ICT LIBRARY UPDATE. Bi-monthly July - August 2017 Vol. 15 : No. 4. Contents

Similar documents
ICT LIBRARY UPDATE. Contents. - Articles - Pages (Subject wise alphabetically indexed) Addition of Books - 5.

Roads: Leading Indicators Show Ramp-Up in Activity

REFERENCE NOTE. No. 23 /RN/Ref./August/2013. National Highways Development Project: An Overview

India: Madhya Pradesh State Roads Sector Project II

Scheme of the Presentation

Environmental Impact Assessment

7. STUDY AND EVALUATION SCHEME FOR DIPLOMA PROGRAMME IN CIVIL ENGINEERING SCHEME. Hrs/week L T P

(Established by National Capital Territory of Delhi, New Delhi)

Telphone : Parivahan Bhawan, Telefax : Parliament Street, New Delhi

COMMITTEE SECTION (S&T)

GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS (DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS)

Guidelines for preparation of AWP&B for the year

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

Project Management Consultant (PMC) for Setting Up and Operations of Way-side Amenities on National Highways in India

Planning Commission ADDENDUM NO. 1 TO THE REQUEST FOR PROPOSAL (RFP) FOR APPOINTMENT OF TECHNICAL CONSULTANT. Government of India

MINISTRY OF COMMERCE AND INDUSTRY DEMAND NO. 12 Department of Industrial Policy and Promotion

SCHEME FOR SETTING UP OF PLASTIC PARKS

FUSION MICROFINANCE PVT LTD

INTRODUCTORY MEETING WITH THE PROSPECTIVE BIDDERS for State Highway Projects of Bihar under ADB Financing (BSHP-III) on 5 th May 2018

A. Assistance to Address Climate Change and to Protect Environment. C. Support for Regional Disaster Risk Reduction and Disaster Management

Response to queries on Pre-bid meeting held on Description of Clause No. Concern / Suggestion Query / Response Response Data Sheet 1.

JICA II Urban Roads Resealing Project.

(Under Construction)

ON-GOING EXTERNALLY AIDED PROJECTS

GOVERNMENT OF INDIA MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS (DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS

SMART CITIES INITIATIVES OF INDIA

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009

PROJECT PREPARATORY TECHNICAL ASSISTANCE

CHAPTER-7 ICT DIFFUSION AND DIGITAL DIVIDE IN INDIA

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

VISHWAKARMA (Online Monthly e - Journal of Construction Industry Development Council) Vol.2 Issue IX E Journal of CIDC Sept, 2013

The RD & T Newsletter

NOTIFICATION RECRUITMENT FOR THE POST OF DIRECTOR (WORKS & INFRASTRUCTURE) (Advertisement No. 1/LMRC/HR/Appointment Dir (W&I)/2018 Dated

Appendix E Federal and State Funding Categories

Aegis Skills Edge Pvt. Ltd.

Rajasthan Urban Sector Development Program

U.A.E DUBAI. ABUDHABI

Summary of Key INFRA Projects by Region (as of end September 2009)

MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS

GOVERNMENT OF UTTARAKHAND Urban Development Department Asian Development Bank UTTARAKHAND URBAN SECTOR DEVELOPMENT INVESTMENT PROGRAM (UUSDIP)

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

A Study on Financial Assistance Programme of NEDFi:

MEGHALAYA. Export Promotion Industrial Park (E.P.I.P) ( Implementation

BRIDGES, FLYOVERS AND ELEVATED ROADS

Welcome to this meeting on July 21, 2017

MSME Sector MAKE IN INDIA. Achievements Report. Department of Industrial Policy and Promotion. Ministry of Micro, Small and Medium Enterprises

Application Form For JAPAN s Grant Assistance for Grassroots Projects (GGP)

