HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

Similar documents
DIRECTIONS: Industrial Stormwater Permit: Anyone seeking coverage under the ARR General Permit must perform the following:

Regulatory Services Division Industrial Discharge Control Section

ANNUAL STANDARDS AND SPECIFICATIONS

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Plan of Development Review Process County of Henrico, Virginia

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

Erosion Control and Water Management Program Policy

SECTION 4. Construction Site Runoff Control Program

ReWa Capacity Approval Process Public Main Extension Project

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Illicit Discharge Detection and Elimination MCM #3

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties

EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO

FY 2016 Clean Water Fund Competitive Grants Policy

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

Non-MACT Plating Operations

APPLICATION FOR NPDES OR WQM PERMIT TRANSFER INSTRUCTIONS

Standard Operating Procedure: Stormwater BMP Inspections

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S))

August 26, Mr. Jatin Patel Jasmine & Hannah, LLC 5034 Nicholas Hill Ln Roanoke, VA 24019

Erosion Control and Water Management Policy

FY 2018 Watershed-Based Funding Pilot Program Policy

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

PERMIT FEE PROGRAM EVALUATION

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Florida Department of Environmental Protection

I. NPDES Permits BUREAU OF MINING PROGRAMS

Water Quality Improvement Program. Funding Application Guide

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610)

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

INDUSTRIAL PRETREATMENT PERMIT

NPDES PERMIT NO. The authority granted by coverage under this General Permit is subject to the following further qualifications:

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA FAX

Section 5 BMP Implementation and Evaluation 5.1 Introduction

Stormwater Management Program Annual Report For Regulated MS4s. Broome County, New York MS4 SPDES # NYR20A332

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

j Water Utility Authority

Conservation Leadership and Innovation Program (CLIP)

Watershed Restoration and Protection

Table of Contents. introduction permit fact sheet completeness checklist. Introduction

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals:

Watershed-based Funding: Pilot program

4. Applicants must be one of the following for profit entities: sole proprietor, partnership, corporation, cooperative or LLC.

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

Q General Cable. July 15, ADEQ Water Division 5301 Northshore Drive North Little Rock, AR RE: Permit Transfer Form ADEQ:

General EMS and Environmental Awareness Training for Contractors/Vendors at Marine Corps Air Station (MCAS) Cherry Point, NC

ROGERS GROUP, INC. P.O. BOX Nashville, TN Phone (615)

460th SPACE WING BUCKLEY AIR FORCE BASE COLORADO

Request for Proposals (RFP) RFP NO. E&CD GRANT WRITING AND ADMINISTRATION SERVICES

History. Acts 1985, No. 876, 2; Acts 1993, No. 322, 1; 1993, No. 440, 1. A.S.A. 1947,

2018 Developer Handbook

Lexington s Stormwater Quality Projects Incentive Grant Program

City of Culver City. Staff Report

Rhode Island Department of Health Application and Instructions for Food Business:

I. Introduction. II. Goals of the Program

GENESEE COUNTY SOIL AND WATER CONSERVATION DISTRICT. Organizational Chart

Submission, Review, and Approval Procedures

Duties of a Principal

TOWN OF GREENWICH Annual Department Operational Plan (FY )

FISCAL YEAR FAMILY SELF-SUFFICIENCY PROGRAM GRANT AGREEMENT (Attachment to Form HUD-1044) ARTICLE I: BASIC GRANT INFORMATION AND REQUIREMENTS

2017 Developer Handbook

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

Stormwater Management Program

Chesapeake Bay Grant Programs. Marcia Fox DNREC Watershed Assessment and Management Section

Virginia Clean Water Revolving Loan Fund (VCWRLF) Water Quality Improvement Fund (WQIF) Stormwater Local Assistance Fund (SLAF)

Revision #: 0 Prepared By: Beth Eckert, Industrial Chemist Revision Date: 1/10/00 Approved By: Larry Cummings, Asst. Superintendent of WWTD

