The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee

Similar documents
DEVELOPMENT AND INFRASTRUCTURE DIVISION Planning and Building Department. Chair and Members of the Community Development Committee

Northline Solar Project

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Provincial Niagara to GTA Corridor Study Community Meeting

Norfolk County Agricultural Advisory Board Meeting Minutes

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL)

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

1136 Dupont Street - Zoning Amendment Application - Preliminary Report

Private Gas Well Policy and Incentive Program

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

The Town of Caledon s Review Process of Niagara Escarpment Development Permit Applications

Administrative Report. Office of the Director of Infrastructure Services

COMMUNITY FEEDBACK REPORT ST MARYS PUBLIC INFORMATION CENTRE 27 JUNE 2012

Bill Waste Free Ontario Act AMO Waste Diversion Portal for Municipal Staff and Elected Officials

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths Preliminary Report. Planning and Growth Management Committee

ABORIGINAL CONSULTATION PLAN FOR THE NANTICOKE SOLAR PROJECT

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report. Planning and Growth Management Committee

1 SMART COMMUTE INITIATIVE - TRANSITION TO THE GREATER TORONTO TRANSPORTATION AUTHORITY (METROLINX)

Guidelines. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) Ontario.

Metro West Inter-Municipal Business Licence Pilot Program

Y CARRIED I LOST TOWN OF CALEDON. Project Update and Proposed Revisions to the Work Program be received

AWMEC. Alberta Water Management and Erosion Control Program. Introduction. Who May Apply? Grant Assistance

Municipal Stream. Community Transportation Grant Program. Application Guidelines and Requirements Issued: December 2017

INVENERGY LLC Meeting Summary Report Northline Solar Project

THE CORPORATION OF THE CITY OF ST. CATHARINES

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Council History March 6, 2007 Council approved amendments to the Municipal Development Plan Bylaw

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

Brownfield Redevelopment Grant Program

Finance. Date to Committee: March 26, 2013 Date to Council: April 8, 2013

Corporate Report. That Council endorse the signing of the Memorandum of Understanding; and

REDO RURAL ECONOMIC DEVELOPMENT OPPORTUNITIES FUND A SMALL TOWNS VICTORIA PROGRAM INITIATIVE

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

TRCA Administrative Fee Schedule for ENVIRONMENTAL ASSESSMENT and INFRASTRUCTURE PERMITTING SERVICES February 1, 2018

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

Community Transportation Pilot Grant Program Application Guidelines and Requirements

APPLICATION INSTRUCTIONS FOR EARTHWORK BOARD PERMIT

Synopsis of Revised Changes to DCA s Rules for Developments of Regional Impact

CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 CITY MANAGER ART ZUIDEMA PERFORMING ARTS CENTRE STUDIES

City of Guelph. Site Plan User Guide. Version 1

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

555 Dupont Street - Rezoning - Preliminary Report

EX14.2 STAFF REPORT ACTION REQUIRED. Update on Paid Duty Activities SUMMARY. Date: April 4, Executive Committee. To: City Manager.

Land Ambulance Service Certification Standards

ESTIMATES OF THE PROGRAM EXPENDITURE AND REVENUE OF THE CONSOLIDATED REVENUE FUND

Request for Proposal Date: November 10 th, 2015 Traffic Calming Guide Deadline: Monday, December 7 th, 2015 at 13:00 E.T.

Downtown Shoulder Area Community Improvement Plan. Investing in our Community

Public Participation Report

Local Health Integration Network Authorities under the Local Health System Integration Act, 2006

Comprehensive Plan 2009

Use of External Consultants

Currant Lake Telecommunication Tower

BOARD OF HEALTH REPORT :30 p.m. Thursday, February 18, 2016 Council Chambers Hamilton City Hall

Request for Proposals

Social Housing Renovation and Retrofit Program (SHRRP) Canada-Ontario Affordable Housing Program (AHP) 2009 Extension. Guidelines Summary

Waterloo Wellington Local Health Integration Network. Board of Directors MINUTES. Thursday, May 22, 2008

Community Engagement Plan

Municipal Interests in Liquor Licensing

Proposed National Forensic Mental Health Service Hospital

Corporation of the County of Grey Committee Report

The Corporation of the Town of Cobourg

4.07. Infrastructure Stimulus Spending. Chapter 4 Section. Background. Follow-up to VFM Section 3.07, 2010 Annual Report. Ministry of Infrastructure

CITY CLERK. Non-Objection Letter for Alcohol and Gaming Commission (Eglinton-Lawrence - Ward 16 and St. Paul's - Ward 22)

E m e rgency Health S e r v i c e s Syste m M o d e r n i zation

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.

