Report on DoD-Funded Service Contracts in Forward Areas

Similar documents
GAO CONTINGENCY CONTRACTING. DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan. Report to Congressional Committees

Future of Logistics Civil Augmentation Program

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN USCENTCOM AOR, IRAQ, AND AFGHANISTAN

CONTRACTING IN IRAQ AND AFGHANISTAN AND PRIVATE SECURITY CONTRACTS IN IRAQ AND AFGHANISTAN

GAO CONTINGENCY CONTRACTING. DOD, State, and USAID Continue to Face Challenges in Tracking Contractor Personnel and Contracts in Iraq and Afghanistan

Department of Defense Contractor and Troop Levels in Iraq and Afghanistan:

June 25, Honorable Kent Conrad Ranking Member Committee on the Budget United States Senate Washington, DC

Analysis of VA Health Care Utilization Among US Global War on Terrorism (GWOT) Veterans

National Guard Personnel and Deployments: Fact Sheet

GAO IRAQ AND AFGHANISTAN. DOD, State, and USAID Face Continued Challenges in Tracking Contracts, Assistance Instruments, and Associated Personnel

Department of Defense Contractor and Troop Levels in Iraq and Afghanistan:

Department of Defense Contractor and Troop Levels in Iraq and Afghanistan:

GAO IRAQ AND AFGHANISTAN. State and DOD Should Ensure Interagency Acquisitions Are Effectively Managed and Comply with Fiscal Law

February 1, The analysis depends critically on three key factors:

GAO MILITARY OPERATIONS

Analysis of VA Health Care Utilization among Operation Enduring Freedom (OEF), Operation Iraqi Freedom (OIF), and Operation New Dawn (OND) Veterans

Department of Defense Contractors in Iraq and Afghanistan: Background and Analysis

Department of Defense Contractors in Iraq and Afghanistan: Background and Analysis

GAO MILITARY OPERATIONS. DOD s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight. Report to Congressional Requesters

The Cost of Iraq, Afghanistan, and Other Global War on Terror Operations Since 9/11

DEPARTMENT OF THE AIR FORCE

National Guard Personnel and Deployments: Fact Sheet

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

Department of Defense Contractors in Iraq and Afghanistan: Background and Analysis

The Cost of Iraq, Afghanistan, and Other Global War on Terror Operations Since 9/11

IT S ALL IN THE NUMBERS. The major US Wars: a look-see at the cost in American lives and dollars. Anne Stemmerman Westwood Middle School

2004 DoD Procurement Conference

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

Report to Congress on Distribution of Department of Defense Depot Maintenance Workloads for Fiscal Years 2015 through 2017

Defense Health Program Operation and Maintenance Fiscal Year (FY) 2010 Budget Estimates Information Management

DEPARTMENT OF DEFENSE FY 2009 OVERSEAS CONTINGENCY OPERATION SUPPLEMENTAL REQUEST FOR

Fiscal Year 2011 Annual Joint Report on Contracting in Iraq and Afghanistan

Current Budget Issues

ADUSD Program Support Contract Support in Contingency Operations

THE ASSISTANT SECRETARY OF DEFENSE 1200DEFENSEPENTAGON WASHINGTON, DC

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. Trends in Spending by the Department of Defense for Operation and Maintenance

MEDIA CONTACTS. Mailing Address: Phone:

Contractors on the Battlefield. 27 February 2007

DFARS Procedures, Guidance, and Information

24JFC U. July August 2015 Army Sustainment

NONCOMPETITIVE FEDERAL CONTRACTS INCREASE UNDER THE BUSH ADMINISTRATION

Advance Planning Briefing for Industry

Operational Contract Support: Learning from the Past and Preparing for the Future

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE

December 18, Congressional Committees. Subject: Overseas Contingency Operations: Funding and Cost Reporting for the Department of Defense

DEPARTMENT OF THE AIR FORCE

Department of Defense Trends in Overseas Contract Obligations

REPORT OF THE COUNCIL ON MEDICAL SERVICE. Acceptance of TRICARE Health Insurance

SUBPART ACQUISITIONS IN SUPPORT OF OPERATIONS IN IRAQ OR AFGHANISTAN (Added September 15, 2008)

SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION

DEPARTMENT OF DEFENSE

GAO DEFENSE CONTRACTING. Improved Policies and Tools Could Help Increase Competition on DOD s National Security Exception Procurements

Summary of u.s. oversight in iraq

DEPARTMENT OF THE AIR FORCE

September 30, Honorable Kent Conrad Chairman Committee on the Budget United States Senate Washington, DC 20510

DEPARTMENT OF DEFENSE FY 2010 Overseas Contingency Operations FOR OPERATION IRAQI FREEDOM (OIF) AND OPERATION ENDURING FREEDOM (OEF)

Outreach. Vet Centers

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN THE USCENTCOM AREA OF RESPONSIBILITY

The Department of Defense s reliance on

USCENTCOM ENGINEER BRIEF

Department of Defense

I. Description of Operations Financed:

Department of the Navy Annual Review of Acquisition of Services Policy and Oversight

U.S. Environmental Security: An Emerging Enabling Concept For Mission Success Jeremey Alcorn George Mason University May 6, 2009

Naval Audit Service Audit Report Marine Corps Use of the Deployed Theater Accountability System

Testimony. April G. Stephenson Director, Defense Contract Audit Agency. before the. November 2, 2009

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities

SUSTAINABLE CONTINGENCY BASE CAMP OPERATIONS

Best for Vets: Employers 2012

SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION LETTER FOR COMMANDING GENERAL, U.S. FORCES-IRAQ

SMALL BUSINESS INNOVATIONS AND CONTRIBUTIONS

The Contract Manager's Role

Defense Security Cooperation Agency Operation Enduring Freedom/Operation New Dawn Operation and Maintenance, Defense-Wide

Critical Information Needed to Determine the Cost and Availability of G222 Spare Parts

OTHER AGENCY OVERSIGHT

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN THE USCENTCOM AREA OF RESPONSIBILITY

OFFICE OF THE UNDER SECRETARY OF DEFENSE 4000 DEFENSE PENTAGON WASHINGTON, D.C

SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION

JOURNAL OF PUBLIC PROCUREMENT, VOLUME 5, ISSUE 1,

SIGAR. CONTRACTING WITH THE ENEMY: DOD Has Limited Assurance that Contractors with Links to Enemy Groups Are Identified and their Contracts Terminated

4OTHER AGENCY OVERSIGHT

NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2012 OFFICE OF THE UNDER SECRETARY OF DEFENSE (COMPTROLLER) MARCH 2011

U.S. Embassy in Iraq

Costs of Major U.S. Wars

Completed Audits DoD OIG did not report any completed audits this quarter.

GAO REBUILDING IRAQ. Report to Congressional Committees. United States Government Accountability Office. July 2008 GAO

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

DOD Authorities for Foreign and Security Assistance Programs

Defense Security Cooperation Agency Overseas Contingency Operations Operation and Maintenance, Defense-Wide

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN THE USCENTCOM AREA OF RESPONSIBILITY

FEDERAL SUBCONTRACTING. Further Actions Needed to Improve Oversight of Passthrough

-name redacted- Information Research Specialist. August 7, Congressional Research Service RS22452

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN THE USCENTCOM AREA OF RESPONSIBILITY TO INCLUDE IRAQ AND AFGHANISTAN

OPERATIONAL CONTRACT SUPPORT

U.S. Forces in Afghanistan

DEPARTMENT OF DEFENSE OPERATION AND MAINTENANCE. Operation and Maintenance, Defense-Wide

UNCLASSIFIED//FOR OFFICIAL USE ONLY

Department of Defense Inspector General 400 Army Navy Drive Arlington, VA

from March 2003 to December 2011,

Assistant Secretary of the Army for Acquisition, Logistics, and Technology Forward Support to Unified Land Operations. May 2014

Transcription:

Report on DoD-Funded Service Contracts in Forward Areas July 2007

REPORTABLE INFORMATION This report provides the information required by section 3305 of the Fiscal Year (FY) 2007 Supplemental Appropriations Act concerning the use of DoD-funded service contracts in the theater of operations in support of United States (U.S.) military and reconstruction activities in Iraq and Afghanistan. 1 A complementary report describing the Department of Defense (DoD) policy and program framework for managing contractor personnel operating in support of forward deployed military forces is being finalized and coordinated and will follow. 2 The current Global War on Terrorism (GWOT) deployments of DoD military forces are the first major contingency operations to reflect the full impact of the shift to reliance on contractor personnel for critical support functions. The scale and duration of GWOT operations have required a significant increase in support by contractors and in deployment of contractor personnel to forward areas. Contractor personnel accompanying the force provide a broad range of capabilities, including base operating support (e.g. housing and dining facilities), security, transportation, medical, communications, training, construction, and maintenance. Information detailing the use of DoD-funded service contracts in the theater of operations in support of U.S. military forces in Iraq and Afghanistan is provided on the following pages. To provide the required information, the DoD continues to rely in part on quarterly updates from the U.S. Central Command (CENTCOM) Contractor Census. This manual system is of limited scope and was designed primarily to capture the total number of DoD contractor personnel working in Iraq. The Joint Contracting Command Iraq / Afghanistan (JCC-I/A), the provisional contracting command for Operations Iraqi Freedom and Enduring Freedom, and the Federal Procurement Data System Next Generation (FPDS-NG) data base are the primary sources for the information concerning contracts and contract costs. 1 U.S. Troop Readiness, Veterans Care, Katrina Recovery, and Iraq Accountability Appropriations Act, 2007, Public Law 110-28 (May 25, 2007). 2 The referenced report will be submitted in response to Section 854 of the John Warner National Defense Authorization Act for Fiscal Year 2007, Public Law 109-364 (October 17, 2006). Section 854 covers Joint Policies on Requirements Definition, Contingency Program Management, and Contingency Contracting. 2

What is the number of contracts used to provide services in support of U.S military and reconstruction activities in Iraq and Afghanistan in fiscal year 2006? There were approximately 2,250 contracts used to provide services in support of DoD military and reconstruction activities in Iraq and Afghanistan in FY 2006. 3 What were the contract costs? The DoD receives funding for contingency contracting in Iraq and Afghanistan primarily from Additional (title IX) and Supplemental appropriations. The dollar value of DoD contingency contract obligations for the last four years and the available projections for FY 2007 obligations are provided below. Fiscal Year External Support for Iraq and Afghanistan Table 1 Dollar Value of DoD Contracts 4 JCC - Iraq JCC- Afghanistan Dollar Value Total 2003 $3,027,736,000 Not Applicable Not Applicable $3,027,736,000 2004 $9,269,006,000 Not Applicable Not Applicable $9,269,006,000 2005 $8,440,672,000 $7,617,550,000 $363,000,000 $16,421,222,000 2006 $9,534,000,000 $5,180,000,000 $529,000,000 $15,243,000,000 2007 (projected) 5 $9,900,000,000 $5,400,000,000 $802,000,000 $16,100,000,000 JCC-I/A categorizes the contract dollars obligated in support of activities in Iraq by the following types of mission: Reconstruction, Iraqi Security, and Support to (commodities and services). In FY 2006, JCC-I/A obligated, in support of activities in Iraq, approximately $5.18 billion as illustrated in Figure 1. 3 Estimate uses FY 2006 Federal Procurement Data System Next Generation (FPDS-NG) data and contract action data provided by JCC-I/A. Contract actions include individual task orders and modifications. There were approximately 1,600 contracts in Iraq and 650 contracts in Afghanistan. 4 External support contracts are contracts let outside of the theater of operations. This figure includes dollars obligated for Logistics Civil Augmentation Program (LOGCAP) support. Iraq and Afghanistan dollar figures, provided by JCC-I/A, account for contracts let within the theater of operations. Data is not provided for FY 2003 2004 because JCC-I/A did not exist at that time. 5 Projections are based upon historical trends and dollars obligated to date. FY 2007 projected contracting costs do not include requirements to support the surge in forces. 3

