DTIC ELECTE SEP ) 098. Instructor/Operator Procedures: Videotape. Bradley Unit Conduct of Fire Trainer

Similar documents
DTIC ELECTE June 1989 S _P 1 I. An Introduction to the Bradley. Conduct of Fire Trainer: A Videotape

Updating ARI Databases for Tracking Army College Fund and Montgomery GI Bill Usage for

a~z The Basic Map Interpretation and Terrain Analysis Course (MITAC) Videodiscs Dudley J. Terrell and Claude 0. Miles Anacapa Sciences, Inc.

Research Note

DTIC D A AD-A !_. _,, I. Training Recommendations Based on Opposing Forces Practices. Report 93-02

UNITED STATES ARMY HEALTH CARE STUDIES AND CLINICAL INVESTIGATION ACTIVITY. A. David Mangelsdorff, Ph.D., M.P.H. Patricia A. Twist

TANK GUNNERY TRAINING DEVICES AND USAGE STRATEGIES

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3

OFFICE OF NAVAL RESEARCH RESEARCH PERFORMANCE PROGRESS REPORT (RPPR) INSTRUCTIONS

CARRIER, PERSONNEL, FULL TRACKED, ARMORED, M113A CARRIER, COMMAND POST, LIGHT TRACKED, M577A

VMware AirWatch Guide for the Apple Device Enrollment Program (DEP) Using Apple's DEP to automatically enroll new devices with AirWatch MDM

TECHNICAL BULLETIN VIS

ARMY TM AIR FORCE TO 35C MARINE CORPS TM 10155A-13/1

OPERATOR S MANUAL FOR MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES) SIMULATOR SYSTEM, FIRING LASER: M83 (NSN ) FOR

FY 11 MSG SELECTION BOARD BRIEFING CMF 19 ARMOR INFORMATION PACKET

SC323 Umoja Requisitioning and Procurement Approvals

B. All of the documents in this RFP form the Basis-of-Design for this project.

Microprocessor Nurse Call System In-Service Training

Soarian Clinicals View Only

[mer FREi S EC M. Copy ) DTkt' OCT 1988 TRAC-F-SP m ACN COMBINED ARMS MODEL-ANTIARMOR MUNITIONS N

Standards in Weapons Training

OPERATOR'S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL FOR MULTIPLEXER SET AN/FCC-97 (NSN )

Genesis Touch Video Conferencing Customer Training. Honeywell HomMed

Concept Plan Modern Army Combatives Program Information Paper As of 6 JUNE 07

SOLDIER'S MANUAL AND TRAINER'S GUIDE MOS 94Y INTEGRATED FAMILY OF TEST EQUIPMENT (IFTE) OPERATOR/MAINTAINER SKILL LEVELS 1, 2, 3, AND 4 MARCH 2009

Allworx Reach and Reach Link

INTRADEPARTMENTAL CORRESPONDENCE. June 7, 2016 BPC #

ECN KNOY Lab Consultant Manual

VMware AirWatch Guide for the Apple Device Enrollment Program (DEP) Using Apple's DEP to automatically enroll new devices with AirWatch MDM

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Army Structure/Chain of Command 19 January 2012

WARFIGHTER FOCUSED. Training Systems

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Why Should You Consider Simulators?

THIS PAGE INTENTIONALLY LEFT BLANK

Digitization... A Warfighter s Perspective

Fort Carson Flight Simulation Facility SOP 20 March 2018

Department of Defense INSTRUCTION. SUBJECT: Development and Management of Interactive Courseware (ICW) for Military Training

3 E. D* -Human Resources Research Organization. ED Util BlIM ill 11l

Staff Response to an Active Shooter event at PNNL. EFCOG Meeting March 12, 2014

FINAL REPORT MARCH 1996 REPORT NO AMMUNITION PECULIAR EQUIPMENT (APE) 1955 GRENADE FUZE TESTER MIL-STD-398 TEST

Summary Report for Individual Task H-1532 Operate 5K Light Capacity Rough Terrain Forklift (LCRTF) Without a Load Status: Approved

TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

GREY NUNS COMMUNITY HOSPITAL ACTIVE ASSAILANT EMERGENCY RESPONSE PLAN

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Conduct Squad Attack 17 June 2011

CERTIFICATION MAINTENANCE FOR CERTIFIED ATHLETIC TRAINERS. Compliance requirements for maintaining BOC certification

PRE-DRILL PLANNING LOGISTICS PLANNING PROCESS TRAINING N N/A

700R4 LOCKUP WIRING TOGGLE SWITCH DOCUMENT

TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

Creating A Patient Portal Link From More Patient Button

United States Army SOLDIER SUPPORT INSTITUTE PREPARE CORRESPONDENCE SOLUTION KEY (PROOF READING) LESSON PLAN # CAA2A153 TASK NO # 805C-42A-1002

