR SERVICES 1. Environmental Impact Assessment (E.I.A) Study All prescribed activities under EIA Order 1987 2. Environmental Management Plan (E.M.P) 3. Environmental Impact Study (E.I.S) 4. Environmental Audit 5. Environmental Monitoring Air Quality Water Quality Aquatic Life Ground Water Terrestrial Life 6. Environmental Modeling Noise Water Quality Air Quality Coastal Hydrology Ground Water

INTRODUCTION OUR SERVICES 7. Environmental Studies Transportation Traffic Natural Resources & Recreational Area Ecology Water Quality Noise Marine Hydrology Ground Water Geological Socio-Economic Leachate Seepage & Permeability Analysis 8. Social Impact Assessment Public Participation Socio-Economic Study 9. Toxic & Hazardous Waste Management Design Site Investigations Health & Safety Data Evaluation Feasibility Studies Planning 10. Solid Waste Management Design Site Investigations Health & Safety Data Evaluation Feasibility Studies Planning 11. Wastewater Engineering (Sewage & Industrial) Design Waste Water Characteristic Study Planning Operation 12. Economic Evaluation

INTRODUCTION ENVIRONMENTAL POLICY WIRANDA (M) SDN. BHD. is committed to providing quality service in a manner that ensures a safe and healthy workplace for our employees and minimises our potential impact on the environment. We operate in compliance with all relevant environmental legislation and strive to use pollution prevention and environmental best practices in all we do. We: seek opportunities to reduce our environmental impact, and we set, communicate, monitor and review objectives and targets to continuously improve our excellent standards of environmental performance. strive to continually improve our environmental performance and minimise the social impact and damage of activities by periodically reviewing our environmental policy in light of our current and planned future activities. avoid unnecessary use of hazardous materials and products, seek substitutions when feasible, and take all reasonable steps to protect human health and the environment when such materials must be used, stored and disposed of, committed to comply with relevant environmental legislation and regulations. committed to minimising waste and pollution arising from our activities and we monitor and, wherever practicable reduce, energy consumption. prefer to work with suppliers who themselves have sound environmental policies. ensure that all who work at Wiranda (M) Sdn. Bhd. is aware of their environmental obligations, and the contributions they can individually make to care for the environment and prevent pollution. communicate our environmental commitment to clients, customers and the public and encourage them to support it, As an environmental company we have put in place right from day one an environmental policy that has become one of the key foundation stones of our corporate culture.

INTRODUCTION QUALITY POLICY Wiranda (M) Sdn Bhd is dedicated to the quality policy that will ensure its products and professional services fully meet the requirements of its customers. The goal of the company is to achieve a high level of customer satisfaction at all times. The quality policy is based on 3 fundamental principles: 1. Ensuring that we fully identify and conform to the needs of our customers. 2. Looking at our service provision processes, identifying the potential for errors and taking the necessary action to eliminate them. 3. Provide continuous training of personnel to improve their knowledge base and career advancement. Our Company will constantly review and improve on our services to ensure tasks are completed in the most cost effective and timely manner for the benefit of our customers. We shall ensure that all our personnel understand and fully implement the Company's quality policies and objectives and are able to perform their duties effectively through ongoing training and development programmes.

INTRODUCTION Safety Policy Wiranda (M) Sdn Bhd is committed to ensure the safety and health of its employees and work place and to develop and implement safe work practices that comply with the requirements of relevant statutory safety rules. It is our policy: To establish safety as our organizational goal. To provide and maintain a workplace and systems of work, so far as is practicable, that employees and visitors are not exposed to hazards. To ensure that all employees are provided with information, instruction, training and supervision appropriate to the scope of the work being undertaken. To consult with employees on any issues that may affect their safety and health at work. To continuously review safety management systems in order to meet or exceed best practice. Employees are required to take all reasonable care to ensure their safety and that of other persons. They are also required to comply with all instructions and directions established to provide a safe and healthy workplace.

ORGANIZATION CHART BOARD OF DIRECTOR MANAGING DIRECTOR Abdul Wahid bin Ghazali DIRECTOR Dr. Mohammad Ismail b. Yaziz GENERAL MANAGER Shamsol Azhar bin Ismail ASSISTANCE GENERAL MANAGER Noor Azman bin Mohd Abdul Wahid PROJECT MANAGER BRANCH MANAGER Mohd Saufie B Ismail @ Besar ENVIRONMENTAL IMPACT ASSESSMENT Nurfaeza Sufa at (Head of Department) ENVIRONMENTAL MANAGEMENT PLAN (EMP & EM) Norazliza Aziz (Head of Department) ESCP Nurul Ain Sapeia (Head of Department) SOCIO ECONOMIC STUDY Noraishah MD Zamani (Head of Department) MAPPING Mohd Shah b Muftaharuddin (Head of Department) HUMAN RESOURCES Azliza Mohd Abdul Wahid (Head of Department)

