Town of Salem, New Hampshire. Development Handbook (last rev. April 2008)

Similar documents
City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

GUIDE TO PERMITTING CITY OF NEW BEDFORD. Mayor Jon Mitchell. Department of Planning, Housing and Community Development

EXCAVATION & FILL PROCEDURE 1

CITY OF PITTSFIELD SPECIAL EVENT CHECKLIST & APPLICATION PACKET

City Council Docket January 22, 2018

APPLICATION INSTRUCTIONS FOR EARTHWORK BOARD PERMIT

High school diploma or G.E.D. and 3 years of experience.

Planning Board Submission Process and Instructions

MOBILE FOOD UNIT FOOD CART (TYPE I)

Title 10: COMMERCE AND TRADE

PLANNING DEPARTMENT ADMINISTRATION

TOWN OF GREENWICH Annual Department Operational Plan (FY )

Opening a Business in West Bridgewater. What Business Owners Need to Know to Successfully Open or Expand a Business in West Bridgewater

Bartlesville City Planning Commission SITE DEVELOPMENT PLAN PROCEDURE AND APPLICATION

Planning Board Minutes of November 16, 2017

CERTIFICATES OF FITNESS

Title 32: PROFESSIONS AND OCCUPATIONS

Recommendation: Board discussion relative to next steps with respect to the need for public safety building replacement.

CARROLL TOWNSHIP PLANNING COMMISSION MEETING MINUTES NOVEMBER 03, 2016 Page 1 of 6

Plan of Development Review Process County of Henrico, Virginia

Starting A Business in Worcester

Small Business Resource Guide for Monroe County, Ohio

VILLAGE OF FOX CROSSING REQUEST FOR PROPOSAL FOR COMPREHENSIVE PLAN

CITY OF MADISON HEIGHTS OFFICE OF THE CITY CLERK BUSINESS LICENSE INITIAL APPLICATION

2017 Developer Handbook

A Guide to. Starting a Business. Auburn, GA

PART Puc 803 SYSTEM REQUIREMENTS Section Puc Procedures and Operation of Notification Center Section Puc Education and Training

Town of Stoughton. 10 Pearl Street, Stoughton, MA Meeting Minutes September 7, 2017

DEERFIELD COMMUNITY PRESERVATION COMMITTEE APPLICATION FOR FUNDS Application Deadline: March 1, 2018 INTRODUCTION

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

PLANNING BOARD APPLICATION

CITY OF WALLED LAKE REQUEST FOR PROPOSALS CONSULTANT: CIVIL ENGINEERING SURVEYING, ENVIRONMENTAL AND FIELD SERVICES

DEP has three main regulatory chapters that relate to pipeline construction.

MUST SUBMIT STATE APPLICATION PD 107

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

CEQA Exempt Referral Staff Approval Permit

Guide to Establishing

Your Development Project and the Public Works Department Part

APPLICATION PERIOD ORDER (Subject to change: See "Open This Month") Exam Title Exam No. Open to Public/Promotion/Qualfied Incumbent Exam (QIE)

APPENDIX A EXEMPT CLASS COUNTY

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

Grand Chute Fire Department

RETAIL FUEL STATION ENERGY RESILIENCY PROGRAM PROGRAM GUIDELINES. (revised) December 2014

Doing Business in New Providence

2018 Developer Handbook

- PHILADELPHIA POLICE DEPARTMENT DIRECTIVE 3.13

APPLICATION FOR PARCEL MAP

City of Irving. General Government PAY PLAN FY Third Quarter

PIPES Act of 2006 Redline of 49 USC CHAPTER SAFETY 49 USC CHAPTER SAFETY 01/19/04 CHAPTER SAFETY

The Council entered into an executive session at 5:10 p.m. Motion to adjourn R Eck, second D Johnson