Your Privacy. Ontario s Information and Privacy Commissioner.

MINISTRY OF ECONOMIC DEVELOPMENT, EMPLOYMENT AND INFRASTRUCTURE BUILDING ONTARIO UP DISCUSSION GUIDE FOR MOVING ONTARIO FORWARD OUTSIDE THE GTHA

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 865

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8

Mayor Strathdee and Members of Council. Grant Brouwer, Director of Building and Development

Guidelines for Proposed Donations of Public Art and Monuments to the City of Toronto

Creation of a New Property Tax Class for Creative Co- Location Facilities

Minister's Expert Panel Report on Public Health in an Integrated Health System

(unofficial translation)

Bursary Guidelines for Conferences

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Cranberry Industry Development Program 2016/17

MOBILE FOOD UNIT FOOD CART (TYPE I)

MUSKOKA AND AREA HEALTH SYSTEM TRANSFORMATION COUNCIL TERMS OF REFERENCE

INVENERGY LLC Meeting Summary Report Severn Sun Solar Project

DECISION OF THE CAPE COD COMMISSION

STATE ROAD FUNDS TO LOCAL GOVERNMENT AGREEMENT 2011/ /16

microfit FAQ Version 4.1

Manager s report on submissions received in respect of the Draft Navan Local Area Plan

HALDIMAND RURAL WATER QUALITY PROGRAM OVERVIEW

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

DEPARTMENT OF TRANSPORTATION POLICY FOR INDUSTRIAL PARK, AGRI-BUSINESS ACCESS, AND COMMUNITY ACCESS GRANT PROGRAMS

407 East Environmental Assessment (EA) Development/Land-use Application Guidelines

Application for vehicle crossing permit

NOTICE OF PUBLIC HEARING March 27, PROPOSED AMENDMENT TO LIQUOR LICENCE FOR Russell Avenue (LL ) White Rock Beach Beer Company

Agenda Item 6.7. Future PROGRAM. Proposed QA Program Models

Aboriginal Community Capital Grants Program Guide

LAND PARTNERSHIPS GRANT PROGRAM. PROGRAM GUIDELINES April 2018

TOWN OF REHOBOTH COMMUNITY PRESERVATION COMMITTEE

Ontario Indigenous Travel Grant

KEA AU (HIGHWAY 130) IMPROVEMENTS. Project No. STP-0130 (27) Public Informational Meeting Kea au au Community Center April 17, 2008

Transcription:

Approved - Planning and Public Works - May 06, 2009 Adopted - Regional Council - May 13, 2009 The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee Mark G. Meneray, Commissioner of Legislative and Planning Services and Corporate Counsel Date: April 16, 2009 Report No. - Re: LPS47-09 - Update on the St. Marys Cement Inc. (Canada) Flamborough Quarry Proposal (City of Hamilton) RECOMMENDATION 1. THAT the Regional Chair write a letter to the Minister of Natural Resources and St. Marys Cement Inc. (Canada) advising that Halton Regional Council objects to the application for a licence under the Aggregate Resources Act (ARA) for the proposed St. Marys Cement Inc. (Canada) Flamborough quarry for the reasons set out in Report No. LPS47-09. 2. THAT the City of Hamilton be advised that the Region objects to the application for a licence under the Aggregate Resources Act (ARA) for the proposed St. Marys Cement Inc. Canada) Flamborough quarry and that Report LPS47-09 be forwarded to the City. 3. THAT Regional Council support the use of the peer-review consultants hired by the City of Hamilton Combined Aggregate Review Team (CART) to assist the Region on matters related to hydrogeology, the natural environment, noise, vibration, and dust. 4. THAT the Regional Clerk forward a copy of Report No. LPS47-09 to the members of the Combined Agency Review Team (CART), Ministry of Natural Resources, and the applicant - St. Marys Cement Inc. (Canada). REPORT Purpose Report LPS47-09 is intended to firstly, bring Regional Council up-to-date on the various Planning Act and Aggregate Resources Act (ARA) applications as submitted by St. Marys Cement Inc. (Canada) and secondly to seek Regional Council s support to advise the Ministry of Natural Resources of Halton Region s objection to the recently submitted Aggregate Resources Act (ARA) application. Regional Council should also be aware that through the recently initiated ARA application process, St. Marys has engaged the formal notification process, which includes a limited (45-day) 1