Using PowerChart: Organizer View

Siemens TEC Unit Vent 0-10V Output Controller. Accessories. Control Applications. Product Description. Product Numbers. Warning/Caution Notation

The Army Proponent System

Documentation Training for Blood Product Administration At Hospital Corporation of America (HCA)

Tactics, Techniques, and Procedures for the Field Artillery Cannon Battery

AIRCRAFT WEAPONS SYSTEMS TEST EQUIPMENT

WORKPLACE VIOLENCE RISK ASSESSMENT

OPERATOR S FOR MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES) SIMULATOR SYSTEM, FIRING, LASER: M82 NSN FOR M1/M1A1 ABRAMS TANK

CRM Course Administrative Data (CAD) Cover Page

E-BOOK // DOUBLE SWITCH DIAGRAM LIGHTS

Distribution Statement A: Approved for public release; distribution is unlimited.

Nurse Call System. A Voice over IP Based Solution for Streamlined Communication, Alerting and Workflow

TM ARMY AH-64A HELICOPTER HELLFIRE MISSILE EQUIPMENT AVIATION INTERMEDIATE MAINTENANCE MANUAL TECHNICAL MANUAL

SAN DIEGO UNIFIED SCHOOL DISTRICT. Site Emergency Response Plan. La Jolla Elementary Marine St., PUBLIC DOCUMENT

NURSE CALLING SYSTEM

APPENDIX 2. TRAINING SUPPORT PACKAGE STATEMENT OF WORK (SOW) FOR IMPROVED ENVIRONMENTAL CONTROL UNITS (9/18/36K IECUs)

Pharmacy Technician Reference Guide. Written by Emily Moore

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

Battle Captain Revisited. Contemporary Issues Paper Submitted by Captain T. E. Mahar to Major S. D. Griffin, CG 11 December 2005

U A. REPORT NO AD-A / 92054U.S. U.S. NAVY (USN) ALPHA MINE ROAD TEST FINAL REPORT OCTOBER 1991 SEP 2 5 ISZ

Evaluation Entry System (EES) User s Guide

LESTER SENIOR HOUSING JOB DESCRIPTION ANNUAL EVALUATION AND COMPETENCY Concierge

CSU STANISLAUS SCHOLARSHIPS REVIEWER S GUIDE

Cold Environment Assessment Tool (CEAT) User s Guide

ADMINISTRATIVE SPECIALIST

ADDENDUM. Data required by the National Defense Authorization Act of 1994

AMC s Fleet Management Initiative (FMI) SFC Michael Holcomb

Contents (click on a header to go to that section)

Perform Primary Voltage Live-Line Testing Status: Approved

Overview of Electronic Security Systems

National Verifier Training: Eligibility. November 8, 2017

VAN WERT COUNTY HOSPITAL. Policy/Procedure: Interdepartmental No.: N Issue Date: 6-90 By: Nursing No. of Pages: 9

TECHNICAL MANUAL OPERATOR S MANUAL FOR MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM, (MILES) SIMULATOR SYSTEM, FIRING, LASER: M80

INCIDENT COMMAND SYSTEM MULTI-CASUALTY

Thomas Built Buses Using ServiceLink TBB Institute

REQUEST FOR PROPOSAL INSTRUCTOR AUDIO-VISUAL PODIUMS FOR ILLINOIS VALLEY COMMUNITY COLLEGE PROPOSAL #RFP2013-P06

BTR-3E ARMOURED TROOP CARRIER CREW TRAINING COMPLEX

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

UNIVERSITY OF TOLEDO

ARCHITECTS' AND ENGINEERS' SPECIFICATIONS FOR NC300 MICROPROCESSOR NURSE CALL SYSTEM

OFFICE OF THE CITY AUDITOR Audit Report PERFORMANCE AUDIT: POLICE PROPERTY ROOM. Stockton City Council Mayor Ann Johnston

EFFORT CERTIFICATION GUIDE

Specifications, Performance & Submittal

Department of Defense INSTRUCTION

February 27, Mr. Benjamin Beresford Mountain Manager Hesperus Ski Area P.O. Box 187 Hesperus, CO RE: Annual Unannounced Inspection

Report Documentation Page

Jason Litt Allan F. Keeth Elementary Winter Springs, FL

Procedural Guidance for Conducting DoD Classified Conferences

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

TENNESSEE STATE UNIVERSITY. Banner Electronic Effort Certification Module User s Guide

Transcription:

4 ARI Research Note 89-44 Nt NA Bradley Unit Conduct of Fire Trainer Instructor/Operator Procedures: Videotape NU.S. Margaret S. Salter Army Research Institute for Field Unit at Fort Benning, Georgia Seward Smith, Chief Training Research Laboratory Jack H. Hiller, Director June 1989 S DTIC ELECTE SEP 12198911 United States.Army Research Institute for the Behavioral and Social Sciences Approved for the public release; distribution is unlimited -) 098

U.S. ARMY RESEARCH INSTITUTE FOR THE BEHAVIORAL AND SOCIAL SCIENCES A Field Operating Agency Under the Jurisdiction of the Deputy Chief of Staff for Personnel EDGAR M. JOHNSON Technical Director JON W. BLADES COL, IN Commanding Technical review by Arnold Dale Bowman Jean L. Dyer Charles 0. Gregory Michael J. Harris NOTICES DISTRIBUTION: This report has been cleared for release to the Defense Technical Information Center (DTIC) to comply with regulatory requirements. It has been given no primary distribution other than to DTIC and will be available only through DTIC or the National Technical Informational Service (NTIS). FINAL DISPOSITION: This report may be destroyed when it is no longer needed. Please do not return it to the U.S. Army Research Institute for the Behavioral and Social Sciences. NOTE: The views, opinions, and findings in this report are those of the author(s) and should not to be construed as an official Department of the Army position, policy, or decision, unless so designated by other authorized documents.

tvnclassified SECURITY CLASSIFICATION OF THIS PAGE la. REPORT SECURITY CLASSIFICATION Unclassified REPORT DOCUMENTATION PAGE lb. RESTRICTIVE MARKINGS 2a. SECURITY CLASSIFICATION AUTHORITY -- Approved 3. DISTRIBUTION /AVAILABILITY OF REPORT for public release; 2b. DECLASSIFICATION / DOWNGRADING SCHEDULE distribution is unlimited. Form Approved OM No 070401e 4. PERFORMING ORGANIZATION REPORT NUMBER(S) 5. MONITORING ORGANIZATION REPORT NUMBER(S) ARI Research Note 89-44 6a. NAME OF PERFORMING ORGANIZATION 6b OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION U.S. Army Research Institute (If applicable) Fort Benning Field Unit PERI-IJ -- 6c. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) P.O. Box 2086 Fort Benning, GA 31905-0686 -- Ba. NAME OF FUNDING/SPONSORING 8b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBER ORGANIZATION U.S. Army Research (If applicable) Institute for the Behavioral and Social Sciences PERI-I BC. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS 5001 Eisenhower Avenue PROGRAM PROJECT TASK WORK UNIT Alexandria, VA 22333-5600 ELEMENT NO. NO. NO. ACCESSION NO. 63007A 794 3306 H1 11. TITLE (Include Securrty Classificat.on) Bradley Unit Conduct of Fire Trainer Instructor/Operator Procedures: 12. PERSONA:. AUTHOR(S) A Videotape Salter. Margaret S. 13a. TYPE OF REPORT 113b TIME COVERED 14. DATE OF REPORT (Year, Month, Day) 1. PAGE COUNT Final FROM 88/07 TO 89/05 1989, June 20 16. SUPPLEMENTARY NOTATION 17. COSATI CODES 18. SUBJECT TERMS (Continue on reverse if necessary and identify by block number) FIELD GROUP SUB-GROUP Bradley Fighting Vehicle (BFV) Bradley gunnery training Conduct of Fire Trainer (COFT) COFT instructor/operator 19, ABSTRACT (Continue on reverse if necessary and identify by block number).the videotape described in this report was designed to be used during Bradley Fighting Vehicle (BFV) Conduct of Fire Trainer (COFT) Instructor/Operator (1O) and Senior 1O training at Fort Benning, GA. The tape highlights procedural differences in the Institutional COFT (I-COFT) at Fort Benning and the Unit COFT (U-COFT) found in Army units worldwide. This report details the rationale for and contents of the videotape and provides a copy of the script. 20. DISTRIBUTION /AVAILABILITY OF ABSTRACT 21. ABSTRACT SECURITY CLASSIFICATION M UNCLASSIFIED/UNLIMITED 0 SAME AS RPT. C DTIC USERS Unclassified 22a. NAME OF RESPONSIBLE INDIV!DUAL 22b. TELEPHONE (Include Area Code) 22c. OFFICE SYMBOL Margarct S. Salter (404) 545-5589 PERI-IJ DD Form 1473, JUN 86 O-evious editions are obsolete. i SECURITY CLASSIFICATION OF THIS PAGE UNCLASSIFIED