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012

LIMITED ENVIRONMENTAL REVIEW

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

STANDARD APPLICATION INSTRUCTIONS PACKET FOR FY19 FUNDING CYCLE

MAINE STATE LEGISLATURE

CITY OF TUSCALOOSA, ALABAMA JOB CLASSIFICATION LIST PAY GRADE ORDER

CITY OF TUSCALOOSA, ALABAMA JOB CLASSIFICATION LIST ALPHABETICAL ORDER

Board of Supervisors' Agenda Items

OGUNQUIT PLANNING BOARD MINUTES OCTOBER 27, 2014

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

ORDINANCE NO AN ORDINANCE AMENDING KITSAP COUNTY CODE CONCERNING SHOOTING RANGES

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS

The DEP has four main regulations that relate to pipeline construction.

Company Profile Phillips & Jordan, Inc. Key Markets

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Town of Londonderry. Site Plan Regulations Amendment

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip

TOWN OF KENNEBUNK BOARD OF SELECTMEN TUESDAY, APRIL 25, :15 P.M. KENNEBUNK TOWN HALL 3 rd FLOOR/ROOM 301 AGENDA

MUNICIPALITY OF MONROEVILLE REGULAR COUNCIL MEETING. May 9, 2006 AGENDA

IC "Disaster" Sec. 1. As used in this chapter, "disaster" has the meaning set forth in IC As added by P.L , SEC.5.

Code Compliance Officer I Code Compliance Officer II

Construction Grant-In-Aid Project Application

Richard Williams, Chairman of the Town of Peru Planning Board, called the meeting of Wednesday, June 13, 2018 at 7:00pm to order.

STANDARD DRAWINGS INDEX

PARISH OF ASCENSION, LOUISIANA REQUEST FOR QUALIFICATIONS COMPREHENSIVE PLAN

Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Community Development Department Strategic Business Plan

I. Background. Definitions

POSITION DESCRIPTION

STATE OF ALASKA COMPETENCY SPECIFICATION

NEIGHBORHOOD BLOCK PARTY APPLICATION FOR PERMIT

microfit FAQ Version 4.1

GENERAL ASSEMBLY OF NORTH CAROLINA 1989 SESSION CHAPTER 372 SENATE BILL 372

REQUEST FOR PROPOSALS (Sealed Bids)

Otter Tail County Limited Area Star Lake Comprehensive Plan PMT Meeting #1

ENVIRONMENTAL HEALTH SPECIALIST TRAINEE/I/II/III

Section F: Committee of Adjustment: Minor Variance and Consent Applications

City of Denton FY General Pay Plan Non-Exempt

EXISTING CONDITIONS

TITLE 7 FIRE PROTECTION AND FIREWORKS 1 CHAPTER 1 MISCELLANEOUS

CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project

Organizational Charts FY


The DRC Outside Agency Review/Approval Checklist is also available for your convenience.

OGDEN AVENUE SITE IMPROVEMENT GRANT An Ogden Avenue Corridor Enhancement Initiative

Request for Proposals. Organic Cranberry Cultivation. Ten-Year License Flax Pond Bog #3, East Falmouth, Massachusetts

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

Comprehensive Planning Grant. Comprehensive Plan Checklist

NORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL FIRE PREVENTION

Transcription:

Town of Salem, New Hampshire Development Handbook (last rev. April 2008) 4

5

DEVELOPMENT HANDBOOK Contents I. Introductions II. Development Directory A. Town of Salem 1. Lay Boards a. Board of Selectmen b. Planning Board c. Board of Adjustment d. Conservation Commission e. Historic District Commission 2. Municipal Offices B. State of New Hampshire a. Town Manager b. Community Development c. Planning Division d. Building Division e. Health Division f. Engineering Division g. Assessor's Office h. Fire Department i. Police Department j. Public Works Department 1. Department of Transportation 2. Department of Environmental Services 3. Wetlands Bureau 4. Public Utilities Commission 5. NH State Electrical Inspectors Board 6. NH State Plumbing Board 6