PROJECT PREPARATORY TECHNICAL ASSISTANCE

49 USC NB: This unofficial compilation of the U.S. Code is current as of Jan. 4, 2012 (see

Possibility of Extension

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

To evaluate the impact of NRHM interventions, by Agencies outside the Government, and make recommendations on:

CORPORATE SOCIAL RESPONSIBILITY POLICY HI-TECH GEARS LIMITED

Adopt-A- Road Group Application Form

BASIC MUNICIPAL TRANSPORTATION GRANT (BMTG)

Ministry of Regional Development and Infrastructure

POLICY ON CORPORATE SOCIAL RESPONSIBILITY (CSR) AND SUSTAINABILITY. Indian Renewable Energy Development Agency Limited, New Delhi

TRAINING ON WATER, SANITATION, AND HYGIENE (WASH) TO THE FRONTLINE WORKERS (FLWS) IN A RURAL SET UP

No. BMRCL/ 002/ ADM / 2015/ PRJ Date: NOTIFICATION FOR CONTRACT APPOINTMENT

EXISTING CONDITIONS

Second Tamil Nadu Road Sector Project PROCUREMENT PLAN

(Financed by the Japan Fund for Poverty Reduction)

Small County Outreach Program (SCOP)

Dr. Ambedkar Medical Aid Scheme (Revised 2016)

Scheme of Merit cum means based scholarship to students belonging to minority communities.

Topics Covered. Introduction Historic Perspective. Transportation. National Highway Bridge Program Challenges and Opportunities in Bridge Engineering

Nov11 13 Tehran, IRAN. Presentation to UNESCAP Expert Group Meeting on Infrastructure Public Private Partnership for Sustainable Development

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Strategic Transportation Infrastructure Program

Corporate Social Responsibility Policy *********

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD)

UIC Regional Assembly for Middle-East

Western Balkans Investment Framework

Completion Report. Project Number: Loan Number: 1747 September India: Surat-Manor Tollway Project

FINANCING HIGHWAY IN MEXICO: CONCESSIONS (BOT) AND PUBLIC - PRIVATE PARTNERSHIPS (PPP) ASPECTS, CHALLENGES AND RECOMMENDATIONS Luis Rocha Chiu

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Consolidated guidelines for preparation of project proposal for RMSA and proposal for preparatory activities

Role of Entrepreneurial Development Programmes in Growth of Entrepreneurship in India

Transport NI York Street Interchange APPENDIX A PROJECT BRIEF

SAFETY & ENVIRONMENT. Bidadi Industries Association Special Purpose Group (SPG) Progress

Candidates willing to be considered for more than one section should fill in separate Application Forms.

Centurion Way Feasibility Study - South Downs National Park Authority Application for Coast to Capital LEP Feasibility Fund

Appendix 5 Freight Funding Programs

49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST)

, 89, SAS

Public-Private Partnership and South-South Cooperation. Conference on South-South Cooperation March 11, 2016, New Delhi

Maharashtra. Department of Industries, Government of Maharashtra

Smart Cities challenge Erode city

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT

A journey towards a sustainable future

G0274-TIM: Mid-Level Skills Training Project

Inspection proforma for B.Sc(Nursing) Course Name.. Inspection Proforma for B.Sc. (N) College. Committee members for inspection.

Rising Uttar Pradesh

3.1 Scope 3.2 Components Land Common Infrastructure Buildings for common facilities Factory buildings

Manual Data Entry Jobs In Delhi Government

NATIONAL RESEARCH DEVELOPMENT CORPORATION TECHNO-COMMERCIAL SUPPORT FOR PROMISING INVENTIONS / INNOVATIONS GUIDELINES

II. HUETTER ROAD CORRIDOR STUDY PROCESS

Technology can help India leapfrog in Addressing Healthcare Challenges

Chapter II. Health Care System in India

Transcription:

1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly July - August 2017 Vol. 15 : No. 4 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-3 - Addition of Books - 4-5 - Reports - 6-10 Prepared by : Neeru Saini Librarian

