Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

Similar documents
REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

Request for Proposals for Construction Manager at Risk Watertown Community Center

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

REQUEST FOR PROPOSAL (RFP) DESIGN BUILD SERVICES. Erie Library Expansion Project

CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project

REQUEST FOR PROPOSALS (RFP) AND STATEMENT OF QUALIFICATIONS

Request for Qualifications Construction Manager at Risk Contract

CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

REQUEST FOR PROPOSAL CAPITAL FACILITIES AND EQUIPMENT IMPACT FEE ORDINANCE UPDATE AND REVIEW. Town of St. Albans, Franklin County, Vermont

REQUEST FOR QUALIFICATIONS

Attention Design Firms

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

CITY OF GOLDEN, COLORADO Parks and Recreation Department

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

Attention Design Firms

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

Request for Proposals Construction Services Workplace Excellence Project

Galesburg Public Library, Galesburg, IL

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project

REQUEST FOR PROPOSALS. General Contractor/ Construction Manager (GC/CM) Services

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

Colquitt Regional Medical Center

Washington County Public Works, Building Services

1/8/2013. IMPORTANT Dates

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington

East/West Technology Building Addition/Renovations. REQUEST FOR QUALIFICATIONS for ARCHITECTURAL SERVICES

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado

Project number: Project Title: Recreation Center Expansion and Student Wellness Center

This request for qualifications seeks the following type of service providers:

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

November 16, 2015 I. INTRODUCTION

Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104

Request for Qualifications Construction Manager

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

Request for Proposals and Qualifications for. Owner s Representative Services (RFP) August Farmington Public Schools. Farmington Town Hall

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

The Town will manage the project, administer funding and review project material.

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

Attention Design Firms

Architectural/Design Services

Town of Middlebury Request for Qualifications

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

REQUEST FOR PROPOSAL. Certification Form. CONSTRUCTION MANAGEMENT SERVICES RFP Number BS June 24, of 9

Facilities Condition Assessment

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

Request for Proposals (RFP) for Planning Consultant Services Africa Town Neighborhood Revitalization Plan. Bid#NRP2015-1

Architectural Services

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

County of San Mateo Project Development Unit

Office of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES

REQUEST FOR QUALIFICATIONS: RFQ PROGRAM/PROJECT MANAGEMENT SERVICES TO SUPPORT MUNICIPAL FACILITIES & CAPITAL IMPROVEMENTS PROJECTS

Construction Management (CM) Procedures

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011

REQUEST FOR PROPOSAL FOR DESIGN (ARCHITECTURAL & ENGINEERING) SERVICES

REQUEST FOR QUALIFICATIONS

MINNESOTA STATE COLLEGES AND UNIVERSITIES

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

SACRAMENTO COUNTY REQUEST FOR PROPOSAL OPERATIONAL REVIEW Voter Registration and Elections DEPARTMENT

Design Build Phase II Service Center Project

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

LOCKHART INDEPENDENT SCHOOL DISTRICT

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

Dakota County Technical College. Pod 6 AHU Replacement

Conrad Grebel University College. Kitchen and Dining Room Expansion and Renovation Architectural Feasibility Study

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: ASU RFQ CMAR 11720

Attention Design Firms

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS

Project number: GC Project Title: The Lane Center for Academic Health Sciences

GUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS

PRE-PROPOSAL MEETING TUESDAY, JULY 17, 2018

REQUEST FOR PROPOSAL (RFP) Police Department Building Construction Manager at Risk, Guaranteed Maximum Price August 30, 2016

Request for Proposals Ground Lease for the Development and Management of Recreation Facilities At the former Baker Hospital Site

Request for Qualifications (RFQ) Consulting Planning, Design and Real Estate Development Services, on an As-Needed Basis

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

BROWARD EDUCATION FOUNDATION REQUEST FOR PROPOSALS FUNDRAISING CONSULTANT SERVICES July 5th, 2018

REQUEST FOR PROPOSAL (RFP) # FY

REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING EVALUATION SERVICES FOR THE PUBLIC SAFETY BUILDING CITY OF OWOSSO, MICHIGAN