C. Federal 1. Army Corps of Engineers D. Other 1. Granite State Electric Company 2. Verizon 3. Northern Utilities III. Process A. Planning Board B. Board of Adjustment C. Permit Application 1. Building Division 2. Fire Department 3. Engineering Division 4. Finance Department 5. Health Division 6. Assessor's Office 7. Utilities Division IV. Other Information A. Land Use Control Ordinance B. Town of Salem Code C. Application Fees D. Community Profile E. Capital Improvement Program 7

I. INTRODUCTION The purpose of this booklet is to guide the public through the land development process in Salem, New Hampshire. It identifies key local officials, boards, departments, and state agencies which have a role in local development. This guidebook also provides information on the necessary permits for project approval and throughout the development process. The place to start with questions regarding development in Salem is the Community Development Department. The Community Development Department office is located in the Town Hall, 33 Geremonty Drive, Salem, New Hampshire 03079, or phone (603) 890-2007. II. DEVELOPMENT DIRECTORY A. TOWN OF SALEM Board of Selectmen: This is a five member elected body which establishes policy, oversees fiscal matters, acts on requests to sell Town-owned land or to release right of way dedications. They also serve as the Board of Health. The Selectmen may be contacted through the Town Manager s office. Planning Board: The seven members of the Planning Board are elected for three year terms. It is their responsibility to review site plans and subdivisions which occur in the town. The Planning Director serves as the Board's agent on a day-to-day basis. Board of Adjustment: This is a five member elected Board that is responsible for hearing all variance requests and special exception requests for the Town of Salem. The Chief Building Official serves as the Board's agent. Conservation Commission: This is a seven member board appointed by the Board of Selectmen with responsibility for locally overseeing the New Hampshire Wetland Protection Act. Any development project that involves filling, dredging, removing or altering any wetland area (or land subject to the regulations of the Act) will require involvement with the Commission. The Planning Director serves as staff support for this board. Historic District Commission: If your property is located in the designated Historic District along Main Street

this commission is responsible for review of your project. Town Manager: An appointee of the Board of Selectmen, he implements the Board's policy decisions and supervises daily operation of town government. Town Manager s Office: (603) 890-2120 Community Development Department: (includes Building, Health, and Planning) Community Development Director: (603) 890-2007 Planning Division: Responsible for the day-to-day planning activities in the Town. These activities include zoning ordinance updates, master plan implementation, site plan and subdivision review, site inspections, and certain permit approvals. Staff is also responsible for coordinating development review. The office serves as staff for the Planning Board and Conservation Commission and implements their decisions. Planning Director: (603) 890-2080 Building Division: This division is responsible for permitting building construction, plumbing, electrical work, signs, pools, sheds, etc. The staff inspects construction projects and investigates citizen complaints (regarding zoning violations, health hazards, etc.) They enforce local, state, and national codes. The office serves as staff for the Zoning Board of Adjustment and its members. Chief Building Official: (603) 890-2020 Health Division: This division is responsible for the enforcement of public health laws and rules and any sanitary investigations which may be necessary, directed by the local Board of Health or as may be required by the New Hampshire Division of Public Health Services. Health Officer: 9

(603) 890-2050 Engineering Department: This department reviews and inspects all work associated with wells, septic systems, roads, municipal water and sewer and storm drainage. Staff inspects septic systems as local agent for the New Hampshire Department of Environmental Services. Senior Engineer: (603) 890-2030 Assessor's Office: The Assessor assigns lot and street numbers for subdivisions. Other information available at this office includes property abutters, legal descriptions of land and real estate information. The Assessor also processes intent-to-cut forms for forestry and logging activities. Chief Assessor: (603) 890-2018 Fire Department: This department is responsible for fire safety inspections, approving sprinkler and fire alarm plans, means of egress, building plans, and water supply location. It reviews subdivision plans, site plans and building plans for fire safety issues. It also approves new road names. Fire Chief: Central Fire Station 152 Main Street (603) 890-2200 Fire Marshal: Central Fire Station 152 Main Street (603) 890-2200 Police Department: This department reviews subdivision plans and site plans for traffic impact and sight distance issues. Police Chief: Veterans Memorial Parkway (603)893-1911 10