FOREWORD This report provides the rationale for and contents of a videotape created for institutional Bradley Fighting Vehicle gunnery training. The project is part of an overall mission to assess instructional strategies and technologies to improve weapon system training. Sponsorship for Bradley research has been provided under a 1983 Memorandum of Understanding between the Training Technology Agency at TRADOC, the U.S. Army Infantry School, and the U.S. Army Research Institute for the Behavioral and Social Sciences (ARI). The videotape was designed to be used as intrcductory material for students receiving Bradley training before handson instruction on the Conduct of Fire Trainer (COFT). The COFT is a computer-driven high fidelity precision gunnery training device used in Bradley units worldwide. The importance of the device, the computer-generated graphics, and the unique scoring system justify development of standardized pretraining materials. The videotape was developed in close coordination with Bradley COFT instructor/operators and trainers and has been provided to the 29th Infantry Regiment, Bradley Instructor Detachment, for use in institutional training. A'cce3ston For DTIC TAB Ju Ltlf imat len- Dlstr1'*utiu/.. Avql lability C*Ims ist Avail and/or Spol iii

ACKNOWLEDGMENTS Special thanks are due to the instructors of the Conduct of Fire Trainer Branch, Bradley Instructor Detachment, 1st Battalion, 29th Infantry Regiment, Fort Benning, Georgia, whose cooperation and assistance made this research possible. Their professionalism and enthusiasm were exemplary. v

BRADLEY UNIT CONDUCT OF FIRE TRAINER INSTRUCTOR/OPERATOR PROCEDURES: A VIDEOTAPE CONTENTS Page INTRODUCTION...... 1 Physical Description of the U-COFT... Physical Description of the I-COFT......... 1 2 Critical Differences Between U-COFTs and I-COFTs...... 2 The Problem...... 3 PROCEDURE...... 3 RESULTS AND DISCUSSION...... 4 CONCLUSIONS...... 4 APPENDIX A. VIDEOTAPE OUTLINED BASED ON U-COFT OPERATOR'S MANUAL, TM 9-6920-737-10...... 6 B. 10 PROCEDURES FILM--SCRIPT..... 13 vii

BRADLEY UNIT CONDUCT OF FIRE TRAINER INSTRUCTOR/OPERATOR PROCEDURES: A VIDEOTAPE INTRODUCTION The Conduct of Fire Trainer, the COFT, is a sophisticated training device. It is a computer driven, high fidelity precision gunnery trainer developed for the Army by General Electric's Simulation and Control Systems Department. The COFT is available for the M1 and M60A3 series tanks and for the M2/M3 Bradley Fighting Vehicle (BFV). The Unit Conduct of Fire Trainer (U-COFT) is found in units world-wide. It provides basic gunnery skill training for novices or transition and cross training for personnel with some related prior experience. The U-COFT is primarily used as a home station sustainment trainer. It is used for diagnostics or to ensure that a crew has achieved minimum proficiency before live fire. It can be used in preparation for a gunnery density or to complement other training to insure that gunnery skills do not deteriorate through lack of practice. In addition to the U-COFT, there are two other versions of the COFT. The Mobile Conduct of Fire Trainer (M-COFT) is used by National Guard units. It is a self-contained U-COFT housed in a trailer. When transported, the M-COFT becomes a mobile gunnery training center. The Institutional Conduct of Fire Trainer (I-COFT) is used for gunnery training at the Armor and Infantry Schools. It has tutorial and practice exercises for the novice, and provides a self-paced program of instruction (POI) for basic gunnery. Specific skills are taught by the device and a trained instructor/operator (10). The I-COFT is used primarily for basic or transition training, although it can be used in a U-COFT mode for experienced crews. Although the I-COFT is similar to the U-COFT in many aspects, there are certain major differences. These vary from the method of instruction to differences in the physical layout of the trainer itself and procedures to be followed in placing the trainer in operation. Physical Description of the U-COFT The U-COFT is a stand alone shelter for individual crew gunnery training. It has several furctionally distinct components. One section contains computers that provide exercise scenarios and store and manage data. A briefing area provides remote monitors so crews awaiting training can watch others fire. An individual crew station replicates the commander and gunner's positions, and with a very few exceptions, is identical in appearance and function to the BFV turret. The 10 sits at an instructor/operator station (the IOS or 10 station) to

