1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly July - August 2017 Vol. 15 : No. 4 Contents - Articles - Pages (Subject wise alphabetically indexed) - 2-3 - Addition of Books - 4-5 - Reports - 6-10 Prepared by : Neeru Saini Librarian
2 Bridge Articles 1 Assessment of structural steel s properties in a railway plate girder bridge : (Structural Engineering International No. 3/2017). Building 1 Investigation of the collapse of a building in the final stage of its construction : (Structural Engineering International No. 3/2017). Bridge 1 Assessment of structural steel s properties in a Railway plate birder : (Structural Engineering International No.3/17). Concrete 1 Durability and serviceability performance of GFRP rebar s as concrete reinforcement : (The Indian concrete reinforcement). 2 Round rebin testing of durability parameters towards identification of suitable durability of suitable durability tests for concrete : (The Indian concrete reinforcement). General 1 Plastic s Gordian knot can humanity defeat its deadly addiction of plastic : (Down to Earth : 1-15, August 2017). 2 End of public healthcare India is rapidly privatizing hospitals and clinic in towns and villages : (Down to Earth : 1-15, August 2017). 3 Cleaning up Delhi what local authorities must keep in mind while enacting by laws for waste management : (Down to Earth 16-31,August 2017). Human Resource Management 1 Sexual harassment at workplace : (Human Capital : August 2017). 2 Way to work A win-win solution for the future : (Human Capital: August 2017). 3 The workplace of the Future : (Human Capital : July 2017). 4 Newer Dynamics in Acquisition : (Human Capital : July 2017).
3 5 Big Data : Not a mere buzzword : (Human Capital : July 2017). Metro 1 Metro projects boost railway industry (Urban Railways : August 2017). Smart City 1 Small teps governments recent measures for financing smart cities : (Indian Infrastructure : July 2017). Tunnel 1 Tunneling under vaitarna cum tansa scheme (Indian Concrete Journal : August 2017). Water 1 Membrane filtration in Water treatment.48 : (Water Today : July 2017). 2 Membrane technologies Increase the value of wastewater by recycling : 88 (Water Today : July 2017). 3 Innovative membrane technologies for boiler feed water 98 (Water Today : July 2017). 4 Control systems of wastewater treatment plant 46 : ( Water Today : August 2017).
4 BOOKS S. No. Acc. No. Title 1 20773 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 2 20774 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 3 20775 IRC : 6 : 2017- Standard specification and code of practice for road bridges. 20813 World road statistics 2016 4 20814 Manual for procurement of goods 2017 5 20815 Central financial rule 2017 6 20816 World transport convention 2017 green and integrated development through 7 20817 Compendium of world transport convention. 2017 8 20822 IS : 1893 (Part-1) : 2016 Criteria of earthquake resistance design of structure 9 20823 IS : 1893 (Part-2) : 2016 Criteria of earthquake resistance design of structure 10 20824 IS : 1893 (Part-3) : 2016 Criteria of earthquake resistance design of structure 11 20825 IS : 1893 (Part-4) : 2016 Criteria of earthquake resistance design of structure 12 20826 IS : 16231 (Part-1) : 2016 Use of glass in building code 13 20827 IS : 16231(Part-2) : 2016 Use of glass in building code of energy and light 14 20828 IS : 16231 (Part-3) : 2016 Use of glass in building code of fire and loading. 15 20829 IS : 15388 : 2003 : Silica fume specification. 16 20830 IS : 15883 (Part-12) : 2016 Construction project management guidelines 17 20831 IS : 16231 (Part-4) : 2014 use of glass in buildings de of practice 18 20832 IS : 16416 2016 : Construction project management project formulation and appraisal..