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR:

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

Solicitation Information WATER MAIN TUCKERTOWN STATION. Water Main Project, Tuckertown Station. Water Main Project, Tuckertown Station on

REQUEST FOR PROPOSALS

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR PROPOSALS FOR A COMMUNITY DEVELOPMENT BLOCK GRANT WRITER/ADMINISTRATOR

REQUEST FOR QUALIFICATIONS

Request for Proposal For Construction Manager at Risk Services for the STEM Building

Transcription:

Request for Proposal for Construction Management (CM) Services for the Shelburne Community Center and Public Library Shelburne, Vermont. Request for Proposal Issued: Friday, Mandatory Site Visit: Thursday, July 13, 2017 3:00 PM (Pierson Library, Shelburne, VT) Deadline for Final Submission of Questions: Thursday, July 20, 2017 5:00 PM Proposal Due Date and Time: Monday, July 31, 2017 2:00 PM Anticipated Notification of CM Finalists: Friday, August 11, 2017 Anticipated Interviews of CM Finalists: Thursday, August 17, 2017 Anticipated CM Notification of Selection: Friday, August 25, 2017 Anticipated Select Board Execution of Contract for Abbreviated Pre-Bond Vote Pre-Construction Services: Tuesday, September 12, 2017 Anticipated Select Board Execution of Contract: Tuesday, December 5, 2017 (One month post bond vote, assuming successful vote.) Request for Proposals will be made available to Construction Managers on Friday, before 5:00 PM, posted electronically on the Town of Shelburne s website. A printed set of the project documentation will also be available for inspection at the offices of Vermont Integrated Architecture, P.C. at 137 Maple Street, Suite 29B in Middlebury, VT and the Shelburne Town Offices at 5420 Shelburne Rd, Shelburne, VT. Request for Proposal Shelburne Community Center and Public Library Page 1

Table of Contents A Project Overview B. Project Team C. Desired Project Outcomes D. Scope of Work E. Notice of Compliance F. Proposal Submission Requirements G. Proposal Evaluation Criteria H. Anticipated Form of Agreement I. Questions Attachments Request for Proposal Shelburne Community Center and Public Library Page 2

A. Project Overview The Shelburne Municipal Center includes the Town Offices, Police Department, Recreation Spaces, Fire Department, Historic Town Hall, and Pierson Public Library all in one central location in the heart of Shelburne Village. The Town Offices, Police Department, and Recreation department are housed in the former public school building at the south end of the municipal campus. The Firehouse is a separate structure located to the west side of the property. Several years ago, the Town Offices vacated the space adjacent to the Historic Town Hall, and Shelburne s Pierson Library moved in, which is where it resides currently. Minimal renovation was done to accommodate the library, and very little has been done since. The Historic Town Hall, constructed in 1928, is listed on the National Register of Historic Places as a contributing structure to the Shelburne Village Historic District. The Historic Town Hall has not had significant improvements since 1994. The Library and Historic Town Hall buildings no longer serve the functions for which they were originally designed. They both suffer from a lack of maintenance and lack of modern energy efficiency strategies and technologies. The Library, specifically, is not of an adequate size to serve its nearly 60,000 visitors annually and has had to limit its programming and collections as a result. The physical condition of the library is extremely poor and limits tremendously the capacity and capabilities of the library to provide services and programs. The Town of Shelburne and its Select Board are committed to addressing the needs of the Library and Historic Town Hall to best serve the community on the site of the municipal campus. In doing so, the Town hopes to not only renovate and restore the Historic Town Hall but also construct a new attached library facility. This project would also include improvements to overall site access and circulation for its wide variety of users and stakeholders. A summary of affected building areas is below: PROGRAM EXISTING NEW Library (Main Level) 4,725 GSF (demo) 6,283 GSF Library (Lower Level of Town Hall) 3,455 GSF (reno) Library (Upper Level) 5,670 GSF Historic Town Hall 2,775 GSF (reno) 6,230 GSF TOTAL 10,955 GSF 15,950 GSF The project shall be subject to a public bond vote on November 7, 2017. The price-tag for this proposed project is $6,500,000 and would cost the Shelburne taxpayer an estimated $35 per every $100,000 of assessed homestead value. According to a town-wide survey conducted and completed in the spring of 2017 by 1,200 registered voters, 57% indicated they would support this project at the voting booth. The preferred alternative design was the result of an extensive, public and community engagement process. The Town and the Design Team have developed a project budget for all anticipated project costs including construction costs, design fees and owner s costs. The total budget for the project is fixed at $6.5 million with $5.6 million of that devoted to construction, including construction contingency. More information is available at: http://www.piersonlibrary.org/new-library-project/ Request for Proposal Shelburne Community Center and Public Library Page 3