PROJECTS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) 2016 EIA For The Detail Design For The Proposed Main Infrastructure Works For Kertih Biopolymer Park Phase 3 At Kertih Biopolymer Park, For East Coast Economic Region Development Council (ECERDC) (Client : WAN HUSIN & ASSOCIATE SDN BHD) (on going) EIA for The Proposed Forest Plantation 396.77 Hectares (Block A) In Hutan Simpan Baluk, Mukim Sungai Karang, District Of Kuantan, Pahang Darul Makmur. (Client : Kilauan Sinar Sdn Bhd) (on going) EIA for The Proposed Forest Plantation 396.77 Hectares (Block B) In Hutan Simpan Baluk, Mukim Sungai Karang, District Of Kuantan, Pahang Darul Makmur. (Client : Kilauan Sinar Sdn Bhd) (on going) EIA for Projek Menaiktaraf Kemudahan Asas, Insfrastruktur Dan Utiliti Di Kepulauan Mersing, Johor (Client : JABATAN KERJARAYA MALAYSIA, CAWANGAN ALAM SEKITAR) (on going) EIA FOR THE PROPOSED FOREST PLANTATION (±202.35 Hectares) IN HUTAN SIMPAN BERKELAH, MUKIM PULAU TAWAR, DISTRICT OF JERANTUT, PAHANG DARUL MAKMUR (Client : CW VENTURES TRADING) (on going) EIA for The Proposed Of DEIA, SIA, ESCP and EMP For The Proposed Project In Penang (Pan Island Link 1) (Client : GAMUDA BERHAD,QSHE DEPARTMENT) (on going) EIA for The Proposed of 2,024.78 Hectares of Oil Palm Plantation in Mukim Pasir Raja, Dungun, Terengganu (Client : Yee Seng Plantations Sdn Bhd) (on going) 2015 DEIA for The Proposed of 10,000 Acres For Oil Palm Plantation in Mukim Tembeling, Distric of Jerantut, Pahang (Client : TH Plantation Berhad ) (on going)

PROJECTS DEIA for Cadangan Pembukaan Ladang Baru Seluas 4,560.96 Hektar Di Mukim Bebar, Pekan, Pahang (Client : YP Plantation Holdings Sdn Bhd. ) (on going) EIA for The Proposed Hotel Teluk Cempedak Kuantan, Pahang Darul Makmur (Client : Kwai Loong Housing Development Sdn Bhd ) 2014 EIA for Cadangan Pembinaan Loji Rawatan Kumbahan Serantau Bandaraya Melaka Di Lot 16643 Dan 1664, Mukim Batu Berendam, Daerah Melaka Tengah, Melaka Bandaraya Bersejarah (Client : Jabatan Perkhidmatan Pembentungan ) EIA for Cadangan Pembinaan Telaga Jejari (HCW) Bagi Projek Menaiktaraf Loji Rawatan Air Kampung Chap, Jajahan Bachok, Kelantan. (Client : Air Kelantan Sdn Bhd) EIA for The Proposed Oil Palm Plantation Development (8,093 Ha) In Mukim Hulu Tembeling, District of Jerantut, Pahang Darul Makmur. (Client : Perbadanan Kemajuan Negeri Pahang) EIA for The Proposed Development of Sport Village, a Multi Sports Facility in Iskandar Malaysia, Mukim Pulai, District of Johor Bahru, Johor Darul Takzim. (Client : Tanjung Aru Capital Sdn bhd) 2013 EIA for PM321 (Songket-1) and PM 320 (Kebaya-1 & Selendang-1) Straits of Malacca, Exploration Drilling Campaign 2013 (Client : Petronas Carigali Sdn Bhd) (Approved on December 2013) EIA for Cadangan Pembinaan Loji Rawatan Kumbahan Serantau Bandaraya Melaka di Lot PT 1819, Kawasan Bandar VI, Daerah Melaka Tengah, Melaka Bandaraya Bersejarah (Tambak Laut) (Client : Jabatan Perkhidmatan Pembentungan) (Approved on Sept 2013) DEIA for The Proposed Timber Latex Clone Plantation Compartment 4 to 10 in Gunung Inas Forest Reserve Baling, Kedah Darul Aman (Client : Perbadanan Menteri Besar Kedah) (Approved on August 2013)

PROJECTS EIA for The Proposed Rubber Plantation in Kg Bukit Mat Daling, Hulu Tembeling, Pahang Darul Makmur (Client : Technopalm Sdn Bhd) (Approved on April 2013) 2012 EIA for Cadangan Menaiktaraf dan Rasionalisasi Loji-Loji Sediada di Kawasan Tadahan Tampin Tengah, Negeri Sembilan Darul Khusus. (Client : Jabatan Perkhidmatan dan Pembetungan) (Approved on February 2014) EIA for Manganese Smelting on Lot 3732, Kawasan Perindustrian Sg Nal Jalan Stapunal, 18000 Kuala Krai Kelantan. (Client : Eastcoast Universe Smelting & Mining (M) Sdn Bhd) (Approved on 30 September 2012) EIA for Cadangan Pembangunan Ladang Model Stesen Penyelidikan MPOB Jerantut, Pahang. (Client : Malaysia Palm Oil Board MPOB) (Approved on 10 August 2012) EIA for The Proposed Oil Palm Plantation (2530 Hectares) In Nenasi, Mukim Bebar, Daerah Pekan, Pahang Darul Makmur. (Client : YP Plantation Holdings Sdn Bhd) (Approved on 3 August 2012) EIA for the Proposed 5000 Acres (2023.4 Ha) Oil Palm Plantation on H.S (D) No. 39694 PT No. 3225 Mukim of Ulu Lepar, District of Kuantan, Pahang Darul Makmur. (Client : Alur Seri Sdn Bhd) EIA for Cadangan Pembangunan Ladang Kelapa Sawit 2433.113 Hektar (6012.944 hektar) di Kg Api Larat, Mukim Bebar, Daerah Pekan, Pahang Darul Makmur. (Client : YP Plantation Sdn Bhd) (Approved on January 2012) 2011 EIA for the Proposed Aquaculture Park (128Ha) In Badong, Pekan, Pahang Darul Makmur. (Client : Lembaga Kemajuan Ikan Malaysia) (Approved on 23 rd December 2011) Environmental Screening for Integrated Fisheries Complex in Tg. Bako, Kuching. (Client: Lembaga Kemajuan Ikan Malaysia) (Approved on September 2011)