opportunity to provide comments to the Ministry of Natural Resources (MNR) on the proposed quarry application and to include along with those comments other supporting documentation. Background St. Marys Cement Inc. (Canada) is proposing a dolostone quarry on approximately 154 hectares (390 acres) of land on Lots 1, 2 & 3, Concession XI, City of Hamilton (formerly Township of East Flamborough) ( Attachment #1: Location Map). The quarry, referred to as the St. Marys Cement (Canada) Inc. Flamborough Quarry, is proposed to produce approximately three million tonnes of dolostone a year for the next 25 to 30 years. The properties on which these applications have been submitted are located on the west side of Milburough (Town) Line just north of Concession 11 E and immediately west of the Town of Milton and the Halton Region boundary within the City of Hamilton. Through the City of Hamilton s preconsultation process, the City of Hamilton advised the proponent that amendments to the former Township of Flamborough Official Plan and Zoning Bylaw and the approval of a Class A Licence under the Aggregate Resources Act (ARA) would be required prior to commencing operations at the proposed quarry. On September 28, 2004, St. Marys applied to the City of Hamilton for an Official Plan Amendment to redesignate the subject property from a Rural to an Extractive Industrial designation and to change the zoning on the subject lands from an A Agricultural and a CM Conservation Management zone to an EI Extractive Industrial zone. In October 2008, a supplementary Official Plan and Zoning By-Law Amendment application was submitted by St. Marys for a 10 acre parcel of land which abuts the main property (1869 Milburough Line). The primary purpose of this additional application is to facilitate an access to the proposed quarry onto Milburough Line north of the intersection of Milburough Line and Concession 11. The Planning Act applications referenced above and their supporting documentation have been under review by Halton Region (Report PPW53-07, PPW132-07, PPW155-07, PPW94-08, and PPW96-08) through our continued involvement in the Combined Aggregate Review Team process as initiated by the City of Hamilton in early 2005. Participants in the CART process include Halton Region, City of Hamilton, City of Burlington, Town of Milton, Ministry of the Environment, Niagara Escarpment Commission, and Conservation Halton. To date, Halton Region has identified significant concerns with the proposal for a quarry in this location. Specifically, the Region has noted that there is the potential for serious impacts to the surface and groundwater resources, the natural environment, transportation infrastructure and existing traffic patterns and from the excessive noise, vibration and dust that would emanate from the proposed quarry. It is anticipated that the review of this quarry proposal including the review of the Aggregate Resource Act (ARA) application, may last for several years. There is still a significant amount of work that needs to be completed by the proponent before the Region would be able to offer an opinion on the suitability of the subject lands for a below the water table quarry. Further study of the hydrogeology, transportation systems (haul-route), air quality, noise and the natural environment still needs to be completed, all of which have significant Regional implications. 2

Recent Events This section of the report is structured as follows: update on the Haul Route Study, update on the Temporary Permit to Take Water, the submission of an Aggregate Resources Act Application, and the recommended position of the Region at this point in time on this application. Update on the Haul Route Study Regional staff and the other CART members have been reviewing St. Marys initial haul route assessment for some time now. St. Marys had previously identified through their draft submission to CART in early 2008, that their preferred haul route is the one traveling through Halton Region and through the Town of Milton to the 401 at the north end of Campbellville. This route consists of an access from the proposed quarry onto Milburough Line; trucks will then travel north along Milburough Line to Campbellville Road, east along Campbellville Road to Twiss Road, north on Twiss Road to Reid Side Road, east along Reid Side Road to the Hwy 401 eastbound access which is just west of the Guelph Line. St. Marys has not identified a haul route that would utilize Regional Roads up to this point in time. Staff at both the Region and the Town of Milton have consistently provided feedback at CART meetings and to the proponent. This feedback was in regards to concerns about the speed at which the haul route study had been moving in the absence of an appropriate amount of time for CART to complete its review of the materials submitted and also in advance of the other components of our review including, but not limited to the Hydrogeological Assessment and the Environmental Impact Assessments. To date, staff at both the Region and the Town of Milton have not received an appropriate level of justification that would demonstrate that St. Marys selection of a preferred haul route through Milton is preferable to the other alternative routes. The materials prepared to date have not been completed in a manner that consider the social, cultural and environmental impacts of the road improvements, and resultant truck traffic to the areas that would be impacted by a truck haul route. Furthermore, the methodology used in the selection of a preferred haul route was in staff s opinion inappropriate, lacked transparency and did not reflect the impacts that the haul route would have to the natural environment, community features and existing transportation systems. While Regional and Town staff will review all the materials that are submitted by St. Marys in support of the ARA Licence application, St. Marys has identified that the Haul Route Evaluation is still not complete. Within the Summary Statement submitted in support of the ARA Licence application, all of the potential haul routes are shown and the identification of a preferred haul has not been provided. It is however believed that the preferred haul routes will encompass some or all of the roadways both to the east and west of the subject property. Given that St. Marys is projecting that 75% of the crushed stone that is proposed to be extracted from the quarry is destined for the GTA and the City of Toronto, it is reasonable to conclude that the truck operators will want the shortest route to the delivery target in order to save money on fuel and time. That would result in a significant number of trips (over 500 each way/day) through Halton Region. In accordance with Council s direction in Report PPW94-08, staff will continue to work with the Town of Milton to assess the impacts of a haul route through the Town of Milton. Staff will 3