B. Project Team Owner: Library Building Steering Committee: Architect: Civil Engineer: Structural Engineer MEP FP Engineer: The Town of Shelburne, Vermont 5420 Shelburne Rd, Shelburne, VT Joseph Colangelo, Town Manager Joe Colangelo, Town Manager Cathy Townsend, Interim Library Director Colleen Parker, Selectboard Member Ann Smallwood Alice Winn Vermont Integrated Architecture, PC PO Box 862 Middlebury, VT 05753 Andrea Murray, AIA, NCARB, LEED AP 802-989-7249 Engineering Ventures, PC 208 Flynn Avenue, Suite 2A Burlington, VT 05401 Peter Gibbs, P.E. 802-863-6225 Engineering Ventures, PC 208 Flynn Avenue, Suite 2A Burlington, VT 05401 Robert Neeld, P.E. 802-863-6225 LN Consulting PO Box 65178 Burlington, VT 05406-5178 Paul Lekstutis, P.E. 802-655-1753 Energy Efficiency Vermont Efficiency: 128 Lakeside Avenue, Suite 401 Burlington, VT 05401 Nick Thiltgen, PE, LEED AP 802-540-7647 Request for Proposal Shelburne Community Center and Public Library Page 4

C. Desired Project Outcomes The Town of Shelburne ( Town ) is seeking a Construction Manager (CM) to assist with the design and preconstruction planning process as well as a well-organized and quality construction process. The CM must be experienced in construction of comparable buildings and related site work activities, historic renovation and preservation, energy efficiency, and publically-funded projects. Proposals will be evaluated based on experience, references, bonding capacity, proposed management team, organization and approach to this project, pre-construction phase costs, general conditions costs and fees. All qualifications being equal, Construction Managers who have ties to the Shelburne community will be given preference in the selection process. The Town has decided to hire a CM early in the design process, prior to a public bond vote, to assist in addressing early concerns the public may have about the project. In addition, the CM will provide constructability review, assist with materials selection, and provide budget and schedule management for the project and minimize project risk. The Town and the design team envision a culture of openness and collaboration throughout the design and construction of the project. Timing The following schedule is proposed for the project. Once a CM is on board, we will refine the bidding and construction schedules as necessary: Schematic Design Refinement July August 2017 CM On-Board September 5, 2017 Schematic Design Budget Check September 2017 Bond Vote November 7, 2017 (Election Day) Appeal Period November 8 December 8, 2017 Design Development December 11, 2017 February 2, 2018 (8 Weeks) Budget Check February 5 February 16, 2018 (2 Weeks) Construction Documentation February 19 April 27, 2018 (10 Weeks) Bidding & Negotiations April 30 May 18, 2018 (3 Weeks) Buffer & Mobilization May 21 June 8, 2018 (3 Weeks) Construction Start June 11, 2018 Construction Complete May/June 2019 General Notes: 1. Town may choose to proceed with planning and design services during the bond appeal period. Often this depends on the margin of the vote. 2. Permitting would occur during the construction documentation and bidding phases is both scenarios. Preconstruction services will parallel the design process beginning with Schematic Design and extending through the Construction Documentation phase. The CM will support the design team by providing costbenefit information, recommendations about material selection and sequencing and constructability input throughout design. The CM will prepare an Order of Magnitude Schematic Design Budget check/cost Estimate, a detailed construction cost estimate at the end of Design Development, and another at 50% Construction Documents, which will be the basis for establishing a Guaranteed Maximum Price (GMP) for the project construction. This will occur at the completion of Construction Documentation phase, prior to bidding subcontractor trades, to ensure alignment of the design and budget. Request for Proposal Shelburne Community Center and Public Library Page 5