PROJECTS EIA for the Proposed of Pembersihan Sg. Segget. Pakej 1: Cadangan Pembinaan Loji Rawatan Air Kumbahan dan Enapcemar Berpusat dengan Kapasiti 120,000 PE dan Kerja- Kerja Berkaitan di Lot 20216, 20217, 20218 dan PTB 20476 Johor Bahru, Johor. (Client : UR Ekacipta Sdn Bhd) (Approved on 17 th August 2011) EIA for the Proposed 809.43 Hectare (2000.143 Acres) Oil Palm Plantation Development in Mukim Semantan, Temerloh, Pahang Darul Makmur. (Client : Felcra Plantation Services Sdn Bhd) (Approved on 7 th January 2011). EIA for the Proposed of New Road from Kg. Keruak, Hulu Besut to Gunung Bongsu, Hulu Terengganu. (Client : Jabatan Kerja Raya Negeri Terengganu) (Approved on 20 th January 2011). 2010 EIA for the Proposed of Oil Palm Plantation (1800 Acres) in Bukit Mempelam, Mukim Rompin, District of Rompin, Pahang Darul Makmur (Approved on 10 th December 2010) EIA for the Proposed of Oil Palm Plantation (1700 Acres) in Tebu Hitam, Mukim Rompin, District of Rompin, Pahang Darul Makmur (Approved on 2 August 2010). EIA for the Proposed of Perusahaan Kuari Kawasan Bukit Batu Hampar, Mukim Kuala Nerus, Daerah Kuala Terengganu, Terengganu Darul Iman. (Approved on 12 July 2010). EIA for the Proposed of 1,352 Hectares Oil Palm Plantation Development for Kawasan Tanam Utama Projek Agropolitan, Pekan, Pahang Darul Makmur. (Approved on 14 June 2010). Detailed Environmental Impact Assessment for The Construction of Paya Peda Dam Besut, Terengganu Darul Iman. (Approved on 2 June 2010). 2009-1997 EIA for UiTM Cawangan Terengganu, Kampus Bukit Besi Asrama, Perpustakaan, Kemudahan Sukan, Infrastruktur, Bangunan Akademik, Dewan Kuliah dan Makmal. (Approved on 2 November 2009)

PROJECTS EIA for the Proposed Development of Fertilizer Compaction Plant, Lot 1997 & 1999 Gebeng, Jalan Kuantan By Pass, Mukim Sungai Karang, Kuantan, Pahang. (Approved on 19 June 2009) EIA for the Cadangan Membina dan Menyiapkan Politeknik Jeli, Kelantan Darul Naim. (Approved on 1 September 2008) EIA for Cadangan Merekabentuk 20 Tingkat Felda Business Residence Di atas Tapak Pejabat Felda Wilayah Terngganu, Lot 1731, Jalan Hiliran, Kuala Terengganu, Terengganu (Approved on 13 th April 2008) EIA for The Proposed of Simpang Pulai-Lojing-Gua Musang-Kuala Berang Road Project, Package 8 - Kg. Teris to Kuala Telemung, Terengganu (Approved on 6th Jun 2007) EIA for The Proposed of Cadangan Membina & Menyiapkan Pulapol Ayer Itam di atas Lot 159, Mukim Serting, Daerah Jempol, Negeri Sembilan (Approved on 28th May 2007) EIA for The Proposed of Cadangan Membina dan Menyiapkan Projek Pembangunan Bercampur di atas Plot 2-23, Plot B&C, Mukim Rawang, Daerah Gombak, Selangor Darul Ehsan. (Approved on 21 st May 2007) EIA for The Proposed of Projek Menaiktaraf Jalan Seremban-Kuala Pilah (dari Simpang Senawang ke Hospital Kuala Pilah), Negeri Sembilan for JKR Malaysia. (Approved on 8 th February 2006) EIA for The Proposed of Trans Eastern Kedah Interland Highway from Durian Burung to Kupang, Kedah for JKR Malaysia. (Approved on 19 th July 2006) EIA of The Proposed Rubber Forest Plantation in Kuala Kuantan, Mukim of Kuala Kuantan, District of Kuantan, Pahang Darul Makmur for Lembaga Getah Malaysia. (Approved on 17 th October 2005) A Supplementary Environmental Impact Assessment Project Jalanraya Simpang Pulai-Lojing- Gua Musang-Kuala Berang Pakej 6-Aring to Jambatan Pasir Pulau. (Approved on 5 th November 2004) EIA of Proposed Agriculture Land, Mukim Endau, District of Rompin, Pahang Darul Makmur. (Approved on 12 th January 2004)