conduct training. The IOS has two color monitors which replicate what the commander and gunner see in their sights and a situation monitor which indicates upcoming targets and locations. A keyboard and terminal printer enable access to the system and data entry. Physical Description of the I-COFT The I-COFT is a set of four unsheltered U-COFTs linked together. I-COFTs are housed inside of buildings especially configured to maximize I-COFT training efficiency. The four I-COFT crew stations and 10 stations can be separated from each other by curtains; a large computer area is located at each end of the training area. The I-COFT has no remote viewing area; _ students monitoring I-COFT training watch the IO's monitors, and listen through headsets attached to his console. A crew command input device (CCID) driver control panel simulates limited driving activity. Additionally, student help and student response buttons are located in the turret to facilitate basic gunnery training. The I-COFT, unlike the U-COFT, has a voice generating system (VGS) which permits the computer to serve as synthetic commander in some POIs. Although each I-COFT can operate independently of the other three, there are mechanisms by which two or more I-COFTs can be connected. Critical Differences Between U-COFTs and I-COFTs Because of the variance in physical construction between the two systems, some of the major differences between the U-COFT and I-COFT impact on the 10 and the procedures he follows during daily operations. For example, there are critical procedural differences in the before-operation preconditioning checks. The U-COFT's three major sections are connected by air bags which insure the integrity of the climate controlled system. Each day the 10 must check the externally located U-COFT air bags to insure that they are intact and without damage. He must also insure that the five air conditioning units located in each U- COFT are in operation. Each individual air conditioner must be checked for temperature setting, function, air flow, and water level. None of these procedures is necessary in the I-COFT since it is housed inside of a climate controlled building with central air conditioning. In readying the U-COFT for daily training, the 10 must check to insure that shelter lightning rods are in place, that exterior power cables are connected, etc. Before training he must insure all four of the shelter doors are unlocked to provide access and emergency exit. These procedures are not necessary in the I-COFT. Power up and power down procedures differ, as do the procedures to be followed in recovery training capability after a catastrophic power failure. 2

The Problem The Bradley Instructor Detachment (BID) at Fort Benning, the primary trainer for BFV personnel, not only trains students to be gunners and commanders, but through the COFT Branch, trains COFT IOs and senior instructor operators (SIOs). The 10 operates and maintains the COFT, and provides training for his unit. The SIO is responsible for a unit's overall COFT program, and for the training and monitoring of other los. Initial IO training is provided by a 46 hour exportable package at Fort Benning, in units, or as a part of a unit's new equipment training (NET). Master gunner students, already 10 qualified, receive SIO training as a part of their POI. In the past, 10 and SIO training were provided at Fort Benning using both the I-COFT and U-COFT. In 1988, however, the 29th Infantry Regiment, of which the BID and COFT Branch are a part, moved to a new location. The U-COFTs are no longer available, as all institutional COFT training has been transferred to 24 I-COFT stations. Gunnery training is unaffected because the I-COFT can be used in a U-COFT mode. However, loss of the U-COFT impacts on the ability to provide adequate 10 and SIO training. Since 10 students who train on the I-COFT at Fort Benning will be using the U-COFT to train gunners when they return to their units, they need to become familiar with U-COFT-specific procedures. The physical differences between the two trainers, the procedural changes and the unavailability of the U-COFT have made some documentation of these differences necessary. Accordingly, the COFT Branch requested that the Army Research Institute (ARI) create a videotape highlighting U-COFT procedures for 10 and SIO students who receive their training on I-COFTs. Newly certified IOs and SIOs returning to their units and U-COFTs can then practice and be tested on the actual procedures with which they were only familiarized during their institutional training. PROCEDURE A preliminary videotape outline was written, based on the correct U-COFT procedures as detailed in the U-COFT Operator's Manual, TM 9-6920-737-10 (Department of the Army, 1985, 1987). (See Appendix A for the procedures.) Over the course of a week, ARI and BID COFT personnel used two video cameras to film specific U-COFT procedures both outside and within one of the old U-COFT shelters. Taping was done with COFT IOs performing the correct procedures and another 10 monitored all filming to insure correct sequences. Filming was done on a real time basis, although the final tape was slightly edited. Based on the 3

outline, a narration was written to go along with the visual scenes. (See Appendix B for the actual script.) RESULTS AND DISCUSSION The finished product, "U-COFT Procedures" consists of three short videotape segments: "Preconditioning Checks", "Power Up/Power Down" and "Recovery from Catastrophic Power Failure." The films have been provided to the Bradley COFT Branch for use in 10 and SIO training. They provide a short, systematic and standardized introduction to some U-COFT procedures in the absence of the actual device. Intended to supplement the existing written I-COFT training materials, the tape was designed in segments with three natural stopping points for teaching specific techniques according to their place in the POI. The narration describes the visually pictured computer shelter, the crew briefing/monitoring area, and the instructor operator station, delineating operator functions and daily procedures. Exterior shots walk the viewer around the outside of a U-COFT shelter, with the narration describing the IO's behavior as he performs each of the required daily checks before entering the shelter. Interior shots of the U-COFT show the locations and servicing of the air conditioners, and show the equipment which the 10 must operate. The computer area and switches are shown in detail, along with the procedures for putting them into operation or shutting them down. In sum, the film documents the 10 procedures which are required in the U-COFT but absent from the I-COFT. CONCLUSIONS Although a videotape cannot substitute for hands on experience with the U-COFT, and IOs must be thcroughly checked out on U-COFT procedures when they return to their units, the tape serves a useful purpose within Bradley training. First, it enables the institution to make use of a no longer available resource, the U-COFT. Second, it provides a standardized familiarization lesson to prepare novice IOs for what to expect when they arrive at their units and are ready to work with the U-COFT. The videotape presentation medium reduces potential errors, the quality of instruction is maintained, and BFV IOs will be better prepared to use their most valuable gunnery device, the Conduct of Fire Trainer. 4