The CM will develop a preliminary project bidding, procurement, and construction schedule in conjunction with the Design Development cost estimate and will use this schedule to also assist the Town and the building users in planning for temporary site access and circulation, temporary relocation, storage, and occupancy. The CM will also manage the schedule appropriately to ensure the construction work is completed on time. Budget/GMP Management We anticipate that the majority of this project will be funded by a taxpayer-supported bond, it is possible that some grant monies from a variety of organizations, and donations and fundraising efforts by the library may also contribute a source of funding to the project. As a result, it is essential that this project be completed within budget. The CM will work with the Town and the design team to manage the budget throughout design and construction. The CM will also need to satisfy any reporting or audit requirements per the Town of Shelburne and for any of the grant funding. Financial Transparency As noted above, the Town envisions an open, honest, and transparent process where information flows freely among designated representatives of the Town, Design Team, and CM. This information will include, but not be limited to, project cost information, bidding results, payroll compliance information, material and systems information, planning information etc. Energy Efficiency and Sustainability The Town has lofty goals to make the new building construction net-zero energy ready and to renovate the Historic Town Hall to be as energy efficient and sustainable as it can possibly be. While the Town is not pursuing LEED certification for the project, it still is pushing to exceed building energy performance required by Vermont CBES code. The design team has budgeted for and is considering envelope and systems upgrades (improvements above code requirements) that are significant and where details in construction are extremely important. The CM will be a key team member in achieving a high performance building within a reasonable budget and the allotted timeframe. The success of this project depends on the project team. The Town is seeking a CM who is a team player and who practices true construction management. The CM will be willing to collaborate with building users, the Select Board, our Design Team, and other members of the community to create this important community place for the Town of Shelburne. Request for Proposal Shelburne Community Center and Public Library Page 6

D. Scope of Work The Town of Shelburne is seeking CM services for both Pre-Construction planning and Construction of the project in accordance with the form of Contract attached as Exhibits A and B, the AIA Documents A133-2009 and A201-2007. Pre-Construction services shall include those in Sections 2.1 and 2.2 of the AIA Document A133-2009 and the following: Project meetings twice per month until construction; Review Schematic Design Documentation, provide written comments regarding coordination and constructability, and prepare an order-of-magnitude budget for the project. Review Design Development documents and provide written comments and observations regarding coordination, omissions and constructability and making recommendations as to material selections and project sequencing. Ongoing Constructability Reviews; Ongoing advising on project cost and schedule implications of design decisions; Construction Scheduling, Planning and Logistics; One complete Design Development Estimate; One complete 50% Construction Documentation bid document review for missing items and accompanying estimate, to set GMP; Bid document review to minimize future changes; Sub-Trade Bidding, including bid packaging and coordination with the Town and Architect; procuring subcontract bidders; preparing bid requests; prequalifying major subcontractors; and assessment of qualifications and proposals. Project scope adjustments (if necessary); Award subcontracts and purchase orders; execute and administer all required insurance and bond information. Construction Services shall include those in Section 2.3 of the AIA Document A133-2009, and in the AIA Document A201, and the following: Ongoing Cost Feedback to support decision-making; E. Notice of Compliance VT and Local Codes, including the Commercial Building Energy Code. Department of the Interior Historic Preservation Standards Town and State cost auditing requirements Request for Proposal Shelburne Community Center and Public Library Page 7