PROJECTS EIA for Proposed Mixed Development on Semenyih Estate, Mukim Semenyih & Beranang, District of Ulu Langat, Selangor for Golden Hope Development Sdn. Bhd. (Approved on January 2004) EIA for the Proposed Integrated Fruit Plantation, Sg. Wangi Estate, Sitiawan, Perak Darul Ridzuan for Golden Hope Plantation Berhad. (Approved on 31 October 2003) EIA for the Proposed New Administrative and Educational Township at Sg. Sedu, Kuala Langat, Selangor. (Approved on 10 October 2002) EIA for the Institut Tanah, Ukur dan Pemetaan Negara (INSTUN) in Ulu Bernam, District of Batang Padang, Perak for Jabatan Kerja Raya, Malaysia. (Approved on 13 June 2000) EIA for the Trans-Asia Railway (Singapore - Kunming, China Rail Link) for the Ministry of Transport, Malaysia (Completed 2000) EIA for the Mixed Development in Penor, Kuantan, Pahang for Pravest Sdn. Bhd. (Completed 2000) EIA for Landfill Investigation and Assessment in the Federal Territory of Kuala Lumpur for Department of Environment. (Completed 2000) EIA for Cadangan Grassroot Petroleum Refinary di Mukim Pulau Kerengga, Marang, Terengganu Darul Naim. (Approved on 14 th January 1998) EIA for the Proposed Agro Forestry Botanical Garden in Baling, Kedah for Kedah State Development Corporation. (Completed 1998) EIA for Cadangan Pembangunan Perumahan dan Perdagangan di Lot-Lot 3338, 2195, 14648, 14649, 14650, 14651, PT 12615, PT 12616 & PT 12617 Mukim Labu, Daerah Seremban, Negeri Seremban Darul Khusus. (Approved on 12 th November 1997) EIA of the Proposed Mixed Development in Nilai, District of Seremban, Negeri Sembilan for Negara Properties Berhad and Golden Hope Berhad. (Completed May 1997) EIA for the Dedicated Highway from Kuala Lumpur to Kuala Lumpur International Airport (KLIA) Sepang for Environment Asia. (Completed July 1997)

PROJECTS EIA of the Proposed Resort Development in Lukut, Port Dickson for Customac Sdn. Bhd. in association with UPM (Completed September 1997) EIA for Assam Jawa - Templer Park Highway for PDI Consultants Sdn. Bhd. (Completed August 1997) ENVIRONMENTAL MANAGEMENT PLAN (EMP) 2015 EMP: Principal Consultant For Detailed Design And Supervision Of Infrastructure Works At Tok Bali Integrated Fisheries Park (TBIFP) Phase 1, Tok Bali Pasir Puteh, Kelantan Darul Naim For The East Coast Economic Region Development Council (ECERDC). (Client : Wan Husin & Associates) EMP: Merekabentuk, Membina Dan Menyiapkan FLYOVER Di Persimpangan Jalan Bukit Ubi, Seksyen 0.00, Jalan Kuantan- Sungai Lembing (C04), Kuantan, Pahang Darul Makmur. (Client: YYM Builders Sdn Bhd) EMP: Projek Lebuhraya Kemuning- Shah Alam (LKSA) (Client: Projek Lintasan Shah Alam Sdn Bhd) EMP: Cadangan Pembinaan Hospital Pengajar Universiti Putra Malaysia Serdang, Selangor. (Client: AIM Concept Sdn Bhd) 2014 EMP: Projek Penggantian Paip Dasar Laut Ke Pulau Ketam (Client : Mersing Construction & Engineering Sdn Bhd) EMP: The Proposed Oil Palm Plantation (2530 Hectares), In Nenasi, Mukim Bebar, District of Pekan, Pahang Darul Makmur. (Client : YP Plantation Holdings Sdn Bhd) Engineering Consultancy Services for the Construction of Bus Rapid Transit (BRT) Sunway Line. (Client : KL Prima Consult Sdn Bhd)