Safety Officer: Veterans Memorial Parkway (603)890-2381 Department of Public Works This department reviews plans and proposed work associated with all aspects of the Town s infrastructure (roads, water, sewer, storm drainage) and public lands. Director: 21 Cross Street (603) 890-2150 B. STATE OF NEW HAMPSHIRE Department of Transportation: The New Hampshire Department of Transportation approves construction of access roads and driveways along state highways. Salem's four state roads are: Route 28 -North/South Broadway Route 38 -Lowell Road Route 97 -Main Street/Pelham Road Route 111 -Shadow Lake/Derry Road Contacts: New Hampshire Department of Transportation Hazen Drive, Box 483 Concord, NH 03301 (603) 271-3734 and New Hampshire Department of Transportation District 5 Office Box 16476 Hooksett, NH 03106 (603) 485-9526 11

Department of Environmental Services: This department regulates public water supplies, sewage disposal and treatment, and water pollution control. The NHDES reviews and issues permits for subdivisions (where lots will be under five acres in size), septic systems (new and repaired), sewer extensions, and terrain alteration. Contact: New Hampshire Department of Environmental Services Hazen Drive, Box 95 Concord, NH 03301. (603) 271-3503 -Main number New Hampshire Wetlands Bureau: The New Hampshire Wetland Bureau is responsible for reviewing all applications for dredge and fill permits in and adjacent to any waters of the state, including wetlands. Dredge and fill permits are necessary for excavation, soil removal, filling, dredging, or construction of any structures on any bank, marsh, or swamp. Written notice of intention to do this work is required. Applications are available from the Town's Planning Division and are filed through the Town Clerk's Office. Contact: New Hampshire Wetlands Bureau 64 North Main Street Box 2008 Concord, NH 03301 (603) 271-2147 New Hampshire Public Utilities Commission: This board has jurisdiction over gas, electric, steam, water, telephone and telegraph, buses, light planes and trucks used in intra-state transport. Contact : New Hampshire Public Utilities Commission 8 Old Suncook Road Concord, NH 03301 (603) 271-2431 12

New Hampshire State Electrical Board: This board is responsible for the testing and licensing of all electricians practicing commercially in New Hampshire. All electrical work in New Hampshire must be installed by a licensed electrician and must comply with state and federal regulations: Contact: New Hampshire State Electrical Inspectors Board Hayes Building Hazen Drive, Box 646 Concord, NH 03301 (603) 271-3748 New Hampshire State Plumbing Board: This board is responsible for the testing and licensing of all plumbers practicing commercially in New Hampshire. All plumbing work in New Hampshire must be installed by a licensed plumber and must comply with state and federal regulations: Contact: New Hampshire State Plumbing Board 105 Loudon Road Box 1396 Concord, NH 03301 (603) 271-3267 C. FEDERAL US Army Corps of Engineers: The US Army Corps of Engineers reviews applications for dredge and fill permits in wetland areas. Contact: US Army Corps of Engineers New England Division 424 Trapelo Road Waltham, MA 02154 (617) 647-8590 (800)343-4789 13

D. OTHER National Grid Company and Verizon All ongoing construction should receive prior clearance from these agencies as well as from the Town's Engineering Division and Public Works Department. National Grid 9 Lowell Road Salem, NH 03079 (603)890-7000 Telephone: Verizon; Residential (800)870-9999; Commercial (800)941-9900 Dig Safe: 1-888-344-7233 Northern Uti1ities Natural Gas: (603)436-0310 III. TOWN PROCESS A. PLANNING BOARD The Planning Board reviews all proposals involving land subdivision or lot line adjustments, commercial and industrial site plan development, and requests for change-of-use permits. The Planning Board normally meets on the second and fourth Tuesday of each month at 7:00 PM in the Knightly Meeting Room of the Salem Town Hall. Applicants are expected to review the Town's Land Use Control Regulations book, (this includes the site plan, subdivision, and zoning regulations for Salem) prior to preparing plans for Planning Board review. These regulations contain information on permitted uses, dimensional restrictions, application procedures, and specific plan requirements. Copies are available from the Community Development Department. Subdivisions and site plans must be submitted to the Planning Board Agent (the Planning Director) at least 15 days prior to the meeting at which they are to be considered. Applicants are encouraged to make an appointment to discuss plans with the agent in advance of the submission deadline as incomplete plans will not be accepted. Six copies of the plan must be submitted, along with a separate list of names and addresses of abutters, and the filing/notice fee. If, at the initial staff review, the Agent finds the plans lacking, the applicant is expected to make all the necessary revisions before returning for a second review. 14