Figure 1 Breakdown of FY 2006 DoD Contract Dollars Obligated in Iraq Iraqi Security 11% Support to 35% $1.8B Support to $576M Iraqi Security $2.8B Reconstruction $5.18B Total Reconstruction 54% In FY 2007 to date, JCC-I/A has obligated $2.1 billion in support of activities in Iraq. They project that they will obligate approximately $5.4 billion by the end of the fiscal year, distributed in the following mission areas: Figure 2 Projected Breakdown of FY 2007 DoD Contract Dollars Obligated in Iraq Iraqi Security 27% Support to 48% Reconstruction 24% $2.6B Support to $1.5B Iraqi Security $1.3B Reconstruction $5.4B Total 4

In support of activities in Afghanistan, JCC-I/A obligated $529 million in FY 2006. Thus far in FY 2007, they have obligated $423 million and estimate that they will obligate $802 million by the end of the fiscal year. JCC-I/A does not categorize contract actions or dollars by mission for Afghanistan. What is the current number of contractor personnel in Iraq and Afghanistan funded by DoD? The most recent update to the CENTCOM Census data was received in April 2007. As of this update, there were approximately 128,888 contractor personnel supporting and funded by the DoD in Iraq. (See Figure 3.) As in previous census reports, this number relies upon manual input of data and represents only the total number of DoD contractor personnel counted. This number does not include data on contractor personnel working for other U.S. Government Departments and Agencies working in the CENTCOM Area of Responsibility (AOR), data that is not available to the DoD. Figure 3 CENTCOM Contractor Census DoD Contractor Personnel in Iraq Local 51% U.S. Citizens 16% 20,819 U.S. Citizens 42,733 Third Country 65, 336 Local 128,888 Total Contractors Third Country 33% In addition to these contractors, there are approximately 4,600 U.S. contractor personnel supporting and funded by the DoD in Afghanistan. Previous CENTCOM Census data calls did not include Afghanistan. Therefore, detailed data on local and third country national contractors supporting the DoD in Afghanistan is not currently available. CENTCOM has directed an AOR-wide census and expects to provide initial census data for Afghanistan to the Office of the Secretary of Defense in August. This data will be provided when available. We expect that there will be some reductions in the number of contractor personnel who are U.S. citizens and an increase in the number of host country nationals. We have 5

seen a decrease of 1 percent of U.S. contractor personnel as reported in the April 2007 census as compared to the January 2007 census, along with an increase of 23 percent of Local working on DoD contracts in Iraq. (See Figure 4.) Approximately 21 percent of DoD contractor personnel in Iraq work on Iraq reconstruction missions. Most of the contractor personnel working on these missions are Local (89 percent). Figure 4 Iraq DoD Contractor Personnel Breakdown by Nationality (as of April 2007) 60 Percent of Contractors 50 40 30 20 10 0 U.S. Citizens Third Country Local Jan-07 Apr-07 What is the estimated number of contracts to be executed in FY 2007? We project that the number of DoD contracts will trend down as contracts in Iraq are consolidated. We estimate that 800 DoD-funded contracts will be executed by the end of FY 2007 in Afghanistan. The estimate for Iraq is 1,200 DoD-funded contracts executed in FY 2007. The main categories of contracts in Iraq and the percentages of contractors working on them are displayed in Figure 5 below. 6

Figure 5 Iraq DoD Contractor Personnel Breakdown by Type of Service Provided (as of April 07) 5% 5% 7% 21% 2% 3% 57% ~ Base Support 72,933 ~ Construction 26,482 ~ Security 8,984 ~ Transportation 7,021 ~ Interpreter 6,623 ~ Communications 2,475 ~ All Other 4,370 Seventeen of the DoD contracts in Iraq are categorized by JCC-I/A as security contracts. 6 The primary scope of these contracts is to provide facility protection services, including Entry Control Point (ECP) security, Specialized Compartmental Information Facility (SCIF) security, Tower Security, Roving Security, Internal Check-Point Security, Local National Escort and Employee Vetting, and installation and personal security services. 7 For the remainder of FY 2007, we expect that the main categories of contracts will generally remain the same, with the levels of support changing to mirror changes in the supported population. 6 JCC-I Report on Security Contracts, May 2007 7 Personal security services provide protection of individuals. Personal security services are distinguishable from military combat missions in that they are defensive in nature and are governed by Rules for Use of Force (RUF) rather than Rules of Engagement, which apply to a military force. Personal security services are exclusively for the conduct of protection and defense. 7