VFD and Pump Incentive Application for Business Customers

Similar documents
2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

1 Customer and Contact Information

2018 NEW HAMPSHIRE ELECTRIC COOPERATIVE (NHEC) COMMERCIAL WEATHERIZATION PROGRAM

Ground Source Heat Pump - July 1, 2016 through June 30, 2017

2017 Business Environmental Sustainability Project Finance Program Application

CUSTOM COMMERCIAL & INDUSTRIAL (C&I) Program Application

Northern Sonoma County Air Pollution Control District Burn Clean! Wood Appliance Replacement Program

Large Energy User Program Pre-Qualification Application July 1, June 30, 2017 Customer Information

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial

Nonprofit Facility Grant Program

SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018

Grant Assistance for Water Efficient Equipment Retrofits Grant Guidelines and Terms

Pedernales Electric Cooperative. Comprehensive Commercial Rebate Program Manual

CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY APPLICATION

PG&E Commercial Water Heater Distributor Incentive Program Participation Agreement

Business Plan Grant Program. Application/Rules

LIBRARY COOPERATIVE GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [Governing Body] for and on behalf of [grantee]

CUSTOM INCENTIVE GUIDE

Manufacturer Job Creation and Investment Program

REBATE PROGRAM APPLICATION

Industrial Optimization Program: Feasibility Study

Terms and Conditions Irrigation Efficiency Program

Our Terms of Use and other areas of our Sites provide guidelines ("Guidelines") and rules and regulations ("Rules") in connection with OUEBB.

Heritage Energy Retrofit Grant Terms and Conditions Sept Oct 2018

WarmWise Business Custom Rebates Program Manual

Farm Energy and Agri-Processing Program Terms and Conditions

Downtown Retail Interior Improvement Award Program Application Packet

Renewable Energy Bonus Scheme - solar hot water rebate. Guidelines and application form

Heritage Energy Retrofit Grant Terms and Conditions

HOT FUND GRANT FUNDING CONTRACT FOR SERVICES By and between the Experience Bryan College Station and

Google Capture the Flag 2018 Official Rules

APPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION. Progress Energy Carolinas INCENTIVE PROGRAM

CAP FARM WATER SUPPLY PROGRAM Terms and Conditions

REQUEST FOR PROPOSALS FOR REPLACEMENT OF GENERATOR AT LAKE HILLS 1860 BOOSTER PUMP STATION

#AcneFreeLife Sweepstakes Official Rules:

PUBLIC LIBRARY CONSTRUCTION GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [GOVERNING BODY] for and on behalf of [GRANTEE]

Downtown Interior Improvement Grant Program Application Packet

City of Jacksonville, Alabama Public Square Overlay District. Façade Improvement Program APPLICATION AND AGREEMENT

County Transportation Infrastructure Fund Grant Program Implementation Procedures

Request for Proposals

Registry of CPE Providers Application

Applicant Information Booklet

Indian Community School of Milwaukee, Inc. BUILDINGS AND GROUNDS USE POLICY AND GUIDELINES

Academy Sports Football Scholarship Program Rules SPONSOR: ACADEMY SPORTS

Smart Energy New Homes Program

Appendix B-1. Feasibility Study Task Order Template

FOCUS ON ENERGY BID FOR EFFICIENCY OFFERING. Frequently Asked Questions (FAQs)

Important considerations for 2019 applicants:

HOT FUND GRANT FUNDING CONTRACT FOR SERVICES By and between the Bryan-College Station Convention & Visitors Bureau and

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.