PROJECTS 2013 EMP for Cadangan Merekabentuk, Membina dan Menyiapkan Double Road Frontage Fasa 2, Dari Pasar Payang ke Taman Shah Bandar, Kuala Terengganu, Terengganu (Client : Kumpulan Liziz Sdn Bhd) Detailed Design and Supervision for Upgrading of The Existing Road from Bukit Kuang Bridge to Kg Bukit Anak Dara, Kijal, Terengganu Darul Iman for the East Coast Economic Region Development Council (ECERDC) (Client : Wan Husin & Associates Sdn Bhd) Rancangan Tembatan Banjir Lembangan Sungai Kerian Membersih Gambut Serta Kerja Kerja Lain Yang Berkaitan Di Kolam Bukit Merah, Daerah Kerian, Perak (Client : Jabatan Pengairan dan Saliran Kuala Lumpur) EMP for The Proposed Timber Latex Clone Plantation Compartment 4 to 10 in Gunung Inas Forest Reserve Baling, Kedah Darul Aman (Client : Perbadanan Menteri Besar Kedah) EMP for Loji Rawatan Air Kumbahan Berpusat Dengan Kapasiti 150,000 PE di Lot 201216 & PTB 20476, Johor Bahru, Johor Darul Takzim (Client: GTS Contractor Sdn Bhd) Monitoring for Cadangan Pembangunan Fasa 1 Bagi 4 Block 28 Dan 30 Tingkat Condominium (928 Unit), 6 Tingkat Podium Tempat Letak Kereta CP1-CP6, Sebuah Pondok Pengawal Dan Sebuah Kebuk Sampah Di Atas Sebahagian Lot 62529 Dan 62531, Persiaran Meranti, Sektor A13, Bandar Sri Damansara, Mukim Bandar Sri Damansara, Daerah Petaling, Selangor Darul Ehsan Untuk Tetuan Sri Damansara Sdn. Bhd (Client: Pembinaan Yuen Seng Sdn Bhd) 2012 Projek Menaiktaraf Lebuhraya Johor Bahru Pasir Gudang Dari 4 Lorong ke 6 Lorong, Johor (Client : IDX Multi Resources Sdn Bhd) Projek Pembangunan Wilayah Ekonomi Pantai Timur (ECER) Menaiktaraf Jalan Persekutuan 3 Dari Persimpangan Bertingkat Jabor Jerangau Ke Persimpangan Bertingkat Sg Ular, Kuantan, Pahang Darul Makmur. Pakej 1 - Persimpangan Bertingkat Sg Ular ke Persimpangan Pelabuhan Kuantan (Client : Syarikat Terbit Serba Boleh Sdn Bhd) Proposed Reclamation and Waterfront Development From Pasar Payang to Taman Shah Bandar, Kuala Terengganu, Terengganu (Client : Kumpulan Liziz Sdn Bhd) EMP Consultancy Services for The Proposed University of Reading Malaysia Campus (URMC) at Iskandar Malaysia, Johor Bharu, Johor Darul Takzim (Client : Education @ Iskandar Sdn Bhd)

PROJECTS EMP for Berjaya Central Park Project Packaje 1 (Office Tower) And The Reinforced Concrete Structural Works For The Rotz-Carlton Residences Tower. (Client : Vinci Construction Grand Projects Sdn Bhd) EMP for the Proposed of New Road from Kg. Keruak, Hulu Besut to Gunung Bongsu, Hulu Terengganu. (Client : MRK Resources Corporation Sdn Bhd JV Kumpulan Liziz Sdn Bhd) Cadangan Pembangunan Pusara Negara dan Kerja-Kerja Berkaitan di atas Sebahagian PT 13301, PT 13304 dan PT 13306, Presint 20, Wilayah Persekutuan Putrajaya untuk Tentuan Jabatan Perdana Menteri (Client : Perunding ZMS Sdn Bhd) Cadangan Pembinaan Terowong di bawah Jalan Dari Pulau Kambing ke Sekolah Menengah Jenis Kebangsaan Chong Hwa Wei Sin, Bukit Kecil, Kuala Terengganu, Terengganu (Client : Kumpulan Liziz Sdn Bhd) 2011 EMP for Projek Pembangunan Wilayah Ekonomi Pantai Timur (ECER); Jalan Persekutuan Laluan 8 & 9 Central Spine Road Pakej 3: Gua Musang, Kelantan ke Kg. Relong, Pahang, (Seksyen 3G: Felda Chegar Perah 2- Felda Telang) (Client : Primercon Sdn Bhd) EMP for Politeknik Balik Pulau (PBU), Pulau Pinang Kerja Bangunan dan Kerja-Kerja Berkaitan (Reka dan Bina) (Client : AIM Concept Sdn Bhd) EMP for the Development of Taman Kekal Pengeluaran Makanan Lojing 1 (TKPM Lojing), Mukim Ulu Nenggiri, Daerah Bertam, Jajahan Gua Musang, Kelanan Darul Naim) (Client : Jabatan Pengairan dan Saliran Negeri Kelantan) 2010 EMP for Projek Pembinaan Jalan dan Jambatan dari Jeram ke Kg. Tok Kong ke Kg. Bukit Guntong, Kuala Terengganu, Terengganu. (Client : Kumpulan Liziz Sdn Bhd) EMP for Cadangan Membina Bangunan Kampus Universiti Teknologi Mara (UiTM) Seremban di Atas PT 16129 dan Sebahagian PT 9550, Seremban 3, Mukim Rasah, Daerah Seremban, Negeri Sembilan Darul Khusus. EMP for The Proposed of Quarry Area at Bukit Batu Hampar, District of Kuala Terengganu, Terengganu.