REFERENCE Department of the Army. (1985, October, with Change 1, January, 1987). Operator's manual Trainer, Unit Conduct of Fire (U- COFT) M2/M3 Fighting Vehicles (sheltered) (Technical Manual 9-6920-737-10). Washington, DC: Author. 5

APPENDIX A VIDEOTAPE OUTLINE BASED ON U-COFT OPERATOR'S MANUAL, TM9-6920-737-10 PRECONDITION CHECKS OUTSIDE THE SHELTER 1. Walk arounc: the shelter and ensure that the lightning rods are not broken or touching the shelter, and are grounded. 2. Check to ensure that air conditioner maintenance switches are set to the ON position. Check airflow bags and check power cables from the source to the shelter. 3. Open the trainer shelter door vent. 4. Check all shelter doors to make sure they are not locked from the outside; unlock as necessary. 5. Open door and without entering, locate fire protection panel insidp and make sure that the AC ON indicator lamp is green, and that the four remaining indicators are off. If the green lamp is not lit, or any other lamp is on, do not enter the shelter; notify organizational maintenance. INSIDE THE SHELTER 1. Enter shelter and turn on light in integration shelter. 2. Remove pin from integration shelter door and turn on light at computer shelter. (Turn on other lights and remove pins from other doors as needed.) In the computer shelter at the AC power line protection panel observe that the three green indicator lamps are lit. If any one of the lamps is off, leave the shelter and notify organizational maintenance. 3. Locate the three emergency lights (one in each shelter) and make sure the toggle switch on each light is set to the ON position, and the red indicator lamp is on. If the red indicator lamp is not on, notify organizational maintenance. 4. Press the PUSH-TO-TEST button on each light and ensure that the emergency lights go on while the button is held. 5. Locate each of the five air conditioners and ensure that each is set to 72 degrees. Set the air conditioner mode select switch according to the chart on page 2-121 in the -10. Feel to make 6

sure air is blowing from the upper louvers on the air conditioner. If air is not blowing, notify organizational maintenance. Check humidifier tank water level windows to ensure tanks are full. If any are not full, fill at this time. 7

POWER-UP PROCEDURES 1. Check temperature/humidity indicator in computer shelter. 2. In trainer shelter, at terminal printer set ON/OFF rocker switzh t.3 ON and observe that ON-LINE indicator lamp lights above keyboard. If lamp does not light, press LINE LOCAL key. 3. In computer shelter at GPC main cabinet control panel set keyswitch to LOCAL position. Observe POWER indicator lamp lights green and ATTN indicator lamp lights red. 4. In trainer shelter at terminal printer observe printed message ending with prompt ">>". 5. At terminal printer press "H" key on keybuard and observe that H appears after prompt. Press RETURN key on keyboard and observe printed message. 6. At terminal printer press "I" key on keyboard and observe that I is printed. Press RETURN key and observe printed message. 7. At terminal printer press "U" key on keyboard and observe that U is printed. Press RETURN key and observe no new message. 8. In computer shelter at disk drive control panel, make sure that only the A pushbutton indicator is depressed, then press and release RUN/STOP pushbutton indicator. 9. Observe that RUN/STOP pushbutton indicator lights, and after a short (1 minute) delay, READY indicator lamp lights. If lamps do not light or if FAULT pushbutton indicator lights, notify organizational maintenance. 10. In trainer shelter, at terminal printer, press B key and observe that B is printed. Press the RETURN key and observe printed message. Wait for four beeps (about 2 minutes). 11. In computer shelter at GPC main cabinet control panel press AUTO RESTART rocker switch to ON position. 12. Set keyswitch to LOCAL DISABLE position. 13. At SPC power management panel make sure that 208 VAC AVAILABLE indicator lamp is lit. 14. Set AC main power circuit breaker to ON and observe AC MAIN POWER INDICATOR lamp lights. Make sure that ten DC POWER SUPPLIES ON indicator lamps light. 8