5 19 20833 Delhi shops establishment act and rules along with allied labour laws 2016 20 20864 BS : 8002 : 2015 code of practice for earth retaining structures
6 Reports Sl. No. 1 2 3 4 5 6 7 8 Projects Name Acc. No. Title of the Report (Hard Copy) Soft Copy 20785 MPR No. 81 : May 2017 NH-15 (PA) : Independent engineer for 4 laning of Pathankot - Amritsar section from.. NH-89 (Ajmer) : Development and operation of Ajmer Nagpur section of NH-89. NH-47 (Chen.) : Independent consultancy services for 6/4 laning from Chengapalli Bihar (BSRDC) : Supervision consultancy of civil project of contract packages.. NH-15 (Bikaner Suratgarh) : Independent engineer services for development and operation of Bikaner-Suratgarh section of.. NH-28/31 (Tajpur) : Independence engineering series for the project of development of greenfield bridge across river ganga. NH-12/45 (MP) : Consultancy services for authority engineer for supervision of rehabilitation and up-gradation of Jabalpur to Hiran River.. NH-45-E (TK) : independent engineer services for two laning with paved shoulder of Dindiguk Theni,.. 20786 Monthly Inspection Report : No.73 : June 2017 20799 QPR No. 27 : June 2017 20796 MPR : June 2017 20838 QPR : June 2017 20780 Monthly Inspection Report : June 2017 20809 Quarterly Report : May 2017 20810 Monthly Inspection Report : May 2017 20781 MPR : SH. No. 81 : May 2017 20782 MPR : SH. No. 91 : May 2017 20783 MPR : SH. No. 90 : May 2017 20792 MPR : No. 46 : June 2017 20802 Monthly Inspection Report : May 2017 20804 MPR : No. 9 : June 2017 20778 QPR No. 22 : June 2017 20779 MPR No. 67 : June 2017 Year 9 NH-47 (KL-3) : Independent engineering services for design, construction, development finance operation and maintenance 20834 MPR : No. 69 : May 2017
7 10 11 12 of. MP (3189) : Construction of ADB Assisted seven highway corridors under. NH-565 : Rehabilitation and up gradation of NH 565 from km. 294. 000 to km 361.327.. MP (Rewa) : Madhya Pradesh Road Development Corporation LTD. Govt. of Madhya Pradesh : MPDRIISP - V : Projects : Package-3, Rewa (Length- 471. 40 km) 20787 MPR No. 27 : June 2017 20788 Monthly Report No. 31 : June 2017 20789 QPR No. 1 : June 2017 13 NH-41 (Bhimasar) : Consultancy services for project 20793 MPR : June 2017 management 14 NH-11/89 (SB):Independent engineer for Development and 20807 Monthly Inspection Report No. 20 : June operation of Sikar Bikaner of. 2017 15 NH-103 : (Bihar) : Two laning of Varuna Bridge.. 20784 MPR : May 2017 16 17 NH-152/65 : Project management consultancy services four laning of Kaithal of. NH-341 (Bhimasar) : Consultancy services for project management phase-1 including preparation of detailed project report for upgradation of junction with NH-41 Bhimasar- Anjar,Bhuk, Khavada-Dharmshala section of NH-341 20801 MPR : May 2017 20837 MPR No. 26 : June 2017 20843 FDPR : Vol. I : Main Report : June 2017 20844 FDPR : Vol. I (A) : Appendices to Main Report (Part-1 of 2) : June 2017 20845 FDPR : Vol. I (A) : Appendices to Main Report (Part-2 of 2) : June 2017 20846 FDPR : Vol. II : Design Report (Part- I : Road Features and Pavement Composition) : June 2017 20847 FDPR : Vol. II : Design Report (Part- II : Design of Bridges & Cross Drainage Structures) : June 2017 20848 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part 1 of 2) : June 2017 20849 FDPR : Vol. II(B) : Geotechnical Investigation Report (Part 2 of 2) : June 2017 20850 FDPR : Vol. II : Design Report (Part- III : Traffic Survey and analysis Report ) : June