Beauty Changes Lives Sydell L. Miller Total Image Esthetic Scholarship Terms and Conditions

Retail Façade Improvement Award Program Application Packet

Energy Savings Bid Program 2007 Policy Manual

Memo of Understanding - Evergreen Options Grant Award

MULTIFAMILY UPGRADE CUSTOMER HANDBOOK

FACILITIES USE POLICY

Façade Improvement Program

EVENT DEVELOPMENT GRANT 2016 Application Package

Outside of Deadwood Grant Fund

Aberdeen School District No North G St. Aberdeen, WA REQUEST FOR PROPOSALS 21 ST CENTURY GRANT PROGRAM EVALUATOR

Savannah Entertainment Production Incentive Rebate Certification Application Effective Date:

Rev. 02/01/16 Page 1 of 5 Copyright (c) 2016 Forever Media, Inc.

Commercial White Box Grant Program

SMALL BUSINESS INCENTIVE GRANT PROGRAM (SBIG)

Pedernales Electric Cooperative. Residential HVAC Rebate Program Manual

HVAC Distributor Rebate Program Participant Agreement

Automated License Plate Reader (ALPR) System. City of Coquitlam. Request for Proposals RFP No Issue Date: January 25, 2017

Culture Projects Grant Program

POLICY AND PROCEDURES MANUAL

Council Policy. Application Form. Grant Year: Applicant Information. Name of Agency/Organization/Group/Event: Address: Telephone: Cell: Fax:

1. daa plc, whose principal address is at Old Central Terminal Building, Dublin Airport, Co Dublin (Funder)

infodev Grant No. [Name of Project] Project

The Ohio Youth-Led Prevention Network. SFY 2018 Request for Proposals

Information sheet for registration of food business Food Act 2014

REQUEST FOR PROPOSAL: SAN EXPANSION & OPTIMIZATION

International Champions Cup Singapore Skills Challenge Contest Terms and Conditions

FUNDING AGREEMENT FOR SECTION 5317 NEW FREEDOM PROGRAM GRANT FUNDS

GUIDELINES FOR BUSINESS IMPROVEMENT GRANT PROGRAM BY THE COLUMBUS COMMUNITY & INDUSTRIAL DEVELOPMENT CORPORATION

SEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services

South Park Eagle Academy Application

Request for Proposal Hydraulic Rescue Tools. Date Issued: September 28 th, 2016

Legislative Administration Office Only. Last First Middle Are you known by other names while previously employed? YES NO.

terms of business Client Details Client name:... Billing name:... Address:... address:... NZBN/NZCN:... Contact name:... Phone number:...

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

Carbon Neutral Adelaide

City of Tecumseh DDA Façade Incentive Grant Program Guidelines

2016 NATIONAL CLUSTER MEETINGS Denver, CO - Nov. 4-6, 2016 Orlando, FL - Nov , 2016 EXHIBITOR PROSPECTUS EXHIBIT. SPONSOR. ADVERTISE. Pg.

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

The Chevron-Marketer Miami-Dade Fuel Your School Promotion Miami-Dade County in Florida

Grant Application Form

Terms and Conditions of studentship funding

ENERGY PERFORMANCE CONTRACTING

STRATFORD-UPON-AVON HISTORIC SPINE SHOP FRONT GRANT SCHEME

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

COMMONWEALTH BANK STAFF COMMUNITY FUND COMMUNITY GRANTS GRANT GUIDELINES.

1.1.2 "child" means the child named on the Nursery Registration Form;

Commercial Façade Improvement Grant Program Application Packet

SEATTLE ART MUSEUM #SummerAtSAM PHOTO CONTEST OFFICIAL RULES

Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0

RESOLUTION NUMBER 2877

Transcription:

2017 VFD and Pump Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and Conditions on page 6. Step 1: Determine Eligibility. Equipment must be new and installed in a business. Only new products which are exact product types listed in this application form are eligible for prescriptive incentives described in this application. If the potential incentive is greater than $10,000, pre-approval from the participating utility is required. Contact the utility to get pre-approval. Step 2: Install Equipment. New equipment must be installed and old equipment properly removed and disposed of. Old equipment must not be installed elsewhere. Step 3: Complete and sign the application. Complete the application and attach copies of all project invoices, including labor costs. Include manufacturer (OEM) specification sheets for all equipment to be rebated. Step 4: Submit completed application. A completed application and all supporting documents must be received by The Utility within 90 days of installation. Incomplete applications will cause delays in payment or denial of the application. Email the application and all supporting documentation to: rebate@amu1.net OR Mail or fax the application and all supporting documentation to: Atlantic Municipal Utilities 15 W 3rd Street Atlantic, IA 50022 Phone: (712) 243-1395 Fax: (712) 243-2029 Please note: Atlantic Municipal Utilities and its supplemental power supplier, Missouri River Energy Services, are offering this Bright Energy Solutions Program. Atlantic Municipal Utilities and Missouri River Energy Services together will be referred to as "The Utility" throughout this document. Please visit www.brightenergysolutions.com for more information about the Bright Energy Solutions Programs. 1 of 6 V4.4 1-1-2017

Customer Information (Please Print) Company Name Contact Name Date Submitted Installation Address City State ZIP Code Mailing Address City State ZIP Code Phone Installation (Completion) Date Email Address (By providing your email address, you are granting the Utility permission to send emails regarding this project or updates on our incentive programs.) Building Use Please Check One: Office Retail 24-hour Facility Warehouse Restaurant Lodging Grocery/Supermarket Manufacturing Municipality Utility Name & Account Number School: Elementary/Secondary College Healthcare: Clinic Hospital Other/Miscellaneous: How did you learn about the program? My Utility Contractor/Supplier Community Event Mailing Bill insert Other: Facility Hours of Operation Hours per Day Days per Week Weeks per Year Hours per Year (hours x days x weeks) Vendor/Contractor Information Company Name Contact Name Phone Address City State ZIP Code Fax Email Address (By providing the vendor s email address, you are granting The Utility permission to send emails regarding this project or updates on our incentive program.) Payment Information Please process payment to: Customer (listed above) Vendor/Contractor (listed above) Alternative Recipient If payment is to be made to an Alternative Recipient, please complete the remainder of this section: Company Name Contact Name Phone Address City State ZIP 2 of 6 V4.4 1-1-2017

A. Variable Frequency Drives (VFD s) on HVAC Fans, HVAC Pumps and Process Pumps The equipment below is (check one): New Equipment Add VFD to Existing Equipment VFD s used to replace existing or failed VFD s do not qualify for incentives. VFD Used to Control (Check One) VFD Motor Horsepower* Make/Model or Catalog # Qty Incentive* Annual Operating Hrs (Minimum of 1500) Date Installed & Operable (mm/yy) Total Incentive Subtotal Section A: $ PLEASE ATTACH THE FOLLOWING REQUIRED DOCUMENTS: 1) Invoice clearly showing proof of purchase including date purchased, model numbers and cost. If contractor installed, please include installation date, address and total project cost. VFD s used to replace existing or failed VFD s do not qualify for incentives. This incentive is for VFD s used on process pumps, HVAC pumps and HVAC fans only. o Examples include VFD s used to control the following: HVAC fans, boiler draft fans, cooling tower fans, chilled water distribution pumps, and hot water distribution pumps. HVAC FANS. Incentives for VFD s used to control HVAC fans are only offered for VFD s installed on existing HVAC fans up to 400 horsepower. Incentives are not offered for VFD s on new installations of HVAC fans. HVAC PUMPS. Incentives for VFD s used to control HVAC pumps are limited to the following horsepower ranges: o For new HVAC pumps - only VFD s used to control motors 1 through 50 horsepower are eligible. o For existing HVAC pumps - only VFD s added to control motors 1 through 400 horsepower are eligible. PROCESS PUMPS. Incentives for VFD s used to control process pumps are limited to the following horsepower ranges: o For new process pumps - only VFD s used to control motors 1 through 50 horsepower are eligible. o For existing process pumps - only VFD s added to control motors 1 through 400 horsepower are eligible. VFDs must be automatically controlled by a variable signal, and have load diversity that will result in savings through motor speed variation. The motor controlled must be set to operate a minimum of 1500 hours annually to be eligible for incentive. Redundant or backup units do not qualify. Qualifying projects must have a true power factor of 90% or greater and should include a line reactor between the power source and the drive with a reactor rating of not less than 3% impedance of the VFD rating. * Maximum incentive cannot exceed 75% of the total project cost including installation. 3 of 6 V4.4 1-1-2017