PROJECTS EMP for Projek Jalanraya Simpang Pulai-Lojing-Gua Musang-Kuala Berang Pakej 6A: Dari Aring ke Sempadan Kelantan/Terengganu. (Approved on July 2010) EMP for Projek Naiktaraf Jalan dari Kg. Berdang Ke Kg. Sungai Rual Melayu, Ke Kg. Sg. Rual, Jeli, Kelantan Darul Naim (Fasa 1), Kelantan Darul Naim. (Approved on May 2010) EMP for Universiti Darul Iman Malaysia (UDM), Kampus Besut, Terengganu-Asrama Pelajar (Fasa 1), Terengganu, Terengganu Darul Iman. (Approved on July 2010) EMP for Pembangunan Institut Kepelbagaian Biologi (IKB), Lanchang, Pahang Darul Makmur (Approved on July 2010) EMP for Lebuhraya Pantai Timur Fasa 2 (Pakej 10) Bukit Besi ke Bukit Payung Cadangan penerusan Pemantauan Alam Sekitar di Tapak Bina, Terengganu Darul Iman (Completed) EMP for Cadangan Pembinaan Paip Pembetungan Utama dan Stesyen Pam, Mukim Klang, Selangor Darul Ehsan. (Completed) EMP for Proposed Construction and Completion of Package 2 Primary Infrastructure Works for Legoland Malaysia Theme Park on Part of Lot PTD 154492 and Lot PTD 154493, Mukim Pulai, Daerah Johor Bahru, Johor Darul Takzim for IDR Assets Sdn Bhd. (Completed) 2009 1997 EMP for Integrated Transport Terminal at Bandar Tasik Selatan, Kuala Lumpur (Completed on October 2010) EMP for The Development of 10MW Small Hydro Power Plant Under Srep Proggramme at Sungai Brooke, Gua Musang, Kelantan (Approved on 4 th November 2009) EMP for Permohonan Kebenaran Merancang Bagi Pendirian Bangunan ke atas Cadangan Menara Pejabat dan Komersil yang Mengandungi: 1) 14 Tingkat Menara Pejabat dan 10 Tingkat Menara Pejabat 2). 1 Tingkat Ruang-Ruang Komersil 3). 2 Tingkat Aras Besemen dan Ruang Komersil dan Kerja-Kerja yang Berkaitan dengannya di atas Plot 3C7 (PT 12069), Presint 3, Wilayah Persekutuan Putrajaya (Completed November 2009)

PROJECTS EMP for Cadangan Membina dan Menyiapkan Pangkalan Polis Marin Di Raja Malaysia Wilayah Selatan, di atas Lot PTD 2417, Mukim Tanjung Kupang, Daerah Johor Bahru, Johor Darul Takzim. (Completed 2006) EMP for Cadangan Membina Dan Menyiapkan Politeknik Jeli, Di Atas Lot A, Mukim Jeli, Daerah Jeli, Kelantan Darul Naim (Pakej 2- Bangunan dan Kerja-Kerja Luaran) (Completed 2004) EMP for Cadangan Pembangunan Bercampur di atas Lot PTD 119774, PTD 119775 & PTD 119776 (Sungai Lunchoo) (Client : Kumpulan Liziz Sdn Bhd) (Completed 2004) EMP for the Proposed New Administrative and Educational Township at Sg. Sedu, Kuala Langat, Selangor for I&P Seriemas Sdn. Bhd. (2005 2007) EMP of Cadangan Menaiktaraf Laluan B9/FT015 Dari Lapangan Terbang Subang ke Hospital Sg. Buloh, Selangor for PERKIM (Damansara Utama) Rira Bina JV Sdn. Bhd. (2004 2005) EMP for the Proposed Taman Wawasan (Zone 1) in Precinct 2, Putrajaya. (Completed in October 2001) EMP and Environmental Audit for the Institut Tanah, Ukur dan Pemetaan Negara (INSTUN) in Ulu Bernam, District of Batang Padang, Perak for Jabatan Kerja Raya, Malaysia. (Completed in August 2001) SOCIO ECONOMIC & SOCIAL IMPACT ASSESSMENT STUDY (SE & SIA) 2015 Environmental and Social Planning Consultant for Putrajaya- Cyberjaya Travel Demand and Public Transport Plan (Client : UrusBudi Transplan Sdn Bhd.) 2014 Axle Load Study (Bridges) On Federal And Major State Routes In Peninsular Malaysia (Client : Servis Eda Sdn Bhd.) Social Scientist for Projek Kajian Menentukan Kriteria Accetable Risk and Toletable Risk dan Aplikasinya dalam Penilaian Risiko Tanah Runtuh (Client : Servis Eda Sdn Bhd.)