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE

FAIRFAX WATER WATER SUPPLY STAKEHOLDER OUTREACH PROGRAM GRANT APPLICATION GUIDELINES AND FORMS FISCAL YEAR 2018

CHAPTER 8 - WATER POLLUTION CONTROL SYSTEM OPERATORS CERTIFICATION COMMISSION

Meeting Agenda & Minutes

Chesapeake Bay Restoration Strategy FAQs

WATER QUALITY MANAGEMENT PERMIT

MONROE COUNTY CONSERVATION DISTRICT DIRT, GRAVEL, AND LOW VOLUME ROAD MAINTENANCE PROGRAM QUALITY ASSURANCE BOARD POLICIES AND PROCEDURES

If you have any questions or need additional information, please contact me by phone at (919) or via at

HOUSE BILL M3, C5 9lr2951 CF SB 4 By: Delegate Niemann Introduced and read first time: February 13, 2009 Assigned to: Environmental Matters

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

SUBCHAPTER 59D - AGRICULTURE COST SHARE PROGRAM FOR NONPOINT SOURCE POLLUTION CONTROL SECTION AGRICULTURE COST SHARE PROGRAM

Annual Plan of Work. July 1, 2016 June 30, 2017

LAW OFFICE OF DAVID A. LUDDER. A Professional Limited Liability Company. June 18, 2014

This Approval does not cover the use of the Exceptional Quality biosolid in a trial composting with "green waste".

ERASE REDEVELOPMENT GRANT

REVISION: This revised Management Directive (MD) updates TSA MD , dated January 29, 2004.

Discharges Associated with Pesticide Applications Under the NPDES Permit Program. Frequently Asked Questions (FAQ)

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

HOUSE RESEARCH Bill Summary

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms

Procedure For Processing An Application. For A Permit To Install Or Modify An Individual Sewer System

Clean Water Assistance - Todd (SWCD)

Storm Water Cost Share Program

SIGNIFICANT NONCOMPLIANCE OF WASTEWATER DISCHARGE LIMITS... 3 NONCOMPLIANCE NOTIFICATION (NCN)... 4 NOTICE OF VIOLATION (NOV)... 4

GRANT APPLICATION GUIDELINES For Greater Hampton Roads Fine Arts and Humanities

Transcription:

CHAPTER 13 13.1 INTRODUCTION A Stormwater Pollution Prevention (SWPPP) is a required component of the General Virginia Pollutant Discharge Elimination System Permit for Discharges of Stormwater from Construction Activities. This permit is referred to as the General Construction Permit (GCP) and is described in Chapter 12 of this Manual. The SWPPP includes the steps and techniques that will be used to reduce pollutants leaving a construction site and must identify all potential pollution sources as well as measures that will be implemented to reduce pollutants from these sources. SWPPPs must be developed and implemented in accordance with the requirements of this chapter. 13.2 APPLICABILITY In accordance with Sec. 10-38 of the Henrico County Code, the requirements of this chapter apply to all VSMP land-disturbing activities. For help determining the land disturbance activity type, please refer to Chapter 3 of this Manual. 13.3 REQUIRED SWPPP COMPONENTS 1. General Information a. A signed copy of the registration statement for coverage under the GCP; b. A copy of the notice of coverage under the GCP (i.e., notice of coverage letter); c. A copy of the GCP; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: 1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; 2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; 3) Locations of major structural and nonstructural control measures including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment that will be installed between disturbed areas and the undisturbed vegetated areas, in order to increase sediment removal and maximize stormwater infiltration; 4) Locations of surface waters; 13-1