F. Proposal Submission Requirements Prospective Construction Management firms must submit their proposals to the Town of Shelburne in the form and manner and by the time and date indicated below. The proposals shall consist of two parts: the main proposal and supporting documents, as follows: Main Proposal The main proposal shall include the following information and shall not exceed 22 pages. Proposals shall be provided in digital format only pdf file format (less than 8 mb). Email digital copy of your proposal and supporting documents in PDF format to: jcolangelo@shelburnevt.org and andrea@vermontintegratedarchitecture.com All proposals received in response to this RFP shall remain the property of the Town of Shelburne. 1. Company Overview provide a brief description and overview of your firm, including company history, size, key personnel, and business philosophy/approach. Please note any connections your firm may have to the Shelburne community. 2. Experience with Construction Management (CM) outline your firm s experience with the Construction Management delivery method, including your experience with Guaranteed Maximum Price (GMP) agreements. How can the Town of Shelburne benefit from your experience with this delivery method? 3. Project Experience and References describe your firm s experience with projects of similar size and complexity completed within the last five to seven years, focusing on CM and GMP projects. Please note if projects were not CM projects, and if your company did or did not provide pre-construction services for the project. Include a project description, GMP values and final project cost values, and contact information for the project owner and architect including the name, mailing or email address, phone number, and title of each reference. Identify your firm s management team for each project. Include at least one project employing your proposed project manager and proposed project site superintendent. 4. Management Team - Provide the resumes of all management personnel to be assigned to the Shelburne Community Center and Library project. At a minimum, resumes for the Project Manager, Site Superintendent(s), Project Estimator and Project Executive shall be submitted. Identify and define their prospective roles and responsibilities and indicate the amount of time they will commit to the project. 5. Historic Preservation Experience - describe your firm s experience on historic renovation and historic preservation projects within the last five years, including particularly your experience with the Department of the Interior Historic Preservation Guidelines and Standards. Include a project description, project cost, and contact information for the project owner and architect. Identify your firm s management team for each example project. Request for Proposal Shelburne Community Center and Public Library Page 8

6. Project Understanding and Approach describe how your firm would approach this project for the Town of Shelburne, including constructability review, logistics and construction planning, scheduling, estimating and budget reconciliation, constructability review, sub-contractor bidding, management of the construction, project commissioning and post-occupancy project close-out. 7. Cost Control Methodology describe your firm s approach to project estimating, managing project budgets, setting a Guaranteed Maximum Price, processing change orders, managing cost during construction, and meeting town and state cost accounting and auditing requirements if necessary. 8. Cost and Fee Proposal provide your Construction Management Fee Proposal on the Proposal Pricing Form included with this RFP. 9. Other Information Provide any other information you deem appropriate to demonstrate conformance with the minimum qualification criteria and the selection criteria in Section G below. Supporting Documents Please provide the following documents with your Proposal. They should be clearly marked with your firm s name, the project name, and the submission date. 1. A complete and sealed AIA A305 Contractor s Qualifications Statement with all attachments. 2. A current Certificate of Insurance showing coverage required by Section 8.1 of the AIA Document A133 Form of Agreement attached as Exhibit A. 3. A letter from your surety indicating your firm s ability to acquire a 100% performance and payment bond for this project, assuming a Guaranteed Maximum Price of $5,600,000. 4. A sample of a detailed project estimate prepared by your firm on a Construction Management project of a similar size. Submission Instructions Proposals, consisting of the main proposal and the supporting documents shall be submitted electronically via email by Monday, July 31, 2017 2:00 PM. Proposals shall also be emailed to: jcolangelo@shelburnevt.org and andrea@vermontintegratedarchitecture.com Note: Proposals received after this date and time will not be considered. Request for Proposal Shelburne Community Center and Public Library Page 9