utilize current operating budget funding to jointly fund a peer review of the information provided by the proponent. Update on the Ministry of the Environment Temporary Permit To Take Water Since early 2005, Regional staff have been working with CART to establish the Terms of Reference for a Hydrological Assessment and to review the background materials submitted by St. Marys as part of their assessment of the hydrogeology of the area. The work plan for the hydrogeological assessment, as prepared by Gartner Lee Limited (dated March 2008), has been reviewed by CART, CART s peer review consultants (Jagger Hims Ltd.) and Regional staff. This work plan had not received final endorsement from CART, the City of Hamilton or Halton Region as of the date of submission of the ARA application. The objective of the discussions on the proposed work plan was to have a common understanding of the expectations of the required hydrogeological submission and to establish a basis for the technical review of this submission. Throughout 2008, St. Marys continued to collect background data related to the hydrogeological conditions in the area and on July 8, 2008, they secured a Temporary Permit to Take Water from the Ministry of the Environment. This permit is required by St. Marys in order to further characterize the hydrogeological conditions on site and test the feasibility of the proposed groundwater recirculation system. In late July 2008, St. Marys initiated Phase 2 of their pump testing and during the test there was a heavy rain event, which in the opinion of some experts, tainted the results of the tests. In October 2008, the Ministry of the Environment advised St. Marys that the results of the test were not being accepted and that the tests would need to be re-done. St. Marys responded back to the Ministry advising them that they are confident that their tests were completed in an appropriate manner and in accordance with established procedures. The Ministry then advised St. Marys in their October 2008 letter that St. Marys has until the permit expires in June 30, 2009 to complete the tests required through the Temporary Permit To Take Water. In March 2009, the Ministry wrote St. Marys another letter advising them that the Ministry was going to revoke their permit by March 20, 2009, if they had not completed the required retesting. St. Marys has since asked the Ministry to not revoke the permit and has requested that dialogue be initiated to see what options are available to St. Marys. The Ministry has agreed to have initial dialogue and has not revoked the permit at the time of writing this report. Staff will continue to monitor this situation and advise Council of how this matter is resolved. Submission of an Aggregate Resource Act (ARA) Application On March 3, 2009, the Ministry of Natural Resources deemed the St. Mary s Aggregate Resources Act (ARA) application complete. The MNR has reviewed the application and supporting documents in accordance with Provincial Standards for an application under the ARA and has found that all the required information has been submitted in accordance with provincial requirements. As a result, St. Marys has received the Province s permission to engage the 45-day notification period as identified in the ARA (Attachment #2). As part of the formal ARA notification process, St. Marys is required to provide written notification to all landowners within 120 metres of the proposed quarry, post sign(s) on the road frontage of the proposed quarry site, 4