5) Locations where concentrated stormwater is discharged; 6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to: (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and 7) When applicable, the location of the on-site rain gauge, or the methodology established in consultation with the VSMP authority, used to identify measurable storm events for inspection purposes. 2. An Erosion and Sediment Control (ESC) developed and approved in accordance with Chapter 8 of this manual. 3. A Stormwater Management (SWM) developed and approved in accordance with Chapter 9 of this manual. 4. A Pollution Prevention (PPP) developed and implemented in accordance with Chapter 10 of this manual. 5. Information demonstrating compliance with the Total Maximum Daily Load (TMDL) requirements described in section Chapter 11 of this manual. 6. Qualified Personnel Qualified personnel responsible for conducting on-site and off-site inspections required by the GCP shall be identified by the Operator in the SWPPP. The Operator is responsible for insuring that the qualified personnel conduct inspections. 7. Delegation of Authority The SWPPP must identify individuals or positions with delegated authority to sign inspection reports and/or amend or modify the SWPPP in accordance with Section 13.5. 8. SWPPP Signature The SWPPP shall be signed and dated in accordance with the signatory requirements described in Section 13.5. 9. SWPPP Amendments/Modifications The SWPPP must contain documentation of all amendments, modifications, and updates made in accordance with Section 18.8. A blank SWPPP amendment/modification form has been included in the SWPPP template/binder described in Section 13.4. 10. SWPPP Inspections The SWPPP must include documentation of inspections conducted in accordance with the inspection requirements described in Section 18.7. A blank inspection form has been provided in the SWPPP template/binder described in Section 13.4. 13-2

11. Corrective Actions The SWPPP must contain documentation of corrective actions taken in accordance with the requirements described in Section 18.9. 13.4 PREPARATION OF THE REQUIRED SWPPP COMPONENTS A SWPPP template/binder, as well as the standard pollution prevention plan sheet identified in Chapter 10, has been prepared by Henrico County to help facilitate the preparation, approval, and implementation of the SWPPP. By developing the template/binder and plan sheet, the County has attempted to identify the most appropriate parties (plan preparer-operator) to successfully prepare the various components of the SWPPP and to carry out its implementation. The roles and responsibilities of the plan preparer and operator are outlined in Table 13.1. A SWPPP template has been provided by DEQ to address the required SWPPP components for single-family construction. 13.5 SWPPP SIGNATORY REQUIREMENTS 1. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decisionmaking functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 13-3

2. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Section 13.5, Item 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Section 13.5, Item 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to the department and VSMP authority, if requested. 3. If an authorization under Section 13.5, Item 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Section 13.5, Item 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Any person signing a document under Section 13.5, Item 1 or 2 must make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." 13-4

Table 13.1 SWPPP Requirements 1. 2. Where to find: Sheet General Information SWPPP Binder Responsible Party: Preparer Operator Copy of Registration for Coverage under General Permit Copy of Notice of Coverage under General Permit 3. Copy of the General Permit Narrative description of the nature of the 4. construction activity 5. Site plan identifying: a) Directions of stormwater flow and appropriate slopes anticipated b) Limits of land disturbance, including steep slopes and natural buffers around surface waters that will not be disturbed c) Locations of major structural and nonstructural control measures d) Locations of surface waters e) Locations where concentrated stormwater is discharged f) Location of the on-site rain gauge OR description of the methodology to identify measureable storm events g) Locations of on-site and off-site: i. Equipment and vehicle washing, wheel wash water, other wash water is to occur ii. Storage area of chemicals iii. Concrete wash out areas iv. Vehicle fueling and maintenance areas v. Sanitary waste facilities vi. Construction waste storage 6. Previously covered construction activities 13-5

Table 13.1 (Continued) SWPPP Requirements Where to find: Sheet SWPPP Binder Erosion and Sediment Control (ESC) (in accordance with Chapter 5) Stormwater Management (in accordance with Chapter 9) Responsible Party: Preparer Operator Pollution Prevention (in accordance with Chapter 10) TMDL Requirements (in accordance with Chapter 11) Effluent Limit Guidelines are met (in accordance with Chapter 8) Record of Inspection Amendments of SWPPP SWPPP Certifications 13-6