ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Similar documents
ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 23 R-1 Line #212

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Advanced Tactical Computer Science and Sensor Technology

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #32

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

Exhibit R-2, RDT&E Budget Item Justification February 2008

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Human, Social and Culture Behavior (HSCB) Modeling Advanced Development FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA) FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

Exhibit R-2, RDT&E Budget Item Justification February 2008

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 9 R-1 Line #20

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO

Exhibit R-2, RDT&E Budget Item Justification February 2008

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 11 R-1 Line #50

Transcription:

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) 7 - Operational system development 0305206A - Airborne Reconnaissance Adv Development K98 COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete K98 MASINT SENSOR INTEGRATION (JMIP) 10910 11438 4751 5094 5366 5449 5181 5465 Continuing Continuing A. Mission Description and Budget Item Justification: This project continues development of advanced tactical reconnaissance and surveillance sensor technologies and develops technology for the on-board fusion of multidiscipline intelligence sensors, i.e. Signals Intelligence (SIGINT), Moving Target Indicator/Synthetic Aperture (MTI/SAR) Radar, and Measure and Signature Intelligence (MASINT). Hyperspectral, multi-spectral, interferometric synthetic aperture radar sensors, advanced target and image exploitation software will be developed for imagery intelligence (IMINT) and MASINT applications. The Hyperspectral Longwave Imager for the Tactical Environment () develops the next generation airborne day/night hyperspectral reconnaissance sensor for the countermine mission, and detection and identification of camouflaged and concealed targets in all terrain environments. The Signals Warfare Project Office will develop MASINT/IMINT technologies for Aerial Co mmon Sensor (ACS). Efforts will be directed toward the development of advanced multi-mode Electroptic/Infrared (EO/IR), multi-mode MTI/SAR radar, foliage penetration radar, multispectral/hyperspectral imageries (MSI/HSI), MASINT on-board fusion and regis tration, and cueing of the EO/IR/SAR/HSI imaging sensor. FY04/05 funds continue MTI/SAR and MSI/HSI technology development and supports the integration of these for system demonstrations. MASINT was provided a supplemental fund called Defense Emergency Response Fund (DERF), as a non-add, for $2.6 million in FY 2002. This system supports the Objective transition path of the Transformation Campaign Path (TCP). Accomplishments/Planned Program FY 2002 FY 2003 FY 2004 FY 2005 -Conducted Critical Design Review (CDR)of the Hyperspectral Long Wave Imager for the Tactical Environment () sensor. 6037 1721 0 0 Completed system integration and initial testing. Participated in joint spectral data collection and exercises of various terrain and environmental backgrounds for algoritnm development (day only). Developed and integrated multiple algorithm exploitation and processing techniques for advanced spectral detection and recognition (day only) Spiral development and integration of multi-mode MTI/SAR/MSI/HSI/EO/IR capabilities for the ACS program Development of Signature-based unattended MASINT sensor - Sensor development and improvements of the system for application in the tactical environment. Conduct integration of with the NVESD test bed aircraft. Conduct lab characterization, flight tests, data collections, and field experimentations. 4873 4882 4751 5094 0 2950 0 0 0 1885 0 0 0305206A Item No. 180 Page 1 of 7 Exhibit R-2 Airborne Reconnaissance Adv Development 336 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) 7 - Operational system development 0305206A - Airborne Reconnaissance Adv Development K98 Accomplishments/Planned Program (continued) FY 2002 FY 2003 FY 2004 FY 2005 Totals 10910 11438 4751 5094 B. Program Change Summary FY 2002 FY 2003 FY 2004 FY 2005 Previous President's Budget (FY 2003) 10972 4882 4832 5182 Current Budget (FY 2004/2005 PB) 10910 11438 4751 5094 Total Adjustments -62 6556-81 -88 Congressional program reductions Congressional rescissions -60-128 Congressional increases 6750 Reprogrammings -2-66 SBIR/STTR Transfer Adjustments to Budget Years -81-88 C. Other Program Funding Summary FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Compl Total Cost 0203744A/028 ACS A02005 Aerial Common Sensor 14476 44139 103457 141255 114074 8735 8148 11269 Continue Continue 0 0 0 0 24151 223876 225870 233871 Continue Continue 0305206A Item No. 180 Page 2 of 7 Exhibit R-2 Airborne Reconnaissance Adv Development 337 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) 7 - Operational system development 0305206A - Airborne Reconnaissance Adv Development K98 D. Acquisition Strategy: The system acquisition strategy provided for the award of an R&D effort beginning in FY 1999 under best value full and open competition procedures. Data collection efforts to support analytic studies began in FY1998 using existing sensor and hardware integrated on a NVESD testbed aircraft. The ACS CE phase completed in 1QFY02 and two ACS CAD contracts were awarded in 3QFY02 on a competition basis. The CAD contract's efforts will develop MTI/SAR/MSI/HSI and multi-sensor technologies identified and found critical to the Aerial Common Sensor (ACS) program based upon the ACS Concept Exploration (CE) phase. The System Development and Demonstration (SDD) phase will be a competitive solicitation with contract award scheduled in 1QFY04. 0305206A Item No. 180 Page 3 of 7 Exhibit R-2 Airborne Reconnaissance Adv Development 338 Budget Item Justification