2 Bridge Articles 1 Assessment of structural steel s properties in a railway plate girder bridge : (Structural Engineering International No. 3/2017). Building 1 Investigation of the collapse of a building in the final stage of its construction : (Structural Engineering International No. 3/2017). Bridge 1 Assessment of structural steel s properties in a Railway plate birder : (Structural Engineering International No.3/17). Concrete 1 Durability and serviceability performance of GFRP rebar s as concrete reinforcement : (The Indian concrete reinforcement). 2 Round rebin testing of durability parameters towards identification of suitable durability of suitable durability tests for concrete : (The Indian concrete reinforcement). General 1 Plastic s Gordian knot can humanity defeat its deadly addiction of plastic : (Down to Earth : 1-15, August 2017). 2 End of public healthcare India is rapidly privatizing hospitals and clinic in towns and villages : (Down to Earth : 1-15, August 2017). 3 Cleaning up Delhi what local authorities must keep in mind while enacting by laws for waste management : (Down to Earth 16-31,August 2017). Human Resource Management 1 Sexual harassment at workplace : (Human Capital : August 2017). 2 Way to work A win-win solution for the future : (Human Capital: August 2017). 3 The workplace of the Future : (Human Capital : July 2017). 4 Newer Dynamics in Acquisition : (Human Capital : July 2017).

3 5 Big Data : Not a mere buzzword : (Human Capital : July 2017). Metro 1 Metro projects boost railway industry (Urban Railways : August 2017). Smart City 1 Small teps governments recent measures for financing smart cities : (Indian Infrastructure : July 2017). Tunnel 1 Tunneling under vaitarna cum tansa scheme (Indian Concrete Journal : August 2017). Water 1 Membrane filtration in Water treatment.48 : (Water Today : July 2017). 2 Membrane technologies Increase the value of wastewater by recycling : 88 (Water Today : July 2017). 3 Innovative membrane technologies for boiler feed water 98 (Water Today : July 2017). 4 Control systems of wastewater treatment plant 46 : ( Water Today : August 2017).

4 BOOKS S. No. Acc. No. Title 1 20773 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 2 20774 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 3 20775 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 20813 World road statistics 2016 4 20814 Manual for procurement of goods 2017 5 20815 Central financial rule 2017 6 20816 World transport convention 2017 green and integrated development through 7 20817 Compendium of world transport convention. 2017 8 20822 IS : 1893 (Part-1) : 2016 Criteria of earthquake resistance design of structure 9 20823 IS : 1893 (Part-2) : 2016 Criteria of earthquake resistance design of structure 10 20824 IS : 1893 (Part-3) : 2016 Criteria of earthquake resistance design of structure 11 20825 IS : 1893 (Part-4) : 2016 Criteria of earthquake resistance design of structure 12 20826 IS : 16231 (Part-1) : 2016 Use of glass in building code 13 20827 IS : 16231(Part-2) : 2016 Use of glass in building code of energy and light 14 20828 IS : 16231 (Part-3) : 2016 Use of glass in building code of fire and loading. 15 20829 IS : 15388 : 2003 : Silica fume specification. 16 20830 IS : 15883 (Part-12) : 2016 Construction project management guidelines 17 20831 IS : 16231 (Part-4) : 2014 use of glass in buildings de of practice 18 20832 IS : 16416 2016 : Construction project management project formulation and appraisal..