15. In trainer shelter at IOS power panel make sure the six SPC DC POWER SUPPLIES ON indicator lamps light. 16. Make sure that main power 208 VAC AVAILABLE indicator lamp is lit. 17. Set main power circuit breaker to ON and make sure that AC ON indicator lamp and nine DC POWER SUPPLIES ON indicator lamps light. 18. Set crew station auxiliary equipment circuit breaker to ON and make sure that the AC ON indicator lamp and four DC POWER SUPPLIES ON indicator lamps light. 19. Set CFP/ISUW circuit breaker to ON and make sure AC ON indicator lamp lights. 20. At commander's and gunner's 19-inch color monitors press both power pushbutton switches and observe background color on the screens after a brief warmup. If screens do not light up, notify organizational maintenance. Adjust contrast or brightness as necessary; clean screens as necessary. 21. At commander's and gunner's color monitors press in each DEGAUSS button and hold for 10 seconds. 22. At the top front of crew station locate DEGAUSS levers. Pull each lever and hold for 10 seconds. 23. At communication panel make sure that monitor assignment switch is set to NORMAL position. 24. In integration shelter at remote monitor station cabinet note that the POWER AC AVAILABLE indicator is lit. 25. Position the power ON-OFF circuit breaker to the ON position and observe that the POWER ON indicator lights. 26. At the commander's and gunner's 19-inch color monitors press the power ON-OFF switch and observe that background color appears following a brief warm up. 27. At the 12-inch monochrome monitor set the ON-OFF rocker switch to ON and observe that screen brightens after a brief warm up. 28. Perform user log on procedures. 9

POWER DOWN PROCEDURES 1. Make sure user log off procedures have been performed. 2. In trainer shelter at instructor operator station display terminal keyboard press RETURN key and observe "username" prompt appears on the display. Using the keyboard, type shutdown and observe that it appears on the display after the "username" prompt. 3. Press RETURN key on keyboard and observe "password" prompt appears on the display. Type in your password, press RETURN key and observe message "Are you certain you wish to continue?" Press Y on keyboard and observe that Y appears after prompt. Press RETURN key and observe message on display. 4. At terminal printer wait for printer message. 5. In computer shelter at GPC control panel, set keyswitch to LOCAL position. 6. In trainer shelter at terminal printer keyboard while pressing and holding CRTL key, press "P" key; then release both keys and observe prompt ">>" is printed. 7. Press H key, then RETURN key and observe printed message. 8. In computer shelter at GPC control panel observe that ATTN indicator lamp lights red and RUN indicator light goes off. 9. In trainer shelter at terminal printer, press "I" key and observe that I is printed. Press RETURN key and observe printed message. 10. In the trainer shelter at terminal printer set ON-OFF rocker switch to OFF. 11. At IOS commander's and gunner's color monitors, press both POWER pushbutton switches. 12. At IOS power panel set circuit breakers to OFF and turn ISU/CR/ASU keyswitch to off. 13. In computer shelter at disk drive, press and release RUN/STOP pushbutton indicator and observe READY indicator lamp goes off. Observe the RUN/STOP pushbutton indicator lamp goes out after about 30 seconds. 10

14. At the GPC control panel turn keyswitch to OFF position (fully counterclockwise) and observe that the panel lights go OFF. 15. Press AUTO RESTART rocker switch to OFF position. 16. At SPC power management panel set AC MAIN POWER circuit breaker to OFF. 17. In integration shelter at RMS commander's and gunner's monitors, press and release both POWER pushbutton switches. 18. At RMS 12-inch monitor set ON-OFF rocker switch to OFF. 19. At RMS audio/amp power panel set power circuit breaker tc OFF. 20. At electronics power distribution panel set the seven subcircuit breakers to OFF and the MAIN circuit breaker to OFF. 11

RECOVERY FROM CATASTROPHIC POWER FAILURE 1. When power fails, exit the crew from the shelter. 2. When power is restored, ensure that three green indicator lamps are ON at AC power line protection panel in computer shelter. 3. In computer shelter at the utility power distribution panel set all ten subcircuit breakers to OFF position. 4. Reset main circuit breaker to ON by pulling down to OFF, then up to ON. Set all ten subcircuit breakers to the ON position one at a time. Close panel door. 5. In the integration shelter at the utility power distribution panel reset main circuit breaker by pulling down to OFF, then up to ON. Close panel door. 6. In the trainer shelter, ensure SYSTEM TROUBLE indicator and audible alarm are off. Ensure AC indicator light is green. 7. In the computer shelter at the electronic power distribution panel ensure all seven subcircuit breakers are set to OFF position. Ensure main circuit breaker is set to OFF position. 8. At the SPC, ensure AC main power switch is set to OFF. 9. At the GPC, ensure key is set to OFF position and AUTO RESTART switch is set to OFF position. 10. At the disk drive, ensure RUN/STOP switch is OFF. 11. In the integration shelter at the remote monitor station set main power switch to OFF and remote monitor power switches to OFF position. 12. In the integration shelter set the 12-inch monitor ON/OFF rocker switch to OFF position. 13. In the trainer shelter ensure terminal printer ON/OFF rocker switch is set to OFF position. 14. At the IOS panel ensure four circuit breakers and keyswitch are set to OFF position. 15. In the computer shelter at the electronic power distribution panel reset the main circuit breaker to ON and then the seven subeircuit breakers to the ON position one at a time. 16. Perform power-up procedures. 12