2013 PROJECTS Kajian Kemungkinan Kemudahan Pengurusan Sisa Pepejal Bagi Daerah Tanah Merah. (Client : Kementerian Kesejahteraan Bandar,Perumahan dan Kerajaan Tempatan) Socio Economics & Socio Impact Study and Economic Evaluation of Environmental Impacts (EEEI) Study of Detailed Environmental Impact Assessment (DEIA) Study for Proposed Pengerang Maritime Industrial Park, Teluk Ramunia, Johor (Client : DHI Water & Environmental (M) Sdn Bhd) The Feasisibility Study for Jalan Kong-Kong, Masai to Jalan Skudai (Through The Middle Ring Road), Johor Bharu, Johor (Client : Muda Consult Sdn Bhd) The Feasibility Study and Proposed Road and Tunnel Projects : ( i ) Gurney Drive Lubuhraya Tun Dr Lim Chong Eu By Pass ( ii) Lebuhraya Tun Dr Lim Chong Eu - Bandar Baru Air Itam By Pass (iii) Cadangan Jalan Berkembar Jalan Tanjung Bungah Teluk Bahang (iv) Penang Butterworth Tunnel (Client : Jurutera Konsult Maju Sdn Bhd) Detailed Environmental Impact Assessment (DEIA) Study for Proposed Development of an Integrated Petroleum Hub and Marine Industrial Park Including Reclamation at Tg Piai, Johor (Client : DHI Water & Environment (M) Sdn Bhd Detailed Planning and Pre-Engineering Study For The Proposed Phase 1 Iskandar Malaysia Bus Rapid Transit System Implementation As Part Of RMK-10 Urban Public Transport Improvement Project (Client : Iskandar Regional Development Authority (IRDA)) Feasibility Study For The Proposed Road Upgrading For Jalan Datin Halimah To Persimpangan Sutera, Johor Bahru, Johor Darul Takzim (Client : KFI Engineers Sdn Bhd) Socio Economic for The proposed Timber Latex Clone Plantation Compartment 4 to 10 in Gunung Inas Forest Reserve Baling, Kedah Darul Aman (Client : Perbadanan Menteri Besar Kedah) 2012 Socio Economic for Kajian Kemungkinan Menaiktaraf Jalan dari 2 Lorong kepada 4 lorong Kuala Linggi Masjid Tanah Sungai Udang Klebang Limbangan Jalan Pantai Jambatan Syed Sultan Abd Aziz Alai (Telok Mas), Melaka. (Client : Jurutera Consult Maju Sdn Bhd) Social Impact Assessment for Senawang-KLIA-Salak Tinggi Expressway (Client : Projek Lebuh Raya Utara Selatan Berhad)

PROJECTS Social Impact Assessment for Sungai Dua-Juru Bypass. (Client : Projek Lebuh Raya Utara Selatan Berhad) 2011 Socio Economic for the Proposed Mixed Development at Ulu Tiram, Johor Darul Takzim. Socio Economic for Cadangan Pelan Pembangunan Pelancongan Desaru, Mukim Pantai Timur, Daerah Kota Tinggi, Johor Darul Takzim. 2010 Socio Economic & Social Impact Assessment (SIA) for Feasibility Study of a Proposed Kuala Lipis Kemaman Road Project. Socio Economic & Social Impact Assessment (SIA) for Development of an Integrated Masterplan for Kuala Terengganu City Centre. 2009-2000 Socio Economic Studies for the EIA of Proposed Kuala Lumpur Kuala Selangor Expressway Project (2009) Socio Economic Studies for Johore Ring Road, Johor Bahru (2009) Socio Economic & Social Impact Assessment (SIA) for Mersing-Sg Sedili Besar New Coastal Road Project (2009) Socio-Economic Studies of Transport Consulting Services for the Design Bus Hubs and Depots, Klang Valley (2008) Socio-Economic Studies for Kajian Pengangkutan Bandar Kangar Dan Kawasan Sekitarnya (2008) Socio-Economic for Kajian Kemungkinan Lebuhraya Pantai Timur Fasa 3. (2008) Socio-Economic Study of Proposed 1 x 700 MW Manjung Coal-Fired Power Station Extension in Seri Manjung, Mukim of Lumut, District of Manjung, Perak Darul Ridzuan for TNB Research Sdn. Bhd. (Completed in February 2004).

PROJECTS Social Impacts Assessment of New Highway to Affected Communities in Klang Valley (TRANS- SIMPACT) for Prime Minister Department (Completed in April 2001). Socio-economic Study for the Independent Power Plant and Port Project in Pulau Bunting, Yan, Kedah (Completed 2000). Socio-economic study on the proposed Bukit Bunga Bridge in Kelantan for Kementerian Kerja Raya, Malaysia (Completed 2000). ENVIRONMENTAL AUDIT To carry out environmental compliance audit to the contractor according to EMP Report and for Projek Pembinaan Empangan Kahang, Di Daerah Kluang, Johor. To carry out environmental compliance audit to the contractor according to EMP Report and for Cadangan Pembinaan Hospital Pengajar Universiti Putra Malaysia Serdang, Selangor To carry out environmental compliance audit to the contractor according to EMP Report and for PETRONAS GAS BERHAD, at Pasir Gudang Regional Operation Office. To carry out environmental compliance audit to the contractor according to EMP Report and Arahan Teknik Jabatan Kerja Raya (JKR) for Politeknik Balik Pulau (PBU), Pulau Pinang Kerja Bangunan dan Kerja-Kerja Berkaitan (Reka dan Bina) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Proposed of New Road from Kg. Keruak, Hulu Besut to Gunung Bongsu, Hulu Terengganu. To carry out environmental compliance audit to the contractor according to EMP Report and Arahan Teknik Jabatan Kerja Raya (JKR) for Cadangan Merekabentu, Membina dan Menyiapkan Double Road Frontage Fasa 2, Dari Pasar Payang ke Taman Shah bandar, Kuala Terengganu, Terengganu. To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 9C : Dari Ch 107+700 hingga Ch 112+900). To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 6 : Dari Ch 67+000 hingga Ch 71+300).