and circulate the complete application package to public agencies prior to posting the required notice in a local newspaper. Once the required notice has been given, the MNR deems that the 45- day notification period has commenced. In the case of the St. Marys application, this was completed on April 3, 2009, and the 45 th day falls on May 21, 2009. During the 45-day notification period identified in the ARA, a public information session must be hosted by the applicant. St. Marys and its technical consultants will host this session on April 27, 2009, from 4:00 p.m. to 9:00 p.m., at the Waterdown Legion Hall located at 79 Hamilton Street North, Waterdown, Ontario. Also during the 45-day notification period, any person or public agency may provide the applicant and District Manager of the Ministry of Natural Resources with written notice of reasons for the objection to the issuance of the aggregate licence. After the 45-day notification period has passed, the MNR deems that there are no further objections to the ARA application. Regional staff will post information relating to the 45-day notification period on our website so that members of the community are informed on the nature of and importance of providing their thoughts on this proposal in writing to the MNR. Attachment #3 contains a description of the process under the Aggregate Resources Act, which is particularly important for objectors to understand, as there are key milestones that must be met. Staff will with the support of Council, lodge an objection on the basis that it is pre-mature to deal with ARA matters while technical information and planning matters remain outstanding. It is also important to note that a licence under the Aggregate Resources Act (ARA) can only be issued if the appropriate zoning is in place on the lands on which the quarry is proposed. Prior to the Hamilton City Council considering a zoning by-law amendment on the proposed quarry site, the City of Hamilton Official Plan (former Township of Flamborough) must be amended. Outstanding Work To date CART has met on a some what regular basis to discuss many aspects of the technical information submitted to date by St. Marys. The study areas where the majority of the discussion has taken place to date is on the haul route study and the hydrogeological assessment. CART members have advised St. Marys on several occasions that there are significant concerns with the way in which the haul route study had been completed. Furthermore, the study process and submissions to date including the methodology used in the selection of a preferred haul route were in staff s opinion inappropriate, lacked transparency and did not reflect the impacts that the haul route would have to the natural environment, community features and existing transportation systems. St. Marys has also identified in their ARA submission that the haul route study and all other materials associated with transportation has not been finalized. Once these studies are completed, they will be provided to the agencies for review. For some time, CART members including the Town of Milton and the Region of Halton have voiced concerns with the lack of materials being provided to CART for review and a lack of progress made towards an agreement on the completion of the appropriate background studies for hydrogeology and the natural environment. Until March 2009 and the submission of the ARA application, CART members and St. Marys Cement had not agreed on the methodology and 5

structure of the Hydrogeological Study or Assessment, CART had not received an updated Environmental Impact Assessment or an assessment of the impacts that air quality, noise, dust or blasting would have on the adjacent community and natural environment. Until such time as the Region and other CART members have reviewed all of the appropriate studies including but not limited to an Air Quality Assessment, Hydrogeological Assessment, and Environmental Impact Assessment, a Transportation Impact Assessment, a Noise, Vibration and Dust Assessment, staff is not in a position to recommend support or refusal on the proposed quarry. As such, staff are of the opinion that ARA Licence application and the two Official Plan and Zoning By-law Amendment applications as submitted by St. Marys Cement Inc. (Canada) are premature. While some areas of study have been discussed in some detail with St. Marys (example is the Haul Route Study), most have not. Several key areas of study still require detailed examination by CART members and their consultants. It is also possible that during this detailed review, additional concerns may be identified and further studies may be deemed necessary. CART members will work cooperatively and with their peer-review consultants to assess the comprehensiveness of the technical reports and will continue to evaluate the technical feasibility of the St. Marys proposal. CART has also retained third party consultants to peer review the reports submitted by St. Marys. Staff recommend that the Region utilize the peer review reports in our review of the applications (hydrogeology (Jagger Hims Limited); natural environment (Dougan and Associates); transportation (IBI Group) and noise, vibration and dust (Valcoustics Canada Limited). Along with continuing to participate in the CART process, staff recommends that the Region lodge an (prematurity) objection to the ARA application during the limited ARA public notification period. Staff will continue to update Council on a regular basis regarding the status of this application as new information becomes available. FINANCIAL/PROGRAM IMPLICATIONS Review of the St Marys quarry proposal continues to, for the most part, be covered using existing staff resources as well as the peer review consultants secured by the City of Hamilton for the Combined Aggregate Review Team (CART) which are paid for by St. Marys Cement Inc. (Canada). Staff are also recommending through this report that the Region rely on the professional opinions of the peer-review consultants hired by the City of Hamilton Combined Aggregate Review Team (CART) to provide advice to the Region on matters related to hydrogeology, the natural environment, noise, vibration and dust. As the fees for these consultants are currently paid for by the City of Hamilton through reimbursement by St. Marys, there is no cost to the Region. 6

RELATIONSHIP TO THE STRATEGIC PLAN This report has a direct relationship to the 2009 Planning and Public Works Committee Plan Theme 2: Protect and Enhance of our Natural Environment. Respectfully submitted, Ron Glenn Director, Planning Services and Chief Planning Official Mark G. Meneray Commissioner of Legislative & Planning Services and Corporate Counsel Approved by Pat Moyle Chief Administrative Officer If you have any questions on the content of this report, please contact: Ron Glenn Tel. # 7966 Haiqing Xu Tel. # 7208 Stirling Todd Tel. # 7186 7