B. High Efficiency Pumps (1 Thorugh 20 HP Only) Pump HP Make/Model or Catalog Qty Incentive per Pump* Nominal Efficiency** (pump curve) Minimum Installed Required Annual Operating Hrs (Minimum 1500) 1.5 HP $ 60.00 % 73% or More Hrs. Total Incentive 2 HP $ 70.00 % 73% or More Hrs. 3 HP $ 100.00 % 73% or More Hrs. 5 HP $ 100.00 % 73% or More Hrs. 7.5 HP $ 200.00 % 73% or More Hrs. 10 HP $ 260.00 % 75% or More Hrs. 15 HP $ 300.00 % 77% or More Hrs. 20 HP $ 400.00 % 77% or More Hrs. Subtotal Section B: $ PLEASE ATTACH THE FOLLOWING REQUIRED DOCUMENTS: 1) Pump curves with motor operating points clearly marked. 2) Invoice clearly showing proof of purchase including date purchased, model numbers, horsepower and cost. If contractor installed, please include installation date, address and total project cost. Pump efficiency is based on the pump curve for specific installation. Documentation of the pump curve is required to receive an incentive. Pumps must be set to operate a minimum of 1500 hours annually to be eligible. Additional incentives for the use of a variable frequency drive in combination with the pump are offered in Section A of this application form. *Maximum incentive cannot exceed 75% of the total project cost including installation. **Pump Efficiency represents the efficiency at the design operating point on the pump curve. Summary of Incentives Subtotal Section A: Variable Frequency Drives on HVAC Fans, HVAC Pumps and Process Pumps $ Subtotal Section B: High Efficiency Pumps $ Total Incentive: $ 4 of 6 V4.4 1-1-2017

Certifications and Signature I hereby certify that: 1. The information contained in this application is accurate and complete; 2. All installation is complete and the unit(s) is operational prior to submitting application; 3. All rules of this incentive program have been followed, and 4. I have read and understand the terms and conditions applicable to this incentive program as set forth in this application, including those set forth on page 6 below. The customer agrees to verification of equipment installation which may include a site inspection by a program or utility representative. The customer understands that it is not allowed to receive more than one incentive from this program on any piece of equipment. The customer agrees to indemnify, defend, hold harmless and release The Utility from any claims, damages, liabilities, costs and expenses (including reasonable attorneys fees) arising from or relating to the removal, disposal, installation or operation of any equipment or related materials in connection with the programs described in this application, including any incidental, special or consequential damages. Please sign and complete all information below. Signature Print Name Title (if applicable) Date Member Utility Use Only Date Received Pre-Inspected? Date Pre-Inspected: Post-Inspected? Date Post-Inspected: Yes No Initials: Yes No Initials: Incentive Approved Yes No Amount :$ Date Approved Utility or Program Representative 5 of 6 V4.4 1-1-2017