PROJECTS To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 10 : Dari Bukit Besi ke Bukit Payung) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Lebuhraya Pantai Timur Fasa 2 (Kawasan Rehat Perasing, Daerah Kemaman) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Lebuhraya Pantai Timur Fasa 2 (Pakej 5A : dari Ch 47+300 hingga Ch 60+000) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Membina dan Menyiapkan Politeknik Jeli Fasa 2, Jeli, Kelantan To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Membina dan Menyiapkan UMK Kampus Jeli, Kelantan To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Universiti Darul Iman Malaysia (UDM), Kampus Besut (Asrama Pelajar Fasa 1) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Cadangan Pembangunan Bercampur diatas Lot PTD 119774, PTD 119775 dan PTD 119776 (Sungai Lunchoo), Mukim Plentong, Daerah Johor Bahru, Johor To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Membina Jalan dan Jambatan Kedua Permas Jaya, Daerah Johor Bahru, Johor To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Cadangan Membina Bangunan Kampus Universiti Teknologi MARA (UiTM) Seremban di Atas PT 16129 dan sebahagian PT 9550 Seremban 3, Mukim Rasah, Daerah Seremban, Negeri Sembilan To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Projek Jalanraya Simpang Pulai Lojing gua Musang Kuala Berang (Pakej 6A : Dari Aring ke Sempadan Kelantan / Terengganu) To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Approval Condition & EMP Report for Projek Membina dan Menyiapkan Akademi Kepimpinan Pengajian Tinggi (AKePT) Malaysia, Bandar Baru ENSTEK, Seremban, Negeri Sembilan

PROJECTS To carry out environmental compliance audit to the contractor according to EQA 1974 & EMP Report for Projek Jalan Pintasan Pekan Bidor, Perak Darul Ridzuan To carry out environmental compliance audit to the contractor according to EQA 1974 & EMP Report for Projek Pembangunan Institut Kepelbagaian Biologi (IKB) Lanchang, Pahang To carry out environmental compliance audit to the contractor according to EQA 1974 & EMP Report for Memperelokan Jalan Kuala Terengganu Kota Bharu, KM54 KM 58, Chaluk Kedai, Setiu, Terengganu To carry out environmental compliance audit to the contractor according to EQA 1974, EIA Report, EIA Approval Condition & EMP Report for Central Spine Road (Pakej 3 : Gua Musang ke Kampung Relong, Pahang Seksyen 3G : Felda Chegar Perah 2 Felda Telang) EROSION AND SEDIMENT CONTROL PLAN (ESCP) 2013 Menaiktaraf Jalan Ayer Keroh Ke Bandar Melaka, Melaka. (Client : Jurutera Perunding Zaaba Sdn Bhd) 2012 The Proposed 5000 Acres (2023.4 Ha)Oil Palm Plantation on H.S (D) No. 39694 PT No. 3225 Mukim of Ulu Lepar, District of Kuantan, Pahang Darul Makmur. (Client : Alur Seri Sdn Bhd) The Proposed of New Road from Kg. Keruak, Hulu Besut to Gunung Bongsu, Hulu Terengganu (Pakej 1), Terengganu Darul Iman. (Client : Jabatan Kerja Raya Negeri Terengganu) Kajian Pelan Pengurusan Alam Sekitar Taman Kekal Pengeluaran Makanan (TKPM) Lojing 2, Gua Musang, Kelantan. ( Client : Jabatan Pengairan dan Saliran Negeri Kelantan) 2011 Cadangan Pembangunan Ladang Kelapa Sawit Seluas 4770 Ekar, Mukim Ganchong, Pekan, Pahang Darul Makmur. (Client : Perbadanan Kemajuan Negeri Pahang) Cadangan Perusahaan Kuari Kawasan Bukit Batu Hampar, Mukim Kuala Nerus, Daerah Kuala Terengganu, Terengganu Darul Iman. (Client : Imbuhan Pelangi Sdn Bhd)

PROJECTS The Proposed Aquaculture Park (128Ha) In Badong, Pekan Pahang Darul Makmur. (Client : Lembaga Kemajuan Ikan Malaysia) Kajian Pelan Pengurusan Alam Sekitar Taman Kekal Pengeluaran Makanan (TKPM) Lojing 1, Gua Musang, Kelantan (Client : Jabatan Pengairan dan Saliran Negeri Kelantan) 2009 The development of 10MW Hydropower plant under Srep programme at Sungai Brooke, Gua Musang Kelantan Darul Naim.

CERTIFICATIONS MOHD ABDUL WAHID BIN GHAZALI Managing Director

CERTIFICATIONS DR. MOHAMMAD ISMAIL BIN YAZIZ Director

CERTIFICATIONS IR. ANUAR BIN RAMLE Director

CERTIFICATIONS SHAMSUL AZHAR BIN ISMAIL General Manager

CERTIFICATIONS MINISTRY OF FINANCE

CERTIFICATIONS MINISTRY OF FINANCE

CERTIFICATIONS MINISTRY OF FINANCE

CERTIFICATIONS PETRONAS

CERTIFICATIONS PETRONAS

CERTIFICATIONS PETRONAS

CERTIFICATIONS TENAGA NASIONAL BERHAD

BUSSINESS COLLABORATION DANISH HYDRAULIC INSTITUTE JURUTERA PERUNDING ZAABA SDN BHD KFI ENGINEERS SDN BHD

LIST OF CLIENTS