5 19 20833 Delhi shops establishment act and rules along with allied labour laws 2016 20 20864 BS : 8002 : 2015 code of practice for earth retaining structures

6 Reports Sl. No. 1 2 3 4 5 6 7 8 Projects Name Acc. No. Title of the Report (Hard Copy) Soft Copy 20785 MPR No. 81 : May 2017 NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsar section from.. NH-89 (Ajmer) : Development and operation of Ajmer Nagpur section of NH-89. NH-47 (Chen.) : Independent consultancy services for 6/4 laning from Chengapalli Bihar (BSRDC) : Supervision consultancy of civil project of contract packages.. NH-15 (Bikaner Suratgarh) : Independent engineer services for development and operation of Bikaner-Suratgarh section of.. NH-28/31 (Tajpur) : Independence engineering series for the project of development of greenfield bridge across river ganga. NH-12/45 (MP) : Consultancy services for authority engineer for supervision of rehabilitation and up-gradation of Jabalpur to Hiran River.. NH-45-E (TK) : independent engineer services for two laning with paved shoulder of Dindiguk Theni,.. 20786 Monthly Inspection Report : No.73 : June 2017 20799 QPR No. 27 : June 2017 20796 MPR : June 2017 20838 QPR : June 2017 20780 Monthly Inspection Report : June 2017 20809 Quarterly Report : May 2017 20810 Monthly Inspection Report : May 2017 20781 MPR : SH. No. 81 : May 2017 20782 MPR : SH. No. 91 : May 2017 20783 MPR : SH. No. 90 : May 2017 20792 MPR : No. 46 : June 2017 20802 Monthly Inspection Report : May 2017 20804 MPR : No. 9 : June 2017 20778 QPR No. 22 : June 2017 20779 MPR No. 67 : June 2017 Year 9 NH-47 (KL-3) : Independent engineering services for design, construction, development finance operation and maintenance 20834 MPR : No. 69 : May 2017

7 10 11 12 of. MP (3189) : Construction of ADB Assisted seven highway corridors under. NH-565 : Rehabilitation and up gradation of NH 565 from km. 294. 000 to km 361.327.. MP (Rewa) : Madhya Pradesh Road Development Corporation LTD. Govt. of Madhya Pradesh : MPDRIISP - V : Projects : Package-3, Rewa (Length- 471. 40 km) 20787 MPR No. 27 : June 2017 20788 Monthly Report No. 31 : June 2017 20789 QPR No. 1 : June 2017 13 NH-41 (Bhimasar) : Consultancy services for project 20793 MPR : June 2017 management 14 NH-11/89 (SB):Independent engineer for Development and 20807 Monthly Inspection Report No. 20 : June operation of Sikar Bikaner of. 2017 15 NH-103 : (Bihar) : Two laning of Varuna Bridge.. 20784 MPR : May 2017 16 17 NH-152/65 : Project management consultancy services four laning of Kaithal of. NH-341 (Bhimasar) : Consultancy services for project management phase-1 including preparation of detailed project report for upgradation of junction with NH-41 Bhimasar- Anjar,Bhuk, Khavada-Dharmshala section of NH-341 20801 MPR : May 2017 20837 MPR No. 26 : June 2017 20843 FDPR : Vol. I : Main Report : June 2017 20844 FDPR : Vol. I (A) : Appendices to Main Report (Part-1 of 2) : June 2017 20845 FDPR : Vol. I (A) : Appendices to Main Report (Part-2 of 2) : June 2017 20846 FDPR : Vol. II : Design Report (Part- I : Road Features and Pavement Composition) : June 2017 20847 FDPR : Vol. II : Design Report (Part- II : Design of Bridges & Cross Drainage Structures) : June 2017 20848 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part 1 of 2) : June 2017 20849 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part 2 of 2) : June 2017 20850 FDPR : Vol. II : Design Report (Part- III : Traffic Survey and analysis Report ) : June