Once the plan is formally submitted and all fees paid, the plan is placed on the next Planning Board meeting agenda. Copies of the plan are then distributed to staff members for review and comments. Staff is made up of the Chief Building Official, Town Engineer, Assessor, Fire Marshal, Police Safety Officer, and Public Works Director. They review the plan to make sure it meets local requirements and that it promotes the public health, safety, and general welfare of the community. Their written comments are then made available to the Planning Board. The Planning Board normally reviews projects in two meetings; the first meeting is a preliminary hearing and the second is a final hearing. Applicants should be aware, however, that some plans require more than two hearings. Applicants are expected to present their plans at the meeting and answer questions from the Board. Abutting property owners are invited to express their concerns in regard to the proposed project. Following the first hearing, the Planning Board may request that the applicant address their concerns and, if necessary, revise the plan. The altered plan must be submitted to the Planning Board Agent at least 7 days prior to the next hearing. This process continues until the final hearing at which the Planning Board makes a decision to approve or disapprove the proposed project. Following action by the Planning Board, a followup letter which lists any conditions of approval or reasons for disapproval, is sent to each applicant. If a plan is disapproved, applicants may submit a revised plan or appeal the decision to the Rockingham County Superior Court. When a plan is approved, the next step for the applicant is to apply for, and receive, permits from the Building and Engineering Divisions. B. BOARD OF ADJUSTMENT The Board of Adjustment hears and votes on all requests for variances and special exceptions from the Town of Salem Land Use Controls and the Building Code as adopted by the Town of Salem and appeals from a decision of a building official. The Board of Adjustment meets on the first Tuesday of each month at 7:00 PM in the Knightly Meeting Room of the Salem Municipal Office Building. If necessary, the Board of Adjustment will have a second meeting on the third Tuesday of the month. In order to be placed on an agenda, petitioners (property owners or their designated representatives) must meet with the Board's Agent (the Chief Building Official) and obtain an application packet from the Building Division. The completed application form, along with other required materials, must be filed with the Agent within a legal timeframe to be placed on 15

an agenda. There is a nominal charge for processing the application and for notifying the abutters by certified mail. Applicants shall provide the Board of Adjustment with: 1. A Certified Plot Plan or Site Plan, 2. Exact wording of variance or special exception requested, 3. Names and legal addresses of abutters, 4. Name(s) and address(es) of the owners of the property involved, 5. Written permission of owner, if not property owner. On the night of the meeting, the petitioner must address the criteria for variance or special exception, or in the case of an appeal, reasons petitioner feels an error has been made by a building official in denying petitioner's request. The voting members of the board must address the same criteria in making their decision. If the Board of Adjustment denies the request, the applicant may request a rehearing within 20 days of the date of the original hearing. New evidence must be provided along with the necessary completed forms. An abutter may request a rehearing of a Board of Adjustment decision by filing the necessary forms within 20 days of the Board's decision. New evidence must be submitted and the request must be filed at the Building Division. Following a request for a rehearing, the Board of Adjustment votes whether to grant or deny a rehearing based on the new evidence. If the Board approves the request, it is necessary for the party requesting a rehearing to submit the necessary forms and to pay for the notification of abutters. The petition will be heard at the next open meeting of the Board of Adjustment as a new petition. Within 30 days after the decision of such a rehearing, the petitioner may appeal, by petition, to Superior Court. After a petition has been granted by the Board of Adjustment, barring any requests for rehearings or litigation from abutters, and upon waiting the 20 day appeal period, the next step is for the applicant to obtain the necessary building permits, and Planning Board approval if necessary. C. PERMIT APPLICATIONS 1. Building Division Applicants seeking permits issued by the Building Division are expected to complete the required form(s), provide plans, and speak with the corresponding inspector(s). Fees are required for all permits and inspections are made of completed work. Building permits are 16