ELIGIBILITY: These incentives are offered by Missouri River Energy Services and its participating members. For questions regarding eligibility, call your local utility listed on the cover page of this application. Commercial, industrial, and governmental customers who purchase electricity from The Utility are eligible to participate in the Bright Energy Solutions VFD and Pump Incentive Program. Eligible equipment must be connected to an electric service billed under a commercial or industrial rate class by The Utility. This program is applicable only to equipment that meets the detailed equipment specifications and requirements described in this application. The Utility will determine, in its discretion, whether such specifications and requirements are satisfied. Customers may not receive more than one incentive for each piece of equipment installed under this program or any combination of Bright Energy Solutions programs. TERMS AND CONDITIONS: 1. Incentive Offer: Projects, including all required installation, must be completed by December 31, 2017. A signed application and itemized invoices for materials and labor must be submitted to the participating utility at the address located on the cover page of this application within 90 calendar days of project completion. Please keep a copy for your records. 2. Proof of Purchase: This application must have complete information and be submitted with an invoice(s) itemizing the new equipment purchased and labor costs. The invoice(s) must indicate date of purchase, size, type, make, model and total project cost. Manufacturer (OEM) specification sheets must also be included. 3. Compliance: a) All projects must comply with federal, state, and local codes. b) All equipment must be new or retrofitted with new components per the program specifications. Used or rebuilt equipment is not eligible for incentives. Existing equipment must be removed and properly disposed of. c) Equipment must meet specification requirements and be purchased, installed and operating prior to submitting an incentive application. d) Customers may only receive one incentive per piece of qualifying equipment, except where noted. e) All projects for which more than $10,000 in incentive payments is sought must be approved by The Utility prior to the commencement of the project. Receipt of pre-approval does not guarantee incentive payments will be made. Incentive payments will be made only upon the customer s satisfaction of all terms and conditions of this program. f) All terms and conditions of this application must be satisfied by the customer. 4. Payment: Once completed paperwork is submitted, incentive payments are usually made within 4-8 weeks. Incomplete applications will either delay payments or be denied. The Utility reserves the right to refuse payment and participation if the customer or the customer s contractor violates program rules and procedures. 5. Inspection: The Utility may conduct an inspection of the customer s facility to survey any installed projects. All projects exceeding $10,000 of incentives will be inspected prior to incentive payment. The Utility may inspect customer records relating to incentives sought by the customer. 6. Information Sharing: The Utility reserves the right to publicize your participation in this program, unless you specifically request otherwise in writing. Information contained in this application may be shared with state boards, commissions, departments, and other Bright Energy Solutions participating utilities. 7. Program Discretion: Incentives are available on a first-come, first-served basis. This program and its incentive amounts are subject to change or termination without notice at the discretion of The Utility. Neither pre-approval of a project, nor any other action by The Utility, will entitle a customer to an incentive payment until the application is finally approved by The Utility. 8. Logo Use: Customers or trade allies may not use the name or logo of Bright Energy Solutions, The Utility, or any other participating utility in any marketing, advertising, or promotional material without written permission. 9. Disclaimers: The Utility a) does not endorse any particular manufacturer, product, labor or system design by offering these programs; b) will not be responsible for any tax liability imposed on the customer as a result of the payment of incentives; c) does not expressly or implicitly warrant the installation or performance of installed equipment or any contractor s quality of work (contact the equipment manufacturer or contractor for warranties); d) is not responsible for the proper disposal/recycling of any waste generated as a result of this project; e) is not liable for any damage, injury, or loss of life arising from or relating to the removal, installation, or operation of any equipment, or any other action taken by the customer or The Utility, in connection with a project undertaken by the customer under the programs described in this application; f) does not guarantee that a specific level of energy or cost savings will result from the implementation of energy efficiency measures or the use of products funded under this program. INCENTIVE LIMIT: Eligible customers may purchase and install qualifying equipment and receive an energy efficiency incentive of up to $25,000 per customer, per calendar year. Payments for larger incentives may be allowed at the discretion of The Utility. An incentive exceeding $10,000 must receive written approval from The Utility BEFORE project commencement. Total incentive will not exceed 75 percent of the project cost, including installation. If self-installed, incentives for items of equipment can be up to the purchase price of a specific item, but shall not exceed the Bright Energy Solutions incentives set by Missouri River Energy Services. Incentives for particular items of equipment and/or systems are limited as set forth in this application. 6 of 6 V4.4 1-1-2017