8 18 19 NH-88 (Shimla) : Consultancy services for preparation of feasibility and detailed project report for up gradation to 4 lane of Shimla Jharkhand (3276) :State Highways Authority of Jharkhand Second Jharkhand Road Project (Under ADB Loan No. 3276- IND) : Project Management Consultancy Services 2017 20851 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-1 of 5) : June 2017 20852 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-3 of 5) : June 2017 20853 FDPR : Vol. III : Material Report : June 2016 20854 FDPR : Vol. IV : Environmental Assessment Report Including Environmental Management Plan (EMP) & Resettlement Action Plan (RAP) : June 2017 20855 FDPR : Vol. V : Technical Specification : June 2017 20856 FDPR : Vol. VI : Rate Analysis : June 2017 20857 FDPR : Vol. VII : Cost Estimate : June 2017 20858 FDPR : Vol. VIII : Bill of Quantities : June 2017 20859 FDPR : Vol. XI : Project Clearance : June 2017 20860 FDPR : Vol. X : Civil Work Contract Agreement (EPC Mode) : June 2017 20861 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-2 of 5) : June 2017 20862 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-4 of 5) : June 2027 20863 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-5 of 5) : June 2027 20791 MPR : June 2017 20797 MPR : April 2017 20798 MPR : May 2017 20842 QPR : March 2017

9 20 21 22 Bangladesh (B.L) : Construction of Paira Bridge (Lebukhali Bridge) Over the River Paira : Consultancy services for design and construction Supervision of Paira Bridge (Lebukhali Bridge) over the River Paira on Barisal Patuakh Bangladesh (Paira Bridge) : MP : (Coastal Road) : Consultancy services for preparation of DPR for Development of economic corridors, inter corridors, feeder routes and coastal roads to improve the efficiency NH-58/72(Haridwar) : Independent engineering services for 4- laning of Haridwar-Dehradun section from Lm. 211.000 to km. 218.200 of NH-58 and km.165.000 to km. 196.825 of NH 20841 Midas output file : July 2017 20818 Drawing : June 2016 20819 Midas input file : July 2016 20820 Technical Report : August 2016 20821 Technical Report, liquid retaining tanks : June 2016 20776 Final Quality Assurance Plan : June 2017 20777 Final Inception Report : June 2017 20790 MPR : June 2017 20794 QPR : No. 25 : June 2017 20795 MPR : No. 75 : June 2017 20840 Report for site visit and safety assessment for seven... : July 2017 NH-10 (Haryana) : Independent Engineering Services for 4/6 20800 MPR : May 2017 23 Laning of Delhi/ Haryana Border to Rohtak Section on NH-10, in the State of Haryana, on BOT basis Under NHDP Phase-III 20839 MPR No. 109 : June 2017 MON (KFW) : training workshops under the open programme 20803 Project completion Report : Oct. 2016 24 of rehabilitation and spot improvements of regional transport infrastructure in selected provinces of Mongolia (KFW) DSZ NH-113: Rehabilitation and upgrading to 2 lanes /2 lane with 20805 Accident Analysis Report : July 2017 25 paved shoulders configuration and strengthening of pratapgarh- Padi section (Km.80.00 to km 180.00) of NH-113 in the state of Rajasthan under Phase-1 of NHIIP : NH-77(MS) : Independent Engineer Services for Two laning of 20806 MPR : May 2017 26 Muzaffarpur - Sonbarsa Section of NH-77 (km 208 to km 89.00) in the state of Bihar under NHDP III on Tanzania (TMM) : Road sector support project II (RSSP- II) 20808 Final Report : March 2017 27 Intercontinental Consultants and Technocrats (Pvt.) Ltd in Association with Inter consult (Pvt.) Ltd. Consultancy services for 28 Bharat Mala (Odisha) : Consultancy services for project 20811 Final Quality Assurance plan. : April 2017

10 29 Management including preparation of feasibility study/detailed project report of selected road stretched for NH conncectivity to backward areas/religious/tourist places (BRT) under Bharat Mala scheme for NH-54 (AS-21,22,23) : Laning of Maibang - Harangajao Section of NH - 54 from Km. 126+450 to 190+587 in the state of Assam Under East-West Corridor. Contract Package No. : AS-SC-1. And EW - II B 20812 Final inception report : April 2017 20835 MPR : 64 : June 2017 20836 QPR : June 2017

11

12

13