issued with an effective date which is 10-14 days after permit is issued. The Building Division issues the following permits: Building Electrical Plumbing Raze Chimney/Fireplace Signs Site work (including dredging, filling, grading, etc.) Change of Use Occupancy The Engineering Department and Planning Division must approve certain permits before they are issued by the Building Division. 2. Fire Department The Fire Department issues all permits pertaining to fire/life safety. Contractors and/or owners can apply for Fire Prevention Permits at the Central Fire Station Monday through Friday between the hours of 8: 30 AM and 4:30 PM. Questions regarding permits can be directed to the Fire Inspector by calling the Central Fire Station at (603)890-2200: Fire Prevention Permits include, but are not limited to: Fire Alarm Systems Sprinkler Systems Fixed Fire Protection Systems Flammable/Combustible Liquid Storage Tanks Liquefied Propane Gas Tanks Underground Storage Tank Removal Blasting Operations Explosive Material Storage Welding/Cutting Operations Wood Stoves Oil Burning Equipment Assembly occupancies (50 persons, or if liquor license will be requested) Fire Pumps Persons installing or maintaining fire alarm systems, sprinkler systems, private fire hydrants, and fixed fire protection systems are required to hold a valid Salem Fire Department Certificate of Fitness License to install these systems. Applications for Certificate of Fitness can be obtained at the Central Fire Station at 152 Main St. In addition, the following documents can be obtained from the Central Fire Station: Salem Fire Department Fire Alarm System Requirements Salem Fire Department Sprinkler System Requirements 17

Salem Fire Department Water Supply Regulations Salem Fire Department Private Fire Hydrant Regulations Salem Fire Department Permit Fee Schedule 4. Finance Department Developers interested in connecting to the municipal water system need to complete a "Service Application" form in the Finance Department. Payment for the water meter is to be made at the time that the application is filed. Developers who need a meter larger than 2" must contact the Public Works Department for meter specifications and list of suppliers. Installation of the water service is to be done by the developer. The Public Works Department will inspect all installations. The installation of residential water meters will be done by the Public Works Department. 5. Health Department The following permits are issued by the Health Department: Food Service Massage and Tattoo Establishments Salvage Yards 6. Assessor's Office Property owners or their agent wishing to cut timber must obtain and file an Intent-to-Cut form with the Assessor's Office. 7. Utilities Division The Utilities Division is responsible for issuing permits for water meters and irrigation systems. IV. OTHER INFORMATION A. LAND USE CONTROL ORDINANCE The Land Use Control Ordinance contains zoning, subdivision, and site plan review regulations. Included with the zoning regulations is information on district requirements (minimum lot size, frontage, setbacks, etc), off-street parking and loading, signage, wetland protection, enforcement, and how to seek relief from the regulations. The book is available from the Community Development Department for a nominal fee or can be found on the Town website at www.townofsalemnh.org. 18

B. Town of Salem Code The Town of Salem Code book contains the complete rules and regulations for the government of the Town. It includes local ordinances and regulations on numerous topics. Review copies are available in the Town Hall. C. Community Profile The Community Profile contains information on geography, transportation, government, services, demographics, recreation and major projects approved by the Planning Board. The Community Profile is available from the Planning Division. D. Capital Improvements Program The Capital Improvements Program is the Town of Salem's six year capital budget. It is available from the Community Development Department. 19