G. Proposal Evaluation Criteria Minimum Qualification Requirements Proposers must demonstrate that they meet the following minimum qualification requirements. Any RFP that does not demonstrate that the proposer meets all of these requirements will be rejected and will not be considered. 1. Proposers must have all necessary registrations/licenses to perform the anticipated construction work, including registration with the Vermont Secretary of State to do business in Vermont. 2. Proposers shall have sufficient financial capacity to carry out the work, including access to sufficient capital or other resources to allow it to complete the work even if there are disputed claims. 3. Proposers must demonstrate the ability to provide the bonds and insurance required by Article 8 of the AIA Document A133. 4. Proposers must have reached substantial completion of construction on two similar construction projects with a construction cost of at least $5,600,000. 5. Proposers must provide examples of at least two successful construction operations on historic preservation sites or projects constructed pursuant to the Department of the Interior Historic Preservation Guidelines and Standards. Selection Criteria The Town of Shelburne will use the following criteria to evaluate submitted proposals, weighting each criterion roughly as shown. The Town of Shelburne anticipates inviting selected finalists to interview with members of the Selectboard and the Architect for this project, as noted in RFP schedule above. Not all proposers shall be interviewed. The Town will consider information from the RFPs, from references and from interviews to make its evaluation. 1. Experience and Qualifications of the firm and the management team 35 % a. Clarity and stability of organizational structure, both company-wide and for the Project. Preference will be given to firms in business for at least five (5) years. b. Extent of financial capacity to complete the work including access to sufficient capital or other resources. c. Experience of the firm constructing similar projects. Preference will be given to firms having reached substantial completion of construction on five (5) or more similar projects over the last ten years. d. Experience on historic renovation and historic preservation projects, including particularly experience with the Department of the Interior Historic Preservation Guidelines and Standards. e. Experience on net zero or net zero ready building projects. Request for Proposal Shelburne Community Center and Public Library Page 10

f. Quality and experience of the CM management team. Preference will be given to management teams with at least five years of experience in the same or similar capacities. g. Experience of the CM team members with the CM firm and with each other on common projects. h. Experience with managing competitive bidding of subcontractors. i. Safety record of the firm and the management team. j. Quality of references. k. Communication, presentation and teamwork skills l. Experience working with and connections to the Shelburne community. 2. Project understanding and Project-specific qualifications 20 % a. Suitability of management systems, scheduling and cost-controls. b. Capacity to complete the CM s scope of work within the estimated construction schedules. c. Ability to provide and maintain an exemplary safety program and approach to safety on this project. d. Quality of access to sufficient manpower resources and knowledge of subcontractors and suppliers in the Project area. e. Ability to provide estimating services and present clear and complete project estimates. f. Ability to provide required pre-construction and construction phase services, including constructability review, materials recommendations, scheduling, subcontractor bidding and supervision. g. Ability to provide clear, complete and timely management, schedule and cost reports. h. Ability to complete the work within the CM s scope on time and on or under the budget. 3. Cost and Fee Proposal, including Pre-Construction Fee 45 % General Conditions Costs and CM Fee Request for Proposal Shelburne Community Center and Public Library Page 11

H. Anticipated form of Agreement and Application for Payment The Town of Shelburne shall use an AIA Document A133-2009 Standard Form of Agreement between Owner and Construction Manager where the basis of payment is the Cost of the Work plus a Fee with a Guaranteed Maximum Price and the associated AIA Document A201-2007 General Conditions of the Contract for Construction. The Town shall require use of the AIA Document G702 Application and Certification for Payment for project invoicing. I. Questions Any questions must be submitted in writing or email by Thursday, July 20, 2017 5:00 PM to: Andrea Murray, AIA, NCARB, LEED AP Vermont Integrated Architecture, PC andrea@vermontintegratedarchitecture.com All questions will be answered in a written addendum to this RFP and circulated to all parties who have provided the Town with written or email notice addressed to Ms. Murray advising that they intend to submit proposals. Questions and answers will also be posted on the Town s website. The Town shall not be bound by any information not included in this RFP or an addendum to this RFP. Request for Proposal Shelburne Community Center and Public Library Page 12

Attachments 03 Shelburne Community Center Schematic Design Drawings Existing Site Plan Presentation Site Plan Main Level Floor Plan Upper Level Floor Plan Basement Floor Plan Exterior Renderings 04 Shelburne Community Center Narrative Specifications Architectural Narrative Specification Civil Narrative Structural Narrative MEP Basis of Design 05 Shelburne Community Center Proposal Pricing Form Request for Proposal Shelburne Community Center and Public Library Page 13