8 18 19 NH-88 (Shimla) : Consultancy services for preparation of feasibility and detailed project report for up gradation to 4 lane of Shimla Jharkhand (3276) :State Highways Authority of Jharkhand Second Jharkhand Road Project (Under ADB Loan No. 3276- IND) : Project Management Consultancy Services 2017 20851 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-1 of 5) : June 2017 20852 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-3 of 5) : June 2017 20853 FDPR : Vol. III : Material Report : June 2016 20854 FDPR : Vol. IV : Environmental Assessment Report Including Environmental Management Plan (EMP) & Resettlement Action Plan (RAP) : June 2017 20855 FDPR : Vol. V : Technical Specification : June 2017 20856 FDPR : Vol. VI : Rate Analysis : June 2017 20857 FDPR : Vol. VII : Cost Estimate : June 2017 20858 FDPR : Vol. VIII : Bill of Quantities : June 2017 20859 FDPR : Vol. XI : Project Clearance : June 2017 20860 FDPR : Vol. X : Civil Work Contract Agreement (EPC Mode) : June 2017 20861 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-2 of 5) : June 2017 20862 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-4 of 5) : June 2027 20863 FDPR : Vol. II(A) : Bridige Design Calculation : ( Part-5 of 5) : June 2027 20791 MPR : June 2017 20797 MPR : April 2017 20798 MPR : May 2017 20842 QPR : March 2017
9 20 21 22 Bangladesh (B.L) : Construction of Paira Bridge (Lebukhali Bridge) Over the River Paira : Consultancy services for design and construction Supervision of Paira Bridge (Lebukhali Bridge) over the River Paira on Barisal Patuakh Bangladesh (Paira Bridge) : MP : (Coastal Road) : Consultancy services for preparation of DPR for Development of economic corridors, inter corridors, feeder routes and coastal roads to improve the efficiency NH-58/72(Haridwar) : Independent engineering services for 4- laning of Haridwar-Dehradun section from Lm. 211.000 to km. 218.200 of NH-58 and km.165.000 to km. 196.825 of NH 20841 Midas output file : July 2017 20818 Drawing : June 2016 20819 Midas input file : July 2016 20820 Technical Report : August 2016 20821 Technical Report, liquid retaining tanks : June 2016 20776 Final Quality Assurance Plan : June 2017 20777 Final Inception Report : June 2017 20790 MPR : June 2017 20794 QPR : No. 25 : June 2017 20795 MPR : No. 75 : June 2017 20840 Report for site visit and safety assessment for seven... : July 2017 NH-10 (Haryana) : Independent Engineering Services for 4/6 20800 MPR : May 2017 23 Laning of Delhi/ Haryana Border to Rohtak Section on NH-10, in the State of Haryana, on BOT basis Under NHDP Phase-III 20839 MPR No. 109 : June 2017 MON (KFW) : training workshops under the open programme 20803 Project completion Report : Oct. 2016 24 of rehabilitation and spot improvements of regional transport infrastructure in selected provinces of Mongolia (KFW) DSZ NH-113: Rehabilitation and upgrading to 2 lanes /2 lane with 20805 Accident Analysis Report : July 2017 25 paved shoulders configuration and strengthening of pratapgarh- Padi section (Km.80.00 to km 180.00) of NH-113 in the state of Rajasthan under Phase-1 of NHIIP : NH-77(MS) : Independent Engineer Services for Two laning of 20806 MPR : May 2017 26 Muzaffarpur - Sonbarsa Section of NH-77 (km 208 to km 89.00) in the state of Bihar under NHDP III on Tanzania (TMM) : Road sector support project II (RSSP- II) 20808 Final Report : March 2017 27 Intercontinental Consultants and Technocrats (Pvt.) Ltd in Association with Inter consult (Pvt.) Ltd. Consultancy services for 28 Bharat Mala (Odisha) : Consultancy services for project 20811 Final Quality Assurance plan. : April 2017
10 29 Management including preparation of feasibility study/detailed project report of selected road stretched for NH conncectivity to backward areas/religious/tourist places (BRT) under Bharat Mala scheme for NH-54 (AS-21,22,23) : Laning of Maibang - Harangajao Section of NH - 54 from Km. 126+450 to 190+587 in the state of Assam Under East-West Corridor. Contract Package No. : AS-SC-1. And EW - II B 20812 Final inception report : April 2017 20835 MPR : 64 : June 2017 20836 QPR : June 2017
11
12
13