ARMY RDT&E COST ANALYSIS(R-3) I. Product Development Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. Night Vision Development Support; C/CPFF BAE Systems, NY 10086 1396 3Q 0 0 0 11482 11494 b. ACS Development Support; Hyperspectral Imagery c. ACS Technology contract for MTI/SAR/MIS/HSI/EO/IR C-CPFF BAE Systems, NY 0 1155 3Q 0 0 0 1155 1194 C-CPXF Multiple 4403 4270 1-2Q 4009 1Q 4318 Continue Continue Continue 14489 6821 4009 4318 Continue Continue Continue II. Support Cost Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. ACS System Engineering; EOIR, Fredricksburg VA 1615 125 2Q 0 0 0 1740 1615 b. Technical Support; SAIC Corp, San Diego, CA 228 0 0 0 0 228 228 c. ACS Technical Support; IDA; Washington, DC 260 50 2Q 0 0 0 310 260 0305206A Item No. 180 Page 4 of 7 Exhibit R-3 Airborne Reconnaissance Adv Development 339 Cost Analysis

ARMY RDT&E COST ANALYSIS(R-3) II. Support Cost Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target (continued) d. NV Technical Support Northrop Grumman, Los Angeles, CA 0 250 2Q 0 0 0 250 0 e. ACS Technical Support; Northrup Grumman, Los Angeles, CA 0 250 2Q 0 0 0 250 0 2103 675 0 0 0 2778 2103 III. Test and Evaluation Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. ACS Systems Evaluation: MIPR BCBL; Ft. Huachuca AZ 10 0 0 0 0 10 10 b. ACSTest & Demonstration; c. ACS Integration and Demonstration of MTI/SAR/MSI/HSI/EO/IR technologies MIPR CECOM; NVSED, NJ 922 200 2Q 0 0 0 1122 922 C-CPXF and MIPR Multiple 0 375 2Q 489 1Q 508 1Q Continue Continue Continue 932 575 489 508 Continue Continue Continue 0305206A Item No. 180 Page 5 of 7 Exhibit R-3 Airborne Reconnaissance Adv Development 340 Cost Analysis

ARMY RDT&E COST ANALYSIS(R-3) IV. Management Services Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. NV Program & Engineering Support; MIPR CECOM; NVESD 1265 75 2Q 0 0 0 1340 1265 b. ACS Program & Engineering Support; MTI/SAR/MSI/HSI/EO/IR MIPR CECOM; I2WD 468 237 2Q 253 1Q 268 1Q Continue Continue Continue c. ACS Program & Engineering Support: 0 105 2Q 0 0 0 105 0 d. Signature based unattended MASINT sensors 0 2950 0 0 0 2950 0 1733 3367 253 268 Continue Continue Continue Project Total Cost: 19257 11438 4751 5094 Continue Continue Continue 0305206A Item No. 180 Page 6 of 7 Exhibit R-3 Airborne Reconnaissance Adv Development 341 Cost Analysis

Schedule Profile Detail (R-4a Exhibit) Schedule Detail FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Algorithm Design/Implementation (day/night) and analysis Aircraft Integration Test and Demonstrate ACS MTI/SAR/MSI/HSI/EO/IR technology demonstrations ACS MS B Decision Review ACS MS C Decision Reivew 1-4Q 1-4Q 3-4Q 3Q 3-4Q 1-4Q 3-4Q 1-4Q 1-4Q 1-4Q 1-4Q 1-4Q 1-4Q 4Q 2Q 0305206A Item No. 180 Page 7 of 7 Exhibit R-4a Airborne Reconnaissance Adv Development 342 Budget Item Justification