APPENDIX B I/O PROCEDURES FILM - SCRIPT The 10 unlocks shelter door. PRECONDITIONING CHECKS Checks air bags for proper flow of air. Checks lightening rods for proper grounding. Ensures that all maintenance switches are set to on. Opens trainer shelter door vent. Check power cables for proper connection. Open shelter door and make sure the fire protection panel green light is lit. Turn on all shelter lights. Check all emergency lights by pushing the press to test button. Check all five air conditioners. Set MODE SELECTOR on each air conditioner control panel. Set TEMPERATURE CONTROL on air conditioner to 72 degrees F. Feel to make sure air is blowing from upper louvers. Check HUMIDIFIER TANK WATER LEVEL window and fill if necessary. Un-pins all shelter doors. 13

POWER UP Observe the HYGROMETER/THERMOMETER in the computer shelter. In the trainer shelter turn on terminal printer. In the computer shelter set circuit breaker on SPC to ON position. At GPC make sure AUTO RESTART is off, set key switch to LOCAL position and make sure ATTENTION indicator light is on. At disk drive check that only the "A" push button is depressed. Press and release RUN/STOP push button. Make sure after one minute the READY indicator lamp lights. In the trainer shelter at IOS power panel set main power to ON, the key switch, crew station, commander's forward periscope and ISU window to ON. Press power switches on commander and gunner's 19" monitors, and wait for screens to warm up. After warm up, degauss for a period of 7 to 10 seconds. Check that MONITOR ASSIGNMENT switch is set to NORMAL. Degauss monitors on crew station for a period of 7 to 10 seconds and check that all power is on. In the trainer shelter, at terminal printer, observe printed message. Press appropriate keys on printer keyboard. At IOS display terminal, observe message appears after 2 minutes. Move to computer shelter. DISABLE. At the GPC, turn keyswitch to LOCAL In the integration shelter at the remote monitor station turn on POWER. Turn commander's and gunner's 19" color monitors and remote monitor to ON. After warm up, degauss for 7-10 seconds. 14

POWER DOWN In the computer shelter at the GPC, set keyswitch to LOCAL position. In the trainer shelter at IOS display terminal keyboard, perform the usual log off procedures. At Terminal Printer press appropriate keys and observe printed messages. Turn printer to OFF. At the!os turn the commander and gunner color monitors tc OFF. Turn off the crew station, the ISU commander relay, keyswitch, and main circuit breaker to OFF. In the computer shelter at disk drive, push RUN/STOP button and observe READY light goes off. At the GPC turn keyswitch to OFF. At the SPC, set POWER panel main power circuit breaker to OFF. In the integration shelter, turn off the remote monitor station, the commander's and gunner's 19" monitors and turn the remote audio power switch to OFF. 15

RECOVERY FROM CATASTROPHIC POWER FAILURE If the power fails, the crew exits the shelter quickly. The 10 goes in the computer shelter and insures the green AC power protection panel lights are lit. Opens the utility power panel and turns the ten switches to OFF and resets the main circuit breaker and the ten switches to ON. In the integration shelter at the utility power panel resets main circuit breaker to ON. In trainer shelter at the fire control panel, insure SYSTEM TRUUBLE and audible alarm are off and AC lights green. In the computer shelter opens door of electronic power distribution panel and makes sure main circuit breaker and seven circuit breakers are set to OFF. At the SPC sets AC MAIN POWER circuit breaker to OFF. At the GPC make sure the keyswitch and AUTO RESTART rocker switch are set to OFF. At the disk drive, push the RUN/STOP power button to STOP. Turn off audible power, commander, gunner and remote monitors. In trainer shelter turn off terminal printer. At the IOS power panel, set all circuit breakers, keyswitches and commander and gunner's monitors to OFF. In computer shelter, at electronic power distribution panel set main circuit breaker to ON and sub circuit breakers to ON and perform POWER UP procedures. 16